STORM AND SANITARY SEWER PIPE REHABILITATION BY THE QUADEX STRUCTURAL LINING REHABILITATION SYSTEM

Size: px
Start display at page:

Download "STORM AND SANITARY SEWER PIPE REHABILITATION BY THE QUADEX STRUCTURAL LINING REHABILITATION SYSTEM"

Transcription

1 STORM AND SANITARY SEWER PIPE REHABILITATION BY THE QUADEX STRUCTURAL LINING REHABILITATION SYSTEM OUTLINE PART 1 GENERAL 1.1 Description of Work 1.2 Intent 1.3 Objective 1.4 Work and Components Included 1.5 Applicable ASTM Standards and Specifications 1.6 Safety Equipment and Procedures PART 2 QUALIFICATIONS 2.1 General 2.2 Acceptable Liner Products and Manufacturers 2.3 Manufacturer and Installer Experience 2.4 Qualifying Superintendent and Crew PART 3 GENERAL REQUIREMENTS OF THE STRUCTURAL QM-1S RESTORE LINER 3.1 Reference Specifications 3.2 Materials: QM-1s Restore Liner 3.3 Materials: Packaging and Storage 3.4 Materials: Receipt Procedure PART 4 PIPE DESIGN 4.1 Liner Thickness 4.2 Liner Physical Characteristics 4.3 Minimum Acceptable Liner Thickness (Selected Diameters) PART 5 EQUIPMENT 5.1 Description of Major Equipment 5.2 Equipment Maintenance Schedules PART 6 EXECUTION 6.1 Pipe Cleaning and Preparation 6.2 Sealing Active Leaks

2 6.3 Invert Repair 6.4 Inspections (Pre and Post) 6.5 Identification and Pre-Measurement of Lateral Connections 6.6 Bypass of Flow 6.7 Mixing the QM-1s Restore Lining Material 6.8 Spray Application of QM-1s Restore Lining Material 6.9 Curing of the QM-1s Restore Lining Material 6.10 Termination and Sealing at Manhole Outlets 6.11 Internal Reconnection of Lateral Services 6.12 End of Shift Clean Up Procedures PART 7 QUALITY ASSURANCE AND QUALITY CONTROL 7.1 Quality Control Statement 7.2 Quality Assurance Reports to Management 7.3 Daily Activity Logs 7.4 Equipment Calibration Reports 7.5 Final Inspection 7.6 Sample Preparation and Testing of QM-1s Restore Liner PART 8 PART 9 SUBMITTALS GUARANTEE AND WARRANTY

3 STORM AND SANITARY SEWER PIPE REHABILITATION BY THE QUADEX STRUCTURAL LINING REHABILITATION SYSTEM PART 1 GENERAL 1.1 Description of Work Provide all labor, material and equipment to provide for the structural reconstruction of existing sanitary or storm pipes using an approved structural QM-1s Restore lining system by forming a new pipe within an existing structurally deteriorated pipe, which has generally maintained its original shape. This Specification covers the general requirements for the referenced specifications, QM-1s Restore manufacturer and installer qualifications, submittal and guaranty guidelines, materials, pre-installation and installation procedures, and testing. The QM-1s Restore liner may be spin cast or hand sprayed to various pipe surfaces including: brick, concrete, corrugated metal, clay tile, and various other materials. 1.2 Intent The Quadex System is used to install a QM-1s Restore liner inside storm and sanitary sewer pipes resulting in a structural liner that stops further water infiltration and rebuilds the structure surface. The pipe surface is first cleaned and a structural designed liner is spin cast or manually hand spray applied to the interior surfaces. This specification describes all the work, materials, and equipment required for the purpose of structurally rehabilitating the pipe and stopping water infiltration. A uniform QM-1s liner shall be spin cast applied to a prescribed thickness, to all cleaned interior surfaces. The pipe liner shall extend the full length of the original pipe and shall provide a structurally sound, joint-less new structural pipe within the original pipe. 1.3 Objective The primary objective of this section is to structurally reinforce the existing pipe while stopping excessive infiltration and inflow of extraneous water into the storm or sewer system and thereby reduce sewer overflows and the unnecessary treatment and transport costs associated with inflow/infiltration. It is critical that both the Product and the Installer have the ability to meet or exceed all requirements of the Owner. The secondary objective of this contract is to rehabilitate those sewers on which failure could be very disruptive, hazardous to public health, and/or be very expensive to repair after failure. 1.4 Work and Components Included 1. Pre-Installation Cleaning and TV Inspection of Storm or Sewer Pipes 2. Bypass Pumping 3. Pipe Cleaning and Preparation 4. Application of QM-1s Restore Liner 5. Quality Control Measures 6. Post Rehabilitation Video Taping of Storm or Sewer Pipes

4 1.5 Applicable ASTM and ACI Standards and Specifications Unless revised herein, the Contractor shall follow the latest revision of the practices and standards of the following American Society for Testing and Materials (ASTM) Standards, which are made part of this specification: ASTM Standards: C 109 Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens C 469 Standard Test Method for Static Modulus of Elasticity & Poisson s Ratio of Concrete in Compression C 496 Standard Test Method for Splitting Tensile Strength of Cylindrical Concrete Specimens C Standard Test Method for Bond Strength of Epoxy-Resin Systems Used With Concrete by Slant Shear C A Standard Practice for Preparing and Testing Specimens from Shotcrete Test Panels F 2414 Practice for Sealing Sewer Manholes Using Chemical Grouting ACI Standards: ACI 305R-99 Hot Weather Concreting ACI 306R-88 Cold Weather Concreting ACI Certified Concrete Field Testing Technician, Level Safety Equipment and Procedures 1. Because pipes of various sizes and configurations will be encountered, each one must be evaluated as to its status as a confined space, on a case by case basis. The OSHA Regulation Document, CFR 29, Part considers storm and sewer pipes as confined spaces. 2. Employees must have been provided adequate training as either a confined space entrant or attendant. Personnel records showing the date, location and test results of confined space training are available. 3. It is required that employees use a relevant 4-gas detection meter to monitor the air quality of the storm or sewer pipe before entry and are familiar with its operation. 4. Proper Personal Protective Equipment (PPE) will be worn by the field technicians at all times. Proper PPE consists of a hard hat, eye protection (safety glasses, goggles, or a face shield) steel toed boots, and a reflective vest that shall be worn at all times while at the work site. 5. Personnel involved in mixing operations must have on long sleeve shirts, gloves and appropriate dust masks while mixing the powder materials. 6. Personnel that work near the spin cast head must wear eye protection that includes

5 safety glasses as a minimum and a face shield for employees that wear glasses. 7. When working in manholes they must be treated as permit required confined spaces. 8. When working in permit required confined spaces the permit must be fully and properly filled out before any operations begin. 9. The minimum equipment required for Permit Required Confined space entry consists of a fully functional 4-gas monitor with a hose of proper length to sample all levels within the confined space (this includes the lowest level, breathing/work zone, above breathing zone and below the ceiling), a tripod in good working condition having the chains required tostabilize the legs in place, a suitable retraction device in good working order, and harnesses that fits the entrant comfortably. 10. Every effort will be made to minimize the amount of product released into the air during mixing operations. 11. Employees shall treat all waste matter and material removed from a sewer pipe as a contaminated material. All contaminated substances from sanitary sewers such as fallen brick, sand debris, sludge and organic matter must be disposed of in a proper manner. PART 2 QUALIFICATIONS 2.1 General It is the intention of this Specification to set a standard of quality and design for the application of all QM-1s Restore materials used in the rehabilitation of Storm and Sanitary Sewer Pipes. 2.2 Acceptable Structural Liner Manufacturers In order to establish product quality and installation standards, the approved structural Quadex QM-1s Restore liner shall be applied using the Quadex lining system or preapproved equal. Any subsequently approved equal product and process shall strictly adhere to this specification with regard to all standards and requirements. Where discrepancies exist between this specification and the established manufacturer s product and process specifications, THIS SPECIFICATION SHALL GOVERN. Alternate or equal products and processes must be submitted in writing 30 days prior to bid closing. 2.3 Manufacturer and Installer Experience 1. The installing Contractor must certify that the QM-1s Restore liner to be used is the EXACT system for which ALL SUBMITTALS AND CERTIFICATIONS were made. No substitutions will be allowed, and misrepresentations or omissions will be grounds for contract termination with the Contractor waiving any and all claims against the Owner for work performed or costs incurred.

6 2. The Contractor must have installed a minimum of 5000 linear feet of 54 inch diameter pipe or greater of the exact name brand product bid. 3. The Contractor s office and/or domicile from which t he work for THIS CONTRACT will be executed shall provide a list of qualifying experience within 14 days prior to submitting. At a minimum, the Contractor shall provide the following: project name, owner, and contact person, phone number, diameter and length of pipe. ALL PAST REFERENCES PRIOR TO THE BID MUST BE SUBMITTED. Omission of any references may be grounds for disqualification or termination. 2.4 Qualifying Superintendent and Crew 1. The contractor is required to have at least one Qualifying Superintendent on the job during construction activities. The Qualifying Superintendent and crew that will be undertaking the work must meet the experience requirements. 2. The Qualifying Superintendent must have been trained by the pump manufacturers and have received a certificate of completion. This factory certification of completion of the required training is kept on file. The Qualifying Superintendent must be thoroughly familiar with all aspects of the operation including safety and quality control measures. 3. The Qualifying Superintendent shall provide a list of qualifying experience within 14 days prior to contract. All required information, including: project name, owner, and contact person, phone number, diameter and length of pipe and date completed shall be furnished for each project completed. 4. The work crew will have been thoroughly trained in the specific aspects of their jobs. This training includes training received from equipment manufacturers and in-field training. A fully trained field technician shall apply the QM-1s Restore liner. Moreover, the field technician is required to have a good understanding of the work and product usage. Field technicians must demonstrate their ability to improve their skills and be capable of properly cleaning the sanitary storm or sewer pipe, developing a repair strategy for stopping any minor water infiltration, and spray applying the liner to fully rehabilitate the pipe to specified requirements. The trained field technician is required to follow the manufacturer s guidelines and keep in good standing with the product manufacturer. All of the work including the cleaning course of action, furnishing the materials, preparation of the materials and repair area, providing the installation of the materials and the testing method will be accomplished according to the manufacturer s specific recommendations. The field technicians are given their approval and recognition upon successfully completing the appropriate training. PART 3 GENERAL REQUIREMENTS OF THE STRUCTURAL QM-1S RESTORE LINER The finished pipe must be such that when the QM-1s Restore liner sets, the total wall thickness will be homogeneous and monolithic. This structural liner is designed and installed to meet fully deteriorated pipe conditions.

7 3.1 Reference Specifications Installation and material tests of QM-1s Restore liners must meet the minimum requirements demonstrated in the following ASTM standards: Specifications: Centrifugally Cast or Sprayed QM-1s Restore Liner Physical Properties All QM-1s Restore lining material shall conform to the following 28-day minimum physical properties. A. Compressive Strength (ASTM C109) Min. 10, days B. Modulus of Elasticity (ASTM C469) Min. 5,000, days C. Flexural Strength (ASTM C293) Min days D. Bond Strength (ASTM C882) Min psi E. Density Dry Wet pcf pcf. 3.2 Materials: QM-1s Liner 1. The Quadex QM-1s Restore lining material shall be a micro-fiber reinforced ultradense mortar. This material provides a high strength fiber reinforced mortar specifically designed for ease of mechanical pumping, spraying and spin casting. 2. The Quadex QM-1s liner shall not clog spinner heads or spray equipment. The QM-1s Restore liner can also be used to repair, resurface, or rebuild pits, sumps, trenches, tunnels, bridges, piers or any concrete structure that has experienced deterioration. 3. The Quadex QM-1s Restore liner shall be designed to produce a liner with improved compressive and flexural strength, high adhesion to damp surfaces, lower permeability and increased resistance to aggressive chemical attack. 4. This fiber reinforced formula shall be engineered to improve hydraulic abrasion resistance, provide dimensional stability and protect against penetration by substances such as fats, oils, gases, chloride ions found in marine applications,. 3.3 Material: Packaging and Storage Material shall be delivered in packaged and sealed condition and free of moisture. Do not use materials that have been exposed to moisture or there is visible damage to the

8 packaging. The QM-1s Restore is provided in 60 pound bags and 2,000 pound supersacks. 3.4 Material Receipt Process All materials must be inspected upon receipt and properly documented as to the amount of material, the identification of the material by lot numbers, and inspected by the receiving employee. Dates and times along with the shipping company delivering the material should be recorded for possible future reference. See daily log. PART 4 PIPE DESIGN 4.1 Liner Thickness The Contractor shall submit liner thickness calculations to the Engineer for review. These calculations will be performed by a third party registered professional engineer. The structural QM-1s Restore lining rehabilitation system is designed in accordance with a fully deteriorated gravity pipe condition. 4.2 Liner Physical Characteristics The QM-1s Restore liner material shall also conform to the minimum requirements demonstrated in the following table: Physical Properties ASTM Reference Requirements Compressive Strength ASTM C-109 Min. 10, days Modulus of Elasticity ASTM C-469/469M-10 Min. 5,000, days Flexural Strength ASTM C-293 Min days The contractor shall submit his price proposal based on the appropriate length, size, and existing pipe parameters designated in the Proposal Section. The deterioration of sanitary and storm sewers is an on-going process. Should pre-construction inspections reveal the sewers to be in substantially different conditions than those in the design considerations, the contractor shall request such changes in reconstruction liner thickness, supporting such requests with design data. The deviation, if approved, shall be reflected by the appropriate addition or reduction in the unit cost for that size as agreed to by the Owner. 4.3 Minimum Acceptable Pipe Liner Thickness The minimum installed QM-1s Restore liner thickness shall be one and a half inch (1.5). The design calculations provided by a registered professional engineer will determine thicknesses if they are over the one and a half (1.5) inch minimum, as required. The Contractor shall submit his proposed plan for ensuring that the installed QM-1s Restore liner meets the engineer s minimum thickness requirements. The plan shall include the proposed QM-1s Restore liner thickness to be installed.

9 PART 5 EQUIPMENT 5.1 Description of Equipment Major equipment components consist of a generator, an air compressor, a high pressure washer, a high shear mixer and pump assembly as a single unit, a reciprocating high speed spin cast delivery assembly, an electric chain drive retraction system capable of +/- 5% repeatability, and high pressure hoses and couplings. 1. Application equipment should have material feed, high shear mixer and pump as a single operating unit. These three functions should operate as a single synchronized unit. In addition, the application equipment is required to have sensors that maintain uniform operation of all three functions and have the ability to shut down the equipment in the event of interruption of any of the functions. This will ensure consistent delivery of materials over time and distance. 2. Application equipment needs to have visible display for the rate of water addition. This will ensure water/material ratios are known and controlled. Water/material ratio must be monitored and recorded throughout the application process. 3. Application equipment should measure the back pressure on the discharge side of the pump. The change in pressure will alert the operator to any potential changes in flow rates. Do not exceed 25 bars of back pressure. 4. Spinner head needs to be capable of spraying in a both a clock wise and a counter clock wise direction. The change in spin direction achieves superior application by applying the materials at multiple angles, when making multiple applications passes. 5. Spinner head needs to be attached to a reciprocating mechanism to layer the materials. The reciprocating mechanism needs to oscillate the spinner head by a minimum of 6 inches. The multiple layering allows for a more uniform application of the product and achieves higher thickness levels, in a single pass. 6. Retraction system needs to be capable of pulling the spinner head at a minimum rate of 4 inches per minute with no more than +/-5% tolerance. This 5 percent tolerance validation should be performed on a daily basis and be recorded in the daily log. 7. Retraction system needs to have a visible display that monitors the rate of retraction. The rate of retraction and the volume of material discharged are necessary to calculate the thickness of the sprayed materials. 8. The rate of retraction, material discharge volume, dry material usage and length of pipe covered should be monitored and recorded on a daily basis. This is a critical to measure the thickness of material applied. 9. Thickness design calculations must be provided by a registered Professional Engineer.

10 PART 6 EXECUTION 1. All structural rehabilitation of existing storm or sewer pipe will follow the procedures listed below. 2. The Contractor shall carry out his operations in strict accordance with all applicable OSHA standards. Particular attention is drawn to those safety requirements involving work on an elevated platform and entry into a confined space. 3. The Owner will be responsible for locating and accessing all manholes, as required, and provide free access to water hydrants for cleaning and other work items requiring water. 4. All surfaces, which have been damaged by the Contractor s operations, shall be restored to a condition at least equal to that in which they were found immediately prior to the beginning of the Contractor s operations. Suitable materials and methods shall be used for such restoration. The restoration of existing property or structures shall be done as promptly as practicable and shall not be left until the end of the construction period. Compensation for this work will be included in the rehabilitation item to which it pertains. 6.1 Pipe Cleaning and Preparation 1. The floor and interior walls of the pipe shall be thoroughly cleaned and made free of all foreign materials including dirt, grit, roots, grease, sludge and all debris or material that may be attached to the wall or bottom of the pipe. 2. High pressure water blasting with a minimum of 3,500 psi shall be used to clean and free all foreign material within the pipe. 3. When grease and oil are present within the pipe, water may be heated to 200 degrees, or an approved detergent may be added to the water or a dilute solution of muriatic acid may be used integrally with the high pressure cleaning water. 4. All materials resulting from the cleaning of the pipe shall be removed prior to application of the lining material. 5. All loose or defective concrete, brick, or grout, shall be removed to provide an even surface prior to application of the lining material. 6.2 Sealing Active Leaks The work consists of hand applying a dry quick-setting cementitious mix designed to instantly stop running water or seepage in all types of concrete and masonry structures. The contractor shall apply an approved quick-setting mortar in accordance with manufacturer s recommendations. The use of chemical grouts is also an approved method for stopping leaks. The water stop cement shall be Quadex Quad-Plug or preapproved equal.

11 6.3 Invert Repair The work consists of mixing and applying QM-1s Restore or preapproved equal mortar, to fill all large voids and repair inverts prior to spraying or centrifugally casting the pipe. For invert repairs, flow must be restricted. 1. The area to be repaired must be cleaned and free of all debris. 2. Once mixed to proper consistency, the QM-1s Restore lining material shall be shot or hand troweled for invert repairs. Care shall be taken to not apply excessive material in the channel, which could restrict flow. Once applied, the QM-1s Restore lining material shall be smoothed either by hand or trowel in order to facilitate flow. 2. Spray or centrifugal application of the lining material may proceed immediately after invert repairs are completed. 2. In severe conditions, reinforcing wire mesh or rebar may be required in addition to the QM-1s Restore liner. 2. Suitable flowable fill may be used to fill voids or stabilize soils outside of the pipe or in the invert of the pipe. 6.4 Inspections The Contractor s experienced personnel trained in location breaks and obstacles by CCTV inspection shall perform inspection of the sewer pipe. Utilizing a color video inspection system with data recording capabilities, the entire pipe section to be lined shall be recorded on CD or DVD and two (2) copies produced. The interior of the pipe shall be carefully inspected to determine the location of any conditions, which may prevent the proper installation of the liner, and it shall be noted so that these conditions can be corrected. A CD or DVD and suitable log shall be submitted to the Owner. 1. Sewers service connections shall also be TV inspected, which shall identify all service connections, openings, and condition of service connections to main. 2. Utilizing high-pressure jet cleaning equipment, several passes shall be completed to assure that all debris is removed from the pipe. If roots are present, root cutters or mechanical brushes are attached to the jet nozzle and sent through the line to remove all root intrusions. Should equipment other than high-pressure jetting apparatus be needed to remove debris or roots, additional payment will be authorized by the Owner. 6.5 Identification and Pre-Measurement of Lateral Connections A 360-degree Pan-and-Tilt view camera shall be used to inspect the pipe traveling upstream. At each connection the operator will stop and turn the camera lens toward the lateral thereby inspecting the first 8 to 12 inches of the lateral connection. If there remains a doubt as to whether or not the connection is live, additional dye and flush tests shall

12 be performed. It will be the responsibility of the Owner s representatives to review this process live or review the video tapes to verify and approve which lateral connections are to be reinstated. The Owner shall be responsible for determining if connection is active or inactive. For each existing service connection determined by the Owner to be active, the Contractor shall determine the condition of the service connection to the main, make his recommendation for lateral connection repair, and record both items in his log. All lateral locations will be measured from the back wall (opposing wall) of the basis manhole, typically the downstream manhole. 6.6 Bypass of Flow As required for acceptable completion of the work and/or to avoid damages due to sewer spills or overflows, the Contractor shall provide for sewer flow maintenance around the section or sections of pipe designated for rehabilitation. The bypass shall typically be made by plugging the line at an existing upstream structure and pumping the flow into a downstream structure or adjacent system. The pump and bypass lines shall be of adequate capacity and size to handle the anticipated flow Bypassing of sanitary sewerage into the storm water system will not be allowed. For all bypass pumping, pump noise shall be kept to a minimum. 6.7 Mixing the QM-1s Restore Lining Material 1. Contractor shall add the QM-1s Restore material to the batch water not to exceed a 0.11 water/material ratio. Precision metering of water in mixer is required to maintain the strict water to material ratio. It is important to maintain the specified water to polymer ratio throughout the application process. Uniform water to polymer ratio equates to consistent strength. The ability to closely adjust and monitor the addition of water through the use of a sight tube system is required. 2. Mixing water temperatures must be determined before blending operations begin. The mixing water temperature must be recorded in the daily operation log at multiple times throughout the day during the installation process. If water temperatures exceed 80 degrees F, then the water should be chilled to 80 degrees F or lower. The ability to provide mixing water at a consistent temperature is a critical aspect of the mixing and installation process. Industrial electronic chillers are available and should be of a suitable capacity to provide the proper amount of water and at the required temperature. High temperature applications, those greater than 80 degrees F, require the use of water chillers to maintain the water at the proper temperature. 3. The lining material shall be mixed in a high shear mixer. This ensures thorough and uniform mix of water with the material prior to pumping. Begin pumping through an adjustable swing tube pump for continuous delivery to the appropriate application device. 4. The mixing operations must be performed so that the minimum of dust is released into the surrounding environment. 5. This process requires the use of a batch style mixer and a swing tube pump. The

13 batch style mixing, precise metering of water and pump rate eliminates wet/dry and thick/thin variations resulting in a uniform structure regardless of the pumping distance. 6. Multiple spin cast nozzles should be onsite at all times to address any application issues or failure of the nozzle. Multiple nozzles may be required to produce the required depth or finish of the liner surface. 6.8 Spray Application of QM-1s Lining Material 1. The QM-1s Restore lining material delivery hose shall be coupled to a mediumvelocity spray application nozzle. Pumping of the material shall commence and the material shall be atomized by the introduction of air at the nozzle, creating a mediumvelocity spray pattern for material application. 2. A reciprocating head that has a speed adjustment for making multiple position changes per minute is required. The reciprocating head allows the spin cast mechanism and the associated selected nozzle to make multiple passes on the pipe wall in a single pass of the sled assembly. 3. Spraying shall be performed by starting at the pipe end-project location and progressing towards the entrance of the pipe. 4. Begin at downstream side of the pipe, and retract the spin cast assembly at a monitored uniform rate. Just as important as knowing that a consistent amount of water is being added to the mix, the retrieval rate of the spin head must be measureable and constant. At the beginning of each pipe segment the retraction device should be calibrated. The calibration process includes setting the digital readout to the desired retrieval rate (in inches per minute). Then the retrieval chain is laid out and marked to show the distance traveled in two minutes. The rate obtained must be within 5% of the expected speed and can be verified by this process. 5. The Quadex QM-1s Restore liner shall be applied to a specified uniform minimum thickness no less than 1 1/2 inches. 6. The QM-1s Restore delivery hose shall be coupled to a high speed rotating applicator device. The rotating casting applicator shall then be positioned within the center, or positioned higher inside the pipe, as required by the diameter the pipe. 7. The high speed rotating applicator shall then be initialized, and pumping of the material shall commence. As the material begins to be centrifugally cast evenly around the interior of the cavity, the rotating applicator head shall uniformly travel back and forth at or near the center point of the pipe at a controlled frequency conducive to providing a uniform material thickness to the pipe walls. 8. Controlled multiple passes shall then be made, if necessary, until the specified minimum finished thickness is attained. If the procedure is interrupted for any reason, the operator shall arrest the retrieval of the applicator head until flows are

14 recommenced. 9. Material thickness may be verified at any point with a depth gauge and shall be no less than a uniform 1 1/2-inches. If additional material is required at any level, the rotating applicator head shall be placed at the location and application shall recommence until that area meets the required thickness. 10. The lining material shall be applied to a damp surface, with no free water. 11. The medium-velocity spray nozzle and the centrifugal spin casting head may be used in conjunction to facilitate uniform application of the material to irregularities in the contour of the pipe walls. 12. If desired, the liner may be troweled following the spray application. Initial troweling shall be in an upward motion, to compress the material and solidify the pipe wall. Precautions shall be taken not to over-trowel. 13. Proper steps shall be taken to ensure the material is cured in a moist and moderate climate. General underground conditions are usually adequate to meet this curing requirement. However, when situations of dry and/or hot conditions are present, the use of a wind barrier and fogging spray may be required. 14. The liner should not be placed when the ambient temperature is 37 degrees Fahrenheit and falling or when the temperature is anticipated to fall below 32 degrees Fahrenheit during the next 24 hours, unless specific precautions are employed. 15. During extreme hot weather conditions, chilled water must be used to mix the QM- 1s Restore. The QM-1s Restore material should be maintained at a temperature lower than 90 degrees F. 6.9 Curing of the QM-1s Lining Material 1. Follow manufacturer s recommended cure schedule in curing of QM-1s Restore liner. 2. Refer to ACI 305R-99 Hot Weather Concreting. Do not apply liner material when ambient and surface temperatures are 100 F or 35 C and above. Shade the material and prepare the surface to keep it cool. To extend working time, mix the material with cool water or ice-cooled water. Be certain the substrate is saturated surface dry (SSD) before application begins. Proper curing is always required and is particularly important in hot weather. Follow ACI 305R-99 guidelines for the proper use of curing agents. 3. Refer to ACI 306R-88 Cold Weather Concreting. Low-substrate and ambient temperatures slow down the rate of set and strength development. At temperatures below 45 F or 7 C, warm the material and monitor substrate temperatures. Properly ventilate the area when heating. Protect the new liner from freezing.

15 Termination and Sealing at Manhole Outlets Termination of the QM-1s Restore liner at the end of a pipe or manhole shall be completed by hand applying the liner to the outer surface of the pipe or into the interior of the manhole Internal Reconnection of Lateral Services The Contractor shall reopen the existing active connections after the final QM-1s Restore lining pass. Restored openings shall be neatly and smoothly open and without rough edges. Care must be exercised not to damage the QM-1s Restore lining while reinstating the lateral End of Shift Equipment Clean Up Procedures Employees will properly clean and store all equipment used during the days operations. All hoses, fittings, pumps, mixers, spray head equipment, retraction equipment well be cleaned both inside and out. The chain for the retraction device will be pressure washed and then treated with a non hydrocarbon based lubricant. All mixed QM-1s Restore materials will be captured and disposed of properly. PART 7 QUALITY ASSURANCE AND QUALITY CONTROL 7.1 Quality Control Statement It is hereby the stated policy that all services will be performed by the protocol specified including ACI, ASTM, OSHA or other appropriate guidelines. The final results will be of the highest quality possible, delivered on the date promised. All equipment and supplies shall be obtained and maintained in order to produce results of the highest quality while meeting OSHA, ASTM, ACI or other appropriate guidelines. Personnel shall be fully qualified to perform the tasks assigned to them. Continuing education and monitoring of the performance of personnel and equipment will be reviewed by management. Corrective action will be taken immediately if a problem is identified. Quality assurance and quality control objectives are to produce rehabilitated structures of the highest quality. 7.2 Quality Assurance Reports to Management As management is directly involved in daily operation, the QA/QC plan must be strictly followed. This plan calls for the strict adherence of field protocol and the continuing training and monitoring of all field personnel. All rehabilitated structures are inspected and verified at the end of the installation. All pipe inspection reports, including all photographs and video tapes of the completed structure, are returned to the field superintendent and kept in the project file. 7.3 Daily Activity Logs A Quadex Daily Activity Log will be filled out completely anytime a work crew is on site. This log includes listing the personnel present at the site, when they arrived and when they left the site. Important spray data includes the times material was applied and under

16 which atmospheric conditions. The ambient air temperature, the dry powder temperature, the mixing water temperature, and the temperature inside the pipe are all recorded on the daily activity report. The operating conditions are also recorded. These measurements include the water addition rate taken at the meter tube, the retrieval speed of the retraction system and the pump motor speed recorded at the pump. Any special conditions are to be noted in the daily log. 7.4 Equipment Calibration Reports Equipment calibration reports are to be kept in the truck at all times. 7.5 Final Inspection At the completion of the rehabilitation of the sewer mains, a video inspection CD or DVD and log (1 copy of both) of the completed line segments shall be given to the Owner by the Contractor. This inspection shall be performed by a color video inspection system. The finished QM-1s Restore shall be continuous over the entire length of all runs and be free of dry spots. No infiltration of groundwater shall be observed. All service entrances shall be accounted for and shall be unobstructed including all rehabilitated lateral connection repair(s). 7.6 Sample Preparation and Testing of QM-1s Restore Liner Submit the following information to the engineer: Product data, including manufacturer and brand name along with laboratory tests results to verify 28-day compressive strength in accordance with ASTM C 109. The project superintendent will require that samples of the applied material will be taken on a daily basis. The samples may be taken from the pump immediately before discharge into the hose or at the spin caster, if feasible. A minimum of four samples will be obtained as required by ASTM C 109. The samples must be undisturbed for a period of at least 24 hours before they can be transported. The material thickness may be determined by using depth gauges during the spraying process. Another process to determine thickness is to drill into the lined corrugated metal pipes to determine the amount of materials applied to the pipe walls. The depth measurements should be made at three clock positions around the pipe and near both ends and the middle of the pipe. These measurements must be written down in a log book which will be submitted to the client at the end of the project, along with digital photos of the completed pipe. The client or project engineer may request additional testing to be performed. These additional tests should be addressed in writing before the project begins. In some instances clients may request several cores be taken of the pipe into or through the original pipe to determine the thickness applied. Approved geophysical laboratories are available to perform this type of test on a routine basis. The Contractor shall furnish all equipment and personnel necessary to conduct all required sample preparations.

17 PART 8 SUBMITTALS 8.1. Before any field work by the Contractor, the Contractor shall submit to the Owner for his review the following: 1. A fully detailed engineers report submitted by a third party, registered professional engineer. 2. Detailed installation procedures and specific procedures for rehabilitation of sewer mains, storm pipe and various other underground structures. 3. Certified copies of all third party laboratory test reports on materials referred to within this Section in accordance with ASTM or Federal Specification requirements that support the physical characteristics required from the materials After cleaning and TV inspection by the Contractor of all of the proposed mains to be rehabilitated and before beginning any lining of mains, the Contractor shall submit to the Owner for his review the following: 1. DVD or CD and log (1 copy of both) of the Contractor s TV inspection of the pipes to be rehabilitated. 2. Detailed minimum design thickness calculations for the QM-1s Restore liner based on Contractor s TV inspection results After rehabilitation of the pipe, the Contractor shall submit to the Owner/Engineer for his records the following: 1. DVD or CD and log (1 copy of both) of the Contractor s TV inspection of the Completed Work. 2. Test results of samples of QM-1s Restore liner as specified in the contract documents. PART 9 GUARANTEE AND WARRANTY 1. The material shall be unconditionally guaranteed to meet or exceed the design criteria detailed in Part 4 of this Specification Section. 2. The finished QM-1s Restore liner shall be continuous over the entire length of a run and be as free as commercially practicable from visual defects. It shall also meet the test requirements specified in this Section. During the guarantee period, any defects which will affect the integrity or strength of the QM-1s Restore liner, shall be repaired at the Contractor s expense. END OF SECTION

OVERVIEW. 1 Intent:... 2. 2 Applicability:... 2. 3 Referenced Standards... 2. 5 Invert Repair Mortar... 3

OVERVIEW. 1 Intent:... 2. 2 Applicability:... 2. 3 Referenced Standards... 2. 5 Invert Repair Mortar... 3 PERMACAST CENTRIFUGALLY CAST CONCRETE PIPE (CCCP) OVERVIEW 1 Intent:... 2 2 Applicability:... 2 3 Referenced Standards... 2 5 Invert Repair Mortar... 3 6 Centrifugally Cast Concrete Pipe (CCCP)... 3 7

More information

REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542

REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542 1.0 INTENT REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES 1.01 It is the intent of this specification to provide for the reconstruction of pipelines and conduits by the installation of a resin-impregnated

More information

SECTION XXXXXX TECHNICAL SPECIFICATIONS FOR INSTALLATION OF PROTECTIVE COATINGS FOR MANHOLES, WETWELLS, AND OTHER SANITARY SEWER STRUCTURES

SECTION XXXXXX TECHNICAL SPECIFICATIONS FOR INSTALLATION OF PROTECTIVE COATINGS FOR MANHOLES, WETWELLS, AND OTHER SANITARY SEWER STRUCTURES 1.00 PART 1 GENERAL 1.01 SCOPE A. It is the intent of this contract to install a 100% solids epoxy monolithic coating to the walls, benches and inverts of all manholes and the specified surfaces of other

More information

SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE

SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE PART 1 - GENERAL 1.01 WORK INCLUDED A. This section covers the initial and final cleaning, and the initial and final

More information

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) 1 Intent: The intent of trenchless sewer pipe Insertion is to rehabilitate the existing sewer

More information

INSTALLATION OF INSITUFORM LINER

INSTALLATION OF INSITUFORM LINER PART 1 GENERAL 1.1 SCOPE: A. This item shall include all work and materials to install, insert a flexible polyester felt liner saturated with a thermo-setting resin into the existing sewer line for rehabilitation

More information

FY15 Gravity Sewer and Manhole Rehabilitation

FY15 Gravity Sewer and Manhole Rehabilitation Contract Drawings For FY15 Gravity Sewer and Manhole Rehabilitation TRAVELERS REST TAYLORS Frazier Project No. -030 BASIN 850 Greenville, South Carolina April 2015 BASIN 700A GREENVILLE BASIN 700B FIVE

More information

Demonstration of an Innovative Large-Diameter Sewer Rehabilitation Technology in Houston, Texas

Demonstration of an Innovative Large-Diameter Sewer Rehabilitation Technology in Houston, Texas North American Society for Trenchless Technology (NASTT) NASTT s 2014 No-Dig Show Orlando, Florida April 13-17, 2014 Paper TA-T3-03 Demonstration of an Innovative Large-Diameter Sewer Rehabilitation Technology

More information

ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING

ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING 1.0 General 1.1 The work covered by this section consists of providing all labor, equipment, material and supplies, insurance, accessories, tools, transportation,

More information

STANDARD SPECIFICATIONS SECTION 02959 SEWER MAIN AND LATERAL CONNECTION SEALING BY CHEMICAL GROUT

STANDARD SPECIFICATIONS SECTION 02959 SEWER MAIN AND LATERAL CONNECTION SEALING BY CHEMICAL GROUT STANDARD SPECIFICATIONS SECTION 02959 SEWER MAIN AND LATERAL CONNECTION SEALING BY CHEMICAL GROUT PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for rehabilitation of defective mainline

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by

More information

Section 02702 SEWER PIPE INSTALLATION AND TESTING

Section 02702 SEWER PIPE INSTALLATION AND TESTING PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. SCOPE. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete

More information

C. Section 014510 TESTING LABORATORY SERVICE.

C. Section 014510 TESTING LABORATORY SERVICE. SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,

More information

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS Section Page 36-1 GENERAL... 36.1 36-2 PIPEMAKING EQUIPMENT... 36.1 36-3 TRENCH EXCAVATION... 36.1 36-4 SPECIAL FOUNDATION TREATMENT...

More information

PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY

PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY Cured-In-Place Pipe Pressure & Gravity Lines Pipe Splitting Trenchless Pipe Replacement EcoCast Advanced

More information

SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING

SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING 812-1 SCOPE OF WORK: SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING a. The Contractor shall provide all labor, materials, equipment, and incidentals necessary to perform the cleaning of sewer lines,

More information

SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD

SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD 21.01 SCOPE: It is the intent of the Specification to define the approved methods and materials

More information

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines: Division 53: Slip-Lining of Existing Sewer Line 53.01 GENERAL: This section includes all labor, materials, transportation, equipment necessary to rehabilitate by means of Instituform deteriorated sections

More information

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials. PART 1 GENERAL 1.1 SCOPE A. This item shall include the work necessary for the installation of storm sewer line construction. B. Reference Section 3800 Trenching and Backfill and the General Conditions,

More information

Sewer Rehabilitation Design Requirements

Sewer Rehabilitation Design Requirements Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Sewer Rehabilitation Design Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared

More information

812-3 LIMITATIONS: b. No fire hydrant shall be obstructed or used when there is a fire in the area.

812-3 LIMITATIONS: b. No fire hydrant shall be obstructed or used when there is a fire in the area. 812-1 SCOPE OF WORK: SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING a. The Contractor shall provide all labor, materials, equipment, and incidentals necessary to perform the cleaning of sewer lines,

More information

SECTION 810 SEWER LINE CLEANING

SECTION 810 SEWER LINE CLEANING SECTION 810 SEWER LINE CLEANING I. GENERAL 1.1 DESCRIPTION OF WORK The work covered by this section consists of providing all labor, equipment, material and supplies and performing all operations required

More information

CLEANING, INSPECTION, AND TESTING OF SEWERS

CLEANING, INSPECTION, AND TESTING OF SEWERS CLEANING, INSPECTION, AND TESTING OF SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Cleaning, Inspecting, and Testing Sanitary Sewers B. Cleaning, Inspecting, and Testing Storm Sewers C. Cleaning and

More information

STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS

STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for cleaning and lining existing cast iron and ductile iron water mains

More information

Section 2651 Television Inspection

Section 2651 Television Inspection Section 2651 Television Inspection PART 1: General 1.1 Description Provide all labor, materials, tools, equipment and incidentals as shown, specified, and required to perform television (TV) inspection

More information

Wastewater Capital Projects Management Standard Construction Specification

Wastewater Capital Projects Management Standard Construction Specification CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,

More information

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions. SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings

More information

TECHNICAL REQUIREMENTS AND SPECIFICATIONS

TECHNICAL REQUIREMENTS AND SPECIFICATIONS TECHNICAL REQUIREMENTS AND SPECIFICATIONS REHABILITATION OF CONCRETE AND MASONRY MANHOLES OR UNDERGROUND VAULTS WITH A PROTECTIVE COATING (As Provided by Raven Lining Systems) FOREWORD This specification

More information

Resurfacing Concrete. Page 1 of 5

Resurfacing Concrete. Page 1 of 5 Resurfacing Concrete Materials List QUIKRETE Concrete Resurfacer (No. 1131) (see calculator on page 5 for quantity needed) QUIKRETE Concrete and Stucco Wash (No. 8601) QUIKRETE Concrete Sealer (No. 8800)

More information

SECTION 02630 STORM DRAINAGE SYSTEM

SECTION 02630 STORM DRAINAGE SYSTEM SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE

More information

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TN 5.14 February 2010 Introduction It may be at times necessary, in an aging infrastructure, to rehabilitate drainage and sanitary lines

More information

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted 02-20-14)

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted 02-20-14) POLYMERIC CONCRETE BRIDGE DECK OVERLAY (Adopted 02-20-14) Description The polymeric concrete bridge deck overlay shall consist of an epoxy polymer that acts together with special aggregate to form an overlay

More information

SECTION 02400 - STORM DRAIN SYSTEM

SECTION 02400 - STORM DRAIN SYSTEM SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And

More information

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe 1. GENERAL The following supplemental sewer main specifications are intended to address the installation of high-density polyethylene

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS

SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS PART 1: GENERAL 1.01 SECTION INCLUDES A. Abandonment in place, by cutting and capping, of existing sewers, junction structures, manholes, service lines, and

More information

Sewer Line Rehabilitation

Sewer Line Rehabilitation 1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing sanitary sewers using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting

More information

PAINT REMOVAL SYSTEM PAINT REMOVAL SPECIFICATION SAFE WORK METHOD STATEMENT FOR LEAD PAINT REMOVAL

PAINT REMOVAL SYSTEM PAINT REMOVAL SPECIFICATION SAFE WORK METHOD STATEMENT FOR LEAD PAINT REMOVAL PAINT REMOVAL SYSTEM PAINT REMOVAL SPECIFICATION SAFE WORK METHOD STATEMENT FOR LEAD PAINT REMOVAL CONTENTS: 1.0 AWARENESS AND PRECAUTION 2.0 TEST SAMPLING & REMOVAL EVALUATION 3.0 SITE EVALUATION 4.0

More information

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION ITEM 866 SEWER MAIN TELEVISION INSPECTION 866.1 DESCRIPTION: The Contractor shall furnish all labor, materials, equipment, and incidentals to provide the televising and a NASSCO-(PACP) standard video,

More information

GENERAL SPECIFICATIONS AND GUIDELINES FOR INSTALLATION MASTERLINER CURED-IN-PLACE PIPE SYSTEMS

GENERAL SPECIFICATIONS AND GUIDELINES FOR INSTALLATION MASTERLINER CURED-IN-PLACE PIPE SYSTEMS GENERAL SPECIFICATIONS AND GUIDELINES FOR INSTALLATION OF MASTERLINER CURED-IN-PLACE PIPE SYSTEMS 34 TABLE OF CONTENTS 1.00 INTRODUCTION 2.00 SITE WORK PREPARATIONS 3.00 THE PRODUCT AND COMPONENT MATERIALS

More information

Division 9. SignaFlor Pad and Pour Flooring System

Division 9. SignaFlor Pad and Pour Flooring System Division 9 SignaFlor Pad and Pour Flooring System SPECIFICATIONS Page 1. General... 2 1.1 Description 2 1.2 Quality Assurance 2 1.3 Submittals 2 1.4 Delivery and Storage 3 1.5 Warranty 3 1.6 Working Conditions

More information

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Introduction Wastewater of petrochemical industries and refineries contains high amounts of emulsified aliphatic or

More information

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, Storm Drain Installation, of these Standard Provisions. SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and

More information

Sewer Water Pipeline Replacement with CERTA LOK RESTRAINED JOINT PVC PIPE

Sewer Water Pipeline Replacement with CERTA LOK RESTRAINED JOINT PVC PIPE 1.0 GENERAL 1.1 DESCRIPTION This section addresses the procedures to be employed for pipe bursting existing water/sewer pipelines, as identified on the drawings, and replacing with new Restrained Joint

More information

1.3.2 Method of construction and restoration of existing water service connections. This shall include:

1.3.2 Method of construction and restoration of existing water service connections. This shall include: 1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting

More information

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS The (NRDCA) has prepared this document to provide customers and installers information that the industry

More information

SECTION 807 PUMP STATION REHABILITATION

SECTION 807 PUMP STATION REHABILITATION SECTION 807 PUMP STATION REHABILITATION 807-1 DESCRIPTION: Rehabilitation of pump stations shall be defined as the cleaning, removal, repair and/or replacement of any and/or all components including but

More information

March 2006 DIVISION 3 - CW 2140-R3 TABLE OF CONTENTS

March 2006 DIVISION 3 - CW 2140-R3 TABLE OF CONTENTS March 2006 CW 2140 - SEWER AND MANHOLE CLEANING TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Constructions... 1 3. CONSTRUCTION METHODS... 1 3.1 High

More information

REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS. Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC

REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS. Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC What is really out there? DO YOU DIG IT? INDUSTRY CONCERNS UNEXPECTED DEVELOPMENTS

More information

STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS

STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements to execute internal closed

More information

SANITARY SEWER SPECIFICATIONS

SANITARY SEWER SPECIFICATIONS SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,

More information

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

Storm Sewer Trenchless Upgrade Alternatives and Recommendations Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for

More information

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified. Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

More information

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional

More information

Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology

Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology 2007 Pumper & Cleaner Environmental Expo International Wednesday February 7, 2007 Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology What is Cured-In-Place Pipe (CIPP)

More information

SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES

SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES SECTION 33 05 16.13 PRECAST CONCRETE PART 1 - GENERAL 1.01 SECTION INCLUDES A. This item shall consist of the construction of both sanitary and storm sewer precast concrete manholes in accordance with

More information

STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS

STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements to execute internal closed

More information

SECTION 1 GENERAL REQUIREMENTS

SECTION 1 GENERAL REQUIREMENTS Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,

More information

Section 2100-Trenching and Tunneling

Section 2100-Trenching and Tunneling SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial

More information

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS CCU Engineering Specifications Section 003300 Effective Date: Nov. 1st, 2011 Page 1 of 5 PRECAST CONCRETE PRODUCTS PART 1 - GENERAL The following specification is intended for use for the design, selection

More information

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS Page 1 of 9 SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS 1. GENERAL REQUIREMENTS 1. Description of Work: This work consists of furnishing all materials, equipment and

More information

MILMAN & ASSOCIATES STRUCTURAL CONSULTING ENGINEERS/ PROJECT MANAGERS

MILMAN & ASSOCIATES STRUCTURAL CONSULTING ENGINEERS/ PROJECT MANAGERS MILMAN & ASSOCIATES STRUCTURAL CONSULTING ENGINEERS/ PROJECT MANAGERS May 29, 2013 Revision B Structural Guideline for Design and Installation Holes in Composite Floor Slab Terminal 3, Departure Level

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located

More information

Standard Method for Sampling and Analysis of. of Chlorine Containing Bleaches. Soap Products

Standard Method for Sampling and Analysis of. of Chlorine Containing Bleaches. Soap Products GUIDE SPECIFICATION FOR GENERAL CLEANING AND REMOVAL OF MOLD AND MILDEW ON EXTERIOR INSULATED AND FINISH SYSTEMS AND STUCCO DIVISION 07240 and DIVISION 09240 8/05 PART I: GENERAL 1.01 DESCRIPTION AND SCOPE

More information

See Appendix A for additional information, or contact ASTM directly.

See Appendix A for additional information, or contact ASTM directly. DEFINITIONS Wherever used in these specification guidelines, the following words and terms have the meanings indicated. AREAWAY: A paved surface, serving as an entry area to a basement or subsurface portion

More information

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE 6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction

More information

Waste Collection Systems

Waste Collection Systems Waste Collection Systems System Maintenance and Repair Maintenance and Repair Training Objectives To gain an understanding of: System Maintenance and Repair vocabulary System Maintenance and Repair techniques

More information

SEWER CLEANING, INSPECTION AND ASSESSMENT

SEWER CLEANING, INSPECTION AND ASSESSMENT 3.1 OVERVIEW Chapter 3 SEWER CLEANING, INSPECTION AND ASSESSMENT Preventive maintenance protects the investment of the sanitary sewer collection system infrastructure. Higher frequency cleaning of gravity

More information

LOWELL REGIONAL WASTEWATER UTILITY SPECIFICATIONS FOR THE LOWELL MA CONCRETE FLOODWALL REPAIRS

LOWELL REGIONAL WASTEWATER UTILITY SPECIFICATIONS FOR THE LOWELL MA CONCRETE FLOODWALL REPAIRS Concrete Repairs LOWELL REGIONAL WASTEWATER UTILITY SPECIFICATIONS FOR THE LOWELL MA CONCRETE FLOODWALL REPAIRS PART 1 - GENERAL 1.01 DESCRIPTION OF WORK A. The work will occur within the City of Lowell

More information

CHAPTER 6 - SANITARY SEWER

CHAPTER 6 - SANITARY SEWER CHAPTER 6 - SANITARY SEWER 6.1 GENERAL This section covers the requirements for PVC plastic sewer pipe materials and installation in sanitary sewer construction. 6.2 PIPE PVC gravity sewer pipe and fittings

More information

PC-Concrete Injectable Concrete Anchoring and Repair System

PC-Concrete Injectable Concrete Anchoring and Repair System PC-Concrete Injectable Concrete Anchoring and Repair System DESCRIPTION: PC-Concrete is a two component (1:1 ratio), 100% solids, high modulus, structural epoxy paste. PC-Concrete is a solvent free, no

More information

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel

More information

LS 2540 SEWER LATERALS AND INSPECTION TEES

LS 2540 SEWER LATERALS AND INSPECTION TEES LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal

More information

PERSONAL PROTECTIVE EQUIPMENT FOR CALIFORNIA STATE UNIVERSITY, LOS ANGELES

PERSONAL PROTECTIVE EQUIPMENT FOR CALIFORNIA STATE UNIVERSITY, LOS ANGELES PERSONAL PROTECTIVE EQUIPMENT FOR CALIFORNIA STATE UNIVERSITY, LOS ANGELES OCTOBER 2007 PROGRAM APPROVAL AND AUTHORIZATION James M. Rosser, President Date TABLE OF CONTENTS TITLE Section PURPOSE...1.0

More information

SELF-INSPECTION PROGRAM FOR FIRE PROTECTION EQUIPMENT

SELF-INSPECTION PROGRAM FOR FIRE PROTECTION EQUIPMENT SELF-INSPECTION PROGRAM FOR FIRE PROTECTION EQUIPMENT INTRODUCTION No matter how reliable fire protection equipment may seem, periodic maintenance is needed to ensure proper operation. Fire protection

More information

Letty Arvide-Gomar, PE

Letty Arvide-Gomar, PE Letty Arvide-Gomar, PE Outline DIP History and Applications Corrosion Issues Internal Cleaning Technologies Rehabilitation Options DIP History and Applications Corrosion Issues Internal Cleaning Technologies

More information

Enclosures 1-866-338-0988. DuraSystems Barriers, Inc. www.durasystems.com Email: sales@durasystems.com. The Passive Fire Protection Specialists

Enclosures 1-866-338-0988. DuraSystems Barriers, Inc. www.durasystems.com Email: sales@durasystems.com. The Passive Fire Protection Specialists Enclosures Sturdy single and double wall fire protection construction Impact resistant Fast & easy installation Pre-manufactured and modular Available in galvanized, stainless steel & other specialty metals

More information

CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General

CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General General All sanitary sewers, manholes and force mains shall be acceptance tested, as hereinafter specified in the presence of a City representative. Acceptance testing shall be performed after backfilling

More information

Work Practice: Wastewater Collection System Maintenance Plan Potential Safety Hazards

Work Practice: Wastewater Collection System Maintenance Plan Potential Safety Hazards Potential Safety Hazards Required items Potential PPE None Additional References - Collection System Related Work Practices & Forms Jet Truck Cleaning Work Practice (Do not drive on peoples driveway) CDL

More information

Rehabilitation or Replacement? That Is The Question

Rehabilitation or Replacement? That Is The Question Rehabilitation or Replacement? That Is The Question Chris L. Windley PE Greg Anderson, PE 94th Annual Conference November 18, 2014 Overview Project Background Existing Sewer Condition Flow Projections

More information

STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200

STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200 STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES PART 1 - GENERAL A. Description This section includes materials, testing, and installation of precast concrete

More information

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Village of Shorewood, Wisconsin SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Prepared By: Thomas A. Zoulek, P.E., LEED A.P. Vice President Mid City Plumbing & Heating

More information

MASONRY RESTORATION Lime Putty Mortar Repointing Guide

MASONRY RESTORATION Lime Putty Mortar Repointing Guide 1.0 Preparation for Lime Putty Mortar Pointing 1.1 Tools & Approach A. Grinding - When used in a controlled way, angle grinders with diamond-impregnated metal blades with a maximum 1/8-inch-thickness and

More information

MODEL WEB CONTENT FOR CITY SANITARY SEWER DEPARTMENTS

MODEL WEB CONTENT FOR CITY SANITARY SEWER DEPARTMENTS MODEL WEB CONTENT FOR CITY SANITARY SEWER DEPARTMENTS The following information is designed to be used in conjunction with the Sewer Toolkit, located in the Wastewater section of the Florida Rural Water

More information

DIVISION 4300 STORM DRAINAGE

DIVISION 4300 STORM DRAINAGE DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES

More information

Concrete Repair. Applications and Procedures

Concrete Repair. Applications and Procedures Concrete Repair Applications and Procedures Objectives Identify what surface preparation is needed Identify typical modes of failure and testing methods How to choose the correct material for the repair

More information

SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL. 1.01 Testing - General

SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL. 1.01 Testing - General SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL 1.01 Testing - General Testing shall be of the type and frequency described in each section and summarized in Item 1 of this section. In addition to

More information

ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT

ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT Description: This work shall consist of furnishing all materials, equipment and labor necessary for conducting an Osterberg Cell (O-Cell) Load

More information

T R A N S F E R A B L E F U L LY

T R A N S F E R A B L E F U L LY HSTOPS A WALL OF WATER 22 FT. HIG! F U L LY T R A N S F E R A B L E RESISTS10 PSI ! 1 F U L LY T R A N S F E R A B L E HSTOPS A WALL OF WATER 22 FT. HIG RESISTS10 PSI Guaranteed To Stop Water Even Under

More information

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE 311.1 DESCRIPTION: This item shall consist of a cement treated subgrade base course composed of a mixture of local soil, portland

More information

A. Work on this project shall consist of, but is not limited to, the following:

A. Work on this project shall consist of, but is not limited to, the following: PART 1 - GENERAL CLEANING AND RESTORATION OF SECTION 05900-1 1.1 SUMMARY A. Work on this project shall consist of, but is not limited to, the following: 1. Clean and treat all exposed anodized architectural

More information

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND.

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. 623.10.1 Description. This work shall consist of preparing the surface,

More information

NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE

NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE GENERAL a. These specifications may be used in whole or in part by any party without

More information

Example Specification for Concrete using Current Building Code Requirements

Example Specification for Concrete using Current Building Code Requirements Example Specification for Concrete using Current Building Code Requirements DISCLAIMER: This specification is an example that accompanies a seminar titled The P2P Initiative: Performance-based Specs for

More information

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing 1 Most basements show some signs of leaking and cracking. Through the years, problems with water, poor soils, grading, drainage and possible settling affect the integrity of a basement. Being able to recognize

More information

UNIVERSITY OF CHICAGO ELEVATOR PIT LEAK REPAIR

UNIVERSITY OF CHICAGO ELEVATOR PIT LEAK REPAIR ITEM: UNIVERSITY OF CHICAGO ELEVATOR PIT LEAK REPAIR DESCRIPTION: General Furnish all labor, equipment, and materials necessary and incidental thereto to perform all required operations to eliminate the

More information

BRIDGE FIELD PAINTING, REPAINTING, 412 AND PAINT RESIDUE CONTAINMENT. A. Field Painting, Bridge Repainting and Residue Containment:

BRIDGE FIELD PAINTING, REPAINTING, 412 AND PAINT RESIDUE CONTAINMENT. A. Field Painting, Bridge Repainting and Residue Containment: 412.1 DESCRIPTION BRIDGE FIELD PAINTING, REPAINTING, 412 This specification contains the requirements for the removal, containment, and disposal of existing paint on steel surfaces, preparing the steel

More information

Epoxy Crack Injection (the basics)

Epoxy Crack Injection (the basics) Epoxy Crack Injection (the basics) John Bors ChemCo Systems Introduction Overview of pressure crack injection Practical and technical issues Choose a primary repair technique Epoxy properties ChemCo Systems

More information

SECTION 724 PIPE CULVERTS

SECTION 724 PIPE CULVERTS SECTION 724 PIPE CULVERTS 724.1 Description. This work shall consist of providing pipe or pipe arch of the diameter or shape designated, laid upon a firm bed and backfilled as specified. Where appropriate