1 Byron Area Schools Frequently Asked Questions Bond Proposal
2 How did this come about? For several years the Byron Area Schools Board of Education has included upgrading facilities as one of the district s primary goals. Striving to provide a 21 st century learning environment for current and future students of Byron Area Schools has been a major objective for the Board of Education. The Board began looking at the facilities in earnest about one year ago and completed a needs assessment. In addition, the Community Parent Advisory Committee studied the buildings which included a facility walkthrough as part of their assessment. The School Board also had several architects and construction management companies evaluate all district facilities. Each of the studies determined similar needs: Current entrances to the buildings are not clearly designated or adequately monitored for secure access to the buildings. The heating, electrical, and control systems in the buildings are inefficient or have exceeded their life expectancy. Science laboratories and other instructional spaces are obsolete. Student and staff access to instructional technology is limited. Cafeteria and gymnasium spaces are inadequate to serve student needs. Expansion of parking and improvements to the traffic flow. In conclusion, the Community Parent Advisory committee, architects and construction management companies agreed with the School Board s goal and vision of adding on and renovating our existing structures. What is the goal? The goal is to provide a 21 st century learning environment for current and future students of Byron Area Schools. The district s goal is: Make all school building more energy efficient by replacing boilers, installing temperature and environmental controls, installing new energy efficient lighting with occupancy sensors, installing new windows and updating electrical service to the buildings. Focus on improving existing buildings and minimize new construction. Provide modern science labs and technology throughout buildings to providing an upto-date environment for students. Provide a common secure entrance and centrally located multi-use cafeteria for the high school and middle school students. Provide a common secure entrance with office space and cafeteria at the elementary school. Increase available parking and improve traffic flow at all buildings. Eliminate modular classroom units
3 Why is a bond millage needed? Like many other districts across Michigan, Byron Area Schools Board of Education has been struggling to fund both the educational and building maintenance needs of our district through its current operating budget. Due to declining state funding, the district has had to delay making needed improvements. The situation now requires attention before problems in our district get worse and more costly. How much will it cost? The bond will be $13,450,000. This equates to 4.9 mills in additional property taxes. Bond Language The official bond language, what voters will see on the ballot is: Shall Byron Area Schools, Shiawassee, Livingston and Genesee Counties, Michigan, borrow the sum of not to exceed Thirteen Million Four Hundred Fifty Thousand Dollars ($13,450,000) and issue its general obligation unlimited tax bonds therefore, for the purpose of: erecting, furnishing and equipping additions to and remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; acquiring, installing and equipping technology for school facilities; constructing, equipping, developing and improving the elementary school playground; and developing and improving sites? How long will the bond be outstanding? The maximum number of years the bonds may be outstanding, exclusive of any refunding, is thirty (30) years. How will this affect my taxes? Property taxes will increase as a result of the bond election. A family s net change in taxes is dependent on family income, the number of children in the home and taxable value. Taxable value is 50% of a home s market or assessed value. According to the Shiawassee County Equalization Office, the average property value in Byron is $100,000. A property with an assessed value of $100,000 has a taxable value of $50,000. Here are some examples of how the bond will impact property taxes: Taxable Value Annual Monthly Daily $20,000 $98.00 $8.17 $0.27 $30,000 $ $12.25 $0.40 $40,000 $ $16.33 $0.54 $50,000 $ $20.42 $0.67 $75,000 $ $30.63 $1.01 $100,000 $ $40.83 $1.34 $150,000 $ $61.25 $2.01 Because of the Homestead Property Tax Credit and federal income tax laws, the impact on senior citizens taxes may be zero depending on income and property values.
4 The net change in taxes for families may also be less than the charts on the previous page show because of the Homestead Property Tax Credit and federal income tax laws. Our financial advisor, Stauder and Barch has provided a convenient online tool to calculate your net change in taxes based on your taxable value, family income, and other information. It s 100% confidential. TaxCalc estimates the after tax impact of millage backed proposals by considering the Michigan's homestead tax credit and the federal income tax deduction of property tax. TaxCalc is an efficient tool for taxpayers to obtain this valuable information. You can access it at: How does the proposed millage rate compare to other school districts in the area? Other school districts in the area have either constructed new buildings, remodeled older buildings or a combination of the two. For example: District Millage Rate Project Date Durand 6.15 New Middle School (3.43) 1997 Building renovations (2.72) 2006 Morrice 7.0 Replace roofs 1997 New buses 2007 Building Renovations/additions 2008 Linden 4.16 New middle school and renovations 2003 Swartz Creek Sinking Fund 2003 Fowlerville 8.34 New middle school and renovations 2004 Howell 7.57 New high school and renovations 2003 Byron Area Schools currently has no debt obligation. Why do the schools need remodeling and upgrades? District schools, though very well maintained, are very old. Boilers and electrical systems have provided service beyond their designed limitations. Science labs and other classrooms are obsolete. All buildings are older than the computer era and do not provide access to 21 st Century technology. The High School is 48 years old, the Middle School is 38 years old, and parts of Byron Elementary are as old as 62 years.
5 Here is a summary of the construction and upgrades since 1948: Byron Area Schools Building Construction Dates Building Construction Occupancy Elementary Renovations Converted Shop to Cafeteria Elementary Additions Home Economics Room Lower Elementary Addition East End Elementary Addition - Gymnasium High School Construction Upper Elementary Addition West End High School Addition - Business Office and Three Classrooms Middle School Construction with New Gym and Vocational Education Rooms Elementary Addition Eight New Classrooms How much will it cost when major systems fail? When they fail, replacing infrastructure and other major systems in the buildings will be costly and will exceed the district s ability to do so with general funds or fund equity. For example, for all buildings the cost to replace infrastructure will be: System Cost to Replace Boilers $820,000 Electrical Service $905,000 Sidewalks and Parking Surfaces $800,000 How is this different than the bond proposal in 2005? This is a much smaller request. The proposal in 2005 was to build a new high school and remodel the existing buildings. The bond amount would have been $23,815,000 resulting in a millage rate of It also would have changed the grade configurations in the district. This proposal is designed to improve the common areas of the schools, upgrade our infrastructure and technology and extend the usefulness of our existing facilities.
6 With declining enrollment why does the district need more space? The proposed project does not add any new classroom space. It does add much needed common and student friendly spaces that we do not currently have. For example, it is impossible to seat all of our middle school students in the cafeteria. It is too small. Middle school students also have to walk outside across the campus to get to the cafeteria. The cafeteria at the elementary school is too small to adequately serve our students. As a result some elementary school students eat lunch as early as 10:30 AM. Because we will have to use existing space at the high school for classrooms, the district office will be moved to the elementary school and will be incorporated in the remodeling of the current cafeteria. Why is the district trying to pass a bond at the same time they are making budget cuts? Funding for this project is independent of the support the district receives from the state. The school district receives funding for operations on a per pupil basis from the state. The school district does not receive funds from the state for building improvements. Funding for building and remodeling projects, raised by issuing bonds, cannot be used for operational expenses like salaries, benefits, supplies and textbooks. Bond funds can only be used for building construction, furnishings, instruction technology, new furniture and remodeling. A bond project will allow the district to reallocate operational funds now being spent on repairs and maintenance of aging facilities. For example, an energy audit of the school done in 2008 showed the district could save as much as $68,000 per year by retrofitting the lighting in the buildings, adding an automation system to the lighting, heating and air handling systems, installing new boilers and replacing windows in the connecting hallway between the high school and middle school. These funds could be used to provide new textbooks, computers or other supplies for students. There is potential for even greater savings with the proposed bond. What is the timeline? The election will be held on November 8 th. Construction will begin the following summer. If the bond millage passes, how will the millage collected be used? The money collected will be used strictly for new construction, remodeling, some new furnishings and instructional technology at Byron Area Schools school buildings, facilities and parking areas. School districts are prohibited by law from using debt taxes and bond proceeds for building maintenance, buses, teacher salaries, staff salaries or benefits. Upon completion of the bond project, the school district must also file an independent audit of the construction expenditures with the Department of Treasury showing that the bond proceeds were properly spent and that competitive bidding laws were followed. If the millage passes, when will the community begin to see improvements made to the buildings and facilities? There will be noticeable improvements after the summer of The project should be completed by fall, What improvements are going to be made and to which school buildings in the district? The bond millage will be used to make safety and security improvements, energy conservation improvements, technology enhancements and remodeling at all school buildings in the District.
7 Here are the improvements that will be made: Replace boiler with two energy efficient boilers Upgrade temperature controls for energy conservation Replace electrical panels and retrofit existing lights with high efficiency lamps Provide occupancy sensors for lighting to reduce energy use Replace existing windows with insulated units Provide new fire alarm system Provide a new phone system Remove existing modular classroom units Provide projectors and smart boards in classrooms New main entry, cafeteria and office addition Revise existing north parking lot and expand parking area to create separate Byron Elementary School bus and parent drop-offs with additional parking Remodel kitchen and create storage room Remodel existing offices into special education rooms Remodel kindergarten enrichment into corridor, restrooms and childcare Improve student traffic flow by remodeling existing classrooms into new corridor and restrooms Remove current lobby to create required open courtyard Remodel existing cafeteria into district offices Replace sidewalks Provide changing rooms and restrooms in gym Relocate one playground structure Byron Middle and High Schools Replace boiler with two energy efficient boilers Upgrade temperature controls for energy conservation Replace electrical panels and replace or retrofit existing lights with energy efficient lamps Provide occupancy sensors for lighting to reduce energy use Replace existing windows with insulated units Replace exterior doors at entrances to the high school Provide new fire alarm system at the high school Provide a new phone system for classrooms Remove existing modular classrooms Remodel two high school science rooms and adjacent classrooms into two larger and updated science classrooms Remodel high school classroom for a new computer lab and provide new computers Provide projectors and smart boards in classrooms Replace interior doors New centrally located cafetorium, kitchen and restrooms Improve student traffic flow and building security with new main entry, canopy, new middle school offices, and new high school offices Remodel existing business office area, adjacent corridor and classrooms into new high school offices, and classroom Remodel existing cafeteria and kitchen for an auxiliary gym and classroom Remodel existing high school and administration offices into two classrooms Replace sidewalks and drives at main entrances Remodel locker rooms Replace bleachers in the gymnasium Contact Information Daniel L. Scow, Superintendent of Schools Byron Area Schools 312 West Maple Byron, MI (810) [email protected]
8 Byron Elementary School Plan Byron High School and Middle School Plan
9
10
RESOLUTION NO. 2003-04-13
RESOLUTION NO. 2003-04-13 RESOLUTION OF THE BOARD OF TRUSTEES OF THE CITRUS COMMUNITY COLLEGE DISTRICT ORDERING AN ELECTION, AND ESTABLISHING SPECIFICATIONS OF THE ELECTION ORDER WHEREAS, the Board of
STATE OF MICHIGAN. Bond Qualification Process Overview. School Bond Qualification and Loan Program Bureau of Bond Finance
Michigan Department of Treasury 3160, (Rev. 4-06) STATE OF MICHIGAN Bond Qualification Process Overview School Bond Qualification and Loan Program Bureau of Bond Finance Michigan Department of Treasury
MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010
MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010 To better prepare San Jose City College/ Evergreen Valley
Bond Priorities. Repairs and Maintenance. School Safety. Capacity
Replace old windows, boilers, heating and air conditioning system. Improve accessibility for disabled persons. Keyless entry lock systems, redesign of school entrance, and wireless access throughout building.
Colorado School Finance Project 1200 Grant Street, Denver, Colorado 80203 303-860-9136 - Fax: 303-832-1086 - @COSFP - cosfp.org
Student Count Colorado School Finance Project Override, Sales Tax Dollars Purpose Comments BOND ELECTIONS: Alamosa 2,098 Bond $4,990,000 Constructing, equipping and furnishing an athletic complex on the
School District Bond Issues
MICHIGAN DEPARTMENT OF TREASURY BUREAU OF STATE AND AUTHORITY FINANCE SCHOOL BOND QUALIFICATION AND LOAN PROGRAM 2014 Annual Report Table of Contents 1 Program Overview 3 Statewide Perspective 4 School
Colorado School Finance Project 1200 Grant Street, Denver, Colorado 80203 303-860-9136 - Fax: 303-832-1086 - @COSFP - cosfp.org
BOND ELECTIONS: Alamosa Bond $4,990,000 Constructing, equipping and furnishing an athletic complex on the high school site, including locker rooms, an athletic storage building, a team building, track
Van Vleck ISD Bond Election
Van Vleck ISD Bond Election November 4, 2014 The Van Vleck ISD School Board called a bond election at their meeting on August 18 for $42.7 million. 2 School districts must ask voters for permission to
Bond Refusal in Broward County - Frequently Asked Questions
FREQUENTLY ASKED QUESTIONS The SMART FAQS are provided to answer questions regarding the SMART Initiative and will be updated on an ongoing basis. 1. Q: What is a General Obligation Bond referendum and
PLUMMER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule
Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Homestead HS Sept.'15 Oct'15 Nov'15 Dec'15 Jan'16 Feb'16 Repair Asphalt @ Main Garage Replace Exterior Hollow Metal
Election Type: Bond, BEST, Mill Levy District. Nov. 4: Pass/Fail. Bond, BEST, Mill Levy Override, Sales Tax. Comments (optional) Dollar Amount
Sources: School reports to CSFP, district websites and media reports BOND / BEST - CAPITAL OPERATIONS Adams 12 Five Star Bond Fail $220,000,000 Extending the useful life of existing school buildings, renovating
DAVIESS COUNTY SCHOOLS DISTRICT FACILITIES PLAN
DISTRICT "SHELL" SUBMISSION DATE: 11/13/12 questions 11/26/12 (delete following Hearing) KDE "SHELL" RESUBMISSION DATE: 11/19/12 revised 11/26/12 (delete following Hearing) KBE APPROVAL DATE: FEBRUARY
HAZELWOOD HIGH SCHOOLS SCHEMATIC DESIGN PRESENTATION
HAZELWOOD HIGH SCHOOLS SCHEMATIC DESIGN PRESENTATION 1 AGENDA Hazelwood 1 st Planning Process High School Program Schematic Designs Schedule 2 HAZELWOOD 1 ST GOALS Life, health and safety improvements
DISTRICTWIDE FACILITIES MASTER PLAN. February 18, 2015 PLANNERS / ARCHITECTS / ENGINEERS
DISTRICTWIDE FACILITIES MASTER PLAN February 18, 2015 PLANNERS / ARCHITECTS / ENGINEERS Table of Contents Executive Summary. 2 Section 1: Bridgewater Elementary School. 4 Background Deferred Maintenance
Design and Construction Planning Process Strongsville City Schools
Design and Construction Planning Process Strongsville City Schools THANK YOU. OUR TEAM 50+ years experience Headquartered in Akron, Ohio Full-service A&E firm Over 400 professionals Employee owned OUR
Projected Statements of Local Assessments. City of Saco, Maine. For the years ending June 30, 2015, 2016 and 2017
Projected Statements of Local Assessments For the years ending June 30, 2015, 2016 and 2017 Contents Independent Accountants Report............................................ 1 Projected Statements of
CONSTRUCTION UPDATE November 6, 2015
CONSTRUCTION UPDATE November 6, 2015 Donaldsonville High School Athletic Addition East Ascension High School Athletic Addition St. Amant High School Athletic Addition St. Amant High School Freshman Academy
Five-Year Capital Plan Request FY 2015-16 through FY 2019-20
Section Contents Five-Year Capital Plan Request FY 2015-16 through FY 2019-20 Project Funding Type Total ($ 000s) Critical Maintenance for Community Colleges bonded $417,500 Health and Safety bonded $91,088
ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT
1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.3 Cabinets, Equipment 1.1.4 Portables 1.2 Fire / Life Safety 1.2.1 Corridor, Separation
Vital Questions and Answers on Preserving the Quality of Our Schools and Protecting Our Quality of Life. Visit our website @ www.sarasotacbs.
Vital Questions and Answers on Preserving the Quality of Our Schools and Protecting Our Quality of Life. Visit our website @ www.sarasotacbs.com 1. Does the school district still need the 1 mill? The 1
Ballot Measures. Bremerton School District No. 100-C. Explanatory Statement (Prepared by the attorney for the district as prescribed by law.
Bremerton School District No. 100-C Capital Projects Levy The Board of Directors of Bremerton School District No. 100- C adopted Resolution No. 2015/2016-08 concerning capital projects and technology.
DRAPER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1953 BUILDING AREA 54,000 SF CURRENT PROGRAM CAPACITY 250 ENROLLMENT 2008 84 WARD 8 PROPOSED PROGRAM CAPACITY 325 Site Plan DRAPER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
Fairfax County, Virginia. Bond. Referendum. Facts
Fairfax County, Virginia Bond Referendum Facts Election Day is Tuesday, November 3, 2015 VOTING INFORMATION A school bond referendum will be on the general election ballot Tuesday, November 3, 2015. Polls
MURCH ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1929 BUILDING AREA 47,700 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 491 WARD 3 PROPOSED PROGRAM CAPACITY 500 Site Plan MURCH - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
PAGE INTENTIONALLY LEFT BLANK
PAGE INTENTIONALLY LEFT BLANK TABLE OF CONTENTS I. Introduction 1 Page II. Documentation of Existing Educational Programs 1 and Instructional Space III. State Square Footage Standards 2 IV. Space Allocation
PATTERSON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1945 BUILDING AREA 78,300 SF CURRENT PROGRAM CAPACITY 368 ENROLLMENT 2008 463 WARD 8 PROPOSED PROGRAM CAPACITY 500 Site Plan PATTERSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
Chicago Public Schools
Ames Middle School 1920 N Hamlin Ave 1997 Completed The scope of this project is to construct a new school $16,913,379 2014 Construction The intent of this project is to expand existing Ames middle school
CONSTRUCTION UPDATE. Thank you for your continued support! Noemi Avila-Zamudio Coordinator, Facilities Planning & Construction SEPTEMBER 2012
CONSTRUCTION UPDATE WWW.SVUSD.ORG SEPTEMBER 2012 The 2012-2013 school year is proving to be another year filled with exciting, much needed Measure B building projects. Facilities Planning & Construction
HOUSTON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1962 BUILDING AREA 59,900 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 291 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan HOUSTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
BUNKER HILL ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1970 BUILDING AREA 98,200 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 387 WARD 5 PROPOSED PROGRAM CAPACITY 750 Site Plan BUNKER HILL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
Guideline for Construction Reimbursement Rates. 160-5-4-.16 (a) 7. Educational Facility Site, Construction, and Reimbursement
Guideline for Construction Reimbursement Rates 160-5-4-.16 (a) 7 Educational Facility Site, Construction, and Reimbursement Facilities Services Unit Effective Date: 05-30-12 NEW CONSTRUCTION REIMBURSEMENT
HERMANTOWN COMMUNITY SCHOOLS. New High School Addition End of DD Design Review
HERMANTOWN COMMUNITY SCHOOLS New High School Addition End of DD Design Review SITE AERIAL HIGH SCHOOL ELEMENTARY SCHOOL BUS GARAGES HOCKEY ARENA / DISTRICT OFFICE SITE FORCES EXISTING BUILDING INFORMATION
May 2014 Texas School Bond Elections
May 2014 Texas School Bond Elections What are the individual districts needs? New facilities Renovations Technology Central facilities How much tax revenue can the district generate? Depends on district
BUILD NYC RESOURCE CORPORATION PROJECT COST/BENEFIT ANALYSIS January 7, 2016
BUILD NYC RESOURCE CORPORATION PROJECT COST/BENEFIT ANALYSIS January 7, 2016 APPLICANT The Chapin School, Ltd. 100 East End Avenue New York, New York 10028 PROJECT LOCATION 100 East End Avenue New York,
Schematic Plan Submittal, 21 November, 2011 Roesling Nakamura Terada Architects
To r r e y P i n e s H i g h S c h o o l M a s t e r P l a n Schematic Plan Submittal, 21 November, 2011 Roesling Nakamura Terada Architects I n t r o d u c t i o n 1.0 INTRODUCTION The vision for the
The Charter School Law establishes the following for charter schools with respect to school construction:
Charter Schools - School Construction The Charter School Law establishes the following for charter schools with respect to school construction: 1. A charter school may be located in an existing public
Debt Comparison by Unit Type
QUESTIONS from the COMMUNITY 1. Recently, it was put out that our school district was over $4,000,000 in debt. A website was also introduced that had some of this statistical data. What is the story with
BUDGET NEWS. 0% Increase to the Tax Levy. Hoosic Valley Central Schools. VOTE Tuesday, May 19. 12 Noon 9 p.m. Elementary Gym.
VOTE Tuesday, May 19 12 Noon 9 p.m. Elementary Gym BUDGET NEWS Hoosic Valley Central Schools LEARNING: A SHARED GOAL-A SHARED RESPONSIBILITY May 2015 0% Increase to the Tax Levy This is the second consecutive
Path to a New Horizon:
Path to a New Horizon: Bond Committee Report & Preliminary Recommendations Board of Education July 9, 2015 Bond Committee Peter Spadafore, Co-chair, LSD Board President Nancy Mahlow, Co-chair, Eastside
ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT
1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.2 Water damage in many classrooms. Replace tiles. 1.1.3 Cabinets, Equipment 1.1.4 Portables
Rio Hondo Community College District Measure A General Obligation Bonds Performance Audit July 1, 2012 through June 30, 2013 With Report of
July 1, 2012 through June 30, 2013 With Report of Independent Auditors Table of Contents PAGE REPORT OF INDEPENDENT AUDITORS 1 PERFORMANCE AUDIT Objectives 2 Scope of the Audit 2 Background Information
COMPREHENSIVE FACILITIES MASTER PLANNING. Presented By: Kevin A. MacQuarrie, Principal
COMPREHENSIVE FACILITIES MASTER PLANNING Presented By: Kevin A. MacQuarrie, Principal STRATEGIC GOALS AND VISION Student Achievement Safe Schools Communication Budget Project Creek Watch Math Team Health
NEW CONSTRUCTION BP 7214. General Obligation Bonds. I-Facilities
NEW CONSTRUCTION General Obligation Bonds I-Facilities The Governing Board recognizes that school facilities are an essential component of the educational program and that the Board has a responsibility
Description of Project Statewide Student Data Warehouse
Description of Project Statewide Student Data Warehouse The Department of Education (DE) uses Rebuild Iowa Infrastructure Fund funding to support critical components of Iowa s Statewide Longitudinal Data
Article 11. Window Replacement Project Norman E. Day & Col. John Robinson Elementary Schools
Article 11 Window Replacement Project Norman E. Day & Col. John Robinson Elementary Schools MSBA Accelerated Repair Program Program targets replacement of roofs, windows, doors, and boilers Goal is to
E X I S T I N G F A C I L I T I E S
Los Angeles Unified School District Facilities Services Division E X I S T I N G F A C I L I T I E S 68 TH STREET ELEMENTARY SCHOOL FOOD FACILITIES BUILDING Monthly Program Status Report August 2011 Prepared
A Self-Audit of Your Current Campus Security Systems
A Self-Audit of Your Current Campus Security Systems Security Solutions for Education, Business & Public Safety Free Consultations on ID Card Systems, Access Control, Call Recording, Video Surveillance,
Items in red were complete 2-22-10. Items in green were complete on 8-2-11. Lined out items are Life Safety Codes.
Office of Safe and Orderly Schools Facility Safety Assessment Dennis Meador, School Facilities Supervisor Mark Hobson, School Facilities Supervisor Division of School Building September 18 19, 2007 Items
Facilities Operations Customer Service Standards WORK ORDER PRIORITIES
Facilities Operations Customer Service Standards WORK ORDER PRIORITIES In order to provide fair and consistent maintenance service to all University faculty, staff and students, a work priority system
Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016
Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016 Year Opened 2003 Current Square Footage 391,000 Site Acreage 86.22 cherokeetrail.cherrycreekschools.org $279,200 Asphalt and concrete
REQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS Design Build Services for Information Technology/ Security for Achievement Prep Public Charter School - Wahler Campus Redevelopment Project Issued: Friday, December 19 th, 2014 IMPORTANT
Budget Edition May 2015 roposed Budget 7 am to 9 pm District Office Budget Change Tax Levy Increase Vote Day Details A Look Inside
1 Budget Edition May 2015 Residents to vote on 2015/16 proposed budget May 19 Southern Cayuga Central School District residents will vote on a $16,397,112 budget proposal for the 2015-16 school year on
SCHEMATIC DESIGN PRESENTATION ACTON ELEMENTARY SCHOOL
March 16, 2015 SCHEMATIC DESIGN PRESENTATION ACTON ELEMENTARY SCHOOL DUNCANVILLE INDEPENDENT SCHOOL DISTRICT Acknowledgments 2 Narrative 3 The Process 4 Site Analysis 6 Site Plan 7 ACTON ELEMENTARY SCHOOL
Project Management Division
CAPITAL PROJECTS DEPARTMENT MONTHLY ACTIVITY REPORT February 2015 Project Management Division BELOW: Collins Construction crews complete recent exterior work and await delivery of exterior siding. Collins
PARKVILLE HIGH SCHOOL LIMITED RENOVATION
PARKVILLE HIGH SCHOOL LIMITED RENOVATION DESIGN BRIEFING For Dr. Joe A. Hairston BALTIMORE COUNTY PUBLIC SCHOOLS August 11, 2009 Smolen 3 Emr + Associates Architects 1355 Piccard Drive, Suite 200 Rockville,
INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING
INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING GS 521C-521 requires a local school board to submit its long-range plan for meeting school facility needs to the State
HISTORY OF THE MADISON LOCAL SCHOOLS
HISTORY OF THE MADISON LOCAL SCHOOLS Early History 1815-1929 This brief history of the schools in Madison Township is included in this report in an effort to provide the reader with a background which
HAMILTON SCHOOL. 1401 Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA
INITIAL YEAR BUILT 1968 BUILDING AREA 187,700 SF CURRENT PROGRAM CAPACITY N/A ENROLLMENT 2008 129 WARD 5 PROPOSED PROGRAM CAPACITY N/A Site Plan HAMILTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
Planning for Our Future 10 YEAR FINANCIAL PLAN REVIEW
Planning for Our Future 10 YEAR FINANCIAL PLAN REVIEW AGENDA Mission/District Goals Operational Plan....Boone Hall FY11 Financial Activity Tim Dettwiller The Forecast.Tim Dettwiller The Proposed Plan...Tim
Schematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 OVERLEA HIGH SCHOOL
Schematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 0 Overlea High School - Facility Summary Facility Opened: Auditorium Addition: Activity Room Addition: School Rated Capacity
Bond Referendum Presentation. Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014
Bond Referendum Presentation Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014 Mr. David Fowler President Floral Park- Bellerose Mr. David Del Santo Vice-President New Hyde Park Garden City Park
Facility Status Review
POLICY 409 APPENDIX A Page 1 of 5 Facility Status Review (NAME OF SCHOOL) (SCHOOL DISTRICT) (DATE PREPARED) POLICY 409 APPENDIX A Page 2 of 5 1. LOCATION: Full address (Insert picture of the school) 2.
CAPITAL EXPENDITURES
CAPITAL EXPENDITURES 1 CAPITAL EXPENDITURES CAPITAL EXPENDITURES PLANNING On March 1, 2010 the AmherstPelham Regional School committee adopted a policy for developing a formal capital needs planning process.
PROCEDURES FOR THE NONPUBLIC AGING SCHOOLS PROGRAM (FISCAL YEAR 2015)
PROCEDURES FOR THE NONPUBLIC AGING SCHOOLS PROGRAM (FISCAL YEAR 2015) August 2014 These procedures are available for download at: http://www.pscp.state.md.us Applications for this program must be submitted
MOORESVILLE HIGH SCHOOL RENOVATION A CASE STUDY IN COMMUNICATION
MOORESVILLE HIGH SCHOOL RENOVATION A CASE STUDY IN COMMUNICATION 02 THE KORTE COMPANY LISTEN BEFORE YOU BUILD The more things change, the more they stay the same. Today s children learn using computers,