1 GENERAL SPECIFICATIONS AND GUIDELINES FOR INSTALLATION OF MASTERLINER CURED-IN-PLACE PIPE SYSTEMS 34

2 TABLE OF CONTENTS 1.00 INTRODUCTION 2.00 SITE WORK PREPARATIONS 3.00 THE PRODUCT AND COMPONENT MATERIALS 4.00 TECHNICAL SPECIFICATIONS 5.00 MASTERLINER DESIGN AND SELECTION 6.00 INSTALLATION; PULL IN PLACE WATER INVERSION AIR INVERSION 7.00 PAYMENT 8.00 GENERAL INFORMATION AND WARRANTY 35

3 GUIDELINES AND GENERAL SPECIFICATIONS FOR INSTALLATION OF MASTERLINER CURED IN PLACE PIPE LINING SYSTEMS. 1.0 INTRODUCTION: MASTERLINER CIPP systems are the only available complete encapsulating pipeline rehabilitation process. MASTERLINER has been formed for the sole purpose of developing, manufacturing, distributing and training installers on the use of its proprietary MASTERLINER cured in place pipeline rehabilitation system. The MASTERLINER process has been involved in an extensive 24 month Research and Development program to design a user-friendly, first class NO-DIG pipe lining system INSTALLATION INTRODUCTION: The MASTERLINER CIPP tube combines proprietary equipment and engineering design technology with unique installation techniques to solve the numerous problems encountered when installing a no-dig pipeline rehabilitation process. Utilizing the latest state of the art tools and techniques, sound engineering, and experienced field installation personnel, what you end up with is a quality assured finished product. The liner will be impregnated with a thermal setting resin that will completely wet out the soft flexible absorbent tube. The impregnated liner can now easily be transported to the job site. Curing is accomplished by circulating air and steam to cross-link the customized resin into a hard, impermeable pipe. When cured, the hardened liner will extend from manhole to manhole in a continuous tight fitting watertight pipe-within a pipe, chemically resistant to sewage gases and materials. Where specified, this system can be used in sanitary sewers, storm drains, house connections and manholes. With the assistance of a low powered two-ton standard winch, large diameter liners can be installed easily. ONLY MANUFACTURER CERTIFIED CONTRACTORS WILL BE ALLOWED TO INSTALL MASTERLINER CURED IN PLACE LINER PIPE. 36

4 1.02 INTENTION: The intent of this CIPP lining process is to line pipes which are subject to partial structural deterioration, partial distortion, interior corrosion, settling, misalignment, cracking, ex-filtration and infiltration. The liner will withstand long-term external hydrostatic loading SITE WORK AND PREPARATIONS 2.01 TELEVISION INSPECTION PRIOR TO INSTALLATION: The contractor is advised that a video tape inspection was made of the pipeline to be reconstructed and that this tape is available for review prior to bid opening. All prospective bidders are urged to view the tapes. The contractor will also be required to perform another television inspection and video tape recording of the pipeline a maximum of seven (7) days prior to the setting up of the liner insertion equipment at the job site. This inspection will be performed utilizing a radial eye camera, to determine the latest condition of the pipeline and to accurately identify the location of the active service connections. Should the result of this television inspection show a condition different than previously noted, the contractor shall immediately notify the Engineer CLEANING: The contractor shall furnish all labor, materials and equipment and shall do all necessary work to remove and dispose of all debris, silt, protruding service connections and roots in the existing pipeline and manholes FLOW BYPASSING: The contractor shall provide for the diversion of flow at an existing upstream manhole (if available) and pump the flow into an existing downstream manhole. The pump and bypass lines shall be of adequate capacity and size to handle the flow. The proposed bypassing system shall be submitted to the engineer for approval and no work shall commence until such approval is granted OBSTRUCTION REMOVAL: A high speed rotation hydraulic cutter will be used to cut protruding service laterals, offset joints, roots, barnacles, concrete or other obstructions in V.C.P. (vitrified clay pipe), concrete pipe and C.I.P. (cast iron pipe). The cut will be made flush with the wall of the pipe to be restored, and the debris will be pushed down the pipe to the downstream manhole. If an obstruction cannot be removed by conventional methods or by remotely controlled mechanical equipment, then the contractor shall remove or repair the obstructions by excavation. Such excavation shall be considered as a separate pay time and must be approved prior to start up PRIOR TO COMMENCING WORK: The contractor will provide submittals on all lining materials and resins and shall furnish manufacturer certification that the liner material complies with the requirements of the customer. The contractor will provide pre-sizing calculations that demonstrate that the liner has been properly downsized to avoid the creation of wrinkles or folds SAFETY: The Contractor shall conform to all work safety requirements of pertinent regulatory agencies, and shall secure the site for the working condition in compliance with the same. The contractor shall erect such signs and other devices as are necessary for the safety of the work site. 37

5 The contractor shall also perform all of the work in accordance with applicable OSHA standards. Emphasis is placed upon the requirements for entering confined spaces and working with steam EXTENSION OF TIME: If the contractor is delayed in the course of the work by act or neglect of the client, municipality, or by unexpected problem beyond his control, or by any cause which the engineer shall decide justifies the delay, then the time of completion shall be extended for a reasonable time as agreed upon by the engineer and contractor LINER AND COMPONENT MATERIALS: 3.01 TUBING: The liner tube will consist of one or more layers of flexible needled felt or an equivalent woven or non-woven material GEO MEMBRANE: The needled felt will have a Geo membrane coated on either one or both sides width of a minimum thickness of 12 mils RESIN: A premium corrosion resistant isophthalic, thixotropic unsaturated polyester resin. The resin will be specifically formulated for the use in the manufacture of needled felt liners for insertion into sewer and drain lines needing repair CATALYST: The catalyst shall be compatible with the resin and the other materials used in the manufacturing of the CIPP. The non-promotes resin shall be catalyzed by the addition of a sufficient catalyst to produce the required physical properties of the cured in place pipe TECHNICAL SPECIFICATIONS: 4.01 FINISHED AND CURED LINER PROPERTIES: The material will be capable of carrying resin, be able to withstand installation pressure and curing temperatures, and the compatible with the resin system used. The resin system used will be compatible with the application and pipeline environment and shall be able to cure in the presence or absence of water. The fully cured-in-place liner will meet or exceed the minimum structural standards of the industry. Industry Specifications The CIPP shall conform to the minimal standards as follows: ASTM Rehabilitation of Existing Pipelines and Conduits by the Inversion and Curing of a Resin-Impregnated Tube. ASTM F Rehabilitation of Existing Pipelines and Conduits by Pulled-in-Place Installation of Cured-in-Place Thermosetting Resin Pipe(CIPP) 38

6 D-5813 Standard Specifications for Cured-In-Place Thermosetting Resin Sewer Pipe C-581 Standard Practice for Determining Chemical Resistance of Thermosetting Resins D-2990 Standard Test Methods for Tensile, Compressive, Flexural Creep, and Creep Rupture of Plastics. D-638 Test Method for Tensile Properties of Plastic. D-790 Test Method for Tensile Properties for Unreinforced and Reinforced Plastics and Electrical Insulating Materials. D-256 Impact Test. D-638 Barcol Hardness Test. MASTERLINER exceeds the minimum strength requirements demonstrated in the following ASTM standards: Tensile Yield: 3,000 psi D-638 Modulus of Elasticity: 300,000 psi D-790 Flexural Strength: 4,500 psi D-790 Flex Modulus of Elasticity: 250,000 psi D LINER DESIGN AND SELECTION The contractor shall furnish, prior to the use of the lining materials, satisfactory written guarantee of his compliance with MASTERLINER standards for all materials and techniques being used in the lining process. After the liner has been cured, the contractor will trim any excess liner in the manholes. He will then proceed to reconnect the existing active service connections. This is done without excavation by the use of an internal, remote controlled cutting devise through the newly installed liner RESIN AND TUBE ACCEPTANCE: At the time of resin impregnation, the entire MASTERLINER tube shall be inspected for defects. The resin shall not contain fillers, except those required for viscosity control, fire retardant, or extension of pot life. Thixotropic agents that do not interfere with visual inspection may be added for viscosity control. Resins may contain pigments, dyes, or colors, which do not interfere with visual inspection of the CIPP or its required properties. Additives may be incorporated that enhance the physical and/or chemical resistance. The impregnated liner bag shall be transported to and stored at the site in such a manner that it will not be damaged, exposed to direct sunlight, or result in any danger to public safety. 39

7 5.02 INSPECTION: The contractor shall arrange a freely accessible place and means so that the MASTERLINER pipe and all equipment to be used during the installation, including injection manifolds, gauge stations, steam equipment, winches, etc., can be inspected by the client. The contractor shall prepare and inspect all necessary equipment for the installation prior to going to the job site. The contractor shall also provide all necessary tools and spare parts as may be required for the most frequently damaged equipment, and shall make sure that said tools and spare parts are available at the site. The supporting equipment such as pumps and generators must be provided at the site in the event there is a fluid surge and pumping is required on an emergency basis. The contractor shall also prepare and make operable all necessary communication equipment for his field crew INSPECTION OF LINER: The contractor shall designate a location where the un-cured resin in the original containers and the un-impregnated liner will be impregnated prior to installation. The contractor shall allow the engineer and/or his representative to inspect the materials and chemical impregnation procedure. The quantities of the liquid thermal-setting materials shall be as per manufacturer's standards to provide the lining thickness specified. The impregnated liner material shall be inserted through the existing manhole by means of a winch assembly. If the surface is sufficiently rough to cause damage to the impregnated liner material a protector shield may be used to cover the manhole opening and the invert throughout the section to be lined. Next, the impregnated MASTERLINER shall be inserted into the existing sewer by a cable attached to the liner to be pulled by a winch INSTALLATION, PULL IN PLACE, WATER INVERSION AND AIR INVERSION: 6.01 PULL IN PLACE: The liner may be drawn into the existing sewer by means of winch cable. With the ends of the liner sealed, the liner will be expanded by compressed air or water. The pulling tension shall not exceed more than half of the tensile strength of the liner AIR INFLATION: Initially, compressed air is introduced, inflating and forming the liner material against the inner walls of the pipe to be lined STEAM AND AIR CURING: After the inflation steps are completed, the contractor shall begin the curing process by utilizing the MASTERLINER approved heat source. The equipment will be capable of delivering steam to the far end of the liner to uniformly raise the temperature required to effectively cure the resin. The temperature maintained during the curing period shall be that recommended by the resin manufacturer and approved by the engineer. During the curing process the heat source shall be fitted with pressure gauges and thermocouples to continuously monitoring the temperature of the incoming and outgoing heat medium supply. The water, steam or air temperature during the cure period shall meet the resin manufacturer's requirements as measured at the heat source inflow and outflow return lines. 40

8 At the engineer's direction, the contractor shall provide standby equipment to maintain the heat source supply throughout the curing process, and the contractor shall maintain static head (internal pressure) in the liner greater than the maximum design external water pressure. The initial cure shall be deemed complete when inspection shows that the exposed liner portions appear hard and sound and the remote temperature sensors indicate that an exothermic reaction has occurred. The cure period shall be of duration recommended by the resin manufacturer as modified to account for length, thickness and diameter of the liner. The hardened liner has to be cooled to a temperature below 100 degrees F. After reaching the appropriate temperature, the static head in the lined pipe is relieved. This cool-down period shall occur prior to opening the downstream stopper, reconnecting of services and returning normal flow back into the system. If the cured pipe does not fit tightly against the host pipe at its termination point(s), the voids shall be sealed, by filling them with a resin mixture compatible with the CIPP. All internal (dry or non-bonded) inflation tubes that are not bonded to the resin impregnated tube prior to installation of the liner tube shall be completely removed from the finished cured-in place liner pipe. Wrinkles in the finished liner pipe that cause a backwater, reduce the pipe's hydraulic capacity or structural stability or that create voids between the liner and pipe wall will be unacceptable. All unacceptable sections shall be removed or repaired by a method approved by the engineer at the contractor's expense. Repair methods shall be proposed by the contractor and submitted to the engineer for approval WATER INVERSION: The wet-out tube shall be inserted through an existing manhole or other approved access by means of an inversion process using water with a hydrostatic head sufficient to fully extend it to the next designated manhole or termination point. The tube shall be inserted in the vertical inversion standpipe so that a leak proof seal is created. The inversion head shall be adjusted to sufficient height to cause the impregnated tube to invert from point of termination and hold the tube tight to the pipe wall, producing dimples at side connections. Care shall be taken during the inversion so as not to over-stress the felt fiber HEATED WATER CURING: If heated water is used to cure the liner, provide a suitable head source, and water recirculation equipment capable of delivering hot water to the far end of the liner to quickly and uniformly raise the water temperature in the entire inverted liner to the temperature to commence the exothermic reaction of the resin as determined by the catalyst system employed. The heat source shall be fitted with suitable monitors to gauge the temperatures of the incoming and outgoing water supply to determine when uniform temperature is achieved throughout the length of the liner. Water in the liner shall be raised to a temperature recommended by the resin manufacturer. Initial cure is deemed to be complete when the uniform temperature recommended by the resin manufacturer is achieved throughout the length of the liner. Water temperature monitors at the heat source shall determine this uniform temperature. The post cured period shall then commence with the heat source shut down with recirculation of the water continued to maintain 41

9 uniform temperature in the liner. Hot water may be bled out of the system and replaced by clean water at ambient water main temperature to control post cure water complete cure. Time required to cure is a function of the pipeline section diameter and length, and shall be determined by the lining manufacturer's instructions. The curing process should be sufficient to hold the liner tight to the pipe wall and produce dimples at side connections. After curing, open and drain the line in a manner so a vacuum will not be developed which may damage the installed liner AIR INVERSION: Insert the wet-out tube through an existing manhole or other approved access by means of an inversion process using an application of air pressure sufficient to fully extend it to the next designated manhole or termination point. The tube shall be connected by an attachment at the upper end of the guide chute so that a leakproof seal is created with the impermeable plastic membranes side facing out. As the tube enters the guide chute, the tube shall be turned inside out. The inversion air pressure shall be adjusted so that sufficient pressure is provided to cause the impregnated tube to invert from point of termination and hold the tube tight to the pipe wall, producing dimples at side connections. Care shall be taken during the inversion so as not to over stress the woven and non-woven materials HOT AIR: If hot air is used to cure the liner, provide suitable heat source and recirculation equipment to uniformly distribute the heat. The temperature and pressure in the line during the cure period shall be that recommended by the resin manufacturer. Hot air generating equipment shall be equipment with a suitable monitor to gauge the temperature of the outgoing steam. The temperature of the resin being cured shall be monitored by placing gauges between the impregnated tube and the existing pipe at both ends during cure. Initial cure shall begin during temperature heat-up and shall be deemed complete when exposed portions of the new liner appear to be hard and sound and the remote temperature sensor indicate that the temperature is of a magnitude to create an exotherm or cure in the resin. After initial cure is reached, the temperature shall be raised to the post cure temperature recommended by the resin manufacturer. Post cure temperature shall be held for a period as recommended by the resin manufacturer. During the post cure time the distribution and control of hot air shall continue to maintain required temperature. The curing process should be sufficient to hold the liner tight to the wall and produce dimples at side connections. Curing of the liner pipe shall take into account the existing pipe material and size, the resin system and ground conditions, which includes temperature, moisture level and thermal conductivity of soil SERVICE CONNECTIONS: After the curing is complete and the pipe system is placed into service, all active house connection sewers shall be reinstated without delay. This is to be done without excavation by use of an internal, remote-controlled cutting device through either the lateral pipe or through the newly installed liner TELEVISION INSPECTION AFTER INSTALLATION: A television inspection and video tape recording of the newly lined pipe including the restored service connections shall be performed immediately after work is completed. Should the results of this inspection reveal any defects as defined above, the contractor will be required to repair or replace these defects as ordered by the engineer at the sole cost of the contractor. 42

10 The contractor shall furnish and maintain in good condition, all equipment necessary for the proper execution and inspection of the work PAYMENT: Payment of rehabilitation work will be based on the unit price listed in the bid schedule. This payment shall include full compensation for all labor, material, tools, and incidentals for lining of the existing pipeline Payment for reinstallations of house connection shall be in accordance with bid item. Payment for obstruction removal by a point repair shall be in accordance with bid item MEASUREMENTS FOR PAYMENT: All measurements shall be as specified or made by conventional means with accuracy consistent with field conditions and common practice. Should a discrepancy in measurement exist which is greater than 10%, the item in question shall be re-measured by both the contractor and the owner's representative for verification MEASUREMENT FOR PAYMENT SHALL BE BASED ON THE FOLLOWING SCHEDULE: PIPELINE CLEANING shall be paid for at the unit price bid per linear foot of each size pipe. Measurement of the actual number of feet cleaned shall be made from the center of the manholes. TELEVISION INSPECTION of the sewer lines shall be paid for at the unit price bid per linear foot of each size pipe. Measurements of the actual number of feet inspected shall be made from the center of the manholes. PUMPING AND BYPASSING of sewer flows shall be paid for at the unit price bid per setup. REMOVAL OF INTRUDING PIPES shall be paid for at the unit price bid per removal. INSTALLATION OF LINER shall be paid for at the unit price bid per foot of liner installed for each size pipe. REINSTATEMENT OF SERVICE CONNECTIONS shall be paid for at the unit price bid per reinstatement. FINAL TV INSPECTION shall be paid for at the unit price bid per linear foot of each size pipe. Measurement of the actual number of feet inspected shall be made from the center of the manholes. 43

11 7.03 CLEANUP: After the liner installation has been completed and accepted, the contractor shall clean up the entire project area. The contractor, in accordance with local laws and regulations shall dispose of all excess materials and debris, not incorporated into the permanent installation GENERAL INFORMATION AND WARRANTY THIRD PARTY TEST DATA: Performance quality is assured through stringent in house and third party testing. Tulane University's ASTM lab, established in 1909, has conducted a series of tests on the MASTERLINER PRODUCT. All of the test results prove that the MASTERLINER product is at least equal or superior to the competition. These industry standard tests were conducted to insure quality control: 1. Tensile Strength TEST per ASTM D Flexural Strength Test per ASTM D Impact Test per ASTM D Barcol Hardness Test per ASTM D

12 The randomly picked samples were subjected to a tensile and flexural load using Instron Universal Testing equipment ADVANTAGES TO THE MASTERLINER CURED IN PLACE PIPE SYSTEM: There are many advantages to MASTERLINER'S total encapsulating program: * NO EXCAVATION * FAST AND SIMPLE INSTALLATION * HIGH STRENGTH AND CORROSION RESISTANT VINYL OR POLYESTER RESINS * SUBSTANTIAL COST SAVINGS * JOINT-LESS RENOVATION * CUSTOM PIPE DIAMETERS AND WALL THICKNESSES * IMPROVED FLOW CHARACTERISTICS * VIRTUALLY ELIMINATED INFILTRATION & EXFILTRATION * CONTINUOUS RESEARCH AND DEVELOPMENT QUALITY ASSURANCE The MASTERLINER product can also line service connections & structurally reinforce manholes. MASTERLINER CAN TURN A LEAKING PIPE INTO NEW, STRONG, LEAK-PROOF SYSTEM IN JUST HOURS. MASTERLINER IS THE SUPERIOR CURED-IN-PLACE PIPELINE REHABILITATION SYSTEM WARRANTY: The contractor shall warrant the liner installation for a period of one year. During the warranty period, any defects that affect the integrity or strength of the pipe shall be repaired at the contractor's expense in a manner mutually agreed upon by the owner and the contractor. OUR MISSION WE WILL CONTRIBUTE TO OUR CUSTOMERS' SUCCESS BY PROVIDING EXCEPTIONAL QUALITY PIPE LINING PRODUCTS. WE WILL ACHIEVE AN UNSURPASSED LEVEL OF CUSTOMER SATISFACTION BY PROVIDING FLEXIBLE AND EFFICIENT SERVICE. FOR FURTHER INFORMATION OR THE NAME OF THE QUALIFIED MASTERLINER LICENSED CONTRACTOR IN YOUR AREA CONTACT: 45

REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542

REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542 1.0 INTENT REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES 1.01 It is the intent of this specification to provide for the reconstruction of pipelines and conduits by the installation of a resin-impregnated

More information

INSTALLATION OF INSITUFORM LINER

INSTALLATION OF INSITUFORM LINER PART 1 GENERAL 1.1 SCOPE: A. This item shall include all work and materials to install, insert a flexible polyester felt liner saturated with a thermo-setting resin into the existing sewer line for rehabilitation

More information

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) 1 Intent: The intent of trenchless sewer pipe Insertion is to rehabilitate the existing sewer

More information

Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology

Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology 2007 Pumper & Cleaner Environmental Expo International Wednesday February 7, 2007 Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology What is Cured-In-Place Pipe (CIPP)

More information

02780 LINER FOR SEWER REHABILITATION

02780 LINER FOR SEWER REHABILITATION Section 02780 Liner for Sewer Rehabilitation Page 02780-1 (Revised 11/06/09) 02780 LINER FOR SEWER REHABILITATION SELECTED LINKS TO SECTIONS WITHIN THIS SPECIFICATION Part 1 GENERAL Part 2 PRODUCTS Part

More information

EI- MH06-204 TO MH06-209 LINER

EI- MH06-204 TO MH06-209 LINER EI- MH06-204 TO MH06-209 LINER TABLE OF CONTENTS PART ONE: PROJECT-SPECIFIC CONDITIONS 101 PROJECT DESCRIPTION 102 SCOPE OF WORK 103 ESTIMATED FLOWS 104 PROJECT SCHEDULE 105 HIGH WATER USERS PART TWO:

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by

More information

City of Missoula Wastewater Division Public Works Department 435 Ryman Street, Missoula, Montana 59802

City of Missoula Wastewater Division Public Works Department 435 Ryman Street, Missoula, Montana 59802 City of Missoula Wastewater Division Public Works Department 435 Ryman Street, Missoula, Montana 59802 REQUEST FOR COMPETITIVE SEALED PROPOSALS (CSP) For Installation of 200 Feet of 12 inch Diameter Cure

More information

PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY

PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY Cured-In-Place Pipe Pressure & Gravity Lines Pipe Splitting Trenchless Pipe Replacement EcoCast Advanced

More information

Section 2320 Cured-In-Place Pipe Lining

Section 2320 Cured-In-Place Pipe Lining Section 2320 Cured-In-Place Pipe Lining PART 1: General 1.1 Description 1.1.1 Provide all materials, equipment, labor and incidentals for the installation and testing of cured-in-place pipe lining (CIPPL)

More information

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines: Division 53: Slip-Lining of Existing Sewer Line 53.01 GENERAL: This section includes all labor, materials, transportation, equipment necessary to rehabilitate by means of Instituform deteriorated sections

More information

REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS. Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC

REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS. Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC What is really out there? DO YOU DIG IT? INDUSTRY CONCERNS UNEXPECTED DEVELOPMENTS

More information

SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD

SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD 21.01 SCOPE: It is the intent of the Specification to define the approved methods and materials

More information

CURED-IN-PLACE PIPE MINIMIZING RISK BY DEFECT CODING

CURED-IN-PLACE PIPE MINIMIZING RISK BY DEFECT CODING North American Society for Trenchless Technology 2007 No-Dig Conference & Exhibition San Diego, California April 16-19, 2007 CURED-IN-PLACE PIPE MINIMIZING RISK BY DEFECT CODING Robert K. Lee, P.E. 1 1

More information

SPECIFICATION FOR CURED-IN-PLACE PIPE RENOVATION OF PRESSURE PIPELINES. (As submitted by Insituform Technologies, Inc.)

SPECIFICATION FOR CURED-IN-PLACE PIPE RENOVATION OF PRESSURE PIPELINES. (As submitted by Insituform Technologies, Inc.) SPECIFICTION FOR CURED-IN-PLCE PIPE RENOVTION OF PRESSURE PIPELINES (s submitted by Insituform Technologies, Inc.) 1 INTENT It is the intent of this specification to provide for the renovation of pressure

More information

CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General

CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General General All sanitary sewers, manholes and force mains shall be acceptance tested, as hereinafter specified in the presence of a City representative. Acceptance testing shall be performed after backfilling

More information

SECTION XXXXXX TECHNICAL SPECIFICATIONS FOR INSTALLATION OF PROTECTIVE COATINGS FOR MANHOLES, WETWELLS, AND OTHER SANITARY SEWER STRUCTURES

SECTION XXXXXX TECHNICAL SPECIFICATIONS FOR INSTALLATION OF PROTECTIVE COATINGS FOR MANHOLES, WETWELLS, AND OTHER SANITARY SEWER STRUCTURES 1.00 PART 1 GENERAL 1.01 SCOPE A. It is the intent of this contract to install a 100% solids epoxy monolithic coating to the walls, benches and inverts of all manholes and the specified surfaces of other

More information

Sewer Line Rehabilitation

Sewer Line Rehabilitation 1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing sanitary sewers using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting

More information

1.3.2 Method of construction and restoration of existing water service connections. This shall include:

1.3.2 Method of construction and restoration of existing water service connections. This shall include: 1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting

More information

Trouble Shooting for Trenchless Liner Installation During Sewer Line Rehabilitation

Trouble Shooting for Trenchless Liner Installation During Sewer Line Rehabilitation Trouble Shooting for Trenchless Liner Installation During Sewer Line Rehabilitation Salam Khan*, P.E. and Christoph Dobson, P.E. Sacramento County Sanitation District 1 (CSD-1) 10545 Armstrong Avenue,

More information

SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE

SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE PART 1 - GENERAL 1.01 WORK INCLUDED A. This section covers the initial and final cleaning, and the initial and final

More information

Introduction to Pressure Pipe Rehabilitation with CIPP

Introduction to Pressure Pipe Rehabilitation with CIPP Introduction to Pressure Pipe Rehabilitation with CIPP Founded in early 1990 s RS Technik is a global leader in the rehabilitation of underground pipes RS Technik uses Cured-in- Place (CIPP) technology

More information

Rehabilitation Alternatives. MWEA Collection System Seminar October 1, 2009

Rehabilitation Alternatives. MWEA Collection System Seminar October 1, 2009 Rehabilitation Alternatives MWEA Collection System Seminar October 1, 2009 Overview Types of Rehabilitation Trenchless Categories On-Line Replacement In-Situ Options Selecting the Best Solution Types of

More information

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

Storm Sewer Trenchless Upgrade Alternatives and Recommendations Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for

More information

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION ITEM 866 SEWER MAIN TELEVISION INSPECTION 866.1 DESCRIPTION: The Contractor shall furnish all labor, materials, equipment, and incidentals to provide the televising and a NASSCO-(PACP) standard video,

More information

07 21 19 Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

07 21 19 Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM 07 21 19 STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM 7819 Broadview Road Cleveland, OH 44131 800-522-4522 February, 2011 SPEC NOTE: This guide specification is intended for use when specifying

More information

STANDARD SPECIFICATIONS SECTION 02959 SEWER MAIN AND LATERAL CONNECTION SEALING BY CHEMICAL GROUT

STANDARD SPECIFICATIONS SECTION 02959 SEWER MAIN AND LATERAL CONNECTION SEALING BY CHEMICAL GROUT STANDARD SPECIFICATIONS SECTION 02959 SEWER MAIN AND LATERAL CONNECTION SEALING BY CHEMICAL GROUT PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for rehabilitation of defective mainline

More information

SECTION 18 REHABILITATION OF SANITARY SEWER MAINS BY THE CURED-IN-PLACE (CIPP) METHOD MOBILE AREA WATER AND SEWER SYSEM

SECTION 18 REHABILITATION OF SANITARY SEWER MAINS BY THE CURED-IN-PLACE (CIPP) METHOD MOBILE AREA WATER AND SEWER SYSEM MOBILE AREA WATER AND SEWER SYSEM SECTION 18 REHABILITATION OF SANITARY SEWER MAINS BY THE CURED-IN-PLACE (CIPP) METHOD 18-0 Cured-In-Place Pipe Lining Rev 01/13 Rev 11 /13 Table of Contents TABLE OF CONTENTS...

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located

More information

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe 1. GENERAL The following supplemental sewer main specifications are intended to address the installation of high-density polyethylene

More information

Sewer Water Pipeline Replacement with CERTA LOK RESTRAINED JOINT PVC PIPE

Sewer Water Pipeline Replacement with CERTA LOK RESTRAINED JOINT PVC PIPE 1.0 GENERAL 1.1 DESCRIPTION This section addresses the procedures to be employed for pipe bursting existing water/sewer pipelines, as identified on the drawings, and replacing with new Restrained Joint

More information

CLEANING, INSPECTION, AND TESTING OF SEWERS

CLEANING, INSPECTION, AND TESTING OF SEWERS CLEANING, INSPECTION, AND TESTING OF SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Cleaning, Inspecting, and Testing Sanitary Sewers B. Cleaning, Inspecting, and Testing Storm Sewers C. Cleaning and

More information

External Wrapping of Steel Riser Pipe. Case Study HJ3 CS200902

External Wrapping of Steel Riser Pipe. Case Study HJ3 CS200902 External Wrapping of Steel Riser Pipe Case Study HJ3 CS200902 Introduction Refineries process a wide variety of petroleum products. As part of the process, they rely on cooling towers, which recycle water

More information

EVENT 002177 - ATTACHMENT C

EVENT 002177 - ATTACHMENT C Thermal Cured in Place Pipe 6 pages PART 1 General 1.01 SUMMARY 1.01.01 Section includes thermal cured in place pipe. 1.01.01.01 It is the intent of this specification to provide for the reconstruction

More information

by Leonard Friesenhahn, P.E.

by Leonard Friesenhahn, P.E. by Leonard Friesenhahn, P.E. of sight, out of mind is an adage your top administrators may apply to your campus Out wastewater collection system but as a facilities professional, you know how serious a

More information

Industrial Pipeline Integrity Management & Remote Polyurea Pipe Lining Systems.

Industrial Pipeline Integrity Management & Remote Polyurea Pipe Lining Systems. Industrial Pipeline Integrity Management & Remote Polyurea Pipe Lining Systems. Aging pipeline infrastructure and industry s inability to evaluate and inspect has left many engineers and plant managers

More information

TRENCHLESS TECHNOLOGY GUIDELINES CLOSE FIT THERMOPLASTIC LINING

TRENCHLESS TECHNOLOGY GUIDELINES CLOSE FIT THERMOPLASTIC LINING TRENCHLESS TECHNOLOGIES RESOURCE CENTRE TRENCHLESS TECHNOLOGY GUIDELINES SECOND EDITION CLOSE FIT THERMOPLASTIC LINING NEW VERSION AUGUST 2005 1. OVERVIEW The use of liners that are deliberately deformed

More information

Defense Technical Information Center Compilation Part Notice

Defense Technical Information Center Compilation Part Notice UNCLASSIFIED Defense Technical Information Center Compilation Part Notice ADP017712 TITLE: Rehabilitation of TCE-Contaminated Underground Storm Water System Using Trenchless Technology DISTRIBUTION: Approved

More information

Wastewater Capital Projects Management Standard Construction Specification

Wastewater Capital Projects Management Standard Construction Specification CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,

More information

PORTLAND BES ADVANCES IN SEWER MAINTENANCE AND REPAIRS BY OPERATING MULTIPLE CIPP CREWS.

PORTLAND BES ADVANCES IN SEWER MAINTENANCE AND REPAIRS BY OPERATING MULTIPLE CIPP CREWS. North American Society for Trenchless Technology 2007 No-Dig Conference & Exhibition San Diego, California April 15-20, 2007 Paper # PORTLAND BES ADVANCES IN SEWER MAINTENANCE AND REPAIRS BY OPERATING

More information

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, Storm Drain Installation, of these Standard Provisions. SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and

More information

Rehabilitation or Replacement? That Is The Question

Rehabilitation or Replacement? That Is The Question Rehabilitation or Replacement? That Is The Question Chris L. Windley PE Greg Anderson, PE 94th Annual Conference November 18, 2014 Overview Project Background Existing Sewer Condition Flow Projections

More information

VERIFICATION TESTING GUIDELINES FOR CONTRACTORS

VERIFICATION TESTING GUIDELINES FOR CONTRACTORS Public Works Department Engineering Division VERIFICATION TESTING GUIDELINES FOR CONTRACTORS CITY OF BERKELEY PRIVATE SEWER LATERAL ORDINANCE BMC Chapter 17.24 Effective November 3, 2014 A consent decree

More information

PRODUCT CATALOGUE. for. SMARTPHONE / WEBSITE / DIGITAL EDITION / BOOK / ipad / GPS

PRODUCT CATALOGUE. for. SMARTPHONE / WEBSITE / DIGITAL EDITION / BOOK / ipad / GPS PRODUCT CATALOGUE for This product catalogue has been downloaded from COSSD.com. Listed products/services and their descriptions are shown as supplied by the title company COSSD does not guarantee the

More information

TRENCHLESS SEWER SERVICE REHABILITATION ANNUAL CONTRACTING SERVICES

TRENCHLESS SEWER SERVICE REHABILITATION ANNUAL CONTRACTING SERVICES CITY OF BRENTWOOD REQUEST FOR PROPOSALS (RFP) TRENCHLESS SEWER SERVICE REHABILITATION ANNUAL CONTRACTING SERVICES RFP ISSUANCE DATE - October 13, 2011 I. NAME OF SOLICITING PUBLIC BODY City of Brentwood,

More information

Ultraviolet (UV) Light Cured Fiberglass Reinforced Cured-In-Place Pipe (CIPP) It is not just for sanitary sewer rehabilitation

Ultraviolet (UV) Light Cured Fiberglass Reinforced Cured-In-Place Pipe (CIPP) It is not just for sanitary sewer rehabilitation Ultraviolet (UV) Light Cured Fiberglass Reinforced Cured-In-Place Pipe (CIPP) It is not just for sanitary sewer rehabilitation Dan Broderick Director of Pipeline Rehabilitation ACHEN-GARDNER ENGINEERING,

More information

Section 2651 Television Inspection

Section 2651 Television Inspection Section 2651 Television Inspection PART 1: General 1.1 Description Provide all labor, materials, tools, equipment and incidentals as shown, specified, and required to perform television (TV) inspection

More information

FY15 Gravity Sewer and Manhole Rehabilitation

FY15 Gravity Sewer and Manhole Rehabilitation Contract Drawings For FY15 Gravity Sewer and Manhole Rehabilitation TRAVELERS REST TAYLORS Frazier Project No. -030 BASIN 850 Greenville, South Carolina April 2015 BASIN 700A GREENVILLE BASIN 700B FIVE

More information

Letty Arvide-Gomar, PE

Letty Arvide-Gomar, PE Letty Arvide-Gomar, PE Outline DIP History and Applications Corrosion Issues Internal Cleaning Technologies Rehabilitation Options DIP History and Applications Corrosion Issues Internal Cleaning Technologies

More information

OVERVIEW. 1 Intent:... 2. 2 Applicability:... 2. 3 Referenced Standards... 2. 5 Invert Repair Mortar... 3

OVERVIEW. 1 Intent:... 2. 2 Applicability:... 2. 3 Referenced Standards... 2. 5 Invert Repair Mortar... 3 PERMACAST CENTRIFUGALLY CAST CONCRETE PIPE (CCCP) OVERVIEW 1 Intent:... 2 2 Applicability:... 2 3 Referenced Standards... 2 5 Invert Repair Mortar... 3 6 Centrifugally Cast Concrete Pipe (CCCP)... 3 7

More information

SEWER PIPELINE AND MANHOLE REHABILITATION FOR VARIOUS LOCATIONS WITHIN THE CITY OF BEVERLY HILLS, CALIFORNIA CITY OF BEVERLY HILLS

SEWER PIPELINE AND MANHOLE REHABILITATION FOR VARIOUS LOCATIONS WITHIN THE CITY OF BEVERLY HILLS, CALIFORNIA CITY OF BEVERLY HILLS SEWER PIPELINE AND MANHOLE REHABILITATION FOR VARIOUS LOCATIONS WITHIN THE CITY OF BEVERLY HILLS, CALIFORNIA CITY OF BEVERLY HILLS RESPONSE TO BIDDER S QUESTIONS Question #1: Is the Contractor required

More information

STANDARD SANITARY SEWER REHABILITATION SPECIFICATIONS

STANDARD SANITARY SEWER REHABILITATION SPECIFICATIONS STANDARD SANITARY SEWER REHABILITATION SPECIFICATIONS MATERIAL SPECIFICATIONS FOR SANITARY SEWER REHABILITATION Unless superseded or modified in the Detailed Specifications, all materials, apparatus, supplies,

More information

SANITARY SEWER SPECIFICATIONS

SANITARY SEWER SPECIFICATIONS SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,

More information

Summary 7/11/2012. Michigan Water Environment Association 2012 Annual Conference Boyne Mountain Resort

Summary 7/11/2012. Michigan Water Environment Association 2012 Annual Conference Boyne Mountain Resort Michigan Water Environment Association 2012 Annual Conference Boyne Mountain Resort June 25, 2012 Thomas Gossiaux, PE (AECOM) Matt Raysin, PE (GCDC-WWS) Dave Barnas, PE (AECOM) Ed Tharp, PE (AECOM) Summary

More information

ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING

ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING 1.0 General 1.1 The work covered by this section consists of providing all labor, equipment, material and supplies, insurance, accessories, tools, transportation,

More information

2015 SANITARY SEWER REHABILITATION SPECIFICATIONS SECTION 1.00 SCOPE... 1 SECTION 2.00 SEWER LINE CLEANING... 2 SECTION 3.00 SEWER FLOW CONTROL...

2015 SANITARY SEWER REHABILITATION SPECIFICATIONS SECTION 1.00 SCOPE... 1 SECTION 2.00 SEWER LINE CLEANING... 2 SECTION 3.00 SEWER FLOW CONTROL... 2015 SANITARY SEWER REHABILITATION SPECIFICATIONS UTABLE OF CONTENTS SECTION 1.00 SCOPE... 1 UPage 1.01 General... 1 1.02 Work Included... 1 1.03 Location of Work... 1 1.04 Coordination of Work... 1 1.05

More information

SPR PE Steel Reinforced Liner

SPR PE Steel Reinforced Liner ENGINEERED SOLUTIONS SPR PE Steel Reinforced Liner Reline Done Right Contech is your single source for rehabilitation of sanitary & storm sewers, culverts and bridges. Contech Engineered Solutions has

More information

The information contained in this report was compiled for the use of the Vermont Agency of

The information contained in this report was compiled for the use of the Vermont Agency of The information contained in this report was compiled for the use of the Vermont Agency of Transportation. Conclusions and recommendations contained herein are based upon the research data obtained and

More information

SIDE SEWER CONDITION ASSESSMENT AND REPAIR RECOMMENDATIONS

SIDE SEWER CONDITION ASSESSMENT AND REPAIR RECOMMENDATIONS SIDE SEWER CONDITION ASSESSMENT AND REPAIR RECOMMENDATIONS Introduction City of Tacoma property owners are responsible for the construction, maintenance and repair of private side sewers, which connect

More information

Water Main Lining A Sustainable Alternative to Open Cut Replacement

Water Main Lining A Sustainable Alternative to Open Cut Replacement Water Main Lining A Sustainable Alternative to Open Cut Replacement Sean O Dell, PE Baxter & Woodman, Inc. B&W Client Seminar, Crystal Lake May 1, 2014 Agenda Why, What, When, Where, Who, How Reduction

More information

STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS

STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements to execute internal closed

More information

CHAPTER 6 - SANITARY SEWER

CHAPTER 6 - SANITARY SEWER CHAPTER 6 - SANITARY SEWER 6.1 GENERAL This section covers the requirements for PVC plastic sewer pipe materials and installation in sanitary sewer construction. 6.2 PIPE PVC gravity sewer pipe and fittings

More information

SECTION 02400 - STORM DRAIN SYSTEM

SECTION 02400 - STORM DRAIN SYSTEM SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And

More information

Drain & Tank Cleaning

Drain & Tank Cleaning Drain & Tank Cleaning Our ever growing fleet of drain cleaning vehicles ranging from small vans to Hi-spec Jet-Vac units enable us to provide you with the right equipment at the right time. Services include:

More information

See Appendix A for additional information, or contact ASTM directly.

See Appendix A for additional information, or contact ASTM directly. DEFINITIONS Wherever used in these specification guidelines, the following words and terms have the meanings indicated. AREAWAY: A paved surface, serving as an entry area to a basement or subsurface portion

More information

Corporate Headquarters located in Davison, MI Family owned business with over 50 years industry experience Focus on value based, environmentally safe

Corporate Headquarters located in Davison, MI Family owned business with over 50 years industry experience Focus on value based, environmentally safe Corporate Headquarters located in Davison, MI Family owned business with over 50 years industry experience Focus on value based, environmentally safe products for the infrastructure rehabilitation and

More information

PROVIDING SUPPORT TO THE CONSTRUCTION INDUSTRY BY SUPPLYING CURED IN PLACE PIPE (CIPP) LINING TO COVER DRAINS, SEWERS AND PIPELINES

PROVIDING SUPPORT TO THE CONSTRUCTION INDUSTRY BY SUPPLYING CURED IN PLACE PIPE (CIPP) LINING TO COVER DRAINS, SEWERS AND PIPELINES PROVIDING SUPPORT TO THE CONSTRUCTION INDUSTRY BY SUPPLYING CURED IN PLACE PIPE (CIPP) LINING TO COVER DRAINS, SEWERS AND PIPELINES CLIENTS BENEFIT FROM LINING SUPPORT S SEWER AND PIPE CIPP LINING THAT

More information

Rainwater going astray. EPROPOX FC30 epoxy resin system to be prepared for a rainy day

Rainwater going astray. EPROPOX FC30 epoxy resin system to be prepared for a rainy day Rainwater going astray EPROPOX FC30 epoxy resin system to be prepared for a rainy day Inversion 7 metres up into the vertical pipe with the epros Drum type Mini 3 Moisture damage in the Savings Bank Branch

More information

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe. SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price

More information

SECTION 1 GENERAL REQUIREMENTS

SECTION 1 GENERAL REQUIREMENTS Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,

More information

ENGINEERED SOLUTIONS. A2 Liner Pipe for Trenchless Technology

ENGINEERED SOLUTIONS. A2 Liner Pipe for Trenchless Technology ENGINEERED SOLUTIONS A2 Liner Pipe for Trenchless Technology A2 Liner Pipe Restores Deteriorated Sewers Cost-Effective Rehabilitation The increasing rate of sanitary and storm sewer deterioration requires

More information

CCTV INSPECTION OF SEWER LINES. A. Section 02730 Sanitary Gravity Sewer Lines. B. Section 02731 Sanitary Gravity Sewer Line Testing

CCTV INSPECTION OF SEWER LINES. A. Section 02730 Sanitary Gravity Sewer Lines. B. Section 02731 Sanitary Gravity Sewer Line Testing CCTV INSPECTION OF SEWER LINES PART 1 GENERAL 1.1 SECTION INCLUDES A. CCTV Inspections 1.2 RELATED SECTIONS A. Section 02730 Sanitary Gravity Sewer Lines B. Section 02731 Sanitary Gravity Sewer Line Testing

More information

Presented by: Scott E. Belz Project Manager- URS Corporation Robert P. Kelly, P.E. Director of Engineering-City of Westlake James J. Smolik, P.E.

Presented by: Scott E. Belz Project Manager- URS Corporation Robert P. Kelly, P.E. Director of Engineering-City of Westlake James J. Smolik, P.E. Presented by: Scott E. Belz Project Manager- URS Corporation Robert P. Kelly, P.E. Director of Engineering-City of Westlake James J. Smolik, P.E. Engineer-City of Westlake City of Westlake Facts Founded

More information

REHABILITATION OR REPLACEMENT? THAT IS THE QUESTION

REHABILITATION OR REPLACEMENT? THAT IS THE QUESTION REHABILITATION OR REPLACEMENT? THAT IS THE QUESTION ABSTRACT Chris L. Windley PE, McKim & Creed, Inc. Ben R. Latino, Jr., PE, McKim & Creed, Inc. Greg Anderson, PE, McKim & Creed, Inc. When designing to

More information

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains

More information

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE 6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction

More information

Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority

Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Abstract The United States Virgin Islands Waste Management Authority

More information

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions. SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings

More information

4 Steps for Quality Sewer Performance in Perpetuity

4 Steps for Quality Sewer Performance in Perpetuity 4 Steps for Quality Sewer Performance in Perpetuity By Gerhard Gerry P. Muenchmeyer, P. E. Principal Muenchmeyer Associates, LLC E-mail gerry@muenchmeyerassoc.com INTRODUCTION A well maintained and functional

More information

ENGINEERING DESIGN GUIDE FOR REHABILITATION WITH CURED-IN-PLACE PIPE Second Edition

ENGINEERING DESIGN GUIDE FOR REHABILITATION WITH CURED-IN-PLACE PIPE Second Edition ENGINEERING DESIGN GUIDE FOR REHABILITATION WITH CURED-IN-PLACE PIPE Second Edition Lanzo Company History Lanzo has been a leading competitor in the construction industry for over 45 years. Lanzo was founded

More information

CIPP for Large Diameter Pressure Pipes. Water Research Foundation Large Diameter Pipe Rehabilitation Seminar 20 January 2016 George Bontus, P.Eng.

CIPP for Large Diameter Pressure Pipes. Water Research Foundation Large Diameter Pipe Rehabilitation Seminar 20 January 2016 George Bontus, P.Eng. CIPP for Large Diameter Pressure Pipes Water Research Foundation Large Diameter Pipe Rehabilitation Seminar 20 January 2016 George Bontus, P.Eng. Pressure Pipe Lining What Does it Mean? What is It? No

More information

STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS

STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements to execute internal closed

More information

SEWER CLEANING, INSPECTION AND ASSESSMENT

SEWER CLEANING, INSPECTION AND ASSESSMENT 3.1 OVERVIEW Chapter 3 SEWER CLEANING, INSPECTION AND ASSESSMENT Preventive maintenance protects the investment of the sanitary sewer collection system infrastructure. Higher frequency cleaning of gravity

More information

MIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E.

MIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E. MIAMI-DADE LATERAL PILOT PROGRAM James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E. Hazen and Sawyer, P.C. 4000 Hollywood Boulevard Hollywood, FL 33021 ABSTRACT Since 1994 the Miami-Dade

More information

TECHNICAL REQUIREMENTS AND SPECIFICATIONS

TECHNICAL REQUIREMENTS AND SPECIFICATIONS TECHNICAL REQUIREMENTS AND SPECIFICATIONS REHABILITATION OF CONCRETE AND MASONRY MANHOLES OR UNDERGROUND VAULTS WITH A PROTECTIVE COATING (As Provided by Raven Lining Systems) FOREWORD This specification

More information

C. Section 014510 TESTING LABORATORY SERVICE.

C. Section 014510 TESTING LABORATORY SERVICE. SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,

More information

THE ECOLOGICAL IMPLICATIONS OF TRENCHLESS PIPE REHABILITATION

THE ECOLOGICAL IMPLICATIONS OF TRENCHLESS PIPE REHABILITATION THE ECOLOGICAL IMPLICATIONS OF TRENCHLESS PIPE REHABILITATION Bridget Donaldson Research Scientist Virginia Transportation Research Council Transportation Infrastructure Deterioration of pipes is a growing

More information

SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING

SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING 812-1 SCOPE OF WORK: SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING a. The Contractor shall provide all labor, materials, equipment, and incidentals necessary to perform the cleaning of sewer lines,

More information

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials. PART 1 GENERAL 1.1 SCOPE A. This item shall include the work necessary for the installation of storm sewer line construction. B. Reference Section 3800 Trenching and Backfill and the General Conditions,

More information

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20

More information

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development 7 SPECIFICATIONS There is currently no Irish specification for construction of drainage works, or water supply works. There are several publications that give guidance on drainage works, such as the Building

More information

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing

More information

SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS

SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS PART 1: GENERAL 1.01 SECTION INCLUDES A. Abandonment in place, by cutting and capping, of existing sewers, junction structures, manholes, service lines, and

More information

BKP Berolina Polyester GmbH & Co. KG. Berolina-Liner System Lightspeed in gravity pipe rehabilitation!

BKP Berolina Polyester GmbH & Co. KG. Berolina-Liner System Lightspeed in gravity pipe rehabilitation! BKP Berolina Polyester GmbH & Co. KG Berolina-Liner System Lightspeed in gravity pipe rehabilitation! Berolina-Liner System The Berolina-Liner System sets new standards in pipe rehabilitation. With the

More information

STORM AND SANITARY SEWER PIPE REHABILITATION BY THE QUADEX STRUCTURAL LINING REHABILITATION SYSTEM

STORM AND SANITARY SEWER PIPE REHABILITATION BY THE QUADEX STRUCTURAL LINING REHABILITATION SYSTEM STORM AND SANITARY SEWER PIPE REHABILITATION BY THE QUADEX STRUCTURAL LINING REHABILITATION SYSTEM OUTLINE PART 1 GENERAL 1.1 Description of Work 1.2 Intent 1.3 Objective 1.4 Work and Components Included

More information

Section 402. STORM SEWERS

Section 402. STORM SEWERS 402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide

More information

Sewer Rehabilitation Design Requirements

Sewer Rehabilitation Design Requirements Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Sewer Rehabilitation Design Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared

More information

ElastoFlake & ElastoTec

ElastoFlake & ElastoTec ElastoFlake & ElastoTec Relining Group 02 Revolutionally injection casting ElastoFlake, a new material from the Relining Group, is a polymer plastic mass intended for injection casting, which was developed

More information

812-3 LIMITATIONS: b. No fire hydrant shall be obstructed or used when there is a fire in the area.

812-3 LIMITATIONS: b. No fire hydrant shall be obstructed or used when there is a fire in the area. 812-1 SCOPE OF WORK: SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING a. The Contractor shall provide all labor, materials, equipment, and incidentals necessary to perform the cleaning of sewer lines,

More information

DIVISION 4300 STORM DRAINAGE

DIVISION 4300 STORM DRAINAGE DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES

More information