1 Anderson & Associates, Inc. Professional Services for Community Colleges

2 Access Road Mountain Empire Community College - Big Stone Gap, VA Firm s Responsibility: Base Mapping, Environmental Review, Cost Estimate, Roadway Design Mountain Empire Community College 3441 Mountain Empire Rd Big Stone Gap, VA Construction Costs: $992,000 Founded in 1971, Mountain Empire Community College serves the communities of Lee, Scott, Wise, and Dickenson Counties in addition to the Cities of Wise and Norton. As the course offerings and student life continued to flourish at the college, staff realized that a second campus access point was needed not only for circulation purposes, but to improve safety procedures. Accidents have occurred close to the campus in recent years highlighting the need for secondary access to maintain student and staff safety. Anderson & Associates, Inc. provided preliminary engineering and Virginia Department of Transportation (VDOT) coordination for a new service entrance for the campus on to Route 23. A&A also provided base mapping, a preliminary cost estimate, and environmental review coordination.

3 William F. Snyder Auditorium Wytheville Community College - Wytheville, VA Firm s Responsibility: Site Design, Surveying Wytheville Community College 1000 E. Main Street Wytheville, VA Mr. James Flynn (276) Architect: RRMM Anderson & Associates, Inc. provided professional engineering and surveying services to Wytheville Community College as a sub to Rodriguez Ripley Maddux Motley. The college had a number of courses that were being taught in regular classrooms or a large multi-purpose space, which were better suited for an auditorium setting. In addition, the college s active theater program had no space designed to meet the instructional needs of the students and faculty. A&A provided engineering design services and a cost estimate for this auditorium addition to Smyth Hall. In addition, A&A provided a topographic survey of the subject area and adjacent roadways to produce a 2-foot contour map. Two benchmarks were set within the surveyed area, and all mapping was prepared of the Virginia State Plane Coordinate Datum and compatible with the Town of Wytheville s mapping.

4 Learning Resource Center Southwest Virginia Community College-Richlands, VA Firm s Responsibility: Surveying, Site Design, FIre Flow Testing, Environmental Impact Review Southwest Virginia Community College 369 College Road RIchlands, VA Mr. Richard Hudson (276) Architect: Lukmire Partnership, Inc. Southwest Virginia Community College (SwVCC) first opened in 1968 and contains approximately 100 acres of hills and valleys nestled at the base of the Clinch Mountains. As SwVCC grew to become a comprehensive institution offering more than 80 programs of study, more educational space was required. Anderson & Associates, Inc. provided professional engineering and surveying services for the new Learning Resources Center (LRC), the information and communication heart of campus. The mission of the LRC is to provide materials and technical support for all of the instructional programs at the College. To facilitate that mission, A&A provided topographic surveying, grading and erosion control design, stormwater management, fire flow testing of the existing water system, site utility (water/sanitary sewer) design, and sidewalk and parking layout. A&A also provided an environmental impact review and construction contract administration.

5 Community College Master Plans Virginia Firm s Responsibilities: Planning & Mapping Virginia Community College System James Monroe Building 101 North 14th Street Richmond, VA Development of new Comprehensive Master Plan for eleven Virginia Community College campuses, following Virginia s Capital Outlay Manual. Format included scanning and vectorizing existing base mapping, updating as-built drawings, documenting and projecting utilities and parking, and planning locations for new facilities. Work on 11 campuses to date, including: Southside Virginia CC, John H. Daniel Campus Southside Virginia CC, Christiana Campus Rappahannock CC, Warsaw Campus Rappahannock CC, Glenns Campus Germanna CC Piedmont Virginia CC Dabney S. Lancaster CC Lord Fairfax CC New River CC Virginia Western CC J. Sargeant Reynolds CC, Parham Road Campus

6 Corron Community Development Center Lord Fairfax Community College, VA Firm s Responsibilities: Surveying Lord Fairfax Community College Contractor: Lantz Construction Company 600 Airport Road Winchester, VA Mr. Pete Heffern Anderson & Associates, Inc. is providing professional surveying services for the Lord Fairfax Community College Corron Community Development Center project as a subconsultant to Lantz Construction Company of Winchester. The A&A crews are working on an on-call basis to stakeout the storm sewer and sanitary sewer structures, water lines, building, sidewalks, plazas, curb & gutter, and edge of pavement. Anderson & Associates Middletown Regional Offi ce is located less than a mile from the Lord Fairfax Middletown, Virginia campus. 2009

7 Southwest Virginia Higher Education Center Virginia Highlands Community College - Abingdon, VA Firm s Responsibility: Site Civil Design Southwest Virginia Higher Education Center Rachel Fowlkes One Partnership Circle Abingdon, VA Total Project Cost: $1,500,000 Southwest Virginia Higher Education Center is located on the Virginia Highlands Community College Campus and provides classroom teaching, and conference space for ten Virginia Universities, including UVA, Virginia Tech, and ODU. A classroom expansion will provide more programming space for this high demand facility. A&A provided design of site layout and utilities, grading, stormwater management and erosion and sediment control services. A&A also prepared a rainwater harvest system design for irrigation uses on site. LEED certifi cation was achieved for this project.

8 Learning Resource Center J. Sargeant Reynolds Community College - Richmond VA Firm s Responsibilities: Surveying, Site Layout, Grading, Storm Drainage, Sanitary & Water Services, Roadway Design J. Sargeant Reynolds Community College 1651 East Parham Road Richmond, VA Doug Terrell Architect MWC Architects 2008 Anderson & Associates, Inc. provided professional engineering services for site design that included sidewalk layout, grading, storm drainage, and sanitary & water services. JSRCC built a new learning center along an existing creek with a riparian protection zone along the adjacent creek. The site design accommodated development restrictions from the RPZ and included landscaping treatments to address impacts on the stream buffer from the building. Because the new building was placed on the roadway that connected the east and west parking lots, it became necessary to construct the North Connector Road before beginning building construction. A&A prepared a complete and separate set of road plans and assisted with construction contract administration for the road construction while continuing work on the building site plans.

9 Comprehensive Master Plan Update Dabney S. Lancaster Community College - Clifton Forge, VA Firm s Responsibilities: Master Planning Dabney S. Lancaster Community College PO Box 1000 Clifton Forge, VA Mr. Ed Kenny Fees: $3,200 Dabney S. Lancaster Community College (DSLCC) retained Anderson & Associates, Inc. to update the college s comprehensive master plan. The comprehensive master plan is a tool to guide DSLCC as it plans for the future needs of both its students and facilities. It includes a set of graphic plans, which refl ect the campus s current physical layout and planned improvements, and a master plan narrative, which describes the history, context, and existing and proposed programming and infrastructure updates at the college. Anderson & Associates, Inc. is experienced with the Virginia Community College System (VCCS) and the Virginia Capital Outlay Manuals standards for updating both the graphic plans and the narrative. A&A performed the previous two updates of DSLCC s comprehensive master plan, as well as master planning work and comprehensive plan updates for a number of other Virginia community colleges.

10 Anderson & Associates, Inc. 100 Ardmore Street Blacksburg, VA

Trends in IPEDS Graduation, Transfer, Success, and Retention Rates for VCCS Colleges: Fall 2001 Cohort to Fall 2010 Cohort

Trends in IPEDS Graduation, Transfer, Success, and Retention Rates for VCCS Colleges: Fall 2001 Cohort to Fall 2010 Cohort Trends in IPEDS Graduation, Transfer, Success, and Retention Rates for VCCS Colleges: Fall 2001 Cohort to Fall 2010 Cohort Research Report No. 61-14 Office of Institutional Research, Planning, and Assessment

More information

General Education Student Success at Southwest Virginia Community College

General Education Student Success at Southwest Virginia Community College General Education Student Success at Southwest Virginia Community College Progress of Students Enrolled in Remedial English and Math Classes The Virginia Community College System has replaced the national

More information

How To Help Veterans At The Virginia Community College

How To Help Veterans At The Virginia Community College SERVING THOSE WHO SERVE: VETERAN STUDENTS CHARACTERISTICS AND OUTCOMES IN THE VCCS STUDENT SUCCESS SNAPSHOT #28 October 2013 8 KEYS TO SUCCESS The U.S. Departments of Education and Veterans Affairs developed

More information

Capital Outlay. Capital Outlay Funding ($ in millions)

Capital Outlay. Capital Outlay Funding ($ in millions) Capital Outlay Capital Outlay Funding ($ in millions) Fund Type Chapter 3 2012-14 General Fund $20.3 VPBA/VCBA Tax-Supported Bonds 217.8 9(c) Revenue Bonds 125.6 9(d) NGF Revenue Bonds 665.1 Virginia Port

More information

Benchmark Report: 2005

Benchmark Report: 2005 Benchmark Report: 2005 Research Report No. 30-06 Office of Institutional Research, Planning, and Assessment Northern Virginia Community College September 2006 OFFICE OF INSTITUTIONAL RESEARCH, PLANNING,

More information

Executive Summary. Prior Research on Transfer Student Performance

Executive Summary. Prior Research on Transfer Student Performance Virginia Community Colleges Transfers to Old Dominion University: Academic Performance, Retention, and Graduation[1] Zhao Yang, Ph.D Martha Smith Sharpe, Ed.D University Planning and Institutional Research

More information

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS ENGINEERING DESIGN GUIDELINES for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS City of Birmingham Department of Planning, Engineering and Permits Engineering Division Office of the City Engineer 2008 TABLE

More information

Please send completed application to:

Please send completed application to: VIRGINIA CHILD CARE PROVIDER SCHOLARSHIP PROGRAM Provided by: Virginia Department of Social Services (VDSS) Now Administered by: (NVCC) 1-866-636-1608 OR 703-257-6579 Email: childcare.scholarship@nvcc.edu

More information

Capital Construction Program

Capital Construction Program Capital Construction Program 15 April 2015 Capital Construction Program Ed Gillikin, AIA, VCCO, LEED AP Architect for the Colleges 15 April 2015 23 Colleges on 40 Campuses 23 Colleges on 40 Campuses Tidewater

More information

Institutions of Higher Education in Virginia

Institutions of Higher Education in Virginia Advanced Technology Institute Alliance Medical & Health Sciences College American College of Commerce & Technology American National University - Salem American Public University System American University

More information

Bond Release Process for New Subdivision Developments in Fairfax County

Bond Release Process for New Subdivision Developments in Fairfax County Bond Release Process for New Subdivision Developments in Fairfax County An Overview for Homeowners Associations A Fairfax County, Va., publication April 2009 For more information or to request this document

More information

Academic Performance of Transfers From Virginia s Two-Year Colleges

Academic Performance of Transfers From Virginia s Two-Year Colleges Academic Performance of Transfers From Virginia s Two-Year Colleges Spring 2010 Academic Performance of Transfers from Virginia's Two-Year Colleges April 2010 Background James Madison University annually

More information

COPPER BEECH TOWNHOME DEVELOPMENT

COPPER BEECH TOWNHOME DEVELOPMENT COPPER BEECH TOWNHOME DEVELOPMENT This 28 acre, 30 Townhome development is slated to open doors in time for the 2007 2008 college school year. To accommodate this project s tight time line, Dennis Corporation

More information

The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08

The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08 The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08 Fairfax County requires developers to post a performance bond if they are

More information

ACTUARIAL VALUATION OF THE VIRGINIA529 prepaid AS OF JUNE 30, 2013. By: ALAN H. PERRY, FSA, CFA RICHARD L. GORDON, FSA, EA JILL M.

ACTUARIAL VALUATION OF THE VIRGINIA529 prepaid AS OF JUNE 30, 2013. By: ALAN H. PERRY, FSA, CFA RICHARD L. GORDON, FSA, EA JILL M. ACTUARIAL VALUATION OF THE VIRGINIA529 prepaid AS OF JUNE 30, 2013 By: ALAN H. PERRY, FSA, CFA RICHARD L. GORDON, FSA, EA JILL M. STANULIS, EA 1550 Liberty Ridge Drive Suite 200 Wayne, PA 19087-5572 Tel

More information

Guidelines for Fiber Optic Cable Permits

Guidelines for Fiber Optic Cable Permits Guidelines for Fiber Optic Cable Permits NOVA District (Fairfax/Arlington) Permits www.virginiadot.org/business/fairfax-permits-main.asp Email: NOVAFairfaxPermits@VDOT.Virginia.gov 14685 Avion Parkway

More information

G3 GRANT LID RETROFIT FOR THE ASHLAND MUNICIPAL PARKING LOT

G3 GRANT LID RETROFIT FOR THE ASHLAND MUNICIPAL PARKING LOT G3 GRANT LID RETROFIT FOR THE ASHLAND MUNICIPAL PARKING LOT GREEN STREETS GREEN JOBS GREEN TOWNS PROJECT INFORMATION: Location: Ashland, VA Project Type: Design and Construction Restoration Practice: Bioretention,

More information

Basic Elements of Reading Plans

Basic Elements of Reading Plans Center for Land Use Education and Research at the University of Connecticut Basic Elements of Reading Plans University of Connecticut. The University of Connecticut supports all state and federal laws

More information

Affordability Profile

Affordability Profile Virginia Affordability Profile from Affordability of Public Higher Education in SREB States prepared by Patrick M. Callan, William Doyle, Joni Finney and Darcie Harvey Higher Education Policy Institute

More information

5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons)

5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons) DATE: March 8, 2006 TO: FROM: SUBJECT: Plan Commission Larry D. Nelson, P.E., City Engineer 5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons) The City Engineering

More information

APPENDIX I - AREA PLANS

APPENDIX I - AREA PLANS APPENDIX I - AREA PLANS MIDDLETOWN/LORD FAIRFAX SEWER AND WATER SERVICE AREA Lord Fairfax Community College (LFCC) is a comprehensive, multi-campus public institution of higher education. Through its three

More information

RESOLUTION NO. 1539 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BONNEY LAKE, PIERCE COUNTY, WASHINGTON, APPROVING THE 192 ND CORRIDOR STUDY AND DIRECTING THE MAYOR TO PROCEED WITH PARTIAL DESIGN AND

More information

CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR

CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA RSTP Funds Joint Application FOR Tinker Creek Pedestrian Bridge: Tinker Creek and Glade Creek Greenways Connection Date: September 15, 2014 RSTP Project Profile

More information

Chapter 2 PLAN AND PLAT REVIEW PROCESS

Chapter 2 PLAN AND PLAT REVIEW PROCESS www.cityofknoxville.org/engineering/ Chapter 2 PLAN AND PLAT REVIEW PROCESS 2.1 Overall Sequence for Large Projects The overall sequence of major development and redevelopment projects will generally follow

More information

SUBDIVISION APPLICATION GUIDE

SUBDIVISION APPLICATION GUIDE SUBDIVISION APPLICATION GUIDE August 2013 This brochure provides an overview of the steps involved in the Subdivision Application process. This is a general guide only. It is not meant to replace bylaws

More information

A History of Chancellor s Faculty Fellowships

A History of Chancellor s Faculty Fellowships 2013-2014 Lorrie Coe-Meade Associate Professor of Nursing Wytheville Community College Ph.D. in Community College Leadership Kristyn Moskey Associate Professor, Geology and Environmental Science Ph.D.

More information

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Background What are permeable interlocking concrete pavements (PICP)?

More information

Waterstone Business Park

Waterstone Business Park Orange County, North Carolina Waterstone Business Park Parcel Size Price Location Zoning Topography Combined total of 47 acres (Parcel #5-22 acres, #7-25 acres) $74,545 per acre (Parcel #5), $32,880 per

More information

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM Shepherd University Board of Governors June 9, 2005 Agenda Item No. 9 SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM In 1994 construction began on the Byrd Science and

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

Exhibit C: Scope of Work and Schedule of Deliverables

Exhibit C: Scope of Work and Schedule of Deliverables Exhibit C: Scope of Work and Schedule of Deliverables Project Scope of Work Phases: A City Hall Envelope Renovations B City Hall Skylight Replacement C City Hall Chiller Replacement D City Hall Annex Plaza

More information

Cisco Networking Academy: Virginia Profile

Cisco Networking Academy: Virginia Profile Cisco Networking Academy: Virginia Profile Educating the Architects of the Networked Economy Now in its second decade, Cisco Networking Academy has provided more than two million students worldwide with

More information

West Thornhill Stormwater Flood Remediation Phase 1 Construction. Community Information Meeting

West Thornhill Stormwater Flood Remediation Phase 1 Construction. Community Information Meeting West Thornhill Stormwater Flood Remediation Phase 1 Construction Community Information Meeting Thornhill C.C. May 7, 2014 Purpose To advise residents and businesses of 2014 and 2015 construction activities

More information

Directory of Hospice Providers in Virginia

Directory of Hospice Providers in Virginia Table of Contents Providers... 2 Certified Providers... 9 General Information Introduction This directory contains the provider contact information for licensed and certified hospice programs. Additional

More information

Engineering. 2006 2007 2007 2008 2008 2008 Major Service Actual Budget Projected Request Executive Adopted

Engineering. 2006 2007 2007 2008 2008 2008 Major Service Actual Budget Projected Request Executive Adopted Engineering Agency Number: 53 Budget Function: Public Works and Transportation The Engineering Division is responsible for the design, supervision and inspection of all street, highway, sidewalk and bike

More information

MINUTES OF THE WILLIAMSON COUNTY REGIONAL PLANNING COMMISSION MEETING OF MARCH 13, 2008

MINUTES OF THE WILLIAMSON COUNTY REGIONAL PLANNING COMMISSION MEETING OF MARCH 13, 2008 MINUTES OF THE WILLIAMSON COUNTY REGIONAL PLANNING COMMISSION MEETING OF MARCH 13, 2008 MEMBERS PRESENT Don Crohan Susan Fisher Holli Givens John Lackey Steve Lane Robert Medaugh Pete Mosley Tom Murdic

More information

Specializing in complex infrastructure, transportation + Major Building Projects

Specializing in complex infrastructure, transportation + Major Building Projects Specializing in complex infrastructure, transportation + Major Building Projects MBE WBE DBE ABOUT US Ardmore Associates LLC is an engineering consulting and construction services firm specializing in

More information

VCCS Report on High Performance Metrics Data for Achieve 2015 Goals within VCCS

VCCS Report on High Performance Metrics Data for Achieve 2015 Goals within VCCS DRAFT VCCS Report on High Performance Metrics Data for Achieve 2015 Goals within VCCS Research Report No. 36-12 Compiled by VCCS Office of Institutional Research, Planning, and Assessment Northern Virginia

More information

SITE IMPROVEMENT PLANS CHECKLIST

SITE IMPROVEMENT PLANS CHECKLIST REVIEW SERVICES TEAM SITE IMPROVEMENT PLANS CHECKLIST (Also for SITE DEVELOPMENT PERMIT applications) GENERAL REQUIREMENTS This checklist applies to commercial building site work involving engineering,

More information

EXHIBIT A Accessible Truck Routes Map

EXHIBIT A Accessible Truck Routes Map EXHIBIT A Accessible Truck Routes Map ASHEVILLE, NORTH CAROLINA ROUTE: A ROUTE: B ROUTE: C ROUTE: D ROUTE: E EXHIBIT A EXHIBIT B Craven Street Improvements Map ASHEVILLE, NORTH CAROLINA EXHIBIT B EXHIBIT

More information

AREA: 2.37 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF. Single-family, Non-conforming machine shop

AREA: 2.37 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF. Single-family, Non-conforming machine shop FILE NO.: Z-8958 NAME: Rock Structure Repair Short-form PID LOCATION: Located at 8024 Stanton Road DEVELOPER: Rock Structure Repair Attn. Rudy Gutierrez 3 Kipling Court Little Rock, AR 72209 ENGINEER:

More information

Lincoln Public Schools. 15 Attachments (separately bound) Schematic Design. 15.1 Schematic Design Project Manual

Lincoln Public Schools. 15 Attachments (separately bound) Schematic Design. 15.1 Schematic Design Project Manual 15 Attachments (separately bound) 15.1 Project Manual - Table of Contents - Outline Specifi cations 15.2 Drawings (half size) - Drawing List Section 15.3 15.1 Project Manual Separately bound and being

More information

GeoTEd is. GeoTEd Partners. GeoTEd Overview 6/01/2013

GeoTEd is. GeoTEd Partners. GeoTEd Overview 6/01/2013 NSF ATE DUE 0903270; 1205110 GeoTEd is Funded by the NSF Advanced Technological Education (ATE) Program $899,870 $899,870; October 2012 to 2015 6 state region (VA, TN, WV, KY, MD, NC) Three year new ATE

More information

VIRGINIA WATERWORKS: FINANCING OPTIONS

VIRGINIA WATERWORKS: FINANCING OPTIONS Financing Options: Virginia Department of Health Office of Drinking Water 109 Governor Street, 6 th Floor Richmond, Virginia 23219 Phone: (804) 864-7501 Fax: (804) 864-7521 www.vdh.state.va.us/odw Last

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

Virginia Four-Year Public Colleges and Universities

Virginia Four-Year Public Colleges and Universities Morrow-Stevens Foundation Scholarship Do I Qualify? I reside in Virginia School Division Region 6, 7 or 8 Region 6- Western Virginia Alleghany Botetourt Craig Floyd Franklin Henry Montgomery Patrick Pittsylvania

More information

Executive Director s Recommendation Commission Meeting: July 11, 2013

Executive Director s Recommendation Commission Meeting: July 11, 2013 Executive Director s Recommendation Commission Meeting: July 11, 2013 PROJECT Russell Road Widening Phase 2 United States Marine Corps Base Quantico Prince William County, Virginia SUBMITTED BY United

More information

VIRGINIA. ECE Training Institutions - alphabetized by city

VIRGINIA. ECE Training Institutions - alphabetized by city VIRGINIA ECE Training Institutions - alphabetized by city NORTHERN VIRGINIA COMMUNITY COLLEGE 3001 NORTH BEAUREGARD ALEXANDRIA, VA, 22311 703-845-6171 MARY HANRAHAN PROFESSOR, EARLY CHILDHOOD EDUCATION

More information

Planning and Zoning Commission Johnston, Iowa June 29, 2015

Planning and Zoning Commission Johnston, Iowa June 29, 2015 ITEM NO. 15-19 Planning and Zoning Commission Johnston, Iowa June 29, 2015 SUBJECT: Consider recommending approval of the Final Plat for Crosshaven Plat 6 subdividing 28.28 acres into 47 single family

More information

2015 Approved Training Programs

2015 Approved Training Programs 2015 Approved Training Programs Tier Level 1 Basic Law Enforcement New River Criminal Justice Training Dublin VA (540) 674-5846 Mr. Martin R. Alford Virginia Law Enforcement Certificate CNC/Conventional

More information

Local Government GIS Activities

Local Government GIS Activities Local Government GIS Activities 1 of 7 Local Government GIS Activities As the mandated coordinating body for GIS activities in the Commonwealth of Virginia, VGIN works with local governments on several

More information

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580

More information

Overview of Land Construction Courses at Kansas State University

Overview of Land Construction Courses at Kansas State University Overview of Land Construction Courses at Kansas State University Developed by Professor Day in the mid 1960 s at KSU, continuing to present time, is a vision of a Land Construction course series that examines

More information

SECTION 02100 SITE PREPARATION

SECTION 02100 SITE PREPARATION SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division

More information

SECTION 5 DRAFTING STANDARDS

SECTION 5 DRAFTING STANDARDS SECTION 5 DRAFTING STANDARDS 1 SECTION FIVE TABLE OF CONTENTS Description Page TABLE OF CONTENTS... 5-2 GENERAL... 5-3 DRAFTING STANDARDS... 5-5 DRAFTING MINIMUM REQUIREMENTS HANDOUT... 5-8 2 GENERAL 1.

More information

SECTION ELEVEN: ACTIVITIES REQUIRING A CERTIFIED EROSION AND SEDIMENT CONTROL PLAN 1

SECTION ELEVEN: ACTIVITIES REQUIRING A CERTIFIED EROSION AND SEDIMENT CONTROL PLAN 1 SECTION ELEVEN: ACTIVITIES REQUIRING A CERTIFIED EROSION AND SEDIMENT CONTROL PLAN 1 An application for approval of a soil erosion and sediment control plan in accordance with these regulations shall be

More information

Permit Application No. Development Address. Legal Description. A. Flood Plain and Floodway Information and Sources: (To be completed with Staff)

Permit Application No. Development Address. Legal Description. A. Flood Plain and Floodway Information and Sources: (To be completed with Staff) FLOOD PLAIN DEVELOPMENT PERMIT APPLICATION of Olathe, Department of Public Works 1385 S. Robinson Drive P.O. Box 768 Olathe, Kansas 66051-0768 (913) 971-9045 FAX (913) 971-9099 Olathe, Kansas, Community

More information

SERVICES THAT MAY ONLY BE PERFORMED BY A NEW JERSEY PROFESSIONAL LAND SURVEYOR

SERVICES THAT MAY ONLY BE PERFORMED BY A NEW JERSEY PROFESSIONAL LAND SURVEYOR SERVICES THAT MAY ONLY BE PERFORMED BY A NEW JERSEY PROFESSIONAL LAND SURVEYOR 1. ANY MAP OR PLAN THAT SHOWS: Property Lines. NJSA 45:8-28(e), NJAC 13:40-1.3, 13:40-5.1 Locations of Existing Buildings

More information

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24 Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge

More information

MATERIALS CERTIFICATION SCHOOLS 2016

MATERIALS CERTIFICATION SCHOOLS 2016 MATERIALS CERTIFICATION SCHOOLS 2016 2014, Virginia Department of Transportation Registration Process Online Registration Enrollment and payment for all personnel in the Materials Certification Schools

More information

THE APPRAISAL OF REAL ESTATE 3 RD CANADIAN EDITION BUSI 330

THE APPRAISAL OF REAL ESTATE 3 RD CANADIAN EDITION BUSI 330 THE APPRAISAL OF REAL ESTATE 3 RD CANADIAN EDITION BUSI 330 REVIEW NOTES by CHUCK DUNN CHAPTER 10 Copyright 2010 by the Real Estate Division and Chuck Dunn. All rights reserved ARE 3 rd EDITION REVIEW

More information

VIRGINIA. ECE Training Institutions - alphabetized by city NORTHERN VIRGINIA COMMUNITY COLLEGE 3001 NORHT BEAUREGARD ALEXANDRIA, VA 22311 703-845-6171

VIRGINIA. ECE Training Institutions - alphabetized by city NORTHERN VIRGINIA COMMUNITY COLLEGE 3001 NORHT BEAUREGARD ALEXANDRIA, VA 22311 703-845-6171 VIRGINIA ECE Training Institutions - alphabetized by city 3001 NORHT BEAUREGARD ALEXANDRIA, VA 22311 703-845-6171 MARY HANRAHAN PROFESSOR, EARLY CHILDHOOD EDUCATION VIRGINIA TECH UNIVERSITY HUMAN DEVELOPMENT

More information

VIRGINIA. ECE Training Institutions - alphabetized by city

VIRGINIA. ECE Training Institutions - alphabetized by city PROSOLUTIONS TRAINING 1117 PERIMETER CENTER WEST, SUITE W300 ATLANTA, GA 30338 www.prosolutionstraining.com 7706426939 DEBBIE JOHNSTON VICE PRESIDENT, PARTNERSHIPS DebbieJohnston@ProSolutionsTraining.com

More information

Endowments at Virginia colleges and universities

Endowments at Virginia colleges and universities n The Big Book: EDUCATION Endowments at colleges and universities University 2015 endowment funds ($000s) 1 University of $6,180,515 University of Richmond 2,371,810 Commonwealth University 1,638,147 Washington

More information

Environment Virginia Conference April 6, 2011. Integrating Stormwater, Urban Design, and Growth Policies

Environment Virginia Conference April 6, 2011. Integrating Stormwater, Urban Design, and Growth Policies Environment Virginia Conference April 6, 2011 Integrating Stormwater, Urban Design, and Growth Policies Integrating Stormwater, Urban Design, and Growth Policies Sara Hollberg, AICP, Valley Conservation

More information

Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices

Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices Amy H. Brennan (440) 975-3870 www.crwp.org abrennan@crwp.org Chagrin River Watershed Partners Formed

More information

Rider Alert card distribution locations

Rider Alert card distribution locations Rider Alert card distribution locations Virginia Motorcycle Dealers Association Members Greater Richmond Area Commonwealth Power Sports 2000 Waterside Road Prince George, VA 23875 Colonial Harley Davidson

More information

Accela Automation User Manual for Gwinnett County Automated Inspection Request System (IVR)

Accela Automation User Manual for Gwinnett County Automated Inspection Request System (IVR) Accela Automation User Manual for Gwinnett County Automated Inspection Request System (IVR) Version 1.2 9/30/2010 Table of Contents IVR Instructions...3 Initial Entry Instructions...3 Permit Access Instructions

More information

FILE NO.: Z-6915-C. Gamble Road Short-form PCD and Land Alteration Variance Request

FILE NO.: Z-6915-C. Gamble Road Short-form PCD and Land Alteration Variance Request FILE NO.: Z-6915-C NAME: Gamble Road Short-form PCD and Land Alteration Variance Request LOCATION: Located on the Northwest corner of Chenal Parkway and Gamble Road DEVELOPER: Davis Properties P.O. Box

More information

STATE WIDE TERM CONTRACT TO PERFORM FACILITIES CONDITION ASSESSMENT SERVICES. Contract Purpose/Overview of Scope of Work. Abridged Scope of Work*

STATE WIDE TERM CONTRACT TO PERFORM FACILITIES CONDITION ASSESSMENT SERVICES. Contract Purpose/Overview of Scope of Work. Abridged Scope of Work* E-Mail: aregister@mmo.sc.gov 1201 Main St - Ste 600 Page: 75 STATE WIDE TERM CONTRACT TO PERFORM FACILITIES CONDITION ASSESSMENT SERVICES MAXIMUM CONTRACT PERIOD: JUNE 23, 2009 THROUGH JUNE 22, 2014 Contract

More information

VILLAS OF TRADITIONS AT GREY OAKS

VILLAS OF TRADITIONS AT GREY OAKS Report of Turnover Survey VILLAS OF TRADITIONS AT GREY OAKS Grey Oaks Development Naples, Collier County, Florida Forge Engineering Project Number 2907-001.01 March 2015 Richard P..Lundberg, P.E cn=richard

More information

HARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015

HARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015 HARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015 PROPOSED REDEVELOPMENT The project consists of demolishing

More information

Stanford Graduate School of Business Knight Management Center Campus

Stanford Graduate School of Business Knight Management Center Campus Stanford Graduate School of Business Knight Management Center Campus Mathew Bamm, P.E. LEED AP courtesy: boora architects Overview Introductions Design Team and Project Overview Regulatory Framework and

More information

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Project Name: Tax Map Parcel: Acreage: Plat: ADC Map & Grid Engineering

More information

Virginia Workforce Comprehensive & Satellite Centers: Statewide Listing

Virginia Workforce Comprehensive & Satellite Centers: Statewide Listing Virginia Workforce Comprehensive & Satellite Centers: Statewide Listing Virginia Workforce Comprehensive Center A full service physical site that provides core/self-service job search assistance (including

More information

SPECIAL USE PERMIT 22-01. JCSA Groundwater Treatment Facility Staff Report for the November 5, 2001, Planning Commission Public Hearing

SPECIAL USE PERMIT 22-01. JCSA Groundwater Treatment Facility Staff Report for the November 5, 2001, Planning Commission Public Hearing SPECIAL USE PERMIT 22-01. JCSA Groundwater Treatment Facility Staff Report for the November 5, 2001, Planning Commission Public Hearing This report is prepared by the James City County Planning Division

More information

Developer s/consultants Field Services Guidelines

Developer s/consultants Field Services Guidelines Developer s/consultants Field Services Guidelines 2007 Engineering and Works Department DEVELOPER S/CONSULTANT S FIELD SERVICES GUIDELINES Fourth Electronic Edition February 2007 STATEMENT OF COMPLETION

More information

Engineering Department

Engineering Department Engineering Department Site Plan Review Application 1025 31st St SE PO Box 5006 Minot, ND 58702 engineers@minotnd.org (701) 857-4100 Contact Information Developer/Property Owner Address City State Zip

More information

PROFFER STATEMENT REZONING TLZM 2013-0001 LEEGATE November 1, 2013

PROFFER STATEMENT REZONING TLZM 2013-0001 LEEGATE November 1, 2013 PROFFER STATEMENT REZONING TLZM 2013-0001 LEEGATE November 1, 2013 Leegate LLC and Stanley Martin Companies, LLC, owner and applicant, (the Applicant ) of certain property described as Loudoun County Tax

More information

College/University Course Course Title BSMCON Equivalent

College/University Course Course Title BSMCON Equivalent Blue Ridge Community College ART 101 History and Appreciation of Art I ART Blue Ridge Community College ART 102 History and Appreciation of Art II ART Blue Ridge Community College ART 121 Drawing I ART

More information

TOWN OF JUNO BEACH 340 Ocean Drive Juno Beach, FL 33408 Phone: (561) 656-0302 Fax: (561) 775-0812

TOWN OF JUNO BEACH 340 Ocean Drive Juno Beach, FL 33408 Phone: (561) 656-0302 Fax: (561) 775-0812 TOWN OF JUNO BEACH 340 Ocean Drive Phone: (561) 656-0302 Fax: (561) 775-0812 Application for Building Permit & Certificate of Occupancy OFFICE USE ONLY: Date: Permit #: Tracking #: Job Address: Property

More information

National College Advising Corps Empowering Students to Succeed American Youth Policy Forum May 29, 2009. Our Mission

National College Advising Corps Empowering Students to Succeed American Youth Policy Forum May 29, 2009. Our Mission National College Advising Corps Empowering Students to Succeed American Youth Policy Forum May 29, 2009 Headquartered at the University of North Carolina at Chapel Hill Jackson Hall, Campus Box 2200 Chapel

More information

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm: Page 1 of 6 Section 1. PURPOSE This policy is an Engineering checklist of the Local Review Program for sanitary sewer improvement projects by the Bedford Regional Water Authority ( Authority ). Section

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS The Board of Supervisors of Tazewell County, Virginia is soliciting proposals, pursuant to Section 56-575.4 of the Code of Virginia, from private entities to design and build an onsite

More information

2004 Capital Budget Capital Improvement Program

2004 Capital Budget Capital Improvement Program 2004 Capital Budget Capital Improvement Program Agency Name: Stormwater Utility Agency Number: 53 Capital Budget Future Year Estimates Project Name 2004 2005 2006 2007 2008 2009 1 Accompanying Storm Sewer

More information

Guidelines for. Permeable Pavement

Guidelines for. Permeable Pavement What is permeable pavement? Guidelines for Permeable Pavement When rainwater falls on conventional pavement, such as concrete, it accumulates and then flows across and off of this impervious surface as

More information

12 February 8, 2012 Public Hearing APPLICANT:

12 February 8, 2012 Public Hearing APPLICANT: 12 February 8, 2012 Public Hearing APPLICANT: PROPERTY OWNER: VIRGINIA BEACH ASSOCIATES, LC REQUEST: Conditional Change of Zoning (I-1 to Conditional A-36) STAFF PLANNER: Faith Christie ADDRESS / DESCRIPTION:

More information

New River Valley Commerce Park Virtual Shell Building

New River Valley Commerce Park Virtual Shell Building 1. Regional Overview 2. Site Information Table of Contents 3. Building Information 4. Building Schedule 5. Construction Budget Information 6. Contact Information Overview A : is a shovel-ready alternative

More information

Virginia State Corporation Commission efiling CASE Document Cover Sheet

Virginia State Corporation Commission efiling CASE Document Cover Sheet Virginia State Corporation Commission efiling CASE Document Cover Sheet Case Number (if already assigned) pue-201 1-00011 Case Name (if known) Application of Virginia Electric and Power Company for approval

More information

DLAS Document Summary

DLAS Document Summary DLAS Document Summary DLAS Document Summary Teacher Survey Results Author Department of Education Enabling Authority Item 132, paragraph B. 12., Chapter 890, 2011 Acts of Assembly (May 2, 2011) Executive

More information

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates

More information

Roseman Technology Site *Caroline County, Virginia 110 Acres Seconds off Interstate 95

Roseman Technology Site *Caroline County, Virginia 110 Acres Seconds off Interstate 95 Roseman Technology Site *Caroline County, Virginia 110 Acres Seconds off Interstate 95 Water Service Provider: Caroline Location: I - 95 Route 639, Ladysmith Exit 110 County Suitable for Construction:110

More information

SECTION EIGHT BONDING REQUIREMENTS

SECTION EIGHT BONDING REQUIREMENTS SECTION EIGHT BONDING REQUIREMENTS 8-00 BONDING REQUIREMENTS 8-01 No building permit for any construction in the subdivision shall be issued nor any lot within the subdivision conveyed until a bond has

More information

K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name

K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY 1. Applicant's Name Address (Street or Rural Route) (City & State) (Zip) Person to contact Title Phone Fax

More information

5 Most Common Planning & Management Problems in Ontario County, Canada

5 Most Common Planning & Management Problems in Ontario County, Canada Name of Haz. Mit. Plan: Problem being Mitigated: Action Worksheet TB-1: Town Hall Flood Protection Ontario County Multi-Jurisdictional Hazard Mitigation Plan 2015 Flood risk to some critical facilities

More information

------------------------------------------------------ Annual Report 2013 ------------------------------------------------------

------------------------------------------------------ Annual Report 2013 ------------------------------------------------------ ------------------------------------------------------ Annual Report 213 ------------------------------------------------------ Letter from Andy Casiello Dear Colleagues: Distance Learning is finishing

More information

Definition of Tower from the Bradley County Zoning Resolution

Definition of Tower from the Bradley County Zoning Resolution Definition of Tower from the Bradley County Zoning Resolution 43. TOWER. Any outdoor structure designed and constructed to support one (1) or more transmitting or receiving devices for telephone, radio

More information

PARKVILLE HIGH SCHOOL LIMITED RENOVATION

PARKVILLE HIGH SCHOOL LIMITED RENOVATION PARKVILLE HIGH SCHOOL LIMITED RENOVATION DESIGN BRIEFING For Dr. Joe A. Hairston BALTIMORE COUNTY PUBLIC SCHOOLS August 11, 2009 Smolen 3 Emr + Associates Architects 1355 Piccard Drive, Suite 200 Rockville,

More information

5. Environmental Analysis

5. Environmental Analysis 5.11 The potential for adverse impacts on utilities and service systems was evaluated based on information concerning current service levels and the ability of the service providers to accommodate the

More information

Village of Lynwood REQUEST FOR QUALIFICATIONS (RFQ) MUNICIPAL ENGINEERING SERVICES. Response Due Date: Friday, April 18, 2014, 4:00 p.m.

Village of Lynwood REQUEST FOR QUALIFICATIONS (RFQ) MUNICIPAL ENGINEERING SERVICES. Response Due Date: Friday, April 18, 2014, 4:00 p.m. Village of Lynwood REQUEST FOR QUALIFICATIONS (RFQ) MUNICIPAL ENGINEERING SERVICES Response Due Date: Friday, April 18, 2014, 4:00 p.m. Send Sealed Qualifications to: Eugene Williams, Mayor Village of

More information