Unit 4: Time Management (PMBOK Guide, Chapter 6)

Size: px
Start display at page:

Download "Unit 4: Time Management (PMBOK Guide, Chapter 6)"

Transcription

1 (PMBOK Guide, Chapter 6) The questions on this topic focus heavily on scheduling techniques, network diagrams, Gantt charts, the critical path, compressing the schedule, PERT, and float. You may or may not have to actually work a network diagram, but you will be expected to answer fundamental questions about the critical path, float, crashing a project schedule, and dealing with various dependencies such as finish-to-finish or start-to-start. See course slide #4-1 for an overview of time management. Major Processes 6.1 Plan Schedule Management (establishing procedures for planning, developing, managing, executing, and controlling the schedule) 6.2 Define Activities (identifying specific activities to be accomplished) 6.3 Sequence Activities (identifying and documenting relationships among activities) 6.4 Estimate Activity Resources (estimating type and quantity of resources needed) 6.5 Estimate Activity Durations (approximating the number of work periods to complete individual activities with estimated resources) 6.6 Develop Schedule (analyzing sequences, durations, resource requirements, and schedule constraints to create the schedule) 6.7 Control Schedule (monitoring the status of the project to update progress and managing changes to the schedule baseline) PMI indicates that defining and sequencing activities, estimating resources and durations, and development of the schedule are discrete but tightly linked steps in building a project schedule. On some projects, especially smaller ones, these discrete steps are viewed and performed as a single process. 6.1 Plan Schedule Management (PMBOK Guide, p. 145) Plan Schedule Management establishes and documents procedures for planning, developing, managing, executing, and controlling the project schedule. Plan Schedule Management Inputs Tools Outputs 1. Project management plan 2. Project charter 3. Enterprise environmental factors 4. Organizational process assets 1. Expert judgment 2. Analytical techniques 3. Meetings 1. Schedule management plan CMF Solutions and ESI July 2013 PMC:DJ4:EN:000 ver

2 Four Key Inputs for Plan Schedule Management (PMBOK Guide, p. 146): 1. Project Management Plan: Information used explicitly at this step may include: Scope baseline: The scope statement and WBS information may be used for defining activities, estimating durations, and managing the schedule. Other information: Cost and risk information may be helpful in developing the schedule. 2. Project Charter: The charter usually contains a high-level, summary milestone schedule that would provide a starting point in thinking about the detailed schedule. 3. Enterprise Environmental Factors: Factors that influence the schedule management planning process may include: Organizational structure and resource availability Project management software and published commercial data Work authorization systems 4. Organizational Process Assets: The specific organizational process assets that may affect Plan Schedule Management include (PMBOK Guide, p. 147): Lessons learned, historical information, and templates Schedule and change control procedures Monitoring and reporting tools Risk control procedures and project closure guidelines Three Key Tools for Plan Schedule Management (PMBOK Guide, p. 147): 1. Expert Judgment: Expert judgment coupled with historical information may help apply relevant information from similar projects. 2. Analytical Techniques: Various analytical techniques may help in choosing appropriate scheduling methodologies, estimating approaches, project management software, and whether to employ fast tracking and/or crashing. 4-2 PMC:DJ4:EN:000 ver.2.0 CMF Solutions and ESI July 2013

3 3. Meetings: Used to help develop the schedule management plan. One Key Output for Plan Schedule Management (PMBOK Guide, p. 148): 1. Schedule Management Plan: A component of the project management plan that establishes the criteria and activities for developing, monitoring, and controlling the schedule. The schedule management plan may establish the following: Project schedule model development: The appropriate scheduling methodology and tool may be specified. Level of accuracy: The acceptable range of accuracy for duration estimates (may also include recommended amounts for contingency). Units of measure: The unit of measure for tracking key resources and time might be hours, days, weeks, or months of effort. The unit of measure for materials might be liters, tons, or cubic yards and so on. Organizational procedures links: The WBS provides a consistent framework for estimating schedules. Project schedule model maintenance: Processes used to update schedule status during execution of the work. Control thresholds: Establishes an allowable amount of variation before corrective action is triggered. Often expressed as a percentage of deviation. Rules of performance measurement: Earned Value rules for calculating how much credit to take for partially completed activities (e.g., 0-100, 50-50, and so on). These rules are described in the cost management chapter as part of the earned value management topic. Reporting formats: Formats and frequency for schedule status reports. Process descriptions: Schedule management processes are documented. 6.2 Define Activities (PMBOK Guide, p. 149) Activity definition involves identifying and documenting the specific activities that must be performed to produce the deliverables identified by the WBS. Activities are planned down to the work package level, which is the lowest level displayed in the WBS. PMI also says that work packages may be decomposed another level, which is designated as activities or schedule activities. CMF Solutions and ESI July 2013 PMC:DJ4:EN:000 ver

4 Define Activities Inputs Tools Outputs 1. Schedule management plan 2. Scope baseline 3. Enterprise environmental factors 4. Organizational process assets 1. Decomposition 2. Rolling wave planning 3. Expert judgment 1. Activity list 2. Activity attributes 3. Milestone list Four Key Inputs for Define Activities (PMBOK Guide, p. 150): 1. Schedule Management Plan: Provides the level of detail necessary for managing the work. 2. Scope Baseline: The information explicitly used at this step includes the WBS, project deliverables, constraints, and assumptions. 3. Enterprise Environmental Factors (EEF): The relevant EEF items at this point may include: Organizational structure Published information from commercial databases Project management information systems 4. Organizational Process Assets: The specific organizational process assets that may affect defining project activities include (PMBOK Guide, p. 151): Formal and informal activity planning procedures and guidelines Lessons learned knowledge base and historical information (activity lists from previous, similar projects) Standardized processes and templates Three Key Tools for Define Activities (PMBOK Guide, p. 151): 1. Decomposition: Subdividing project activities into smaller components. The lowest level shown in the WBS is the work package; however, work packages can be further decomposed into activities, which represent the work required to produce the work package deliverables. PMI indicates that a complete activity 4-4 PMC:DJ4:EN:000 ver.2.0 CMF Solutions and ESI July 2013

5 list includes all the activities necessary to complete each work package. Involving team members in the decomposition may lead to more accurate results. 2. Rolling Wave Planning: A form of progressive elaboration where work to be performed in the near term is planned at a low level of the WBS (work package), i.e., a highly detailed plan with as much accuracy as possible. Work farther in the future is planned with less detail (at a higher level of the WBS, perhaps what some practitioners call a planning package). Course slide #4-2 shows what this timing distinction might look like. 3. Expert Judgment: Using appropriate subject matter experts to ensure the activity definition is accurate. Three Key Outputs for Define Activities (PMBOK Guide, p. 152): 1. Activity List: A comprehensive list of all activities that must be performed. The list should include all activities (including those decomposed below the work package level), an activity identifier (code of accounts number), and a sufficient description of the work. 2. Activity Attributes: Much like the WBS dictionary, activity attributes include detailed information for each activity. The amount of information increases as the project progresses (progressive elaboration). Activity attributes includes the following information: Activity ID, WBS ID, and activity name Activity description Predecessor and successor activities (for sequencing) Logical relationships (type of dependency) Leads and lags Resource requirements Imposed dates, constraints, and assumptions Responsible resource Geographical area (if work is done in multiple locations) 3. Milestone List: Milestones are important points in time and they have zero duration. Milestones may be requested or demanded by the customer, management, the team, or may be required by the contract. Typical milestones often include the date on which important activities should begin or end. CMF Solutions and ESI July 2013 PMC:DJ4:EN:000 ver

6 6.3 Sequence Activities (PMBOK Guide, p. 153) Activity sequencing involves identifying and documenting interactivity dependencies (also called logical relationships). The process can be done manually, with software, or with a combination of both. Except for the first and last, all activities must have a predecessor and a successor. In addition to appropriate logical relationships, it may be necessary to incorporate leads or lags to create realistic, achievable schedules. Sequence Activities Inputs Tools Outputs 1. Schedule management plan 2. Activity list 3. Activity attributes 4. Milestone list 5. Project scope statement 6. Enterprise environmental factors 7. Organizational process assets 1. Precedence diagramming method (PDM) 2. Dependency determination 3. Leads and lags 1. Project schedule network diagrams 2. Project documents updates Seven Key Inputs for Sequence Activities (PMBOK Guide, p. 154): 1. Schedule Management Plan: Identifies the intended scheduling method for the project. 2. Activity List: Identifies schedule activities that must be sequenced, Section Activity Attributes: An output of the previous process, Section This information includes predecessors and successors for each activity. 4. Milestone List: Described in Section , milestones must also be sequenced and some milestones may have imposed dates (schedule constraints) that may affect sequencing. 5. Project Scope Statement: Includes product characteristics that help planners understand required activity sequences. For instance, there may be physical or technical aspects of the work that make a mandatory dependency necessary. The scope statement also identifies deliverables, constraints, and assumptions which may influence sequencing decisions. 4-6 PMC:DJ4:EN:000 ver.2.0 CMF Solutions and ESI July 2013

7 6. Enterprise Environmental Factors (EEF): EEF that may influence sequencing include: Government or industry standards Project management information system Scheduling tool and work authorization systems 7. Organizational Process Assets (OPA): The specific OPA that may affect the sequencing of project activities include (PMBOK Guide, p. 156): Files from the knowledge base on scheduling methods Scheduling templates Three Key Tools for Sequence Activities (PMBOK Guide, p. 156): 1. Precedence Diagramming Method (PDM): This is one way to display a schedule in network fashion; it is also called activity-on-node. It was developed in the early 1960s at Stanford University and is the method that project management software uses today. The activities are listed inside boxes (called nodes) and are connected by lines (or arrows) to indicate sequences. Design Test Produce The PDM approach uses the following four types of dependencies: Finish-to-Start: Initiation of the successor activity depends on completion of the predecessor activity. Finish-to-Finish: Completion of the successor activity depends on completion of the predecessor activity. Start-to-Start: Initiation of the successor activity depends on initiation of the predecessor activity. Start-to-Finish: Completion of the successor activity depends on initiation of the predecessor activity. Supplemental course slides #SU-3 through #SU-6 show examples of each type of dependency (use of the slides is optional). Finish-to-start is the most commonly used dependency, whereas PMI suggests that start-to-finish is rarely used on actual projects. CMF Solutions and ESI July 2013 PMC:DJ4:EN:000 ver

8 PDMs offer several advantages over other methods (such as arrow diagrams): The technique provides flexibility in sequencing activities by allowing four types of logical dependencies. By comparison, arrow diagrams are limited to finish-to-start dependencies. The technique does not require the use of dummy activities whenever multiple dependencies are needed in a schedule. Finally, the technique adds the concept of lag and lead times between activities. Figure 6-11, PMBOK Guide, p. 160 shows a network using PDM. 2. Dependency Determination: The following four categories of dependencies are used during activity sequencing: Mandatory dependencies: Also referred to as hard logic, mandatory dependencies are inherent in the nature of the work and often involve physical or technical limitations of some kind. For example, you cannot shingle the roof of a building until the roof has been built. Mandatory dependencies may also occur because of legal or contractual requirements. Discretionary dependencies: Known as soft logic or preferential logic, these optional dependencies are usually chosen because they represent best practices or there is a preferred approach even though other approaches would also be acceptable. External dependencies: These dependencies usually involve interfaces outside the project and are usually outside the direct control of the project team. Examples include waiting on delivery of hardware from an outside source or waiting on delivery of aircraft engines before installation in the airframe. Internal dependencies: Whether they are mandatory or discretionary, these dependencies are within the direct control of the project team (direct contrast with external dependencies). 3. Leads and Lags: Adjustment of lead and lag times may help define the timing of the work more accurately. A lead time allows the successor (follow-on) task to be accelerated. Conversely, a lag time delays the successor activity. 4-8 PMC:DJ4:EN:000 ver.2.0 CMF Solutions and ESI July 2013

9 Two Key Outputs for Sequence Activities (PMBOK Guide, p. 159): 1. Project Schedule Network Diagrams: A schematic display of the project activities and their logical relationships, most often using PDM as the method of display. Note: Although coverage of arrow diagrams was removed from the PMBOK Guide, they are still on the exam for many people. 2. Project Documents Updates: As a result of sequencing, the following documents could be updated: Activity lists and attributes Milestone list and risk register See course slides #4-3 through #4-17 for examples of network diagrams and key issues associated with them. 6.4 Estimate Activity Resources (PMBOK Guide, p. 160) Determining what resources (people, equipment, material, and facilities) will be needed, along with the associated quantities and time frames. Resource issues also apply to the cost estimating process. Estimate Activity Resources Inputs Tools Outputs 1. Schedule management plan 2. Activity list 3. Activity attributes 4. Resource calendars 5. Risk register 6. Activity cost estimates 7. Enterprise environmental factors 8. Organizational process assets 1. Expert judgment 2. Alternative analysis 3. Published estimating data 4. Bottom-up estimating 5. Project management software 1. Activity resource requirements 2. Resource breakdown structure (RBS) 3. Project documents updates Eight Key Inputs for Estimate Activity Resources (PMBOK Guide, p. 162): 1. Schedule Management Plan: Identifies the desired level of accuracy and units of measure for resources (staff hours) and schedule (whether it will be measured in days, weeks, or other units). See Section CMF Solutions and ESI July 2013 PMC:DJ4:EN:000 ver

10 2. Activity List: Resource estimates should be done for the associated activities. 3. Activity Attributes: Activity attributes were developed during activity definition and now provide a primary source of data for estimating the resources required for each activity. 4. Resource Calendars: Described in PMBOK Guide, Sections and , the resource calendar system should provide information such as when a resource is available for a work assignment, experience level of a given resource, skill sets possessed by individuals, and geographical location. 5. Risk Register: Potential risk events may affect resource availability. 6. Activity Cost Estimates: The comparative cost of specific resources may affect the decision on which resources may be selected. 7. Enterprise Environmental Factors: Information about the existing resource infrastructure (resource availability and skill sets) would be relevant at this step. 8. Organizational Process Assets: Organizational Process Assets that would affect the estimation of resources required to support project activities include: Staffing policies Procedures for renting or purchasing supplies and equipment Historical information about resource usage on similar projects Five Key Tools for Estimate Activity Resources (PMBOK Guide, p. 164): 1. Expert Judgment: Appropriate subject matter experts will help judge the accuracy of resource estimates. 2. Alternative Analysis: This analysis considers the various options for doing the work and assures that appropriate resource estimates are available. For example, a project might pursue either of two technological possibilities; there may be a choice between manual or automated tools/processes; or various levels of resource capabilities may be considered. 3. Published Estimating Data: Some industries and trade groups collect and publish cost, schedule, and resource data for specific types of work PMC:DJ4:EN:000 ver.2.0 CMF Solutions and ESI July 2013

11 4. Bottom-Up Estimating: If a schedule activity cannot be estimated with reasonable confidence, the work may be decomposed to a lower level to provide more detail. The bottom-up approach then aggregates these estimates at higher levels. 5. Project Management Software: Most project management software is capable of organizing resource data for individual team members or groups (sometimes called resource pools). The software can usually define: Resource availability Resource rates Resource calendars Resource breakdown structures (RBS) Three Key Outputs for Estimate Activity Resources (PMBOK Guide, p. 165): 1. Activity Resource Requirements: Identifies the type and quantity of resources needed to support each individual schedule activity. If the work was decomposed below the work package (schedule activity), the resource requirements are added (aggregated) to determine total resource needs for the work package. Estimates should include: The basis of the estimate (method used) Any assumptions that were made Resource availability Resource quantity 2. Resource Breakdown Structure: Whereas the WBS focuses primarily on activities, the RBS is a hierarchical structure focusing primarily on resources. The RBS identifies activities to which the resources are assigned as well as the associated time frames. The RBS is also useful in determining whether a resource is available in any given time period. 3. Project Documents Updates: Project documents that might be updated include: Activity list Activity attributes Resource calendars CMF Solutions and ESI July 2013 PMC:DJ4:EN:000 ver

12 6.5 Estimate Activity Durations (PMBOK Guide, p. 165) Duration estimating coordinates information about activity scope, resource types and quantities, and resource calendars so that a realistic schedule can be developed. Duration estimating has been defined as assessing the number of work periods needed to complete an activity. Estimates should be: Produced by the people most familiar with the work (or at least approved by them). This observation refers to the importance of expert judgment. Progressively elaborated, in other words, estimates will usually become more accurate as the quality of the input data improves. Adjusted for the effects of elapsed time (whether or not weekends are treated as work periods). Note: Project management software makes it much easier to assess the effect of these elapsed times on a project schedule. Duration estimating should also consider the difference between effort and duration. If four people work 10 hours each on a task, the total effort that must be paid for is 40 person-hours. If those four people are working simultaneously, i.e., in parallel, the duration to complete the work will be 10 hours. In summary, durations are used for scheduling and effort is used to estimate costs. Estimate Activity Durations Inputs Tools Outputs 1. Schedule management plan 2. Activity list 3. Activity attributes 4. Activity resource requirements 5. Resource calendars 6. Project scope statement 7. Risk register 8. Resource breakdown structure 9. Enterprise environmental factors 10. Organizational process assets 1. Expert judgment 2. Analogous estimating 3. Parametric estimating 4. Three-point estimating 5. Group decision-making techniques 6. Reserve analysis 1. Activity duration estimates 2. Project documents updates 4-12 PMC:DJ4:EN:000 ver.2.0 CMF Solutions and ESI July 2013

13 Ten Key Inputs for Estimate Activity Durations (PMBOK Guide, p. 167): 1. Schedule Management Plan: Defines the estimating method, desired level of accuracy, and frequency for updates. 2. Activity List: Described in Section , durations must be estimated for each activity. 3. Activity Attributes: Described in Section Activity Resource Requirements: Duration estimates are affected by how many resources are assigned to a task (two people can usually complete a task faster than one person). In turn, actual availability of those resources is also a major factor. If resources prove to be unavailable, some form of outsourcing may be required. As mentioned earlier, durations are also affected by relative levels of experience and capability. 5. Resource Calendars: Resource calendars identify the availability and capability of all required resources (people and equipment). 6. Project Scope Statement: Any constraints or assumptions from the scope statement that may affect activity durations. A constraint could be that a key stakeholder has imposed a strict deadline for completion of initial testing. An assumption might be that hurricane activity will not disrupt product testing in your sea coast facility and, therefore, you will meet the planned deadline. 7. Risk Register: Provides the list of potential risk events, the results of risk analysis, and the appropriate response plans. 8. Resource Breakdown Structure: Identifies resources by category (labor, equipment, materials) and type (skill level, grade level, etc.). 9. Enterprise Environmental Factors: Environmental factors that may affect duration estimates include: Duration estimating databases Productivity metrics Published commercial information CMF Solutions and ESI July 2013 PMC:DJ4:EN:000 ver

14 10. Organizational Process Assets: Organizational Process Assets that may affect duration estimates include: Historical information on likely durations Project calendars Scheduling methodology Lessons learned Six Key Tools for Estimate Activity Durations (PMBOK Guide, p. 169): 1. Expert Judgment: PMI recommends the use of expert judgment guided by historical information whenever the combination is possible. Expert judgment is crucial because of the potential number of factors that can affect durations. 2. Analogous Estimating: A form of top-down estimating, this approach uses the actual durations of previous, similar activities to estimate the duration of future activities. These estimates are usually adjusted by experts for differences in complexity, size, and risk. Key points: The technique is usually applied in the early stages of a project when detailed information is limited and is, therefore, considered a ballpark guesstimate. Developing such an estimate is not costly, but the accuracy is limited. The technique is most reliable when a) the previous activities are similar in fact and not just in appearance and b) the individuals making the estimates have the needed expertise (for example, expert judgment was the first tool). 3. Parametric Estimating: For some tasks, duration estimates can be derived from the quantity needed multiplied by the appropriate productivity rate. For example, if a drawing takes approximately 10 hours and you need 50 drawings, the estimated duration of creating the drawings would be 500 hours. 4. Three-Point Estimating: Such estimates can improve accuracy by considering risk. This technique calculates an expected average duration from the following three estimates: Optimistic: The best-case scenario as seen by someone familiar with the work. Pessimistic: The worst-case scenario as seen by someone familiar with the work PMC:DJ4:EN:000 ver.2.0 CMF Solutions and ESI July 2013

15 Most Likely: The most likely scenario as seen by someone familiar with the work. In similar fashion, a well-known technique for doing the same thing is PERT (Program Evaluation and Review Technique). The differences among PERT, three-point estimate, and CPM (Critical Path Method) will be discussed in the next process on schedule development. 5. Group Decision-Making Techniques: The use of group processes such as brainstorming, Delphi, and nominal group may help teams produce more accurate estimates. PMI also believes that this teaming process will usually lead to increased commitment in achieving the schedule. 6. Reserve Analysis: Contingency reserves (sometimes referred to as time reserve or buffers) are sometimes added to duration estimates to account for risk or uncertainty. Contingency may be a percentage of the overall schedule or a fixed number of time periods. If used, reserve time should be documented along with assumptions and other data. Ultimately, reserve time may be used, reduced, or eliminated (as needed). PMI has identified the following methods for handling reserve. These methods also apply to cost estimating. Contingency Reserves: This amount of time is allocated within the schedule baseline for known-unknowns, i.e., the time associated with handling identified risks. These reserves may be associated with specific activities or aggregated into buffers (see PMBOK Guide, Figure 6-19, p. 178, Critical Chain). Management Reserves: An amount of duration withheld from the baseline and intended for unknown-unknowns, i.e., unforeseen problems that may affect the schedule. Two Key Outputs for Estimate Activity Durations (PMBOK Guide, p. 172): 1. Activity Duration Estimates: Quantitative assessments of the number of work periods (hours, days, and so on) needed to complete an activity (and by extension, to complete the entire project). PMI recommends that these estimates should also include a range of possible results. Note: Duration estimates for different activities are assumed to be statistically independent (the estimate of one task does not determine or influence the duration estimate of a different task). CMF Solutions and ESI July 2013 PMC:DJ4:EN:000 ver

16 2. Project Documents Updates: Documents that may be updated include: Activity attributes Assumptions inherent in the duration estimates 6.6 Develop Schedule (PMBOK Guide, p. 172) Schedule development builds upon the previous processes (schedule management plan, activity list, sequencing, resource estimates, and duration estimates) to establish the project schedule. Entering these data into a scheduling tool (usually software such as Microsoft Project or Primavera or others) will establish planned start and finish times for each task. The approved schedule becomes the baseline for tracking progress. Develop Schedule Inputs Tools Outputs 1. Schedule management plan 2. Activity list 3. Activity attributes 4. Project schedule network diagrams 5. Activity resource requirements 6. Resource calendars 7. Activity duration estimates 8. Project scope statement 9. Risk register 10. Project staff assignments 11. Resource breakdown structure 12. Enterprise environmental factors 13. Organizational process assets 1. Schedule network analysis 2. Critical path method 3. Critical chain method 4. Resource optimization techniques 5. Modeling techniques 6. Leads and lags 7. Schedule compression 8. Scheduling tool 1. Schedule baseline 2. Project schedule 3. Schedule data 4. Project calendars 5. Project management plan updates 6. Project documents updates Thirteen Key Inputs for Develop Schedule (PMBOK Guide, p. 174): 1. Schedule Management Plan: Identifies the scheduling method (such as critical path method or critical chain method) for creating the schedule. 2. Activity List: Described in Section (identifies the activities that must be scheduled) PMC:DJ4:EN:000 ver.2.0 CMF Solutions and ESI July 2013

17 3. Activity Attributes: Described in Section (provides the details for each activity). 4. Project Schedule Network Diagrams: Described in Section (shows the sequencing). 5. Activity Resource Requirements: Described in Section (types and quantities of resources needed). 6. Resource Calendars: Described in Sections and (availability and capability of resources). 7. Activity Duration Estimates: Described in Section (the number of work periods needed to complete project activities). 8. Project Scope Statement: Any constraints or assumptions that may affect the schedule. PMI has identified two categories of time constraints that may potentially affect the schedule: Imposed dates: Mandates from someone else (customer, upper management, or a court-imposed date). Project management software allows date constraints such as Start No Earlier Than and Finish No Later Than. Key events or major milestones: Completion of certain deliverables might be desired, requested, or demanded by specified dates. 9. Risk Register: Described in Section (identifies risk events that may affect the schedule). 10. Project Staff Assignments: Identifies which resources are assigned to specific activities. 11. Resource Breakdown Structure: Provides the details needed to organize and report as to how resources are affecting the schedule. 12. Enterprise Environmental Factors: Environmental factors that may affect schedule development include: Standards and communication channels Scheduling tool selected for building the schedule CMF Solutions and ESI July 2013 PMC:DJ4:EN:000 ver

18 13. Organizational Process Assets: Organizational Process Assets that may affect schedule development include: Scheduling methodology Project calendar Eight Key Tools for Develop Schedule (PMBOK Guide, p. 176): 1. Schedule Network Analysis: Techniques that generate the project schedule using a schedule model and various analytical techniques such as critical path method, critical chain method, what-if analysis (simulation), resource optimization (resource leveling and smoothing), and so on. 2. Critical Path Method: Calculates theoretical start and finish dates for all schedule activities without regard to resource limitations. The technique: Uses a forward and backward pass to determine early and late times. Calculates available float or slack (float or slack indicates where any flexibility in the schedule exists to delay activities without delaying the project). Determines the critical path (the longest path, the path with zero float or the least float available, the shortest possible duration for the project). It is possible to have more than one critical path, which would make the schedule more risky. The critical path may have positive total float if the project is ahead of schedule or negative total float if the project is behind schedule. A near-critical path exists when the duration of a path is almost as long as that of the critical path. If the activities on such a path are subject to considerable risk or variation, those activities must be monitored as carefully as those on the critical path. Historically, the exam has asked numerous questions about PERT (Program Evaluation and Review Technique) as well as any differences between PERT and CPM (Critical Path Method). The course slides will examine these issues. 3. Critical Chain Method: This technique modifies the schedule to account for limited resources. The critical path is first determined using a normal process without resource limitations. Next, resource limitations are applied and a resource-constrained schedule is produced. The resource-constrained critical path is known as the critical chain PMC:DJ4:EN:000 ver.2.0 CMF Solutions and ESI July 2013

19 Non-work activities called duration buffers are added to the end of activity sequences. One of these buffers is known as the project buffer and is placed at the end of the critical chain. Other buffers, called feeding buffers, are placed at any point where non-critical tasks feed into the critical chain. The size of each buffer should reflect the uncertainty associated with that sequence of tasks. Compared to traditional approaches, the schedule is managed by monitoring the duration buffers (comparing remaining buffer amounts to remaining activity durations) instead of managing float and the critical path. 4. Resource Optimization Techniques: The two following techniques are identified by PMI: a) Resource Leveling: This technique applies when a schedule has already been produced but one of the following problems exists with resources: There are fewer resources available than the schedule requires Certain resources are only available at specific times Resource usage needs to be kept at a constant level When any of these resource constraints exist, the goal is to balance demand for resources with the available supply. The most popular response is as follows: In time periods with too much work for the available resources, some of the work may be moved into other time periods. This is often done by moving tasks with available positive float. This guideline or rule of thumb is referred to as a heuristic by some people. Note: Be aware that resource leveling tends to result in a project duration that is longer than originally planned. b) Resource Smoothing: Conceptually similar to resource leveling, you must operate within predefined resource constraints or limits. The difference is that, with smoothing, activities must be performed within the available float. The schedule is not allowed to slip. Therefore, it may not be possible to optimize all resources. 5. Modeling Techniques: Two highly related techniques are identified: a) What-If Scenario Analysis: As the name suggests, this analysis uses the power of the computer to consider various potential scenarios. In this way, you can model the potential effects of different internal or external events, such CMF Solutions and ESI July 2013 PMC:DJ4:EN:000 ver

20 as: a component is not delivered on time, defective parts arrive, a labor strike occurs, or an extreme weather problem (hurricane, blizzard, lightning strike) occurs. This technique is related to the use of simulation programs. b) Simulation: Monte Carlo simulation calculates numerous potential project durations under differing assumptions and produces a distribution of possible results with associated probabilities. There are numerous commercially available software programs that will perform such a simulation. This process provides invaluable feedback about the feasibility of the schedule and may also help in devising contingency plans. 6. Leads and Lags: Leads and lags may be adjusted to develop viable, realistic schedules. They make it easier to delay or accelerate work. 7. Schedule Compression: Seeking ways to shorten the schedule without changing the scope. There are two primary techniques: Crashing: Exploring cost and schedule trade-offs to shorten the schedule for the least incremental cost. The technique essentially involves adding resources to critical path activities but will almost always increase project cost. Fast tracking: Doing more activities in parallel (may also apply to overlapping phases of a project, sometimes called concurrent engineering). Note that fast tracking usually increases risk because it requires increased coordination of resources and may result in rework. 8. Scheduling Tool: Automated scheduling tools make it easier to produce a schedule and to track changes to the schedule. Refer to Course Slides #4-18 through #4-32 for additional information on Three-Point Estimates, CPM, PERT, crashing, and fast tracking. Six Key Outputs for Develop Schedule (PMBOK Guide, p. 181): 1. Schedule Baseline: The approved schedule, which then becomes the plan against which to measure performance. The schedule baseline is a component of the project management plan and is also part of the triple constraint. 2. Project Schedule: This output refers to various possible presentations of the resulting schedule. PMI states that schedules remain preliminary until resource assignments have been confirmed. They also say that the schedule can be 4-20 PMC:DJ4:EN:000 ver.2.0 CMF Solutions and ESI July 2013

21 presented in summary form (such as a high-level master schedule) or in detail. Possible formats for presentation include: Project schedule network diagrams which show activity dependencies (logic) and the critical path. Bar charts (also called Gantt charts) which are easy to read and used frequently in presentations. Gantt charts show activity start and finish dates, activity durations, and dependencies. They are especially good for showing progress or variance. They may also be used to display summary tasks, which are sometimes referred to as hammock activities (a group of related schedule activities aggregated at a summary level). Milestone charts: You need to know the definition of a milestone: an important event with zero duration, that is, an important point in time. Milestone charts are a good way to communicate high-level schedule status to customers and upper management. See Figure 6-21 on PMBOK Guide, p. 183 for illustrations. 3. Schedule Data: Supporting data for the schedule include: Activities, attributes, milestones, assumptions, and constraints Resource requirements by time period (displayed in a resource histogram) Alternative schedules Contingency reserves 4. Project Calendars: Some practitioners refer to this as the working calendar. The default working calendar in the Microsoft Project software is Monday through Friday, 8 am to 5 pm daily. The project calendar distinguishes time periods available to perform work from those that are not available. 5. Project Management Plan Updates: Relevant portions of the project plan that might be updated include the: Schedule baseline Schedule management plan CMF Solutions and ESI July 2013 PMC:DJ4:EN:000 ver

22 6. Project Documents Updates: Documents that may be updated include: Activity resource requirements (especially if resource leveling has been used) Activity attributes (any changes in resources, durations, risks, assumptions, etc.) Calendar (standard working days or weeks, etc.) Risk register 6.7 Control Schedule (PMBOK Guide, p. 185) Controlling the schedule involves monitoring schedule status and managing schedule changes. Schedule change control is concerned with the usual factors: Determining the current status of the schedule Influencing the factors that create schedule changes Determining (and tracking) that schedule changes have occurred Managing the changes as they occur Control Schedule Inputs Tools Outputs 1. Project management plan 2. Project schedule 3. Work performance data 4. Project calendars 5. Schedule data 6. Organizational process assets 1. Performance reviews 2. Project management software 3. Resource optimization techniques 4. Modeling techniques 5. Leads and lags 6. Schedule compression 7. Scheduling tool 1. Work performance information 2. Schedule forecasts 3. Change requests 4. Project management plan updates 5. Project documents updates 6. OPA updates Six Key Inputs for Control Schedule (PMBOK Guide, p. 187): 1. Project Management Plan: As described earlier, the project management plan contains the schedule management plan and the schedule baseline. The schedule management plan establishes how the schedule will be managed and how changes will be processed. The baseline is compared to actual outcomes to determine if preventive actions, corrective actions, or changes are needed PMC:DJ4:EN:000 ver.2.0 CMF Solutions and ESI July 2013

23 2. Project Schedule: The most recent, approved project schedule is the baseline. It is this baseline that will change if schedule changes are approved. 3. Work Performance Data: Provides information on whether planned dates have been met. Activities are classified as to whether they have started or finished and metrics are tracked (such as actual duration, remaining duration, and percent complete). 4. Project Calendars: Described in Section , calendars identify time periods available for completing work and forecasting remaining work. 5. Schedule Data: Described in Section , detailed schedule data is updated as necessary during control of the schedule. 6. Organizational Process Assets: Organizational Process Assets that may affect schedule control include: Formal and informal policies regarding scheduling control (changes, preventive action, corrective action, and monitoring actual results) Schedule control tools Monitoring and reporting methods Seven Key Tools for Control Schedule (PMBOK Guide, p. 188): 1. Performance Reviews: Performance reviews compare and analyze planned vs. actual performance data such as start and finish dates, percent complete, and remaining duration. The following techniques may be used in conducting this analysis: Trend analysis: Examines performance over time to determine whether performance is improving or deteriorating. Graphical analysis may be used to display any trends, e.g., a line graph. Critical path method: Identifying variances on the critical path may provide the best insight into schedule status. Evaluating activity variances on any near-critical paths can help identify schedule risks. Critical chain method: Compares remaining buffer amounts to buffer amounts needed to protect the schedule (based on schedule risk). Earned value management: Provides schedule measures such as schedule variance and schedule performance index. If earned value is used, a method for measuring in-progress activities must CMF Solutions and ESI July 2013 PMC:DJ4:EN:000 ver

24 be adopted (e.g., percent complete or the rule). An important part of schedule control is to determine whether schedule variations are sufficient to require responses such as corrective or preventive actions. The details of earned value will be covered in the cost management chapter. If earned value is not used, a generic schedule variance may be calculated using the formula: Plan - Actual. 2. Project Management Software: Provides the means to track planned versus actual dates and to forecast expected future performance. 3. Resource Optimization Techniques: Used to optimize the distribution of work against the available resources (Section ). 4. Modeling Techniques: Uses what-if analysis and simulation to analyze various scenarios and determine the probability of different schedule outcomes (Section ). 5. Leads and Lags: Used to bring the schedule back in line with the plan by delaying or accelerating work (Section ). 6. Schedule Compression: Techniques such as crashing and fast tracking to realign the current schedule with the original plan/baseline (Section ). 7. Scheduling Tool: The schedule data are updated to reflect actual progress. Manual or automated scheduling methods are used to produce an updated schedule. Six Key Outputs for Control Schedule (PMBOK Guide, p. 190): 1. Work Performance Information: For schedule purposes, the schedule variance and the schedule performance index should be calculated and reported to appropriate stakeholders. 2. Schedule Forecasts: Forecasts of future outcomes are updated based on work performance information available at the time. Earned value indicators are often used for this purpose, e.g., estimate at completion (EAC) and variance at completion (VAC). 3. Change Requests: If change requests occur during analysis of schedule variances, they should be processed using integrated change control PMC:DJ4:EN:000 ver.2.0 CMF Solutions and ESI July 2013

25 4. Project Management Plan Updates: Updates to the project management plan may include: Schedule baseline (in response to approved change requests) Schedule management plan (changes in the way the schedule is to be managed) Cost baseline (additional costs incurred in compressing the schedule) 5. Project Documents Updates: Documents that may be updated include: Schedule data (New network diagrams may be developed to show remaining duration and/or modifications to the original plan.). Project schedule (An updated schedule may be produced that reflects approved changes.). Risk register (The risk register and/or risk response plans may be updated based on the use of schedule compression techniques.). 6. Organizational Process Assets Updates: Organizational Process Assets that may be updated as a result of schedule control include: Other Topics: The causes of variances that have occurred Corrective actions chosen and the rationale Other lessons learned with respect to schedule control Monte Carlo analysis: You should know that CPM and PERT tend to understate schedule durations in comparison to Monte Carlo. This is because Monte Carlo simulation can account for path convergence whereas CPM and PERT cannot. This topic is addressed in more detail in the chapter on risk management. See course slide #4-33. GERT (Graphical Evaluation and Review Technique): This technique was removed from the PMBOK Guide but may remain on the exam. It is a sophisticated schedule development tool that can handle loops (activities that occur more than once) and conditional branches (activities that occur only if something else happens first, i.e., If Then logic). Note: Additional practice network diagrams are included in course slides #4-34 through #4-53 CMF Solutions and ESI July 2013 PMC:DJ4:EN:000 ver

26 This page intentionally blank 4-26 PMC:DJ4:EN:000 ver.2.0 CMF Solutions and ESI July 2013

27 Self-Study Drill Practice: Time Management Question 1. Name four categories of dependencies used in activity sequencing. Note: All page numbers in this drill practice refer to the study guide unless otherwise indicated. 2. Name two methods of compressing project duration. Answer 1. a. Mandatory (also called hard logic ) b. Discretionary (also called preferred, preferential, or soft logic ) c. External (work not under the direct control of the project team) d. Internal (work under the direct control of the project team) (p. 4-8) 2. Crashing and Fast Tracking (p. 4-20). 3. Describe crashing: 3. Adding resources to critical path activities to reduce the overall project schedule. Usually increases cost (p. 4-20). 4. Describe fast tracking: 4. Doing activities in parallel that were initially planned in sequence (p. 4-20). Usually increases risk because of additional coordination of resources and the possibility of rework. 5. What is total float (slack)? 5. The amount of time an activity can be delayed without delaying the project finish date. Some practitioners also refer to total float as either path float or shared float. (Course slides 4-9, 4-17) 6. What is free float (slack)? 6. The amount of time an activity can be delayed without delaying the early start of any immediate successor activities. Float owned independently by an activity. (Course slides 4-10, 4-17) CMF Solutions and ESI July 2013 PMC:DJ4:EN:000 ver

28 7. What is resource leveling? 7. Any form of network analysis in which scheduling decisions are driven by resource management concerns (p. 4-19). In practice, this usually means rescheduling tasks into time periods where sufficient resources are available. The usual result of this practice is to push out the project end date. Therefore, in an ideal world, resource leveling should be limited to activities with positive float, if possible. 8. How is schedule variance calculated? 8. Plan - Actual (pp. 1-7 and 4-23/24) If a task is supposed to take five days and actually takes ten days, the variance is negative five days. Negative variances mean the task took longer than expected. 9. What are the three tools of sequence activities? 9. Precedence diagramming method Dependency determination Leads and lags (pp. 4-7/8) 10. What are heuristics? 10. Problem-solving techniques producing acceptable or good enough results; often called rules of thumb. (p. 4-19) 11. What is a milestone? 11. An activity with zero duration and requiring no resources; normally used to mark the beginning or ending of a task or deliverable. (p. 4-5) 4-28 PMC:DJ4:EN:000 ver.2.0 CMF Solutions and ESI July 2013

29 12. What is the critical path? 12. The longest path through the project network. Also the path with the least slack (float). Activities on the critical path usually have zero float (but not always as the statement above implies) (p and course slides 4-9, 4-17). 13. Name three major advantages of precedence diagrams. 14. Name and define each of the four types of dependencies or logical relationships used in activity sequencing. 15. What are the advantages of a bar (Gantt) chart? 13. a. They do not require dummy activities. b. They increase scheduling flexibility by allowing the overlapping of activities. c. They deal with lag more easily. (p. 4-8) 14. a. Finish-to-start: initiation of the successor depends on completion of the predecessor. b. Finish-to-finish: completion of the successor depends on completion of the predecessor. c. Start-to-start: initiation of the successor depends on initiation of the predecessor. d. Start-to-finish: completion of the successor depends on initiation of the predecessor (p. 4-7) 15. Easy to construct and easy to read; bar charts are an easy way to show progress or status (i.e., schedule variances) (p. 4-21). 16. Define activity duration estimating. 16. Assessing the number of work periods it will take to complete an activity (p. 4-15). 17. What are the two outputs of estimate activity durations? 17. Activity duration estimates and project documents updates (pp & 4-16). CMF Solutions and ESI July 2013 PMC:DJ4:EN:000 ver

PROJECT TIME MANAGEMENT. 1 www.pmtutor.org Powered by POeT Solvers Limited

PROJECT TIME MANAGEMENT. 1 www.pmtutor.org Powered by POeT Solvers Limited PROJECT TIME MANAGEMENT 1 www.pmtutor.org Powered by POeT Solvers Limited PROJECT TIME MANAGEMENT WHAT DOES THE TIME MANAGEMENT AREA ATTAIN? Manages the project schedule to ensure timely completion of

More information

Project Time Management

Project Time Management Project Time Management Study Notes PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. Points to Note Please

More information

Project Time Management

Project Time Management Project Time Management Study Notes PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. Points to Note Please

More information

Project Time Management

Project Time Management Project Time Management Plan Schedule Management is the process of establishing the policies, procedures, and documentation for planning, developing, managing, executing, and controlling the project schedule.

More information

PROJECT TIME MANAGEMENT

PROJECT TIME MANAGEMENT 6 PROJECT TIME MANAGEMENT Project Time Management includes the processes required to ensure timely completion of the project. Figure 6 1 provides an overview of the following major processes: 6.1 Activity

More information

The Project Planning Process Group

The Project Planning Process Group 3 The Project Planning Process Group............................................... Terms you ll need to understand: Activity Activity attributes Activity list Activity on arrow diagram (AOA) Activity

More information

Chapter 6. (PMBOK Guide)

Chapter 6. (PMBOK Guide) Chapter 6 Project Time Management (PMBOK Guide) Mohammad A. Rajabi Dept. of Geomatics Eng., University it of Th Tehran Tel: +98 21 8833 4341, Cell: +98 912 132 5823 Email: marajabi@ut.ac.irac ir Homepage:

More information

The Plan s Journey From Scope to WBS to Schedule

The Plan s Journey From Scope to WBS to Schedule The Plan s Journey From Scope to WBS to Schedule Presented by: Rick Clare, CBAP, PMP, OCP, CSM PM Centers USA, LLC. 2013 Company Background Consulting and Training (Virtual, Public and Private Training)

More information

Scheduling Glossary Activity. A component of work performed during the course of a project.

Scheduling Glossary Activity. A component of work performed during the course of a project. Scheduling Glossary Activity. A component of work performed during the course of a project. Activity Attributes. Multiple attributes associated with each schedule activity that can be included within the

More information

Chapter 6: Project Time Management. King Fahd University of Petroleum & Minerals SWE 417: Software Project Management Semester: 072

Chapter 6: Project Time Management. King Fahd University of Petroleum & Minerals SWE 417: Software Project Management Semester: 072 Chapter 6: Project Time Management King Fahd University of Petroleum & Minerals SWE 417: Software Project Management Semester: 072 Learning Objectives Understand the importance of project schedules Define

More information

TIME MANAGEMENT TOOLS AND TECHNIQUES FOR PROJECT MANAGEMENT. Hazar Hamad Hussain *

TIME MANAGEMENT TOOLS AND TECHNIQUES FOR PROJECT MANAGEMENT. Hazar Hamad Hussain * TIME MANAGEMENT TOOLS AND TECHNIQUES FOR PROJECT MANAGEMENT Hazar Hamad Hussain * 1. Introduction The definition of Project as a temporary endeavor... refers that project has to be done within a limited

More information

SCHEDULING AND TIME MANAGEMENT. Project Management and Leadership 2015D, PhD, PMP

SCHEDULING AND TIME MANAGEMENT. Project Management and Leadership 2015D, PhD, PMP SCHEDULING AND TIME MANAGEMENT Project Management and Leadership 2015D, PhD, PMP Our PROGRAMME: 1. INTRODUCTION TO PROJECT MANAGEMENT 2. STARTING A PROJECT 3. WORK MOTIVATION 4. COMMUNICATION 5: TEAMS

More information

Importance of Project Schedules. matter what happens on a project. projects, especially during the second half of projects

Importance of Project Schedules. matter what happens on a project. projects, especially during the second half of projects Project Time Management Chapter 6 Importance of Project Schedules Managers often cite delivering projects on time as one of their biggest challenges Time has the least amount of flexibility; it passes

More information

Time Management. Herb Pollard III

Time Management. Herb Pollard III Time Management A Small Business Perspective Herb Pollard III Project Manager for Time Management - Pollard PMI Slide 1 Introduction: Time Management - Pollard PMI Slide 2 Project Phases and the Areas

More information

Project Time Management

Project Time Management Project Academy Series Project Time Management 01/22/2015 01/23/2015 Welcome and Introductions Ramaswamy Adisesh: Data Processing Manager III California Project Management Office Department of Technology

More information

Table of Contents Author s Preface... 3 Table of Contents... 5 Introduction... 6 Step 1: Define Activities... 7 Identify deliverables and decompose

Table of Contents Author s Preface... 3 Table of Contents... 5 Introduction... 6 Step 1: Define Activities... 7 Identify deliverables and decompose 1 2 Author s Preface The Medialogist s Guide to Project Time Management is developed in compliance with the 9 th semester Medialogy report The Medialogist s Guide to Project Time Management Introducing

More information

Define Activities Sequence Activities Estimate Activity Resources Estimate Activity Durations Develop Schedule Control Schedule

Define Activities Sequence Activities Estimate Activity Resources Estimate Activity Durations Develop Schedule Control Schedule 1 (Image) 2 The process required to manage timely completion of the project. Project time management start with planning by the project management team (not shown as a discrete process). In small project,

More information

Appendix A of Project Management. Appendix Table of Contents REFERENCES...761

Appendix A of Project Management. Appendix Table of Contents REFERENCES...761 Appendix A Glossary Terms of Project Management Appendix Table of Contents REFERENCES...761 750 Appendix A. Glossary of Project Management Terms Appendix A Glossary Terms of Project Management A Activity

More information

Information Technology Project Management, Sixth Edition. Note: See the text itself for full citations. More courses at cie-wc.edu

Information Technology Project Management, Sixth Edition. Note: See the text itself for full citations. More courses at cie-wc.edu Note: See the text itself for full citations. More courses at cie-wc.edu Understand the importance of project schedules and good project time management Define activities as the basis for developing project

More information

Project Management Glossary

Project Management Glossary Project Management Glossary THE VOCABULARY OF ACHIEVEMENT RON BLACK THE MENTOR GROUP WWW.RONBLACK.COM 800-381-8686 This glossary is an excerpt from Ron Black s book, The Complete Idiot s Guide to Project

More information

Scheduling Fundamentals, Techniques, Optimization Emanuele Della Valle, Lecturer: Dario Cerizza http://emanueledellavalle.org

Scheduling Fundamentals, Techniques, Optimization Emanuele Della Valle, Lecturer: Dario Cerizza http://emanueledellavalle.org Planning and Managing Software Projects 2011-12 Class 9 Scheduling Fundamentals, Techniques, Optimization Emanuele Della Valle, Lecturer: Dario Cerizza http://emanueledellavalle.org Credits 2 This slides

More information

Chapter 2: Project Time Management

Chapter 2: Project Time Management Chapter 2: Project Time Management Learning Objectives o o o o Understand the importance of project schedules and good project time management. Define activities as the basis for developing project schedules.

More information

Develop Project Charter. Develop Project Management Plan

Develop Project Charter. Develop Project Management Plan Develop Charter Develop Charter is the process of developing documentation that formally authorizes a project or a phase. The documentation includes initial requirements that satisfy stakeholder needs

More information

Egypt Scholars Presented by Mohamed Khalifa Hassan Jan 2014

Egypt Scholars Presented by Mohamed Khalifa Hassan Jan 2014 Project Management Six Session Egypt Scholars Presented by Mohamed Khalifa Hassan Jan 2014 Mohamed Khalifa, 2014 All Rights 1 7. Scheduling 2 7. Scheduling 7.1 Scheduling techniques 7.3 Critical path method

More information

Learning Objectives. Learning Objectives (continued) Importance of Project Schedules

Learning Objectives. Learning Objectives (continued) Importance of Project Schedules Chapter 6: Project Time Management Information Technology Project Management, Fifth Edition Learning Objectives Understand the importance of project schedules and good project time management Define activities

More information

Project Time Management

Project Time Management Project Time Management By Augsburg College 1 Learning Objectives Understand the importance of project schedules and good project time management Define activities as the basis for developing project schedules

More information

Chapter 4: Project Time Management

Chapter 4: Project Time Management Chapter 4: Project Time Management Importance of Project Schedules Managers often cite delivering projects on time as one of their biggest challenges Time has the least amount of flexibility; it passes

More information

Time Management. Part 5 Schedule Development. Richard Boser

Time Management. Part 5 Schedule Development. Richard Boser Time Management Part 5 Schedule Development Richard Boser 6.5 Schedule Development Inputs Organizational Process Assets Scope Statement Activity List Activity Attributes Network Diagrams Resource Req ms

More information

PMP Exam Preparation Answer Key

PMP Exam Preparation Answer Key Chapter 2 Answers 1) d) They are all of equal importance unless otherwise stated The Triple Constraint of Project Management is that Scope, Time, and Cost are all equal unless otherwise defined as such.

More information

Lecture 6: Project Time Management By: Prof. Lili Saghafi. Information Technology Project Management, Fifth Edition

Lecture 6: Project Time Management By: Prof. Lili Saghafi. Information Technology Project Management, Fifth Edition Lecture 6: Project Time Management By: Prof. Lili Saghafi Information Technology Project Management, Fifth Edition Learning Objectives 2 Understand the importance of project schedules and good project

More information

pm4dev, 2015 management for development series Project Schedule Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS

pm4dev, 2015 management for development series Project Schedule Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS pm4dev, 2015 management for development series Project Schedule Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS A methodology to manage development

More information

Goals of the Unit. spm - 2014 adolfo villafiorita - introduction to software project management

Goals of the Unit. spm - 2014 adolfo villafiorita - introduction to software project management Project Scheduling Goals of the Unit Making the WBS into a schedule Understanding dependencies between activities Learning the Critical Path technique Learning how to level resources!2 Initiate Plan Execute

More information

Introduction to Project Management

Introduction to Project Management Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George 2008 Prentice Hall 6-1 What is Project

More information

Chapter 6: Project Time Management

Chapter 6: Project Time Management CIS 486 Managing Information Systems Projects Fall 2003 (Chapter 6), PhD jwoo5@calstatela.edu California State University, LA Computer and Information System Department Chapter 6: Project Time Management

More information

8. Project Time Management

8. Project Time Management 8. Project Time Management Project Time Management closely coordinated Two basic approaches -bottom-up (analytical) -top-down (expert judgement) Processes required to ensure timely completion of the project

More information

Project Management Process. Prepared by Jay Knape

Project Management Process. Prepared by Jay Knape Project Management Process Prepared by Jay Knape PMI Project Project is... temporary endeavor undertaken to produce a unique products, service or result. UITS Project Definition For Columbus State University

More information

www.pmworldjournal.net Featured Paper Satya Narayan Dash By Satya Narayan Dash, PMP, CSM, MCP

www.pmworldjournal.net Featured Paper Satya Narayan Dash By Satya Narayan Dash, PMP, CSM, MCP PMBOK Guide 5 th Edition and MS Project 2010: A Practical Step-by-Step Approach 1. Abstract By Satya Narayan Dash, PMP, CSM, MCP Project Management Body of Knowledge (PMBOK) Guide, from PMI, comes with

More information

Scheduling. Anne Banks Pidduck Adapted from John Musser

Scheduling. Anne Banks Pidduck Adapted from John Musser Scheduling Anne Banks Pidduck Adapted from John Musser 1 Today Network Fundamentals Gantt Charts PERT/CPM Techniques 2 WBS Types: Process, product, hybrid Formats: Outline or graphical organization chart

More information

Project Time Management Activity Definition Activity Sequencing Duration Estimating Schedule Development Schedule Control

Project Time Management Activity Definition Activity Sequencing Duration Estimating Schedule Development Schedule Control Project Time Management Activity Definition Activity Sequencing Duration Estimating Schedule Development Schedule Control Activity Definition Input Work Breakdown Structure Scope Statement Historical Information

More information

WORK PROGRAM GUIDELINES

WORK PROGRAM GUIDELINES Project Managed Change Program WORK PROGRAM GUIDELINES JABATAN KERJA RAYA MALAYSIA Cawangan Pengurusan Projek Kompleks (PROKOM) Ibu Pejabat JKR Malaysia 2 Document Ownership Section No Section Amendment

More information

Unit 5: Cost Management (PMBOK Guide, Chapter 7)

Unit 5: Cost Management (PMBOK Guide, Chapter 7) (PMBOK Guide, Chapter 7) The questions on this topic have historically been more difficult than average for some exam takers because of unfamiliarity with some of the math. You will be responsible for

More information

PROJECT TIME MANAGEMENT

PROJECT TIME MANAGEMENT PROJECT TIME MANAGEMENT http://www.tutorialspoint.com/pmp-exams/project_time_management.htm Copyright tutorialspoint.com Here is a list of sample questions which would help you to understand the pattern

More information

added to the task, using Project, it will automatically calculate the schedule each time a new resource is added.

added to the task, using Project, it will automatically calculate the schedule each time a new resource is added. Chapter 3 Effort Driven Task Type By now, you will be getting sick of my repetition of the effort driven formula: Resource Units X Duration = Work I make no apologies, as it needs to be engraved in the

More information

Module 3: The Project Planning Stage

Module 3: The Project Planning Stage Overview Once you've initiated the project and gathered all relevant information, you'll then begin planning your project. The planning stage depends on the size of your project, how much information you

More information

PMI Lexicon of Project Management Terms

PMI Lexicon of Project Management Terms Project Management Institute PMI Lexicon of Project Management Terms Version 3.0 Published by: Project Management Institute, Inc. 14 Campus Boulevard Newtown Square, Pennsylvania 19073-3299 USA Phone:

More information

Project Planning and Scheduling

Project Planning and Scheduling Project Planning and Scheduling MFS606 Project Planning Preliminary Coordination Detailed Task Description Objectives Budgeting Scheduling Project Status Monitoring When, What, Who Project Termination

More information

State of Michigan (SOM) August 2013. Department of Technology, Management & Budget

State of Michigan (SOM) August 2013. Department of Technology, Management & Budget State of Michigan (SOM) PROJECT MANAGEMENT KEY TERMS, DEFINITIONS AND ACRONYMS August 2013 Department of Technology, Management & Budget Table of Contents Table of Contents Key Terms, Definitions, and

More information

Software Project Management I

Software Project Management I Software Project Management I Dr. Jong Yih Kuo Dr. Chien-Hung Liu Computer Science and Information Engineering National Taipei University of Technology Course Schedule Time Topic Document 18:10~18:55 (45

More information

CPM-200: Principles of Schedule Management

CPM-200: Principles of Schedule Management CPM-: Principles of Schedule Management Lesson B: Critical Path Scheduling Techniques Instructor Jim Wrisley IPM Fall Conference PMI-College of Performance Management Professional Education Program Copyright

More information

Project Cost Management

Project Cost Management Project Cost Management Study Notes PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. Points To Note Please

More information

Project Management Institute (PMBOK 2000) PMP Preparation Worksheet

Project Management Institute (PMBOK 2000) PMP Preparation Worksheet Project Integration Management Processes required to ensure that the various elements of the project are properly coordinated to meet / exceed stakeholder expectations. Project Plan Development Other ning

More information

Project Time Management

Project Time Management Project Skills Team FME www.free-management-ebooks.com ISBN 978-1-62620-981-3 Copyright Notice www.free-management-ebooks.com 2014. All Rights Reserved ISBN 978-1-62620-981-3 The material contained within

More information

SYSTEMS ANALYSIS AND DESIGN DO NOT COPY

SYSTEMS ANALYSIS AND DESIGN DO NOT COPY Systems Analysis and Design in a Changing World, Fourth Edition -488-6-5 Copyright 7 Thomson Course Technology. All rights reserved. FOURTH EDITION SYSTEMS ANALYSIS AND DESIGN IN A C HANGING W ORLD John

More information

Information Technology Project Management

Information Technology Project Management Information Technology Project Management by Jack T. Marchewka Power Point Slides by Jack T. Marchewka, Northern Illinois University Copyright 2006 John Wiley & Sons, Inc. all rights reserved. Reproduction

More information

Metadata-Based Project Management System. A Case Study at M-Files Corporation. Iulia Adomnita

Metadata-Based Project Management System. A Case Study at M-Files Corporation. Iulia Adomnita Metadata-Based Project Management System. A Case Study at M-Files Corporation Iulia Adomnita University of Tampere School of Information Sciences Computer Science M.Sc. Thesis Supervisors: Timo Poranen,

More information

Object-Oriented Analysis. with the Unified Process. John W. Satzinger Southwest Missouri State University. Robert B. Jackson Brigham Young University

Object-Oriented Analysis. with the Unified Process. John W. Satzinger Southwest Missouri State University. Robert B. Jackson Brigham Young University Object-Oriented Analysis and Design with the Unified Process John W. Satzinger Southwest Missouri State University Robert B. Jackson Brigham Young University Stephen D. Burd University of New Mexico ALL

More information

Test Fragen + Antworten. October 2004 Project Management Wilhelm F. Neuhäuser IBM Corporation 2003

Test Fragen + Antworten. October 2004 Project Management Wilhelm F. Neuhäuser IBM Corporation 2003 Test Fragen + Antworten October 2004 Project Management Wilhelm F. Neuhäuser IBM Corporation 2003 Question 1 All the following Statements about a WBS are true except that it a. Provides a framework for

More information

Project Management Using Earned Value

Project Management Using Earned Value Project Management Using Earned Value Third Edition Gary C. Humphreys Earned Value Management Consulting Training 2002, 2011, 2014 Gary C. Humphreys Humphreys & Associates, Inc. All rights reserved. No

More information

Introduction to Project Management

Introduction to Project Management L E S S O N 1 Introduction to Project Management Suggested lesson time 50-60 minutes Lesson objectives To be able to identify the steps involved in project planning, you will: a b c Plan a project. You

More information

Quick Reference Guide Interactive PDF Project Management Processes for a Project

Quick Reference Guide Interactive PDF Project Management Processes for a Project Project Processes for a Project Click the Knowledge Area title (below and left in blue underline) to view the details of each Process Group. Project Process Groups and Knowledge Areas Mapping Project Process

More information

PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >

PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > Date of Issue: < date > Document Revision #: < version # > Project Manager: < name > Project Management Plan < Insert Project Name > Revision History Name

More information

The 10 Knowledge Areas & ITTOs

The 10 Knowledge Areas & ITTOs This document is part of a series that explain the newly released PMBOK 5th edition. These documents provide simple explanation and summary of the book. However they do not replace the necessity of reading

More information

Network Diagram Critical Path Method Programme Evaluation and Review Technique and Reducing Project Duration

Network Diagram Critical Path Method Programme Evaluation and Review Technique and Reducing Project Duration Network Diagram Critical Path Method Programme Evaluation and Review Technique and Reducing Project Duration Prof. M. Rammohan Rao Former Dean Professor Emeritus Executive Director, Centre for Analytical

More information

Managing the Project Schedule

Managing the Project Schedule Managing the Project Schedule Project Skills Paul Newton www.free-management-ebooks.com ISBN 978-1-62620-981-3 Copyright Notice www.free-management-ebooks.com 2015. All Rights Reserved ISBN 978-1-62620-981-3

More information

Making project management indispensable for business results. Project Management 101

Making project management indispensable for business results. Project Management 101 Making project management indispensable for business results. Project Management 101 Donald E. Moore, MBA, PMP, President of PMI NB Kelly Barter, Chapter Manager of PMI NB AGM April 28, 2011 Topics of

More information

Precedence Diagram Method. CSTM 462 Planning & Scheduling

Precedence Diagram Method. CSTM 462 Planning & Scheduling Precedence Diagram Method CSTM 462 Planning & Scheduling Precedence Diagramming Method (PDM) PDM is more flexible than AON or AOA networks because PDM allows the overlapping of concurrent activities.

More information

Synergy between PMBOK and MS Project 2007 A Schedule Management Perspective

Synergy between PMBOK and MS Project 2007 A Schedule Management Perspective 1. Abstract PM WORLD TODAY FEATURED PAPER MARCH 2009 Synergy between PMBOK and MS Project 2007 A Schedule Management Perspective By Satya Narayan Dash, PMP, MCP and Uttam Kumar Singh, PMP, PAHM MS Project

More information

Chapter 3 Managing the Information Systems (IS) Project

Chapter 3 Managing the Information Systems (IS) Project Content Chapter 3 Managing the Information Systems (IS) Project Process of managing IS projects Skills required to be an effective project manager Skills and activities of a project manager during project

More information

SWEN 256 Software Process & Project Management

SWEN 256 Software Process & Project Management SWEN 256 Software Process & Project Management Plan: Identify activities. No specific start and end dates. Estimating: Determining the size & duration of activities. Schedule: Adds specific start and end

More information

Systems Analysis and Design

Systems Analysis and Design Systems Analysis and Design Slides adapted from Jeffrey A. Hoffer, University of Dayton Joey F. George, Florida State University Joseph S. Valacich, Washington State University Modern Systems Analysis

More information

output: communications management plan

output: communications management plan Q1. (50 MARKS) A. List the nine PMBOK knowledge areas and give a one sentence description of the purpose of each knowledge area along with at least one output (document etc.) and its purpose. 1.Project

More information

CPM -100: Principles of Project Management

CPM -100: Principles of Project Management CPM -100: Principles of Project Management Lesson B: Time and Cost Management Presented by Bruce R. Shaw, P.E., PMP starshaw@starpower.net Ph: 703-922-2772 Presented at the PMI-CPM 2002 Fall Conference

More information

PROJECT COST MANAGEMENT

PROJECT COST MANAGEMENT 7 PROJECT COST MANAGEMENT Project Cost Management includes the processes required to ensure that the project is completed within the approved budget. Figure 7 1 provides an overview of the following major

More information

IMCPM04 Project Scheduling and Cost Control. Course Outline

IMCPM04 Project Scheduling and Cost Control. Course Outline IMCPM04 Project Scheduling and Cost Control Course Outline January 2012 Project Scheduling and Cost Control Course Aim Project Scheduling and Cost Control is a five-day (5 day) course which provides participants

More information

Test Fragen. October 2003 Project Management Wilhelm F. Neuhäuser IBM Corporation 2003

Test Fragen. October 2003 Project Management Wilhelm F. Neuhäuser IBM Corporation 2003 Test Fragen October 2003 Project Management Wilhelm F. Neuhäuser IBM Corporation 2003 Question 7 Which term describes a modification of a logical relationship that delays a successor task? a. Lag b. Lead

More information

Integration Mgmt / Initiating Process Group 4.1 Develop Project Charter

Integration Mgmt / Initiating Process Group 4.1 Develop Project Charter 1 Mgmt / Initiating Process Group 4.1 Develop Project Charter Project statement of work Business case Agreements Facilitation techniques Project charter 26/02/2013 18:23:36 1 2 Mgmt / Planning Process

More information

Basic Schedule Analysis

Basic Schedule Analysis Basic Schedule Analysis Topics Why are Schedules Important Scheduling Basics Attributes of a Valid Schedule Scheduling Best Practices Basic Schedule Analysis Tools and Techniques Sources: NASA Schedule

More information

ONLINE SUPPLEMENTAL BAPPENDIX PROJECT SCHEDULES WITH PERT/CPM CHARTS

ONLINE SUPPLEMENTAL BAPPENDIX PROJECT SCHEDULES WITH PERT/CPM CHARTS ONLINE SUPPLEMENTAL BAPPENDIX PROJECT SCHEDULES WITH PERT/CPM CHARTS Chapter 3 of Systems Analysis and Design in a Changing World explains the techniques and steps required to build a project schedule

More information

Mastering Microsoft Project 2010

Mastering Microsoft Project 2010 Mastering Microsoft Project 2010 Duration: 2 days Course Description This two-day instructor-led course provides students with the knowledge and skills to plan and manage projects using Microsoft Project

More information

Input, Output and Tools of all Processes

Input, Output and Tools of all Processes 1 CIS12-3 IT Project Management Input, Output and Tools of all Processes Marc Conrad D104 (Park Square Building) Marc.Conrad@luton.ac.uk 26/02/2013 18:22:06 Marc Conrad - University of Luton 1 2 Mgmt /

More information

PMI PMBOK & ESTIMATING PMI PMBOK & ESTIMATING PMI PMBOK & ESTIMATING PMI PMBOK & ESTIMATING PMI PMBOK & ESTIMATING PMI PMBOK & ESTIMATING

PMI PMBOK & ESTIMATING PMI PMBOK & ESTIMATING PMI PMBOK & ESTIMATING PMI PMBOK & ESTIMATING PMI PMBOK & ESTIMATING PMI PMBOK & ESTIMATING PMI PMBOK & ESTIMATING PMI PMBOK & ESTIMATING PMI PMBOK & ESTIMATING PMI PMBOK & ESTIMATING PMI PMBOK & ESTIMATING PMI PMBOK & ESTIMATING 03-23-05 Christine Green, PMI PMBOK and Estimating EDS, Delivery

More information

THE PROJECT MANAGEMENT KNOWLEDGE AREAS

THE PROJECT MANAGEMENT KNOWLEDGE AREAS THE PROJECT MANAGEMENT KNOWLEDGE AREAS 4. Project Integration Management 5. Project Scope Management 6. Project Time Management 7. Project Cost Management 8. Project Quality Management 9. Project Human

More information

Introduction. http://www.alexsbrown.com/ Page 1

Introduction. http://www.alexsbrown.com/ Page 1 Modeling Tough Scheduling Problems with Project Management Software Alex S. Brown, PMP, Strategic Planning Manager, Mitsui Sumitomo Marine Management (U.S.A.), Inc. Introduction Despite year-over-year

More information

Expert Reference Series of White Papers. Importance of Schedule and Cost Control

Expert Reference Series of White Papers. Importance of Schedule and Cost Control Expert Reference Series of White Papers Importance of Schedule and Cost Control 1-800-COURSES www.globalknowledge.com Importance of Schedule and Cost Control Bill Scott, PE, PMP, PgMP Outline I. Project

More information

CSC 443: IT Project Management Midterm 1 exam - Spring semester 2011-2012 March 21 st, 2012

CSC 443: IT Project Management Midterm 1 exam - Spring semester 2011-2012 March 21 st, 2012 King Saud University College of Computer & Information Sciences Department of Computer Science CSC 443: IT Project Management Midterm 1 exam - Spring semester 2011-2012 March 21 st, 2012 1- Decomposing

More information

Administration. Welcome to the Eastwood Harris Pty Ltd MICROSOFT PROJECT 2010 AND PMBOK GUIDE FOURTH EDITION training course presented by

Administration. Welcome to the Eastwood Harris Pty Ltd MICROSOFT PROJECT 2010 AND PMBOK GUIDE FOURTH EDITION training course presented by Welcome to the Eastwood Harris Pty Ltd MICROSOFT PROJECT 2010 AND PMBOK GUIDE FOURTH EDITION training course presented by Paul E Harris Administration Evacuation Timings, meals and facilities Mobile phones

More information

SE351a: Software Project & Process Management

SE351a: Software Project & Process Management SE351a: Software Project & Process Management W8: Software Project Planning 22 Nov., 2005 SE351a, ECE UWO, (c) Hamada Ghenniwa SE351 Roadmap Introduction to Software Project Management Project Management

More information

Project Management Concepts

Project Management Concepts Project Management Concepts Day Workshop Course PM12 PM12 - Project Management Concepts Course ID: PM12 Credits: 21 PDUs Course Duration: 3 days Course Level: Basic 3 Days 21 PDUs Course Description: In

More information

DESCRIPTION OF KNOWLEDGE, LITERATURE REVIEW AND INDUSTRY PRACTICES

DESCRIPTION OF KNOWLEDGE, LITERATURE REVIEW AND INDUSTRY PRACTICES CHAPTER 2 DESCRIPTION OF KNOWLEDGE, LITERATURE REVIEW AND INDUSTRY PRACTICES This Chapter first presents the summary of Project Management analyzing it in context of HR Management. Then it presents HR

More information

Project Integration Management

Project Integration Management Integration Initiating ning Executing Monitoring & Controlling Closing 4.1 Develop Charter Statement Of Work Business Case 4.2 Develop 4.3 Direct and Manage Work 4.4 Monitor and Control Work 4.5 Perform

More information

NE-50413B Mastering Microsoft Project 2010

NE-50413B Mastering Microsoft Project 2010 NE-50413B Mastering Microsoft Project 2010 Summary Duration Vendor 3 Days Microsoft Audience This course is intended for both novice and experienced Project Managers and project support personnel who need

More information

Knowledge Area Inputs, Tools, and Outputs. Knowledge area Process group/process Inputs Tools Outputs

Knowledge Area Inputs, Tools, and Outputs. Knowledge area Process group/process Inputs Tools Outputs HUMAN RESOURCE MANAGEMENT Organizational planning Staff Acquisition Project interfaces such as organizational interfaces, technical interfaces and interpersonal interfaces. Staffing requirements Staffing

More information

CRITICAL PATH METHOD (CPM) SCHEDULES

CRITICAL PATH METHOD (CPM) SCHEDULES 96 CRITICAL PATH METHOD (CPM) SCHEDULES How-to for Reading, Understanding, and Using CPM Schedules (without Direct Primavera Access.) 1 Objectives Learn to read, understand, and use CPM schedules (without

More information

Basic CPM Calculations

Basic CPM Calculations Overview Core Scheduling Papers: #7 Basic CPM Calculations Time Analysis calculations in a Precedence Diagramming Method (PDM) Critical Path Method (CPM) network can be done in a number of different ways.

More information

Certificate In Project Management (CIPM)

Certificate In Project Management (CIPM) Conceptualize Plan Plan & Deliver Organize Implement Control Change if Required Integrate Deliver & Closeout Knowledge Leverage Certificate In Project Management (CIPM) Course Overview The Certificate

More information

Project Management Certificate (IT Professionals)

Project Management Certificate (IT Professionals) Project Management Certificate (IT Professionals) Whether your field is architecture or information technology, successful planning involves a carefully crafted set of steps to planned and measurable goals.

More information

Module 11. Software Project Planning. Version 2 CSE IIT, Kharagpur

Module 11. Software Project Planning. Version 2 CSE IIT, Kharagpur Module 11 Software Project Planning Lesson 29 Staffing Level Estimation and Scheduling Specific Instructional Objectives At the end of this lesson the student would be able to: Identify why careful planning

More information

Is Your Schedule Correct? Common Scheduling Mistakes and How to Avoid Them

Is Your Schedule Correct? Common Scheduling Mistakes and How to Avoid Them Sponsored by Is Your Schedule Correct? Common Scheduling Mistakes and How to Avoid Them Joseph A. Lukas PMP, CSM, CCP, PE White Paper 1-888-762-3683 www.pmcentersusa.com Joe Lukas & PM Centers USA, LLC

More information

Mastering Microsoft Project 2010 50413B; 3 days, Instructor-led

Mastering Microsoft Project 2010 50413B; 3 days, Instructor-led Mastering Microsoft Project 2010 50413B; 3 days, Instructor-led Course Description This three-day instructor-led course provides students with the knowledge and skills plan and manage projects using Microsoft

More information