Economic Viability Assessment of Active Building Envelope Systems

Size: px
Start display at page:

Download "Economic Viability Assessment of Active Building Envelope Systems"

Transcription

1 Economic Viability Assessment of Active Building Envelope Systems Flor Rivas Achille Messac Steven Van Dessel Corresponding Author Achille Messac, Ph.D. Distinguished Professor and Department Chair Mechanical and Aerospace Engineering Syracuse University, 263 Link Hall Syracuse, New York 13244, USA Tel: (315) Fax: (315) Bibliographical Information Rivas, F., Khire, R. A., Messac, A., and Van Dessel, S., Economic Viability Assessment of Active Building Envelope Systems, 1st AIAA Multidisciplinary Design Optimization Specialist Conference, Paper No. AIAA , Austin, Texas, April 18-21, 2005.

2 Economic Viability Assessment of Active Building Envelope Systems Flor Rivas, Ritesh A. Khire, Achille Messac, and Steven Van Dessel, Rensselaer Polytechnic Institute, Troy, NY 12180, U.S.A. Active Building Envelope (ABE) systems represent a new thermal control technology that actively uses solar energy to compensate for passive heat losses or gains in buildings or other enclosures. As a result, these systems are expected to eliminate the need to supply electricity to operate conventional air-conditioning systems and/or non-renewable energy sources to thermally condition buildings or other enclosures. This paper presents new findings pertinent to the development of ABE systems. Specifically, in this paper, we investigate the economic viability of ABE systems. A preliminary cost model of the ABE system is developed that combines individual cost models of its components. Different configurations of ABE systems, each comprising different heat absorbing component, are examined. The configuration that requires the least power unfortunately also results in the highest cost. A multi-objective optimization tool is used to resolve the trade-off between the power and the cost of ABE systems. Based on these optimization results, direction for future work is suggested. This paper represents an important step forward in obtaining a cost-effective ABE system that will provide an attractive alternative to current approaches. I. Introduction The built environment accounts for a significant fraction of the global energy consumption. A large fraction of this energy consumption is used to maintain a comfortable thermal indoor environment. This energy consumption comes in the form of use of electrical energy to operate conventional air-conditioning systems or that of non-renewable fossil fuels (such as coal, oil, and gas) for heating. Active building Envelop (ABE) systems represent a new technology that proposes to actively use solar energy to compensate for passive heat losses or gains in buildings or other enclosures. In ABE systems, solar radiation energy is converted into electrical energy by means of a photovoltaic unit (PV unit). Subsequently, this electrical energy is used to power a thermoelectric heat pump unit (TE unit), which is a collection of thermoelectric Masters Student, Department of Mechanical Engineering. PhD Candidate, Department of Mechanical Engineering, and AIAA student member. Professor, Department of Mechanical Engineering, and AIAA Fellow. Assistant Professor, School of Architecture. 1 of 17

3 coolers (heaters in winter). Among the key differences between ABE systems and conventional thermal control technologies are that the formers: (i) are intended to operate using solar energy, 1 (ii) are made of solid state devices and operate silently with no moving parts, (iii) use little or no fossil energy sources, and (iv) should result in important long-term environmental benefits. In this paper, we assess the economic viability of ABE systems using preliminary cost and engineering models of its components. A. Active Building Envelopes A brief description of the proposed ABE system is provided here (see Fig. 1). For more details, see. 1 As shown in Fig. 1, the ABE system is comprised of two basic components, a photovoltaic unit (PV unit) and a thermoelectric heat pump unit (TE unit). The PV unit converts solar radiation energy into electrical energy. The TE unit converts electrical energy into thermal energy, or the reverse. Both the PV and the TE units are integrated within the overall ABE enclosure. The TE unit can operate in a heating or a cooling mode, depending on the direction of the current. This feature allows for Thermoelectric Cooler Internal Heat Sink Thermal Mass Thermal Insulation External Heat Sink Air Flow Heat Dissipation Zone Photovoltaic System Figure 1. Active Building Envelope (ABE) system the ABE system to be used for heating as well as cooling applications. The PV unit forms an envelope surrounding the external wall such that a gap is maintained between the wall and the PV unit. This gap acts as an external heat dissipation zone for the TE unit (see Fig. 1). The external walls of the proposed ABE system consist of two layers. The external layer (facing the PV unit) is made of a good thermal insulating material, and the internal layer is made of a material with high heat storage capacity. In Fig. 1, the words Thermal Insulation and Thermal Mass pertain to the external and the internal layers of the ABE wall, respectively. TE coolers are dispersed inside the openings provided in the insulating layer. Each TE cooler consists of two heat sinks. The internal heat sink either absorbs or dissipates heat to the thermal mass layer. The external heat sink either absorbs heat from, or dissipates heat to, the surrounding air; through natural or forced convection. In the present study, we have neglected the internal heat sink in keeping with the scope of this preliminary study. B. Economically Viable ABE systems System design is a multifaceted process that involves taking into account important system features, such as the engineering feasibility and the economic viability of that system. Engineering feasibility is essential to ensure proper functioning of any system. In the current paper, we use an approximate analytical model of a TE cooler that takes into account the effect of a heat sink, to assess the engineering feasibility of ABE systems. The use of this computationally inexpensive approximate model is appropriate in keeping with the scope of this preliminary study. 2 of 17

4 Economic viability assessment of a system plays a key role in the design process. The cost of a specific system may govern the decision of an engineer, between alternate feasible designs. To assess the economic viability of ABE systems, we develop individual cost models of its components. These individual cost models are then combined to develop an overall cost model used to assess the economic viability of ABE systems. The input power for the TE unit and the cost of the ABE system are the two design objectives that we want to optimize simultaneously. Our preliminary investigation suggests that a tradeoff exists between these two design objectives. We use the multi-objective optimization tool to resolve the tradeoff between the two objectives of ABE systems (power and cost). This paper is organized as follows. Section II presents the overview of the study performed in this paper. Section III develops the approximate analytical models of the TE cooler and heat sink used to assess the engineering feasibility of ABE systems. Section IV develops the cost models for ABE systems. Section V presents the multi-objective optimization problem formulation used to design an appropriate ABE system configuration. Section VI presents the results of numerical optimization. In section VII we compare the ABE systems to conventional air-conditioning systems. Section VIII provides concluding remarks. II. Economic Viability Assessment of ABE systems In this section, we provide an overview of the economic viability assessment study of ABE systems, presented in this paper. Figure 2 depicts a flow chart that describes various models and the decision making tool used in this study. This assessment work involves three main aspects: the development of engineering models, the development of cost models, and the application of the multi-objective optimization tool. Design variables and parameters Engineering model Cost model TE unit TE cooler House Insulation TE cooler Solar cell Heat sink Heat sink Insulation Multi-objective optimization Optimal design Engineering Model Figure 2. Flow chart: overview As shown in Fig. 2, the engineering models of the TE unit and the house (for which the ABE system is designed) are combined to model the operation of ABE systems. The model of the TE unit includes the TE cooler model and the heat sink model. These two models are combined so as to allow the effect of the thermal resistance of the heat sink on the performance of the TE cooler to be considered. 1 The TE unit model is evaluated for the amount of heat load estimated from a preliminary house model considered in this paper (see Sec. III-D). 3 of 17

5 Cost Model In this paper, we develop individual cost models for the four main components of ABE systems that dictate it s fixed cost: TE cooler, heat sink, wall insulation, and solar cell. We note that in the current paper, we have not explicitly modeled the PV unit. Instead, we use the power required to operate the TE unit (which is supplied by the PV unit) to estimate the cost of PV unit (solar cells). We use the cost data available in product catalogs of these components to develop these models. These individual models are combined into an overall cost model that estimates the fixed cost of our ABE system. Multi-objective Optimization We use the cost of the ABE system and the input power required to operate the TE unit as the two design objectives that we minimize. Our preliminary investigation suggests that a trade-off exists between the two design objectives. That is, the cost of the ABE system increases as the input power decreases, and viceversa. We formulate a multi-objective optimization problem to simultaneously minimize these two conflicting objectives. The input power required to operate the TE unit is obtained from the engineering model, and the cost is obtained from the cost model. Different configurations of the ABE system are evaluated using the multi-objective optimization technique, details of which are provided in Sec. IV-A. III. Engineering Models This section develops computationally inexpensive models of the TE unit and the house. The model of the TE unit is composed of that of it s individual components. The individual component models are coupled, yielding a single integrated model that takes into account the effect of the heat sink on the TE cooler. This model is used to assess the engineering feasibility of the ABE system for the heat load estimated by the model of the house. A. Thermoelectric cooler Hot Junction Cold Junction Heat Absorbed (Q pc, T c ) Material 1 Material 2 L I Heat Released (Q ph, T h ) As shown in Fig. 3, when a current flows through the junction of V two dissimilar conductors (also called a thermocouple), heat is either liberated or absorbed (depending on the direction of the current) at that junction. This phenomenon is known as the Peltier effect; 2 4 Figure 3. Schematic of a thermocouple and it causes decrease in the temperature at the heat-absorbing junction, and in simultaneously increasing the temperature at the heat-releasing junction. When a current flows through a TE cooler, which contains n thermocouples, the amount of heat absorbed at the cold junction (Q pc ) is given by 5 7 Q pc = n[sit c K(T h T c ) 1 2 I2 R] (1) 4 of 17

6 where K = k 1A 1 L 1 + k 2A 2 L 2 (2) R = ρ 1L 1 A 1 + ρ 2L 2 A 2 (3) In Eqs. 1, 2, and 3, S is the relative Seebeck coefficient of the thermocouple; I is the input current flowing through the circuit; T c and T h are the temperatures of the cold and the hot junctions, respectively; K is the thermal conductance of the thermocouple; R is the electrical resistance of the thermocouple; k is the thermal conductivity; ρ is the electrical resistivity; and A and L represent the cross-sectional areas, and the lengths of the thermoelectric element, respectively. The subscripts 1 and 2 refer to the thermoelectric materials 1 and 2, respectively. B. Heat Sink Heat sinks lower or maintain the temperature of a device by dissipating heat into the surrounding medium. The primary requirement of an effective heat sink is to provide a low thermal resistance path for heat dissipation. In ABE systems, heat sinks are required to dissipate the heat generated at the hot side of the TE coolers, see Fig. 4. Failure to dissipate the required heat from the TE cooler may result in an increase in it s hot side temperature. The heat dissipated by a heat sink is given by 8 Q hs = T h T o R hs (4) TE cooler Figure 4. Ambient air, T o Heat sink Hot side, T h Schematic of a heat sink where Q hs is the heat dissipated by the heat sink, T h is the temperature of the heat source (in the ABE systems, the hot side of the TE cooler), T o is the ambient air temperature, and R hs is the thermal resistance of the heat sink. C. Estimating Effect of Heat Sink on TE Cooler As stated in the previous subsection, a heat sink is required to dissipate the heat generated at the hot side of the TE cooler. The heat generated at the hot side of the TE cooler (Q ph ) is given by 9 Q ph = Q pc + V I (5) Since the heat sink is required to dissipate this heat, we have Q hs = Q ph. Using Eqs. 4 and 5, we obtain the expression for the temperature at the hot side of the TE cooler as 9 T h = T o + (Q pc + V I)R hs (6) Substituting Eq. 6 into Eq. 1, to eliminate T h, we can determine the effect of a heat sink on a TE cooler; namely, the dependence of Q pc on R hs. 5 of 17

7 D. Estimating Heat Load for the House Figure 5 shows the schematic of the house used in this paper. We consider a 10 m wide 10 m long 3 m high house, with no windows or doors. We assume that conduction is the only mode of heat transfer for this house. Thus, the heat load for this house equals the 3 m 3 10 m 1 5 House 2 Conduction heat 4 amount of heat conducted through its four side walls and the roof. As shown in Fig. 5, surfaces 1 to 5 allows Ground 10 m conduction heat transfer. The amount of heat conducted through these surfaces is given by Fourier s law as Figure 5. Schematic of the house Q load = A(T o T i ) k t (7) where Q load is the heat load, A is the combined area of surfaces 1 to 5, T i is the inside temperature, k is the thermal conductivity of the wall insulation, and t is the thickness of the wall (we assume that all five surfaces have equal thickness). In the next section, we develop individual cost models for the components of the ABE system, and combine them into an overall cost model. IV. Cost Models The economic viability of any system is determined in part by its Life Cycle Cost (LCC), which includes 10, 11 the fixed cost (or the initial capital cost) and the recurring cost. The LCC is given as LCC = C F + C R (8) where C F is the fixed cost, and C R is the recurring cost. In conventional air-conditioning systems, the annual maintenance cost and the operating cost (electricity cost) are part of the recurring cost. In these systems, the wear and tear of the moving parts form a major fraction of the maintenance cost. Interestingly, ABE systems do not require external electricity nor do they have any moving parts. Hence, we expect that ABE systems will have low maintenance and operating costs. Based on this assumption, we consider only the fixed cost of the ABE system, in this paper. The fixed cost primarily consists of the fabrication cost and of the installation cost. In this paper, the fabrication cost includes the cost of: TE coolers, heat sinks, solar cells, and the volume of the wall insulation material. The installation cost primarily depends on the labor cost and the transportation cost. In keeping within the preliminary nature of this paper, we do not consider the installation cost. A. Development of Individual Cost Models First, we develop individual cost models for the ABE system components. We use the regression technique to develop these individual cost models. The cost data for these components is collected from product catalogs supplied by reputed manufacturers of these components of 17

8 Cost of a TE cooler, C TE ($) C TE = n n Regression model Manufacturers data Number of thermocouples per TE cooler Cost of heat sink C hs ($) C hs = R hs Regression model Manufacturers data Heat sink resistance ( o C/W) (a) CP1.0-n-08L type TE cooler (b) Extruded fin heat sink Figure 6. Cost models developed using regression technique 1. Cost models for TE coolers In this paper, we select the CP1.0-n-zzL and CP1.4-n-zzL classes of TE coolers manufactured by Melcor Corporation, USA. 15 Here, n represents the number of thermocouples per TE cooler, and zz is a two digit number assigned by the Melcor Corporation to represent the value of λ (the ratio of the cross-sectional area, A, to the length, L, of the thermoelectric element). From each of these two classes, we select three types of TE coolers. A total of 2 3 = 6 types of TE coolers are evaluated in this study. These six types of TE coolers and their corresponding λ values (in m) are given in the first two columns of Table 1. The cost of a TE cooler depends on the number of thermocouples (n) included in one TE cooler. 15 Based on the cost data, the cost models of the TE coolers take the general form C T E = a n 2 + b n + c (9) where C T E is the cost of one TE cooler in US dollars ($). The values of the coefficients a, b, and c for the six types of TE coolers are given in Table 1. To obtain the total cost incurred by all TE coolers used in the ABE system, we multiply Eq. 9 by the number of TE coolers (N). Fig. 6(a) shows the cost data and the cost model for CP L type of TE coolers. Table 1. TE cooler cost model coefficients λ a b c CP L CP L CP L CP CP CP of 17

9 2. Cost model for Heat Sinks We use the extruded fin type heat sink, supplied by Melcor Corporation, USA. 15 The cost of the heat sink depends on it s thermal resistance (R hs ). The cost model for the extruded fin type heat sink is given by C hs = (R hs ) (10) where C hs is the cost of one heat sink in US dollars ($). Figure 6(b) shows the cost data and the regression model for the extruded fin heat sink. To obtain the total cost for heat sinks, we multiply Eq. 10 by the number of heat sinks (N). Cost of solar panel, C sol ($) C sol = (P ) in 100 Regression model Manufacturers data Power developed by solar panel, P (W) (a) Solar cells in Cost of insulation m of wall area C ($) 2 ins Regression model Manufacturers data C ins = 8.447(k/t) ins o 4 Thermal Conductivity/thickness, (k/t) (W /C m ) (b) Fiber glass insulation ins Figure 7. Cost models developed using regression analysis 3. Cost model for Solar Cells Figure 7(a) shows the cost model for solar cells. In ABE systems, solar cells generate the power required to operate the TE unit. The cost of solar cells is assumed proportional to the electrical power that they are 13, 14 required to generate. The data for the solar cell cost model is gathered from different manufacturers. The cost model for solar cells is given by C sol = 3.391P in (11) where C sol is the cost of solar cells in US dollars ($), and P in is the power generated by solar cells in W. This is the input power required to operate the TE unit (see Sec. V-C). 4. Cost model for Insulation Figure 7(b) shows the cost model for the fiberglass insulation. The cost of the insulating material depends on the ratio of it s thermal conductivity to the thickness (k/t) ins. The cost of insulating materials increases as this ratio decreased. The cost model for the fiberglass insulation is given by C ins = 8.477(k/t) ins (12) 8 of 17

10 where C ins is the cost of insulation per m 2 of wall area in US dollars ($). To obtain the total cost of the insulating material used in the ABE system, C ins is multiplied by the area of the insulated walls (A). B. Fixed Cost Model of ABE Systems The fixed cost of the ABE system (C F ) is equal to the sum of the costs of the ABE components, given by C F = N C T E + N C HS + C sol + A C ins (13) This fixed cost model is used to assess the economic viability of ABE systems. V. Multi-objective Optimization Strategy In this section we discuss the multi-objective optimization strategy used to assess the economic viability of ABE systems. Using multi-objective optimization, we determine: the optimal ABE system design that compensates the estimated cooling load, and the fixed cost associated with this design. In this paper, we consider two design objectives: (1) the electrical power required to operate the TE unit, and (2) the fixed cost of the ABE system. Both of these objectives are minimized simultaneously using the Normalized Normal Constraint method. 16 The following subsections describe the design variables, the design constraints, and the design objectives for the optimization problem. A. Design Variables The present optimization problem involves five design variables: the number of TE coolers (N), the number of thermocouples per TE cooler (n), the input current (I), the thermal resistance of the heat sink (R hs ), and the ratio of the thermal conductivity to the thickness of the insulating material (k/t) ins. In this formulation, the number of TE coolers is not allowed to become less than one or more than The input current is not allowed to exceed the maximum allowable current (I max ), which is specified in the Melcor product catalog. 15 The upper and the lower bounds on the number of thermocouples per TE cooler, the thermal resistance of the heat sink, and the thermal conductivity of the insulating material are the same as those on the sampling data for these components (Figs. 6(a), 6(b), and 7(b), respectively). B. Design Constraints The total heat absorbed by all the TE coolers is used as an equality constraint in the optimization problem. Equation 1 determines the amount of heat absorbed by a single TE cooler (Q pc ). The total heat absorbed by all the TE coolers is calculated by multiplying the amount of heat absorbed by a single TE cooler by the number of TE coolers (N). During the optimization process, the total heat absorbed by all the TE coolers is constrained to equal the estimated cooling load (Q load ). The temperature of the hot side of the TE cooler (T h ) is used as the first inequality constraint in the optimization problem. Equation 6 evaluates the temperature of the hot side of the TE cooler. This 9 of 17

11 temperature is not allowed to exceed the maximum allowable temperature for the TE cooler (T max ), which is specified in the Melcor product catalog. 15 The input voltage (V ) applied to a single TE cooler is used as the second inequality constraint in the optimization problem. The input voltage for a single TE cooler is given by V = S(T h T c ) + IR (14) This input voltage is not allowed to exceed the maximum voltage (V max ), which is specified in the Melcor product catalog. 15 C. Design Objectives Input power: The input power (P in ) required to operate the TE unit is used as the first design objective, and is given by P in = N V I (15) In ABE systems, the TE unit is powered by the PV unit (solar cells). The PV unit only produces electrical energy during the part of the day when solar radiation is available. 17 As a result, there may be a need to store power for use at night and at peak power demand periods. Hence, minimizing the input power is central to the feasibility of this system. Fixed cost: The second design objective is the fixed cost of the ABE system (C F ), which is given by Eq. 13. An ABE system with an excessive cost may not present a viable economical alternative to the conventional air-conditioning systems. Hence, we minimize the fixed cost in our search for a cost-effective ABE system configuration. D. Optimization Problem Statement The optimization problem statement for designing the optimal configuration of the TE unit is as follows. min (P in, C F ) (16) N, n, I, R hs, (k/t) ins subject to NQ pc Q load 1 = 0 (17) V V max 1 0 (18) T h T max 1 0 (19) 1 N 10, 000 (20) 0.01 I I max (21) R hsmin R hs R hsmax (22) 10 of 17

12 n min n n max (23) ((k/t) ins ) min (k/t) ins ((k/t) ins ) max (24) In the next section, we discuss the results of numerical optimization. VI. Results and Discussion We evaluate six different configurations of the ABE system in this paper. Each configuration includes a different type of TE cooler, as shown in Table 1. First, we discuss the trade-off characteristics between the two design objectives: the input power and the fixed cost. Input Power, P in (kw) L 1 L 2 L 3 P 3 P 2 P 1 CP L CP L CP L Input Power, P in (kw) L 4 L 5 L 6 P 6 P 5 P 4 CP L CP L CP L 4 H 3 H 2 H 1 4 H 6 H 5 H Fixed cost in, C x 10 5 F ($) (a) Pareto Frontier of the CP-1.0 model Fixed cost, C x 10 5 F ($) (b) Pareto Frontier of the CP-1.4 model Figure 8. Pareto frontiers for different ABE system configurations A. Trade-off Between Fixed Cost and Input Power Figures 8(a) and 8(b) show the trade-off characteristics (also called the Pareto frontiers) between the input power and the fixed cost, for all of the ABE system configurations evaluated in this study. Pareto frontiers shown in Figs. 8(a) and 8(b) are for the configurations of the ABE system that use CP-1.0 and CP-1.4 class of TE coolers, respectively. From these Pareto frontiers, we observe that the fixed cost increases as the input power decreases. The points marked L, on Figs. 8(a) and 8(b), represent the case where the fixed cost is minimized alone, and those marked H represent the case where the input power is minimized alone. For the CP-1.0 class (Fig. 8(a)), we observe that when the fixed cost is minimized alone, the ABE configuration with CP L type of TE coolers results in the lowest cost. However, when the input power is minimized alone, all three configurations result in similar fixed costs. For the CP-1.4 class (Fig. 8(b)), the difference between the design objectives for the configurations with CP1.4-06L and CP L types of TE coolers is almost insignificant. We compare the performance of the six ABE system configurations at a point when the input power equals 5 kw. We note that this value of input power is selected purely for comparison purposes only. Details of the 11 of 17

13 Table 2. Comparison of different configurations of the ABE system at P in = 5 kw Notation TE cooler Fixed Insulation Heat Sink Thermocouples/ No. of TE I/p Current Type Cost (C F ) (k/t) ins R hs TE cooler (n) coolers (N) I U.S.$ W/C m 2 C/W Amp P 1 CP L 85, P 2 CP L 76, P 3 CP L 68, P 4 CP L 74, P 5 CP L 65, P 6 CP L 70, six design configurations at 5 kw are presented in Table 2. We observe that the ABE system configuration that uses the CP L type of TE coolers results in the lowest cost (Table 2-column 4) and is considered preferred among the six configurations evaluated in this study. However, it is important to note that the fixed cost of all of the design configurations is between $65,000 and $85,000. This appears to be a large investment for an air conditioning system. We note that for developing the cost models, we have used the cost data available in the product catalogs. The prices quoted in these catalogs are often for small quantities. The cost of the ABE system components is likely to decrease, when they are purchased in large quantities. This will result in lowering the fixed cost of ABE systems. However, the results reported in Table 2 lead to some interesting observations that may allow us to further reduce the cost of ABE systems. These observations are discussed in the following two subsections. B. Thermal conductivity of the insulation per unit thickness, (k/t) ins From the fourth column of Table 2, we observe that the optimal (k/t) ins value of the insulating material converges to 1.6 W/C m 2, for all of the ABE system configurations evaluated in this study. From Fig. 7(b), 1.6 W/C m 2 is the lower limit of the (k/t) ins values, for which the cost model is developed. We evaluate this behavior in detail. The multi-objective optimization problem attempts to find a balance between two competing objectives: the input power and the fixed cost of ABE systems. The cost of the insulation material increases as its thermal conductivity per unit thickness decreases, (Fig. 7(b)). For (k/t) ins = 1.6 W/C m 2, the cost of insulation is the highest. Interestingly, the optimization problem always converges to the lower limit of (k/t) ins. Although insulation materials with smaller (k/t) ins are more expensive, they reduce the heat load (Eq. 7). This behavior causes a decrease in the number of TE coolers (or the fixed cost) and in the input power. If we further reduce the (k/t) ins value of the insulating material, we can obtain a smaller heat load than that obtained by (k/t) ins = 1.6 W/C m 2. However, there would reach a point where the increase in the 12 of 17

14 insulation cost will overshadow the gains achieved through the smaller (k/t) ins value. Since (k/t) ins always converges to the lower limit, such a point has not been reached for the range of insulation materials evaluated in this study. Thus, we recommend the use of an insulating material with smaller (k/t) ins than the one used in this paper. C. Thermal resistance of the heat sink, (R hs ) From Fig. 6(b), a heat sink with high thermal resistance results in low cost. However, high thermal resistance also results in increased hot side temperature of the TE cooler (see Eq. 6). This increase in the hot side temperature increases the input power. However, from Table 2, the thermal resistance of the heat sink converges to 1.3 C/W, which is the upper limit for its cost model. Hence, the reduction in the cost related to using a heat sink with the highest thermal resistance is more significant than the corresponding increase in the input power. If we increase the heat dissipation capacity of the heat sinks, without significantly increasing its cost, an economically viable ABE system configuration can be designed. In this paper, we have considered heat sinks that dissipate heat through free convection. However, an external fan will be able to increase the heat dissipation capacity of the heat sinks. Since the external fan will add to the cost and the electrical power consumption, a detailed cost-based analysis will be required to select an appropriate fan. D. Number of TE coolers, (N) The number of TE coolers (which is also equal to that of the heat sinks) is one of the important factors in the design of ABE systems. To obtain a system with the lowest cost, the number of TE coolers should be minimized. However, an ABE system with the minimum number of TE coolers requires the highest input power. A viable approach to minimize both objectives, the input power and the fixed cost, is to make the heat transfer process efficient. In ABE systems, we can make the heat transfer process efficient by implementing the recommendations given in the previous two subsections. That is, we can reduce the heat load by using insulation materials with lower thermal conductivities, and improve the heat dissipation capacity of the heat sinks by incorporating a fan. From Table 2, the preferred ABE system configuration P 5 requires 2583 TE coolers of type CP E. Number of Thermocouples per TE cooler, (n) The number of thermocouples per TE cooler has a direct impact on the number TE coolers. The number of TE coolers (N) decreases as the number of thermocouples per TE cooler (n) increases. However, as discussed in the previous subsection, the ABE system configuration with the smallest number of TE coolers is not necessarily the optimal one, for the bi-objective optimization problem considered in this paper. We observe this behavior from the results shown in Table 2. For the six ABE configurations evaluated in this study, the number of thermocouples per TE cooler never converges to the upper limit of 254 thermocouples. (The lower 13 of 17

15 and upper limits for n are 7 and 254, respectively, see Fig. 6(a)). For the preferred ABE system configuration, P 5, the optimal design requires CP type of TE coolers, each containing 56 thermocouples. F. Input current (I) For the six ABE system configurations evaluated in this paper, the input current ranges from 0.68 Amp to 0.78 Amp. It may not be feasible for a single solar cell to produce this current at all times. In such cases, multiple solar cells connected in parallel can be used to generate the required input current. We note that, in the present paper, we have not used the input current as a design objective in keeping with the scope of this study. However, the input current may take significance, especially in the regions where ample sunlight is not available, as the current generated by the PV unit is proportional to the intensity of the incident solar radiation. 17 This ends the discussion of the results obtained from the numerical optimization. In the next section, we compare ABE and conventional air conditioning systems. VII. ABE and Conventional Air-conditioning system: Comparison Based on the results obtained from the numerical optimization, we mentioned in Sec. VI-A that ABE systems require a large initial investment. In this section, we compare the fixed cost of the ABE system with that of conventional air-conditioning systems. To determine the fixed cost of a conventional air conditioning system, we first determine its cooling load, which is discussed next. A. Cooling Load for Conventional System We estimate the cooling load for the same house described in Sec. III-D and shown in Fig. 5. Again, we assume that heat gain occurs through conduction only. To determine the cooling load, we use the American Society of Heating Refrigeration and Air-conditioning Engineers (ASHRAE) method. 18 The heat gain through the structure is calculated as Q = UA(CLT D) (25) where Q is the heat gain through the structure, U is the rate of heat transmission, and CLT D is the Cooling Load Temperature Difference for the applicable surface. Here, the rate of heat transmission is the reciprocal of the sum of all the individual thermal resistances of the structure. 19 Using the design temperatures for Albany, NY, listed in Ref, 18 we obtain the total heat load as W. Next, we select a conventional air-conditioning system for this heat load. B. Estimating the Cost of Conventional Air-conditioning System The smallest air-conditioning unit (in terms of heat load) commercially available is 1.5 Ton, which handles a heat load of approximately 5274 W. Considering the total heat gain obtained in the previous subsection, this value can be considered a good approximation for the conventional air-conditioning system (as several 14 of 17

16 heat adding factors are neglected in the evaluation). Thus, the fixed cost of the conventional system includes the cost of the 1.5 Ton air-conditioning unit and that of the insulation. Table 3 summarizes the fixed cost for the conventional system. The total fixed cost for a conventional air-conditioning system is approximately Table 3. Fixed cost of a conventional system Unit of measure Quantity $/Unit of measure $ Walls (Insulation) Area(m 2 ) Roof (Insulation) Area(m 2 ) Conventional heat pump Ton TOTAL $2100. C. Comparison of ABE versus Conventional System By comparing the fixed cost of the ABE system (Table 2) to that of the conventional system (Table 3), we observe that the former results in a extremely large fixed cost compared to the latter. Thus, based on the fixed cost comparison, the conventional system appears more attractive than the ABE system. However, we note that unlike conventional systems, ABE systems are expected to result in a lower operating cost, as discussed in Section IV. Thus, an accurate comparison of these two systems cannot be performed based on the fixed cost only. A Life Cycle Cost (LCC) analysis will be required in the future to compare these two systems in more detail. Also, ABE systems promise to offer significant environmental benefits, an important feature missing from the conventional systems. Other benefits such as reduction of toxic waste represent a noticeable advantage over conventional systems. In addition, ABE systems can potentially qualify for the federal and state governments special tax credits for using renewable sources of energy. Finally, the ongoing research in the field of solid state devices is expected to lower the costs of TE coolers and solar cells. Collectively, all these factors are expected to lower the cost of ABE systems, making them a cost-effective alternative to conventional system. D. Future Work Although the list of future work is extensive for ABE systems, we provide here few major items of importance. (1) Extend the range of the insulation cost model by incorporating insulations with lower thermal conductivity values. (2) Evaluate the effect of incorporating an external fan to improve the heat dissipation capacity of the heat sinks. (3) Refine the cost models: the cost modeling and estimating process is iterative and becomes more accurate as more information becomes available. (4) Perform Life cycle cost analysis of ABE systems. (5) Consider the environmental benefits of ABE systems. 15 of 17

17 VIII. Concluding Remarks In this paper, we have examined the economic viability of Active Building Envelope (ABE) systems. To do so, individual cost models of the components of the ABE system were developed. These individual cost models were combined into an overall cost model that estimates the fixed cost of ABE systems. To ensure the engineering feasibility of ABE systems, approximate analytical models of the TE cooler and heat sink were used. A multi-objective optimization strategy that simultaneously minimizes the input power and the fixed cost was used to evaluate different configurations of ABE systems. The results indicate that ABE systems require a large initial investment. However, it was noted that the cost of the ABE system can be significantly lowered by making the heat transfer process efficient. Two techniques were suggested to improve the efficiency of the heat transfer process without appreciably increasing the fixed cost: to use insulation material with lower conductivity, and to incorporate an external fan to dissipate heat from heat sinks. Finally, the ABE system was compared with the conventional airconditioning system. Although ABE systems result in a higher fixed cost, unlike conventional systems, they will have significantly less recurring cost. Also, ABE systems promise to offer important environmental benefits. A number of items for the future work were suggested. This paper represents the first step in developing cost-effective ABE systems. IX. Acknowledgement Support from the National Science Foundation, award numbers CMS and DMI , is gratefully acknowledged. References 1 Van Dessel, S., Messac, A., and Khire, R., Active Building Envelopes: A Preliminary Analysis, Asia International Renewable Energy Conference, Beijing, China, Apr Pollock, D. D., Thermocouples theory and practice, ISBN , CRC press Inc., Boca Raton, Florida 33431, U.S.A., Ioffe, A. F., Semiconductor and Thermoelements and Thermoelectric Cooling, Infosearch Limited, London, Rowe, D. M., CRC Handbook of Thermoelectrics, IEEE, CRC Press, July 1995, ISBN: Baird, J. R., Fletcher, D. F., and Haynes, B. S., Local condensation heat transfer rates in fine passages, International Journal of Heat and Mass Transfer, Vol. 46, No. 23, November 2003, pp Seifert, W., Ueltzen, M., and Muller, E., One-dimensional modeling of thermoelectric cooling, phys. stat. sol. (a), Vol. 194, No. 1, 2002, pp Chein, R. and Huang, G., Thermoelectric cooler application in electronic cooling, Applied Thermal Engineering, Vol. 24, No , October 2004, pp Holeman, J. P., Heat Transfer, ISBN , McGraw-Hill Inc., U.S.A., 5th ed., Nagy, M. J. and Buist, R., Effect of Heat Sink Design on Thermoelectric Cooling Performance, AIP Conf. Proc., Vol. 316, No. 1, Aug. - Sep. 1994, pp Barringer, H. P. and Weber, D. P., Life Cycle Cost Tutorial, Fifth International Conference on Process Plant Reliability, 16 of 17

18 Houston, TX, October 1996, Organized by Gulf Publishing Company. 11 Barringer, H. P., Life Cycle Cost And Good Practices, NPRA Maintenance Conference, San Antonio, TX, 1998, pp. May Owens Corning, Owens Corning catalog, SANYO North America Corporation, SANYO catalog, BP Solar International LLC, BP Solar catalog, Melcor Corporations, Melcor Thermal Solutions catalog, pp Messac, A., Ismail-Yahaya, A., and Mattson, C. A., The Normalized Normal Constraint Method for Generating the Pareto Frontier, Structural and Multidisciplinary Optimization, Vol. 25, No. 2, 2003, pp Green, M. A., Solar cells Operating principles, technology, and system application, ISBN , Printice-Hall, Inc, Englewood Cliff, NJ 07632, U.S.A., American Society of Heating, Refrigerating and Air-Conditioning Engineers, ASHRAE handbook, Fundamentals, Martin, P. and Oughton, D., Heating and Air-Conditioning of Buildings, Butterworth & Co. Publishers Ltd., 7th ed., of 17

Everline Module Application Note: Round LED Module Thermal Management

Everline Module Application Note: Round LED Module Thermal Management Everline Module Application Note: Round LED Module Thermal Management PURPOSE: Use of proper thermal management is a critical element of Light Emitting Diode (LED) system design. The LED temperature directly

More information

Integration of a fin experiment into the undergraduate heat transfer laboratory

Integration of a fin experiment into the undergraduate heat transfer laboratory Integration of a fin experiment into the undergraduate heat transfer laboratory H. I. Abu-Mulaweh Mechanical Engineering Department, Purdue University at Fort Wayne, Fort Wayne, IN 46805, USA E-mail: mulaweh@engr.ipfw.edu

More information

How To Know If A Refrigeration System Is Efficient

How To Know If A Refrigeration System Is Efficient Universitatea de Ştiinţe Agricole şi Medicină Veterinară Iaşi ASSESSMENT OF E SUBCOOLING CAPABILITIES OF A ERMOELECTRIC DEVICE IN A VAPOR COMPRESSION REFRIGERATION SYSTEM R. ROŞCA 1, I. ŢENU 1, P. CÂRLESCU

More information

Impacts of Static Pressure Set Level on the HVAC Energy Consumption and Indoor Conditions

Impacts of Static Pressure Set Level on the HVAC Energy Consumption and Indoor Conditions Impacts of Static Pressure Set Level on the HVAC Energy Consumption and Indoor Conditions M. Liu, Y. Zhu, D. E. Claridge Energy Systems Laboratory Texas A&M University Ed. White Energy Management Operation

More information

HOW TO CONDUCT ENERGY SAVINGS ANALYSIS IN A FACILITY VALUE ENGINEERING STUDY

HOW TO CONDUCT ENERGY SAVINGS ANALYSIS IN A FACILITY VALUE ENGINEERING STUDY HOW TO CONDUCT ENERGY SAVINGS ANALYSIS IN A FACILITY VALUE ENGINEERING STUDY Benson Kwong, CVS, PE, CEM, LEED AP, CCE envergie consulting, LLC Biography Benson Kwong is an independent consultant providing

More information

Calculating Heat Loss by Mark Crombie, Chromalox

Calculating Heat Loss by Mark Crombie, Chromalox Calculating Heat Loss by Mark Crombie, Chromalox Posted: January 30, 2006 This article deals with the basic principles of heat transfer and the calculations used for pipes and vessels. By understanding

More information

Software Development for Cooling Load Estimation by CLTD Method

Software Development for Cooling Load Estimation by CLTD Method IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) ISSN: 2278-1684Volume 3, Issue 6 (Nov. - Dec. 2012), PP 01-06 Software Development for Cooling Load Estimation by CLTD Method Tousif Ahmed Department

More information

ENERGY PRODUCING SYSTEMS

ENERGY PRODUCING SYSTEMS ENERGY PRODUCING SYSTEMS SOLAR POWER INTRODUCTION Energy from the sun falls on our planet on a daily basis. The warmth of the sun creates conditions on earth conducive to life. The weather patterns that

More information

THE ROOFPOINT ENERGY AND CARBON CALCULATOR A NEW MODELING TOOL FOR ROOFING PROFESSIONALS

THE ROOFPOINT ENERGY AND CARBON CALCULATOR A NEW MODELING TOOL FOR ROOFING PROFESSIONALS THE ROOFPOINT ENERGY AND CARBON CALCULATOR A NEW MODELING TOOL FOR ROOFING PROFESSIONALS James L. Hoff, VP of Research Center for Environmental Innovation in Roofing Tools and Models Tools require models

More information

Performance Evaluation of a Heat Pump System for Simultaneous Heating and Cooling

Performance Evaluation of a Heat Pump System for Simultaneous Heating and Cooling for Simultaneous Heating and Cooling F. Sustainable Energy Centre, University of South Australia Mawson Lakes Boulevard, Mawson Lakes 5095 AUSTRALIA E-mail: Frank.@UniSA.edu.au Abstract The high efficiency

More information

A Mathematical Model for Online Electrical Characterization of Thermoelectric Generators using the P-I Curves at Different Temperatures

A Mathematical Model for Online Electrical Characterization of Thermoelectric Generators using the P-I Curves at Different Temperatures A Mathematical Model for Online Electrical Characterization of Thermoelectric Generators using the P-I Curves at Different Temperatures Eduardo I. Ortiz-Rivera, Member IEEE Email: eduardo.ortiz@ece.uprm.edu

More information

AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries

AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries Hot tips and cool ideas to save energy and money! Air conditioning units or systems are often used by foundries

More information

ALONE. small scale solar cooling device Project No TREN FP7EN 218952. Project No TREN/FP7EN/218952 ALONE. small scale solar cooling device

ALONE. small scale solar cooling device Project No TREN FP7EN 218952. Project No TREN/FP7EN/218952 ALONE. small scale solar cooling device Project No TREN/FP7EN/218952 ALONE small scale solar cooling device Collaborative Project Small or Medium-scale Focused Research Project DELIVERABLE D5.2 Start date of the project: October 2008, Duration:

More information

Federation of European Heating, Ventilation and Air-conditioning Associations

Federation of European Heating, Ventilation and Air-conditioning Associations Federation of European Heating, Ventilation and Air-conditioning Associations Address: Rue Washington 40 1050 Brussels Belgium www.rehva.eu info@rehva.eu Tel: +32 2 514 11 71 Fax: +32 2 512 90 62 REHVA

More information

Heat Pipe Cooling of Concentrating Photovoltaic (CPV) Systems

Heat Pipe Cooling of Concentrating Photovoltaic (CPV) Systems Heat Pipe Cooling of Concentrating Photovoltaic (CPV) Systems William G. Anderson 1, Sanjida Tamanna 2, David B. Sarraf 3, and Peter M. Dussinger 4 Advanced Cooling Technologies, Inc., Lancaster, PA, 17601

More information

Residential HVAC System Sizing

Residential HVAC System Sizing Residential HVAC System Sizing William P. Goss University of Massachusetts, Amherst, Massachusetts, USA Corresponding email: goss@acad.umass.edu SUMMARY Heating, ventilating and air-conditioning (HVAC)

More information

ENERGY STATEMENT for a proposed new residential care home at Great North Road, Doncaster, South Yorkshire, DN6 7EJ

ENERGY STATEMENT for a proposed new residential care home at Great North Road, Doncaster, South Yorkshire, DN6 7EJ ENERGY STATEMENT for a proposed new residential care home at Great North Road, Doncaster, South Yorkshire, DN6 7EJ Ref. No: 12/02870/FULM Contents 1. General... 2 2. Planning Condition... 2 3. Development...

More information

The Second Law of Thermodynamics

The Second Law of Thermodynamics Objectives MAE 320 - Chapter 6 The Second Law of Thermodynamics The content and the pictures are from the text book: Çengel, Y. A. and Boles, M. A., Thermodynamics: An Engineering Approach, McGraw-Hill,

More information

Peltier Application Note

Peltier Application Note Peltier Application Note Early 19th century scientists, Thomas Seebeck and Jean Peltier, first discovered the phenomena that are the basis for today s thermoelectric industry. Seebeck found that if you

More information

Climate and Energy Responsive Housing in Continental Climates. The Suitability of Passive Houses for Iran's Dry and Cold Climate. Farshad Nasrollahi

Climate and Energy Responsive Housing in Continental Climates. The Suitability of Passive Houses for Iran's Dry and Cold Climate. Farshad Nasrollahi Climate and Energy Responsive Housing in Continental Climates The Suitability of Passive Houses for Iran's Dry and Cold Climate Farshad Nasrollahi Table of Contents Abstract German Abstract Introduction

More information

HEAT TRANSFER ANALYSIS OF COLD STORAGE

HEAT TRANSFER ANALYSIS OF COLD STORAGE HEAT TRANSFER ANALYSIS OF COLD STORAGE Upamanyu Bangale and Samir Deshmukh Department of Mechanical Engineering, SGBA University, Amravati, India ABSTRACT India is largest producer of fruit and vegetable

More information

The Fundamentals of Thermoelectrics

The Fundamentals of Thermoelectrics The Fundamentals of Thermoelectrics A bachelor s laboratory practical Contents 1 An introduction to thermoelectrics 1 2 The thermocouple 4 3 The Peltier device 5 3.1 n- and p-type Peltier elements..................

More information

PERFORMANCE OPTIMIZATION OF HYBRID SOLAR HEATING SYSTEM USING THERMOELECTRIC GENERATOR

PERFORMANCE OPTIMIZATION OF HYBRID SOLAR HEATING SYSTEM USING THERMOELECTRIC GENERATOR International Journal of Advanced Research in Engineering and Technology (IJARET) Volume 7, Issue 2, March-April 216, pp. 9-2, Article ID: IJARET_7_2_2 Available online at http://www.iaeme.com/ijaret/issues.asp?jtype=ijaret&vtype=7&itype=2

More information

Ampacity simulation of a high voltage cable to connecting off shore wind farms

Ampacity simulation of a high voltage cable to connecting off shore wind farms Ampacity simulation of a high voltage cable to connecting off shore wind farms Eva Pelster 1, Dr. David Wenger 1 1 Wenger Engineering GmbH, Einsteinstr. 55, 89077 Ulm, mail@wenger-engineering.com Abstract:

More information

Rate of Heating Analysis of Data Centers during Power Shutdown

Rate of Heating Analysis of Data Centers during Power Shutdown 2011. American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. (www.ashrae.org). Published in ASHRAE Transactions, Volume 117, Part 1. For personal use only. Additional reproduction,

More information

HVAC Efficiency Definitions

HVAC Efficiency Definitions HVAC Efficiency Definitions Term page EER - 2 SEER - 3 COP - 4 HSPF - 5 IPLV - 6 John Mix May 2006 Carrier Corporation 1 Energy Efficiency Ratio (EER) The energy efficiency ratio is used to evaluate the

More information

Thermal Mass Availability for Cooling Data Centers during Power Shutdown

Thermal Mass Availability for Cooling Data Centers during Power Shutdown 2010 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. (www.ashrae.org). Published in ASHRAE Transactions (2010, vol 116, part 2). For personal use only. Additional reproduction,

More information

Adaptive strategies for office spaces in the UK climate

Adaptive strategies for office spaces in the UK climate International Conference Passive and Low Energy Cooling 631 Adaptive strategies for office spaces in the UK climate I. Gallou Environment & Energy Studies Programme, Architectural Association Graduate

More information

CFD SIMULATION OF SDHW STORAGE TANK WITH AND WITHOUT HEATER

CFD SIMULATION OF SDHW STORAGE TANK WITH AND WITHOUT HEATER International Journal of Advancements in Research & Technology, Volume 1, Issue2, July-2012 1 CFD SIMULATION OF SDHW STORAGE TANK WITH AND WITHOUT HEATER ABSTRACT (1) Mr. Mainak Bhaumik M.E. (Thermal Engg.)

More information

RosevilleProject. LoE _ 2 Glass Products. You can reduce your cooling energy usage by 25% or more. Here is the proof.

RosevilleProject. LoE _ 2 Glass Products. You can reduce your cooling energy usage by 25% or more. Here is the proof. RosevilleProject Glass Products You can reduce your cooling energy usage by 25% or more. Here is the proof. Hot-Button Issues Residents of California, Arizona, and Nevada don t need a weather forecast

More information

Simplified Solar Heating Model

Simplified Solar Heating Model Simplified Solar Heating Model For SolarAttic PCS1 Pool Heater Prepared from notes of the 1994 Scoping Analysis as performed by Professor Ephraim M. Sparrow, University of Minnesota, Minneapolis, MN. Heat

More information

1/9/2013. Terminology Calculating Heat Transfer Code Requirements Design Examples and Sustainability

1/9/2013. Terminology Calculating Heat Transfer Code Requirements Design Examples and Sustainability 1/9/13 By Brett T. Fagan, P.E. Presented by Marie Horan, P.E. Building Diagnostics, Inc. Building Diagnostics Terminology Calculating Heat Transfer Code Requirements Design Examples and Sustainability

More information

Solar Aquaponics Designing a 100% Solar Aquaponics Greenhouse

Solar Aquaponics Designing a 100% Solar Aquaponics Greenhouse Solar Aquaponics Designing a 100% Solar Aquaponics Greenhouse Dan Chiras, Ph.D. Director, The Evergreen Institute Gerald, MO 63037 www.evergreeninstitute.org Topics Creating a 100% solar operation Efficiency

More information

ANSI/ASHRAE Standard 140-2004 Building Thermal Envelope and Fabric Load Tests

ANSI/ASHRAE Standard 140-2004 Building Thermal Envelope and Fabric Load Tests ANSI/ASHRAE Standard 140-2004 Building Thermal Envelope and Fabric Load Tests DesignBuilder Version 1.2.0 (incorporating EnergyPlus version 1.3.0) - June 2006 1.0 Purpose The ANSI/ASHRAE Standard 140-2004

More information

Using Thermoelectric Coolers

Using Thermoelectric Coolers Using Thermoelectric Coolers in Electronics Cooling Thermoelectric devices are semiconductor modules which use the Peltier effect to create a heat flux between the junctions of two different types of materials.

More information

Theoretical Study on Separate Sensible and Latent Cooling Air-Conditioning System

Theoretical Study on Separate Sensible and Latent Cooling Air-Conditioning System Purdue University Purdue e-pubs International Refrigeration and Air Conditioning Conference School of Mechanical Engineering 2008 Theoretical Study on Separate Sensible and Latent Cooling Air-Conditioning

More information

Solar Power Analysis Based On Light Intensity

Solar Power Analysis Based On Light Intensity The International Journal Of Engineering And Science (IJES) ISSN (e): 2319 1813 ISSN (p): 2319 1805 Pages 01-05 2014 Solar Power Analysis Based On Light Intensity 1 Dr. M.Narendra Kumar, 2 Dr. H.S. Saini,

More information

CHAPTER 7 THE SECOND LAW OF THERMODYNAMICS. Blank

CHAPTER 7 THE SECOND LAW OF THERMODYNAMICS. Blank CHAPTER 7 THE SECOND LAW OF THERMODYNAMICS Blank SONNTAG/BORGNAKKE STUDY PROBLEM 7-1 7.1 A car engine and its fuel consumption A car engine produces 136 hp on the output shaft with a thermal efficiency

More information

Market Potential Study for Water Heater Demand Management

Market Potential Study for Water Heater Demand Management Market Potential Study for Water Heater Demand Management Rebecca Farrell Troutfetter, Frontier Associates LLC, Austin, TX INTRODUCTION Water heating represents between 13 and 17 percent of residential

More information

SOLAR ELECTRICITY: PROBLEM, CONSTRAINTS AND SOLUTIONS

SOLAR ELECTRICITY: PROBLEM, CONSTRAINTS AND SOLUTIONS SOLAR ELECTRICITY: PROBLEM, CONSTRAINTS AND SOLUTIONS The United States generates over 4,110 TWh of electricity each year, costing $400 billion and emitting 2.5 billion metric tons of carbon dioxide (Yildiz,

More information

Design Exercises and Projects in Energy Engineering Course

Design Exercises and Projects in Energy Engineering Course Session XXXX Design Exercises and Projects in Energy Engineering Course Kendrick Aung Department of Mechanical Engineering Lamar University, Beaumont, Texas 77710 Abstract Energy Engineering is a senior

More information

6 18 A steam power plant receives heat from a furnace at a rate of 280 GJ/h. Heat losses to the surrounding air from the steam as it passes through

6 18 A steam power plant receives heat from a furnace at a rate of 280 GJ/h. Heat losses to the surrounding air from the steam as it passes through Thermo 1 (MEP 261) Thermodynamics An Engineering Approach Yunus A. Cengel & Michael A. Boles 7 th Edition, McGraw-Hill Companies, ISBN-978-0-07-352932-5, 2008 Sheet 6:Chapter 6 6 17 A 600-MW steam power

More information

Forms of Energy. Freshman Seminar

Forms of Energy. Freshman Seminar Forms of Energy Freshman Seminar Energy Energy The ability & capacity to do work Energy can take many different forms Energy can be quantified Law of Conservation of energy In any change from one form

More information

Glossary of Heating, Ventilation and Air Conditioning Terms

Glossary of Heating, Ventilation and Air Conditioning Terms Glossary of Heating, Ventilation and Air Conditioning Terms Air Change: Unlike re-circulated air, this is the total air required to completely replace the air in a room or building. Air Conditioner: Equipment

More information

K.Vijaya Bhaskar,Asst. Professor Dept. of Electrical & Electronics Engineering

K.Vijaya Bhaskar,Asst. Professor Dept. of Electrical & Electronics Engineering Incremental Conductance Based Maximum Power Point Tracking (MPPT) for Photovoltaic System M.Lokanadham,PG Student Dept. of Electrical & Electronics Engineering Sri Venkatesa Perumal College of Engg & Tech

More information

SOLAR COOLING WITH ICE STORAGE

SOLAR COOLING WITH ICE STORAGE SOLAR COOLING WITH ICE STORAGE Beth Magerman Patrick Phelan Arizona State University 95 N. College Ave Tempe, Arizona, 8581 bmagerma@asu.edu phelan@asu.edu ABSTRACT An investigation is undertaken of a

More information

Daikin Altherma Hybrid Heat Pump

Daikin Altherma Hybrid Heat Pump your comfort. our world. Daikin Altherma Hybrid Heat Pump The natural combination Heating Integrated Solutions Ventilation Air Conditioning Refrigeration About Daikin Forward thinking... Daikin has a worldwide

More information

Solar energy and power

Solar energy and power Solar energy and power Solar Basics Energy from the Sun The sun has produced energy for billions of years. Solar energy is the sun s rays (solar radiation) that reach the Earth. This energy can be converted

More information

Figure 1 - Unsteady-State Heat Conduction in a One-dimensional Slab

Figure 1 - Unsteady-State Heat Conduction in a One-dimensional Slab The Numerical Method of Lines for Partial Differential Equations by Michael B. Cutlip, University of Connecticut and Mordechai Shacham, Ben-Gurion University of the Negev The method of lines is a general

More information

Why is it renewable? Well, the sun will always be there for us, and we can use as much of the sun s energy as we want and it will never run out.

Why is it renewable? Well, the sun will always be there for us, and we can use as much of the sun s energy as we want and it will never run out. 6. Solar Energy So far we have been looking at how to reduce CO 2 emissions by cutting down on our use of fossil fuels. Now let s look at getting renewable energy from the sun. Why is it renewable? Well,

More information

RULES FOR THE SETTING UP OF SUSTAINABLE BRANCHES Summary

RULES FOR THE SETTING UP OF SUSTAINABLE BRANCHES Summary RULES FOR THE SETTING UP OF SUSTAINABLE BRANCHES Summary January 2013 TABLE OF CONTENTS INTRODUCTION... 3 GENERAL RECOMMENDATIONS... 3 Communication with customers in the field of environmental sustainability...

More information

Hybrid heat pumps. saving energy and reducing carbon emissions

Hybrid heat pumps. saving energy and reducing carbon emissions Hybrid heat pumps saving energy and reducing carbon emissions Bart Aspeslagh Product planning and new technology manager, Daikin Europe NV. aspeslagh.b@daikineurope.com Stefanie Debaets Design engineer,

More information

PERFORMANCE EVALUATION OF WATER-FLOW WINDOW GLAZING

PERFORMANCE EVALUATION OF WATER-FLOW WINDOW GLAZING PERFORMANCE EVALUATION OF WATER-FLOW WINDOW GLAZING LI CHUNYING DOCTOR OF PHILOSOPHY CITY UNIVERSITY OF HONG KONG FEBRUARY 2012 CITY UNIVERSITY OF HONG KONG 香 港 城 市 大 學 Performance Evaluation of Water-flow

More information

August 16, 2006. Rebecca Duff ICF Interna tional 9300 Lee Highway Fairfax, VA 22301. Re: ENERGY STAR Version 2.0 Final Draft. Dear Ms.

August 16, 2006. Rebecca Duff ICF Interna tional 9300 Lee Highway Fairfax, VA 22301. Re: ENERGY STAR Version 2.0 Final Draft. Dear Ms. Roof Coatings Manufacturers Association 1156 15 th Street, NW, Suite 900 Washington, DC 20005 Tele: 202-207-0919 Fax: 202-223-9741 www.roofcoatings.org August 16, 2006 Rebecca Duff ICF Interna tional 9300

More information

Module 2.2. Heat transfer mechanisms

Module 2.2. Heat transfer mechanisms Module 2.2 Heat transfer mechanisms Learning Outcomes On successful completion of this module learners will be able to - Describe the 1 st and 2 nd laws of thermodynamics. - Describe heat transfer mechanisms.

More information

CHAPTER 3. BUILDING THERMAL LOAD ESTIMATION

CHAPTER 3. BUILDING THERMAL LOAD ESTIMATION CHAPTER 3. BUILDING THERMAL LOAD ESTIMATION 3.1 Purpose of Thermal Load Estimation 3.2 Heating Load versus Cooling Load 3.3 Critical Conditions for Design 3.4 Manual versus Computer Calculations 3.5 Heating

More information

In today s world of wireless communications

In today s world of wireless communications TUTORIAL RF CERAMIC CHIP CAPACITORS IN HIGH RF POWER APPLICATIONS Reprinted with permission of MICROWAVE JOURNAL from the April 2000 issue. 2000 Horizon House Publications, Inc. In today s world of wireless

More information

Solar and Wind Energy for Greenhouses. A.J. Both 1 and Tom Manning 2

Solar and Wind Energy for Greenhouses. A.J. Both 1 and Tom Manning 2 Solar and Wind Energy for Greenhouses A.J. Both 1 and Tom Manning 2 1 Associate Extension Specialist 2 Project Engineer NJ Agricultural Experiment Station Rutgers University 20 Ag Extension Way New Brunswick,

More information

HEATING OF DOMESTIC OUTDOOR SWIMMING POOLS

HEATING OF DOMESTIC OUTDOOR SWIMMING POOLS HEATING OF DOMESTIC OUTDOOR SWIMMING POOLS INTRODUCTION 1. There are no general EU regulations and standards for outdoor swimming pool heating. Local regulations in the member countries are covering most

More information

Solar systems provide a range of flexible heating

Solar systems provide a range of flexible heating f a c t s h e e t 7 Solar Power Production photo by Alex Nikada Why solar? Solar systems provide a range of flexible heating and electricity options and are particularly wellsuited to remote or off-grid

More information

Passive Cooling Systems Air Conditioning Without the Need of Energy

Passive Cooling Systems Air Conditioning Without the Need of Energy Passive Cooling Systems Air Conditioning Without the Need of Energy 1 Introduction and Abstract PCS Shelter for ADCO SAS project in the UAE/Sahil and Shah Pipe Lines and Supply Networks often run through

More information

SOLEL SUNCOOLER SOLAR-POWERED AIR-CONDITIONING / HEATING SYSTEM

SOLEL SUNCOOLER SOLAR-POWERED AIR-CONDITIONING / HEATING SYSTEM SOLEL SUNCOOLER SOLAR-POWERED AIR-CONDITIONING / HEATING SYSTEM organization / project coordinator (address, telephone, email) Solel Solar Systems Ltd./ Mr. Avi Brenmiller 3, Hac'shara St, Industrial Zone

More information

Vicot Solar Air Conditioning. V i c o t A i r C o n d i t i o n i n g C o., l t d Tel: 86-531-8235 5576 Fax: 86-531-82357911 Http://www.vicot.com.

Vicot Solar Air Conditioning. V i c o t A i r C o n d i t i o n i n g C o., l t d Tel: 86-531-8235 5576 Fax: 86-531-82357911 Http://www.vicot.com. Vicot Solar Air Conditioning V i c o t A i r C o n d i t i o n i n g C o., l t d Tel: 86-531-8235 5576 Fax: 86-531-82357911 Http://www.vicot.com.cn Cooling, heating, and domestic hot water. Return on investment

More information

INVESTIGATION ON AIR-CONDITIONING ENERGY CONSUMPTION OF A TYPICAL COMMERCIAL BUILDING COMPLEX

INVESTIGATION ON AIR-CONDITIONING ENERGY CONSUMPTION OF A TYPICAL COMMERCIAL BUILDING COMPLEX , Volume 6, Number 4, p.178-183, 2005 INVESTIGATION ON AIR-CONDITIONING ENERGY CONSUMPTION OF A TYPICAL COMMERCIAL BUILDING COMPLEX Qinghai Luo College of Architecture and Resource, Nanhua University,

More information

Daikin Altherma Hybrid Heat Pump

Daikin Altherma Hybrid Heat Pump Daikin Altherma Hybrid Heat Pump Smart technology for the best of both worlds NATIONAL HEAT PUMP 19 JUNE 2014 ICC BIRMINGHAM WINNER Forward thinking Now is the time to rethink the way we heat our homes

More information

Investigation into the energy consumption of a data center with a thermosyphon heat exchanger

Investigation into the energy consumption of a data center with a thermosyphon heat exchanger Article Mechanical Engineering July 2011 Vol.56 No.20: 2185 2190 doi: 10.1007/s11434-011-4500-5 SPECIAL TOPICS: Investigation into the energy consumption of a data center with a thermosyphon heat exchanger

More information

Simplified Procedure For Estimating Air- Conditioning Cooling Load In Ghana

Simplified Procedure For Estimating Air- Conditioning Cooling Load In Ghana Simplified Procedure For Estimating Air- Conditioning Cooling Load In Ghana Felix A. Uba, YesuenyeagbeA. K. Fiagbeand Emmanuel A. Sarsah Abstract: Undersized or oversized air conditioning equipment leads

More information

978-1-4673-1965-2/12/$31.00 2012 IEEE 1488

978-1-4673-1965-2/12/$31.00 2012 IEEE 1488 Generic Thermal Analysis for Phone and Tablet Systems Siva P. Gurrum, Darvin R. Edwards, Thomas Marchand-Golder, Jotaro Akiyama, Satoshi Yokoya, Jean-Francois Drouard, Franck Dahan Texas Instruments, Inc.,

More information

A car air-conditioning system based on an absorption refrigeration cycle using energy from exhaust gas of an internal combustion engine

A car air-conditioning system based on an absorption refrigeration cycle using energy from exhaust gas of an internal combustion engine A car air-conditioning system based on an absorption refrigeration cycle using energy from exhaust gas of an internal combustion engine G Vicatos J Gryzagoridis S Wang Department of Mechanical Engineering,

More information

The Three Heat Transfer Modes in Reflow Soldering

The Three Heat Transfer Modes in Reflow Soldering Section 5: Reflow Oven Heat Transfer The Three Heat Transfer Modes in Reflow Soldering There are three different heating modes involved with most SMT reflow processes: conduction, convection, and infrared

More information

Series and Parallel Circuits

Series and Parallel Circuits Series and Parallel Circuits Components in a circuit can be connected in series or parallel. A series arrangement of components is where they are inline with each other, i.e. connected end-to-end. A parallel

More information

OPTIMIZING CONDENSER WATER FLOW RATES. W. A. Liegois, P.E. Stanley Consultants, Inc. Muscatine, Iowa

OPTIMIZING CONDENSER WATER FLOW RATES. W. A. Liegois, P.E. Stanley Consultants, Inc. Muscatine, Iowa OPTIMIZING CONDENSER WATER FLOW RATES W. A. Liegois, P.E. Stanley Consultants, Inc. Muscatine, Iowa T.A. Brown, P.E. Thermal Energy Corporation Houston, Texas ABSTRACT Most chillers are designed for a

More information

SIMULATION OF NONSTATIONARY HEATING/COOLING PROCESS OF TWO-STAGE THERMOELECTRIC MODULE

SIMULATION OF NONSTATIONARY HEATING/COOLING PROCESS OF TWO-STAGE THERMOELECTRIC MODULE SIMULATION OF NONSTATIONARY HEATING/COOLING PROCESS OF TWO-STAGE THERMOELECTRIC MODULE Vainer A.L., Perepeka V.I., Skipidarov S.Ya. ( Scientific research institute «Storm», 7, Tereshkova Str., Odessa,

More information

Circuit breaker panel. Power supply for condensing unit. Power supply for furnace. Air handler (Furnace)

Circuit breaker panel. Power supply for condensing unit. Power supply for furnace. Air handler (Furnace) UNIT OBJECTIVES Describe the concept of year-round air conditioning List three typical year-round air conditioning system types List the five ways to condition the air Determine airflow for a cooling system

More information

A Survey of Companies Relating to the Solar Energy Industry in Louisiana With Regard to Economic Impact

A Survey of Companies Relating to the Solar Energy Industry in Louisiana With Regard to Economic Impact A Survey of Companies Relating to the Solar Energy Industry in Louisiana With Regard to Economic Impact A Report by Stefanie Gilliam, Charles Henkel, David Horaist, Pranjali Muley, Manish Patil and Cornelis

More information

Selecting Energy Efficient New Windows in Texas

Selecting Energy Efficient New Windows in Texas Selecting Energy Efficient New Windows in Texas www.efficientwindows.org January 06 Zones. Meet the Energy Code & Look for the Windows must comply with your local energy code. Windows that are certified

More information

Energy harvesting from multiple sources for Battery charging

Energy harvesting from multiple sources for Battery charging Energy harvesting from multiple sources for Battery charging John John Therampilly Senior Project Advisor: Dr. Taufik Electrical Engineering Department California Polytechnic State University San Luis

More information

Creating Efficient HVAC Systems

Creating Efficient HVAC Systems Creating Efficient HVAC Systems Heating and Cooling Fundamentals for Commercial Buildings Heating, ventilating, and air conditioning (HVAC) systems account for nearly half of the energy used in a typical

More information

Design ng. Souma. Jie Zhang. Adaptive Optimal. Chowdhury. Thermally Insulated Orlando,

Design ng. Souma. Jie Zhang. Adaptive Optimal. Chowdhury. Thermally Insulated Orlando, Adaptive Optimal Design of Active Thermally Insulated Windows Using Surrogate Modelin ng Junqiang Zhang Achille Messac Souma Chowdhury Jie Zhang Corresponding Author Achille Messac, Ph.D. Distinguished

More information

Saving Heating Costs In Warehouses

Saving Heating Costs In Warehouses 2005, American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. (www.ashrae.org). Reprinted by permission from ASHRAE Journal, (Vol. 47, No. 12, December 2005). This article may not

More information

Optimization of Water - Cooled Chiller Cooling Tower Combinations

Optimization of Water - Cooled Chiller Cooling Tower Combinations Optimization of Water - Cooled Chiller Cooling Tower Combinations by: James W. Furlong & Frank T. Morrison Baltimore Aircoil Company The warm water leaving the chilled water coils is pumped to the evaporator

More information

Session 2: Hot Water Supply

Session 2: Hot Water Supply MEBS6000 Utility Services http://www.hku.hk/mech/msc-courses/mebs6000/index.html Session 2: Hot Water Supply Dr. Benjamin P.L. Ho Department of Mechanical Engineering The University of Hong Kong E-mail:

More information

Electricity from PV systems how does it work?

Electricity from PV systems how does it work? Electricity from photovoltaic systems Bosch Solar Energy 2 Electricity from PV systems Electricity from PV systems how does it work? Photovoltaics: This is the name given to direct conversion of radiant

More information

Solar Homes Catch the Sun. Are you planning a new house? Discover how you can apply solar architecture principles to:

Solar Homes Catch the Sun. Are you planning a new house? Discover how you can apply solar architecture principles to: PASSIVE Solar Design Solar Homes Catch the Sun Are you planning a new house? Discover how you can apply solar architecture principles to: keep your heating bills to a minimum enjoy the comfort of a warm

More information

ENERGY SAVING STUDY IN A HOTEL HVAC SYSTEM

ENERGY SAVING STUDY IN A HOTEL HVAC SYSTEM ENERGY SAVING STUDY IN A HOTEL HVAC SYSTEM J.S. Hu, Philip C.W. Kwong, and Christopher Y.H. Chao Department of Mechanical Engineering, The Hong Kong University of Science and Technology Clear Water Bay,

More information

CONCEPTUALIZATION OF UTILIZING WATER SOURCE HEAT PUMPS WITH COOL STORAGE ROOFS

CONCEPTUALIZATION OF UTILIZING WATER SOURCE HEAT PUMPS WITH COOL STORAGE ROOFS CONCEPTUALIZATION OF UTILIZING WATER SOURCE HEAT PUMPS WITH COOL STORAGE ROOFS by Dr. Bing Chen and Prof. John Bonsell Passive Solar Research Group University of Nebraska-Lincoln Omaha campus and Richard

More information

Daikin Altherma Hybrid Heat Pump

Daikin Altherma Hybrid Heat Pump your comfort. our world. Daikin Altherma Hybrid Heat Pump Smart heating technology for the best of both worlds Heating Integrated Solutions Ventilation Air Conditioning Refrigeration Forward thinking About

More information

Building Information Modelling (BIM); How it Improves Building Performance. R.P. Kumanayake Lecturer, Department of Civil Engineering

Building Information Modelling (BIM); How it Improves Building Performance. R.P. Kumanayake Lecturer, Department of Civil Engineering Building Information Modelling (BIM); How it Improves Building Performance R.P. Kumanayake Lecturer, Department of Civil Engineering R.M.P.S. Bandara Lecturer, Department of Mechanical Engineering Faculty

More information

EFFECT OF OBSTRUCTION NEAR FAN INLET ON FAN HEAT SINK PERFORMANCE

EFFECT OF OBSTRUCTION NEAR FAN INLET ON FAN HEAT SINK PERFORMANCE EFFECT OF OBSTRUCTION NEAR FAN INLET ON FAN HEAT SINK PERFORMANCE Vivek Khaire, Dr. Avijit Goswami Applied Thermal Technologies India 3rd Floor,C-Wing,Kapil Towers, Dr. Ambedkar Road, Pune- 411 1 Maharashtra,

More information

Recover Heat from Boiler Blowdown Water

Recover Heat from Boiler Blowdown Water Prepared for California Energy Commission (CEC) Prepared By: Southern California Gas Company (A Sempra Energy Utility) E3M Inc. May 2012 i Disclaimer The CEC and its contractor, Southern California Gas

More information

Rainwater Harvesting

Rainwater Harvesting Rainwater Harvesting With climate change now a reality rather than a speculated possibility, the demand on water resources has gone up, whilst the amount of water available for supply has gone down. Forth

More information

How To Save Energy With High Pressure Control

How To Save Energy With High Pressure Control Energy savings in commercial refrigeration equipment : High Pressure Control July 2011/White paper by Christophe Borlein AFF and IIF-IIR member Make the most of your energy Summary Executive summary I

More information

The Effect of Forced Air Cooling on Heat Sink Thermal Ratings

The Effect of Forced Air Cooling on Heat Sink Thermal Ratings zpero 1 The Effect of Forced Air Cooling on Heat Sink Thermal Ratings By Paul Bachman, Fellow Engineer & Ronnie Haiduk, Applications Engineer, Crydom, Inc. ABSTRACT A heat sink s ability to dissipate thermal

More information

Carnegie Mellon University School of Architecture, Department of Mechanical Engineering Center for Building Performance and Diagnostics

Carnegie Mellon University School of Architecture, Department of Mechanical Engineering Center for Building Performance and Diagnostics Carnegie Mellon University School of Architecture, Department of Mechanical Engineering Center for Building Performance and Diagnostics A Presentation of Work in Progress 4 October 2006 in the Intelligent

More information

MODELLING AND OPTIMIZATION OF DIRECT EXPANSION AIR CONDITIONING SYSTEM FOR COMMERCIAL BUILDING ENERGY SAVING

MODELLING AND OPTIMIZATION OF DIRECT EXPANSION AIR CONDITIONING SYSTEM FOR COMMERCIAL BUILDING ENERGY SAVING MODELLING AND OPTIMIZATION OF DIRECT EXPANSION AIR CONDITIONING SYSTEM FOR COMMERCIAL BUILDING ENERGY SAVING V. Vakiloroaya*, J.G. Zhu, and Q.P. Ha School of Electrical, Mechanical and Mechatronic Systems,

More information

THE NATIONAL BUILDING REGULATIONS PART XA: ENERGY EFFICIENCY. Presentation by Peter Henshall-Howard: HEAD: BUILDING DEVELOPMENT MANAGEMENT.

THE NATIONAL BUILDING REGULATIONS PART XA: ENERGY EFFICIENCY. Presentation by Peter Henshall-Howard: HEAD: BUILDING DEVELOPMENT MANAGEMENT. THE NATIONAL BUILDING REGULATIONS PART XA: ENERGY EFFICIENCY. Presentation by Peter Henshall-Howard: HEAD: BUILDING DEVELOPMENT MANAGEMENT. A Diagrammatic representation of the relationship between the

More information

FUNDAMENTALS OF ENGINEERING THERMODYNAMICS

FUNDAMENTALS OF ENGINEERING THERMODYNAMICS FUNDAMENTALS OF ENGINEERING THERMODYNAMICS System: Quantity of matter (constant mass) or region in space (constant volume) chosen for study. Closed system: Can exchange energy but not mass; mass is constant

More information

ILX Lightwave Corporation www.ilxlightwave.com

ILX Lightwave Corporation www.ilxlightwave.com # 14 Optimizing TEC Current Optimizing TEC Drive Current This Application Note discusses methods for optimizing the TEC drive current for optimum operation in heating and cooling applications. BACKGROUND

More information

Prospects and Viability of Solar Energy in Khyber Pakhtunkhwa Pakistan

Prospects and Viability of Solar Energy in Khyber Pakhtunkhwa Pakistan Prospects and Viability of Solar Energy in Khyber Pakhtunkhwa Pakistan Muhammad Riaz 1, Amjad Ullah 2, Khadim Ullah Jan 3 1,2 Department of Electrical Engineering, University of Engineering and Technology

More information

TEXTILE FABRICS AS THERMAL INSULATORS

TEXTILE FABRICS AS THERMAL INSULATORS TEXTILE FABRICS AS THERMAL INSULATORS Zeinab S. Abdel-Rehim 1, M. M. Saad 2, M. El-Shakankery 2 and I. Hanafy 3 1 Mechanical Engineering Department of the National Research Center, Dokki, Giza, Egypt 2

More information