POLYMERIC-BASED STRUCTURAL REHABILITATION OF WATER MAINS CASE STUDY. City of Peterborough

Size: px
Start display at page:

Download "POLYMERIC-BASED STRUCTURAL REHABILITATION OF WATER MAINS CASE STUDY. City of Peterborough"

Transcription

1 POLYMERIC-BASED STRUCTURAL REHABILITATION OF WATER MAINS CASE STUDY Peterborough Utilities Commission December 2013 WSI Study report FINAL.doc 1 10/12/2013

2 Acknowledgements This study was undertaken in a partnership among the Peterborough Utilities Commission, ACURO Infrastructure Rehabilitation, and Caesars Infrastructure Services. We wish to acknowledge the Government of Ontario for funding support received from the Government of Ontario under the Showcasing Water Innovation Program ( Such support does not indicate endorsement by the Government of Ontario of the contents of this material. We wish to express our gratitude to the staff of the Environmental Innovations Branch of the Ontario Ministry of the Environment, the administrators of the SWI Program, for their support, patience and guidance throughout the process. Our gratitude also goes out to Dr. Eric Lanteigne of the Faculty of Engineering, University of Ottawa. Dr. Lanteigne and his graduate students performed the destructive testing necessary to measure the liner thickness of the lined samples, information which was used to confirm the accuracy of a newly developed ultrasound-based liner thickness measuring device. The project team partners also wish to thank Peter Dafoe, Utilities Manager, Greater Napanee Utilities and his staff for their participation serving on our study committee, in critiquing our work, as well as providing their own insight and findings based on similar non-structural lining work they were carrying out simultaneously using this same liner product. Case Study Steering Committee A steering committee was established to provide guidance on planning and implementing the Project, and also advise on knowledge transfer. The steering committee is composed of members from the Peterborough Utilities Commission, Acuro Infrastructure, Caesars Infrastructure Services, and Greater Napanee Utilities. Greater Napanee is undertaking a similar project under the SWI Program. This collaborative approach allowed the two communities to share information and best management practices. It also leveraged collective expertise and knowledge to optimize Project outcomes to achieve effective problem and issues resolution. WSI Study report FINAL.doc 2 10/12/2013

3 Table of Content Acknowledgements... 2 Case Study Steering Committee Project Background SWI Program Support Project Objectives Spray-in-Place Structural Lining and the ACURO Lining Technology Liner Thickness Determination (to ASTM standard) Liner Thickness Verification The Contractual Work Study Results and Findings Savings and Advantages Lessons Learned and Areas for Improvement General Conclusions and Recommendations Promotional Materials and Presentations Appendices WSI Study report FINAL.doc 3 10/12/2013

4 1.0 Project Background The water infrastructure in Peterborough dates as far back as the early 1900s. As it reaches the end of its useful life, certain water main sections will become structurally deficient and must be replaced or refurbished to extend their life. The Peterborough Utilities Commission (referred to as PUC hereinafter) is responsible for supplying all of Peterborough residents and businesses with safe, clean potable water with sufficient pressure and flow. At this time, the PUC rehabilitates its water infrastructure using cement mortar lining (CML). This technique is employed to improve the water quality but does not provide structural properties to the infrastructure. CML has an estimated useful life of 30+ years. Structural integrity of deteriorated water main is historically addressed through replacement of the pipe. Replacement of pipe is costly, requires the removal and replacement of surface structures (e.g. roads and sidewalks), is disruptive to the public, and is challenging in restrictive work areas. Structural lining is an alternative worth consideration. To repair these water mains, the PUC collaborated with Caesars Infrastructure Services (CIS) to undertake the Project (also known as Polymeric-based Structural Rehabilitation of Water Mains ) to pilot test the use of ACURO s proprietary technology (the Liner) for repairing water mains. CIS and ACURO worked with the PUC to apply the Liner in a portion of the s water mains. The polymeric resin is NSF/ANSI 61 certified and exceeds the physical properties required for the ASTM F1216 standard for the rehabilitation of existing pipelines and conduits by the inversion and curing of a resinimpregnated tube. The NSF/ANSI 61 standard establishes minimum health effects requirements for materials, components, products, or systems that come into contact with drinking water, drinking water treatment chemicals, or both. The PUC had the ACURO liner product applied to 150mm water mains on Albertus Ave. and Auburn St. in the in order to structurally rehabilitate the ailing water mains and eliminate tuberculation from occurring. This innovative technology is also expected to extend the service life of the water mains for another years at a reduced cost compared to replacement. Caesar s Group is comprised of the following divisions: Caesar s Plumbing and Heating; Caesar s Environmental Services, Caesar s Network Services, and Caesar s Infrastructure Services (CIS). CIS was, at the time the project took WSI Study report FINAL.doc 4 10/12/2013

5 place, the only licensed Acuro Operator/Installer for all of Canada. CIS had exclusive rights for the Ontario market. Acuro is a separate entity that has the licensing and intellectual property rights to the Liner and is responsible for its standards development (ASTM, AWWA). Acuro had granted CIS the rights to apply the polymeric resin technology in Ontario. Acuro worked in partnership with CIS, with CIS having responsibility for carrying out all field installations including all research and development efforts. The Project also validated to a limited degree the use of CIS and Acuro s new ultrasonic thickness measuring device to measure the liner thickness installed inside the pipe. The device is owned by Acuro and must be field tested by CIS. This device will confirm that the minimum polymeric thickness required for structural integrity of the pipe has been met and that the liner comes in close contact with the host water main. For validation, a section of the liner (called a coupon ) is cut out and compared to the results obtained by the ultrasonic device. If the ultrasonic device results are validated, the ultrasonic device may be used to measure Liner thickness on the entire length of rehabilitated water mains, not only the coupon sections and without the need to excavate. Secondary benefits of the Project include improved flow and water quality, reduced carbon dioxide emissions compared to replacement, and minimum disruption of traffic to residents and businesses. 2.0 SWI Program Support The project received much appreciated funding support for this new technological initiative from the Government of Ontario s Showcasing Water Innovation Program. This support made it possible to pilot a new structural lining product for the rehabilitation of water mains possible as well as introduce a prototype ultrasonic liner thickness verification unit. 3.0 Project Objectives The objective of the Project is to showcase innovative, trenchless technologies that will structurally rehabilitate ailing water mains in the and to serve as a demonstration for other Ontario communities to learn about these two technological advancements. WSI Study report FINAL.doc 5 10/12/2013

6 4.0 Spray-in-Place Structural Lining and the ACURO Lining Technology The ACURO product is an IC-202 Spray-applied two component NSF/ANSI-61 Certified Polymeric Resin (refer to Appendix 3 for the Product Data Sheet including technical data on the product). The product is proprietary Polyurea blend material. IC-202 is a performance coating that can be utilized to provide structural reinforcement to potable water mains because it is extremely resistant to hydrostatic pressure, corrosion and abrasion. Specially designed equipment was developed for pipeline spraying. The unit must be capable of heating the product up to 82⁰C (180⁰F) and maintain the temperature in heated lines. The plural compound pump used must be piston driven and capable of generating up to 20.7 MPa (3000psi) at a minimum of 9.5 L/min. (2.5 USgpm). The required equipment depends on capturing spray procedures of line speed, spray temperature, and metering of materials during application. Once sprayed inside the pipe the liner product gels in 7 seconds and is tack free within 30 seconds. At this point the next layer can be applied or the pipe can have a camera passed through. The liner, grey in colour, is provided in a number of passes which is determined based on the need for structural or non-structural lining. Structural lining requires more passes and is calculated based on the current condition of the pipe to be lined, in accordance with ASTM1216. WSI Study report FINAL.doc 6 10/12/2013

7 At 1mm thickness per spray pass, the number of passes applied increases the thickness, which then augments the structural reinforcement of the liner as desired. The liner is anticipated to have a minimum of a 50 year life span. 5.0 Liner Thickness Determination (to ASTM standard) ACURO Infrastructure Rehabilitation determined the internal liner thickness in accordance with ASTM F1216 for 150mm (6 ) buried pressure pipe. The calculation is affected by the existing pipe conditions, coating parameters as well as various other calculated data. See Appendix 2 for the calculation sheet. The calculated thickness is to be a minimum of 2.12mm or inches. 6.0 Liner Thickness Verification Adequate liner thickness within the rehabilitated water main is to be confirmed through measurement in-situ using the ultrasonic unit prototype which was developed specifically to measure the liner thickness in-situ. For this pilot project the unit was to confirm minimum liner thickness every metre or thereabouts. Furthermore, for the particular study, samples of the lined pipe will be cut out of the water main and sent to an independent party to actually remove the liner and measure the thickness. As noted above, the calculated minimum required liner thickness is 2.12mm. The independent party that measured the liner thickness was Dr. Eric Lanteigne, Department of Mechanical Engineering, University of Ottawa, with the assistance of some of his senior students. Even though the liner sets in about 7 seconds, it is in a liquid state during spraying so it is pulled by gravity towards the bottom of the pipe. For that reason, liner thickness measurements are taken at the top of the pipe where the liner thickness would be the thinnest. It is that measurement which must meet the minimum thickness requirement. WSI Study report FINAL.doc 7 10/12/2013

8 7.0 The Contractual Work 7.1 The Work Sites The water mains within two streets of the city Abertus Ave. and Auburn St. were structurally lined using the ACURO product. The Albertus Ave. water main, 150mm cast iron installed in 1950, had experienced 11 documented water main breaks over the 310 metre length and was in a fairly restricted workspace a narrow street with other existing buried and above ground utilities to accommodate. The Auburn St. water main, 150mm cast iron installed in 1930 & 1952, had experienced nine (9) documented water main breaks in the past over its 325 metre length. ALBERTUS AVE. VIEW AUBURN ST. VIEW 7.2 Work Site Preparations Arrangements with the had to be made for road and lane closures where required and plan traffic routing during the stages of construction, and slug discharge for pipe cleaning water, flushing water and shock-chlorinated water prior to putting the water main back in service. PUC staff had to go around and confirm that all the water main valves and the service curb stop valves were operational, and repair/replace them if they failed to operate properly. Otherwise, the lining would either blister or fail to bond to the pipe wall if water were permitted to leak back through a Water main before rehabilitation WSI Study report FINAL.doc 8 10/12/2013

9 faulty valve into the pipe to be lined. Installation of a temporary water main and services to all customers was required, connected to the hose bibs during the period that the water main was shut down. All the customer s curb stops had to be shut off first as noted above. Note that future consideration could be given to only shutting the water main down for two one-day shutdowns cleaning one day and lining the second, once the process is refined and the contractor better experienced. No temporary water main would be required, reducing the cost of this technique by approximately 30%. Project notification went to affected customers on the streets to be lined as well as neighbouring customers affected by the shutdown of a section of water main. WSI Study report FINAL.doc 9 10/12/2013

10 Albertus Avenue Plan WSI Study report FINAL.doc 10 10/12/2013

11 Auburn Street Plan WSI Study report FINAL.doc 11 10/12/2013

12 Excavations of access pits, approximately every 150m, were made above the water main to be lined, as well as at intersections. The pits were approximately 2.5 m x 2.5 m x 2m deep and shored for safety. The pits were required to access the water main for cleaning and for lining the water main. 7.3 Water Main Cleaning and Drying Prior to lining the water main, the contractor has to open up the pipe by cutting out a section of water main approximately 2 m 3 m long in each of the pits in order to clean the pipe. Cleaning is required to remove obstructions such as solids and solidified deposits, oil, grease, prior coatings such as bitumen or other coatings that will prevent the application of the liner and bonding of the liner to the pipe. The pipes, considering these two streets had cast iron pipes that are 1950 s vintage water mains, were in poor condition having significant tuberculation internally due to internal corrosion. Various cleaning methods were tried scraping/brushing the water main; highpressure water application (by Exotec), and blowing stone (Envirologics Tomahawk process) through the pipe. Once the cleaning was complete and verified by CCTV video inspection using a self-driven camera unit, the pipe was air dried by pumping air through the water main. The success of the drying was confirmed by further video inspection. Water main after cleaning 7.4 Water Main Spray-on Lining Application Once the pipe has been confirmed by video inspection as dry and clean, the application of the liner commenced. The liner is applied by first pulling a spray head hose through the pipe from one pit to another. The robotic spray head is then attached to the end of the hose and pulled back through the pipe, spray-forming to the original pipe. The Insertion of the spray gun and start of spray application polymeric resin is a thermoset material, cure-applied using impingement mixing of two components under hydraulic pressure within the hose. WSI Study report FINAL.doc 12 10/12/2013

13 Following the first pass the spray process is repeated enough times to obtain the necessary thickness required to meet the structural lining criteria as per ASTM F1617. The fast-set nature of the polymeric resin (gels in 7 seconds, tack free in 30secs) allows further applications to occur immediately after each application. Each pass applies an average wall thickness of 1mm. Therefore, to obtain the calculated minimum wall thickness of 2.12mm for this project three passes were required. The contractor actually applied 3 or 4 passes recognizing that even though the gel time is short the material will to some degree migrate to the bottom of the pipe due to gravity. The thickness is computer controlled by the spray rig software, which controls the polymericresin feed rate as well as the rate that the sprayer moves through the pipe. The spray rig software produces a printed record of volume of resin applied, hence the average lining thickness. The post lining video validates proper installation. Liner after spray application In some cases a customer s water service may be plugged or partially plugged. Once the liner has set, a remote-controlled robotic cutter can be used to drill and reinstate a service (although this was not required on this project since the services were not plugged and the liner protected the service). Service locations are marked as part of the video inspection after pipe cleaning, although most services tend to be visible after spray application. Water Service after Lining Following pipe lining, the wall thickness is verified and a video inspection undertaken of the lining. The removed sections of pipe in the access pits that allowed access to the main are then replaced with a new section of pipe. The newly lined pipe is then disinfected in accordance with AWWA standards, flushed, and then water quality tested to ensure it is safe (chlorine residual, turbidity, and bacteriological testing). The water main is placed back into service WSI Study report FINAL.doc 13 10/12/2013

14 and the site restored, which includes road restoration, sidewalk replacement and sod or seeding of grassed areas. 7.5 Liner Performance and Measurements The anticipated results of structurally lining the water main are to: Obtain an interior pipe coating that will compensate for the deteriorated condition of the cast iron water main eliminating further interior corrosion and hence extending its service life. Obtain a smooth- walled coating and restored interior pipe diameter through the removal of internal build up (rust carbuncles) and lining application thereafter that will improve flow conditions and water quality. Achieve structural renewal through adequate liner thickness based on the liner material being used and the state of the deteriorated pipe. Obtain a liner that is free of layer splitting or wall/liner separation. Once the water main had been lined, a 300mm 450mm sample was cut out from each water main. Due to the destructive nature of extracting a lined section of water main, only one sample from each street was taken. Cutting out a section introduces two more points of potential failure which compromises the integrity of the pipe. For this project we were able to obtain one of the samples where a new isolation valve was being installed anyway. The sample liner thicknesses were first measured using the new ultrasound measuring device by Caesar s Infrastructure at their facility in Ottawa. The original intent was to measure the liner thickness on site along the entire length at one metre intervals on each street. The unit, a newly developed prototype broke down during the first attempt on measuring in-situ on Albertus St. Failed parts had to be ordered from Australia after which the person skilled in its operation had to leave the country. Therefore extracted samples had to be measured in Ottawa. This reduced the pipe length of measurement readings for wall thickness confirmation from 700 m (based on 1 m intervals on site) to two cut out sections totalling 580mm, in addition toreadings of 17m of pipe length taken on Albertus prior to the unit breaking down. The ultrasonic unit results were verified by actual measurements of the liner by Dr. Eric Lanteigne of the Department of Mechanical Engineering at the University of Ottawa. Liner thickness was confirmed at the 10 o clock, 12 o clock (top of pipe) and 2 o clock positions where the liner would be the thinnest. A copy of his WSI Study report FINAL.doc 14 10/12/2013

15 report is appended (Appendix 1). In summary, the ultrasonic readings versus physical measurement in Ottawa were as follows: Sample 1 Albertus Ave. Min mm/in. Max mm/in. Average mm/in. Design Thickness mm/in. Ultrasonic 2.44/ / / /0.083 Physical 2.03/ / /0.083 Variance % +20% +2% Physical at 12 o clock 1.75/ /0.092 Sample 2 Auburn St. Min mm/in. Max mm/in. Average mm/in. Design Thickness mm/in. Ultrasonic 2.67/ / / /0.083 Physical 2.21/ / /0.083 Variance % +21% +0.7% Physical at 12 o clock 1.98/ /0.104 From the above results the conclusions are that: On average the minimum thickness of 2.12 mm (0.083 ) was likely obtained based on the ultrasonic measurements as well as physical measurements obtained from the University of Ottawa lab results. The liner failed to obtain a minimum liner thickness in some locations at the 12 o clock position of the pipe, the interior top of the pipe being the area receiving thinner coverage due to gravitational pull on the sprayed product. The ultrasonic unit, based on very limited comparison testing, on average appears to provide wall thickness readings slightly greater than actual wall thickness (2% and 0.7%) and significantly higher for the minimum thickness readings (20%). WSI Study report FINAL.doc 15 10/12/2013

16 Due to failure of the ultrasonic unit during construction, adequate data could not be collected to better verify the accuracy of the ultrasonic unit. More testing and calibration of the ultrasonic unit is required in the future. The application process of the polymeric resin needs to be refined or additional passes are required to ensure that the minimum thickness is achieved along the entire length and interior circumference/surface of the pipe. 7.6 Disinfection, Water Sampling and Service Restoration Upon completion of the lining of the water main, the main is flushed using the municipal distribution system to remove any debris. Following flushing, the newly lined main is superchlorinated for 24 hours using continuous feed method with a chlorine solution that maintains a concentration between 75mg/L and 300mg/L (note that this has been reduced in 2013 to a range of 25mg/L to 200mg/L in line with AWWA Standard 651). After chlorination, the main is flushed to clear the main of the super-chlorinated water. Water used for flushing is discharged to the municipal sanitary system. Flushing continues until the free chlorine residual is less than 1.5mg/L and the turbidity is less than 1.0 NTU. Bacteriological sampling and testing is undertaken on the main, every 200m or less, once the main has been flushed and the free chlorine residual and turbidity levels have been achieved. Bacteriological testing includes testing for total coliform, E-coli, Background Count, and Heterotrophic Plate Count (HPC). Three consecutive samples were taken at least 24 hours apart, all which met the criteria noted below. Note that for Day 1 of the 3 days of testing, free chlorine residual and turbidity is measured in addition to the bacteriological measurements. The following criteria must be met: Free chlorine must exceed 0.20mg/L Total chlorine must not exceed 1.5mg/L Turbidity must be less than or equal to1.0 NTU Total coliform must be Not Detectable (O. Reg. 169/03) E-coli must be Not Detectable (O. Reg. 169/03) Background must be less than 200 CFU/100ml WSI Study report FINAL.doc 16 10/12/2013

17 HPC must be less than 500 CFU/1ml The main can be placed back into operation once the testing passes. Service is restored by opening the curb stops and the temporary water main can be dismantled. It should be noted that to facilitate return to service conditions, other methods for disinfection could be used to reduce the disinfection period. However, these methods were not a consideration for this pilot project Study Results and Findings The characteristics used to evaluate the success of the project include hydraulics impact; water quality; aesthetic impact, liner thickness findings, and pipe life expectancy. The purpose of the PUC structural lining of the municipal water main is to both extend the life of the water main while increasing resistance to internal pressures and external loads (hence the structural component of lining) and to improve the water quality and flow characteristics (hence lining the water main). The liner thickness verification at the University of Ottawa indicates that: 1. the ultrasonic unit, or the interpretation of the ultrasonic readings, over-estimates (ranging from 0.7 to 21%) the actual liner thickness and therefore needs calibration or refined interpretation 2. generally the minimum thickness of liner has been achieved throughout with some exceptions for readings at 12:00 (top of the pipe) From this study we believe that with the polymeric resin lining we have a water main that is structurally more sound, which will reduce the potential for leakage and breakage, and therefore will last longer, theoretically some 50 years. Flow has improved due to the increased diameter that resulted from eliminating tuberculation. Fully expect that water quality is improved since the iron tuberculation has been eliminated permanently in these two sections of water main. Due to the limited extent of this pilot project,(only 635meters of 150mm cast iron water main rehabilitated), the improvement would not be detectable. WSI Study report FINAL.doc 17 10/12/2013

18 Chlorine demand reduced due to elimination of the tuberculation. However with only two mains restored, the reduction would not be detectable. When considering that some 150km or so will be lined to eliminate tuberculation the demand will be significant. To date the Utility has lined approximately 121km and replaced some 40km, of a system currently composed of some 415km. Over that same period the chlorine use in mg/l has been reduced by 74%. Therefore a portion of this reduction can be attributed to lining (primarily cement mortar lined, with some polymericresin lining in the past) and replacement of water main with PVC water main. Napanee has undertaken studies in 2011 of water main lined with the Acuro product and their findings indicate that the fire hydrant flows increased anywhere from 110% to 680%. Furthermore, lining eliminated low chlorine residuals at dead ends, increasing residuals from around.35ppm to 1.25ppm, and reduced/eliminated rusty water complaints. PUC s own limited flow testing indicates that on Auburn St., fire hydrant flows increased by approximately 200%. However, on Albertus the limited historical flow test results infer that that fire hydrant flow has experienced no significant increase, likely due to the similar corroded pipe in the area yet to be lined. The polymeric liner forms a very smooth, hard plastic-like surface which aids flow and deters buildup within the pipe. The ultrasonic unit broke down after completing some 17metres of the first section of water main that was lined. Parts had to be ordered from Australia which was expected to take some 2 weeks. By the time the parts came in the sole person skilled at running the unit had left the country. 9.0 Savings and Advantages Capital Cost Savings: The alternative to structurally lining a water main is to replace the water main. Replacing a water main on either of these two streets would cost in the order of $ per metre. The average actual cost of structurally lining these two streets was $662 per metre. This results in a savings of $138 per metre, or a total savings of $94,800. Deferred Replacement: This rehabilitation method is anticipated to extend the service life of the two water mains by approximately 50 years. WSI Study report FINAL.doc 18 10/12/2013

19 Water Break Repair Savings: Albertus has experienced 11 breaks over the past 50 years with an average break rate of 0.64 breaks/km/year. Auburn has experienced 9 breaks in the past 50 years with an average break rate of 1.1 breaks/km/yr. Based on a repair cost of $10,000 per break, the cost savings for the two streets amounts to $5,900 per year. The significant reduction in water main breaks will reduce customer service interruption and the dirty or rusty water complaints relating to system start up. The use of an ultrasonic device will confirm on site right after the liner application whether the desired liner thickness along the entire length has been achieved. Additional liner application can then be done immediately following if required. Previously the only means to confirm liner thickness was through destructive testing by digging a pit, cutting out a sample and measuring the exposed liner thickness Lessons Learned and Areas for Improvement The lining of water mains using the polymeric-based resin is a fairly new technology, although the product itself has been used in many other applications for many years. The greatest challenge faced by this technology isn t so much the product but is the application of the product and more so the ancillary works relating to the application, such as cleaning the water main. The following are a number of issues encountered during this pilot project. Cleaning Technique: The water main cleaning technique needs to be determined and identified in advance. Three techniques (water, air, and/or stone media) were used, partly for different pipe conditions encountered but also involved trying new cleaning methods. There is a need to develop pipe cleaning procedures for types and conditions of pipes encountered. Also, possibly further field and lab testing of the pipe cleaning techniques. Action by: Envirologics/ACURO Stone cleaning method issue with stones being blasted into tees, hydrant leads, services or just sitting in the pipe; need a means of ensuring all stone is removed such as blow back on services and on the main before lining...need a protocol Action by: Envirologics Note that Napanee used water jetting and also the stone blasting method to clean the pipe and remove the bitumen coating. Access to Buildings/Homes: Access could be required to turn off or on the main water service shutoff or to provide an outside water tap where there was none for the temporary water service. Major problem noted by WSI Study report FINAL.doc 19 10/12/2013

20 Napanee was the access to customers homes too many times having to get into homes/buildings often hard to find people at home; customers frustrated with being bothered so often, but more importantly there was no protocol as to when and why access was needed. Action by: CSI: develop a protocol for building access when in the process, why, who, blowing lines out, drop water meters Plugged Water Meters: Plugged water meters due to some cleaning processes (grit or stone), also other equipment in the house such as a refrigerator water dispenser. It was noted that in the Cambridge project all the water meters were removed prior to cleaning. Action by: CIS/Envirologics - part of the protocol for building access Humidity: Humidity in the pipe was an issue creating blistering in the liner. Blowing of cool air apparently has eliminated this problem. Equipment reliability: During these projects equipment broke down e.g. ultrasonic unit breaking down almost right away and out of service for the rest of project (broke down and no one to operate it thereafter since this was a new unit under development; no off the shelf replacement available); the liner gun failed significantly reduces productivity, delays the project, increases the cost, or in the case of the ultrasonic unit was not able to confirm on-site the validity of this new piece of equipment which is meant to confirm liner thickness. Action by: CIS/application contractor needs to have key equipment and replacement components readily available. Radical liner thickness at ends: Noted that the liner spray can be radical near the end of the pipe (such as stalagmites forming in one section of Auburn St, Peterborough. Peter Dafoe, Napanee Utilities, suggested placing a temporary extension to the pipe during spraying. This may require the pits to be larger. Action by: CIS/ACURO to look into possible solutions. Pit Numbers and Size: Unforeseen by the PUC, required for lining and for stone blasting cleaning procedures, the number of pits and the size of the pits are significantly increased in comparison to cement mortar lining of water main, leading to restoration cost increases and roads with more patching. In Napanee s experiences, pits were limited to about 110m, noting there were also situations that required these shorter runs. PUC noted that pits were approx. 50% bigger than CML pits. Action by: CIS/Envirologics look into whether pits can be smaller dimensionally and if longer runs can be lined. (Noted that hose is 500 ft but spray gets disrupted on longer runs due to simultaneous air spray when improperly managed). WSI Study report FINAL.doc 20 10/12/2013

21 A protocol/practice needs to be outlined from first day through to cleanup regarding such processes as pit location selection, pipe cleaning technique selection and related process, customer information and building access expectations and processes, stone removal from tees, services etc., equipment requirements and equipment failure protocols. Action by: CIS develop protocol On-site communications failure i.e. between CIS and their subcontractor, as well as between all the other involved parties. Need to have just one contractor contact on site. Action by: CIS develop protocol Pipe cleaning Because of the existing bitumen coating that had to be removed, new cleaning techniques were developed. It was noted that in Peterborough on Auburn St at least, the water main was cleaned using a specially fabricated nozzle that rotates around and in very close proximity to the pipe wall using low pressure water. This method was used since the stone blasting technique alone did not completely remove the bitumen coating at the time. After cleaning and removal of the bitumen coating, the blast stone method was used mostly to dry the pipe. Peter Dafoe, Napanee Utilities, suggests that possibly removing most of the build-up inside the pipe could be accomplished with first using the scraper technique, used in CML projects, before stone blasting this was success in a past year s trial of this product. Select cleaning process(es) depending on condition of the pipe and type of coating to be removed. Action by: CIS/ACURO Field Operations: Field operations were very inefficient with jobs taking much longer than estimated by CIS, due in most part to contractor being unfamiliar with the requirements of the work other than cleaning and spraying of the pipe, learning ways to properly clean and dry the pipe, and equipment failure. It is noted that this was a pilot project and therefore many aspects relating the application of this new material was a learning experience for CIS. Action by: CIS, to apply the knowledge and experience gained on this pilot project to improve their performance on future projects General Conclusions and Recommendations 1. It is concluded that the polymeric-based liner product provides a practical solution to structurally enhance deteriorated cast and ductile water mains while at the same time eliminating tuberculation, and the water quality and WSI Study report FINAL.doc 21 10/12/2013

22 flow issues resulting from tuberculation. It is also an alternative solution where long term interruption required by water main replacement of local activities cannot be tolerated, such as on a busy commercial street. The use of this product for this purpose is therefore recommended. 2. The ultrasonic unit broke down on the first run on site on Albertus Ave. after only completing 17m of water main. This is a critical component to confirm that the liner of adequate thickness to provide the structural strength required. It is recommended that the unit s reliability needs to be greatly improved with a backup unit and key spare parts available. 3. Once the ultrasonic unit was repaired the person skilled at its operation and results interpretation was no longer available. It is recommended that the contractor have adequate skilled resources to ensure the ultrasonic component of lining can be undertaken and unit repairs completed on site. 4. It is recommended that the ultrasonic unit be calibrated assuming the interpretation are correct and undergo further field testing prior to using the device to confirm liner thickness. 5. It is recommended that the contractor(s) licensed to structurally line water main with the ACURO product be better trained in the application andthe work required before and after lining to improve efficiency and reduce time required to line and put back into service a water main. 6. The water main needs to be cleaned and dried prior to lining. Various water main cleaning techniques were tried prior to lining a water main. Bitumen on the interior of the water main created additional challenge to cleaning the pipe in the case of Peterborough s water main. It is recommended that cleaning and drying techniques be further investigated, refined, selected based on the water main encountered, and develop a protocol for an operator on site to reference. Overall, the product is worthy of consideration as a means of structurally enhancing a water main, avoiding replacing a water main, or simply as a means of improving water characteristics such as flow and water quality. However the application process and the ultrasonic unit need significant, but not insurmountable, improvements. WSI Study report FINAL.doc 22 10/12/2013

23 12.0 Promotional Materials and Presentations The following is a list of promotional materials and presentations regarding this pilot project utilizing the ACURO lining product. 1. A Project Overview video prepared by ACURO Infrastructure; reviewed by PUSI. 2. A Single page handout Peterborough Utilities Services Water Main Structural Lining Pilot Project; prepared by ACURO Infrastructure and handed out at trade shows attended by ACURO Infrastructure; reviewed by PUSI. 3. A Powerpoint presentation entitled: Cutting Edge Advancements: Water Main Renewal using Spray on Polymeric Resin, prepared and presented by ACURO Infrastructure at the Underground Infrastructure Research International Conference and Trenchless Technology Road Show held in Niagara Falls June 5-6, It included a short video of lining projects being undertaken. 4. This pilot project was mentioned in a Powerpoint presentation entitled A New Watermain Cleaning and Lining Preparation Process by Envirologics (a subcontractor on this pilot project) at the CATT Workshop on Pilot Projects: Lessons Learned; dated January 24, Other Promotions ACURO Infrastructure had a trade show booth at the annual Eastern Ontario Water Works Conference held in Trenton, Ontario on Oct. 23/24, As well ACURO presented at the trenchless technologies conference noted above. 6. This report once finalized, which will be available on the Peterborough Utilities website. WSI Study report FINAL.doc 23 10/12/2013

24 13.0 Appendices 1. Technical Report: Produitson Ultrasonic Module Polymer Thickness Verification; by Dr. Eric Lanteigne, Department of Mechanical Engineering, University of Ottawa; December Internal Liner Thickness determination for structural lining of Peterborough Utilities water mains; by ACURO Infrastructure, May 08, ACURO product data sheet IC-202 Spray-Applied Lining 4. Structural Lining of Mains anticipated cost savings backup info. (single page) 5. , An Understanding of Structural Lining, from ACURO to PUC, May 29, Table & chart of Chlorine Demand as a result in part of Watermain Replacement WSI Study report FINAL.doc 24 10/12/2013

25 APPENDIX 1 - Technical report by the University of Ottawa WSI Study report FINAL.doc 25 10/12/2013

26 WSI Study report FINAL.doc 26 10/12/2013

27 WSI Study report FINAL.doc 27 10/12/2013

28 WSI Study report FINAL.doc 28 10/12/2013

29 WSI Study report FINAL.doc 29 10/12/2013

30 WSI Study report FINAL.doc 30 10/12/2013

31 WSI Study report FINAL.doc 31 10/12/2013

32 WSI Study report FINAL.doc 32 10/12/2013

33 WSI Study report FINAL.doc 33 10/12/2013

34 WSI Study report FINAL.doc 34 10/12/2013

35 The above results are from the ultrasonic unit inspection of the liner thickness on Albertus Ave. which was the first use of the new unit. The unit broke down during this inspection and could not be repaired prior to the completion of either Albertus Ave. or Auburn St. WSI Study report FINAL.doc 35 10/12/2013

36 WSI Study report FINAL.doc 36 10/12/2013

37 WSI Study report FINAL.doc 37 10/12/2013

38 WSI Study report FINAL.doc 38 10/12/2013

39 Report Author s Note (Dec. 09, 2013): The above results are from Caesar s subjecting the two cut out samples of lined water main to the ultrasound unit. Note that apparently only a single measurement was taken in each sample at the 10, 12 and 2 positions whereas lab testing at the University of Ottawa took several thickness measurements along the full length of each water main sample. WSI Study report FINAL.doc 39 10/12/2013

40 APPENDIX 2 - Internal Liner Thickness Determination for structural lining of Peterborough Utilities water mains; by ACURO Infrastructure, May 08, WSI Study report FINAL.doc 40 10/12/2013

41 APPENDIX 3 - ACURO Product Data Sheet IC-202 Spray- Applied Lining (pg. 1 of 3) WSI Study report FINAL.doc 41 10/12/2013

42 ACURO product data sheet IC-202 Spray-Applied Lining (pg. 2 of 3) WSI Study report FINAL.doc 42 10/12/2013

43 ACURO product data sheet IC-202 Spray-Applied Lining (pg. 3 of 3) WSI Study report FINAL.doc 43 10/12/2013

44 APPENDIX 4 - Structural Lining of Mains: Anticipated Cost Savings info WSI Study report FINAL.doc 44 10/12/2013

45 APPENDIX 5 An Understanding of Structural Lining WSI Study report FINAL.doc 45 10/12/2013

46 APPENDIX 6 WSI Study report FINAL.doc 46 10/12/2013

STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS

STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for cleaning and lining existing cast iron and ductile iron water mains

More information

RENEW. A Water Main Cleaning and Lining Program Designed to Improve Water Quality and Service

RENEW. A Water Main Cleaning and Lining Program Designed to Improve Water Quality and Service Investing in Our Infrastructure RENEW A Water Main Cleaning and Lining Program Designed to Improve Water Quality and Service 1500 Ronson Road P.O. Box 1500 Iselin, New Jersey 08830-3020 renew Hotline 800-549-3802

More information

Water Main Lining A Sustainable Alternative to Open Cut Replacement

Water Main Lining A Sustainable Alternative to Open Cut Replacement Water Main Lining A Sustainable Alternative to Open Cut Replacement Sean O Dell, PE Baxter & Woodman, Inc. B&W Client Seminar, Crystal Lake May 1, 2014 Agenda Why, What, When, Where, Who, How Reduction

More information

REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542

REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542 1.0 INTENT REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES 1.01 It is the intent of this specification to provide for the reconstruction of pipelines and conduits by the installation of a resin-impregnated

More information

What is water main cleaning & lining

What is water main cleaning & lining What is water main cleaning & lining The Borough s water distribution system includes cast iron pipe. The program involves cleaning older section of cast iron pipe and lining it with cement mortar. Over

More information

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) 1 Intent: The intent of trenchless sewer pipe Insertion is to rehabilitate the existing sewer

More information

LEE S SUMMIT USES PIPE BURSTING TO BROADEN ITS ASSET MANAGEMENT TOOLBOX AND REHABILITATE POTABLE WATER DISTRIBUTION SYSTEM

LEE S SUMMIT USES PIPE BURSTING TO BROADEN ITS ASSET MANAGEMENT TOOLBOX AND REHABILITATE POTABLE WATER DISTRIBUTION SYSTEM North American Society for Trenchless Technology (NASTT) No-Dig Show 2010 Chicago, Illinois May 2-7, 2010 Paper D-4-02 LEE S SUMMIT USES PIPE BURSTING TO BROADEN ITS ASSET MANAGEMENT TOOLBOX AND REHABILITATE

More information

Superior Pipe Restoration Solutions. Proven, state-of-the-art technology that saves money, time and inconvenience. belcopipe.com

Superior Pipe Restoration Solutions. Proven, state-of-the-art technology that saves money, time and inconvenience. belcopipe.com Superior Pipe Restoration Solutions Proven, state-of-the-art technology that saves money, time and inconvenience. belcopipe.com About Us Belco Pipe Restoration was founded with the concept of using British

More information

Relining of Water Mains with. Flexible High Pressure Pipelines. Raedlinger Primus Line, Inc. Ivan Zubiaga Executive Vice President 2014

Relining of Water Mains with. Flexible High Pressure Pipelines. Raedlinger Primus Line, Inc. Ivan Zubiaga Executive Vice President 2014 Relining of Water Mains with Flexible High Pressure Pipelines Raedlinger Primus Line, Inc. Ivan Zubiaga Executive Vice President 2014 Aging water main infrastructure The American Society of Civil Engineers

More information

Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology

Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology 2007 Pumper & Cleaner Environmental Expo International Wednesday February 7, 2007 Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology What is Cured-In-Place Pipe (CIPP)

More information

STANDARD OPERATING PROCEDURES FOR ALL WATERMAIN DISTRIBUTION REPAIR & INSTALLATION

STANDARD OPERATING PROCEDURES FOR ALL WATERMAIN DISTRIBUTION REPAIR & INSTALLATION Page 1 of 14 O&P 1.1 October 2005 J. Boc No.:F11 15/06/10 J. Boc STANDARD OPERATING PROCEDURES FOR ALL WATERMAIN DISTRIBUTION REPAIR & INSTALLATION 1.0 Purpose The purpose of this procedure is to ensure

More information

INSTALLATION OF INSITUFORM LINER

INSTALLATION OF INSITUFORM LINER PART 1 GENERAL 1.1 SCOPE: A. This item shall include all work and materials to install, insert a flexible polyester felt liner saturated with a thermo-setting resin into the existing sewer line for rehabilitation

More information

PRODUCT CATALOGUE. for. SMARTPHONE / WEBSITE / DIGITAL EDITION / BOOK / ipad / GPS

PRODUCT CATALOGUE. for. SMARTPHONE / WEBSITE / DIGITAL EDITION / BOOK / ipad / GPS PRODUCT CATALOGUE for This product catalogue has been downloaded from COSSD.com. Listed products/services and their descriptions are shown as supplied by the title company COSSD does not guarantee the

More information

Letty Arvide-Gomar, PE

Letty Arvide-Gomar, PE Letty Arvide-Gomar, PE Outline DIP History and Applications Corrosion Issues Internal Cleaning Technologies Rehabilitation Options DIP History and Applications Corrosion Issues Internal Cleaning Technologies

More information

Township of Enniskillen. Asset Management Plan

Township of Enniskillen. Asset Management Plan Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing

More information

REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS. Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC

REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS. Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC What is really out there? DO YOU DIG IT? INDUSTRY CONCERNS UNEXPECTED DEVELOPMENTS

More information

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Introduction Wastewater of petrochemical industries and refineries contains high amounts of emulsified aliphatic or

More information

High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines

High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines Jeff Schell General Manager United Pipeline Middle East, Inc. Introduction HDPE Liners A cost effective and environmentally beneficial

More information

PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY

PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY Cured-In-Place Pipe Pressure & Gravity Lines Pipe Splitting Trenchless Pipe Replacement EcoCast Advanced

More information

Introduction to Pressure Pipe Rehabilitation with CIPP

Introduction to Pressure Pipe Rehabilitation with CIPP Introduction to Pressure Pipe Rehabilitation with CIPP Founded in early 1990 s RS Technik is a global leader in the rehabilitation of underground pipes RS Technik uses Cured-in- Place (CIPP) technology

More information

DIVISION: 22 00 00 PLUMBING SECTION: 22 11 16 DOMESTIC WATER PIPING REPORT HOLDER: CURAFLO IP LLC 4035 E. OASIS STREET MESA, AZ 85215

DIVISION: 22 00 00 PLUMBING SECTION: 22 11 16 DOMESTIC WATER PIPING REPORT HOLDER: CURAFLO IP LLC 4035 E. OASIS STREET MESA, AZ 85215 0 ICC ES Report ICC ES (800) 423 6587 (562) 699 0543 www.icc es.org 000 Most Widely Accepted and Trusted PMG 1057 Valid: 02/15 to 02/16 DIVISION: 22 00 00 PLUMBING SECTION: 22 11 16 DOMESTIC WATER PIPING

More information

VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES

VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES SEWER BACK-UP POLICY General Sewer back-ups are an unfortunate, but common problem in older communities. A sewer back-up can create a health or

More information

1.3.2 Method of construction and restoration of existing water service connections. This shall include:

1.3.2 Method of construction and restoration of existing water service connections. This shall include: 1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located

More information

Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority

Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Abstract The United States Virgin Islands Waste Management Authority

More information

SASTT contact details:

SASTT contact details: SASTT contact details: Web: www.sastt.org.za President: Andries Lötz Tel: (011) 688 1483 Fax: (011) 688 1524 E-mail: alotz@jwater.co.za Honorary director: Joop van Wamelen Tel: (012) 567 4026 Fax: 086

More information

Water Quality Contingency Planning Standard EPB 540B

Water Quality Contingency Planning Standard EPB 540B Water Quality Contingency Planning Standard EPB 540B November 15, 2012 Water Quality Contingency Planning Standard The Water Quality Contingency Plan Standard is provided to aid waterworks owners and operators

More information

The leader in trenchless rehabilitation

The leader in trenchless rehabilitation The leader in trenchless rehabilitation The trenchless rehabilitation of underground water and sewer pipes is a solution that s more ecological, more cost efficient, faster and less invasive for taxpayers

More information

AWWA Small Systems Pipe Repair Checklist, as published in July 2008 Opflow Question of the Month

AWWA Small Systems Pipe Repair Checklist, as published in July 2008 Opflow Question of the Month , as published in July 2008 Opflow Question of the Month Thanks to: Mike Grahek, Los Angeles Department of Water, Los Angeles, California Ahmad Havivian, Black & Veatch, Gaithersburg, Maryland David Kroon,

More information

December 2003 EPB 241B. Some sections are completed, some are partially complete and some are left blank.

December 2003 EPB 241B. Some sections are completed, some are partially complete and some are left blank. Note: As of October 1, 2012 The Water Security Agency and Saskatchewan Ministry of Environment share responsibility and authority for the administration of The Environmental Management and Protection Act,

More information

PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta

PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification Number: 3503-11.2.610 Rev. 2 Rubber Lined Steel Pipe and Fittings Mechanically Coupled Plain End Type System Issued Revised Approved

More information

Industrial Pipeline Integrity Management & Remote Polyurea Pipe Lining Systems.

Industrial Pipeline Integrity Management & Remote Polyurea Pipe Lining Systems. Industrial Pipeline Integrity Management & Remote Polyurea Pipe Lining Systems. Aging pipeline infrastructure and industry s inability to evaluate and inspect has left many engineers and plant managers

More information

A cure for water damage in real estate

A cure for water damage in real estate A cure for water damage in real estate Presented for BC Non-Profit Housing Association by Jeff Shearman, Zurich Services Corporation 2010 Zurich Canada Focused on our customer Reduce overall risk by reducing:

More information

HYDRAULIC ANALYSIS OF PIPE LINED WITH MADISON S 100% SOLIDS STRUCTURAL POLYURETHANE COATINGS

HYDRAULIC ANALYSIS OF PIPE LINED WITH MADISON S 100% SOLIDS STRUCTURAL POLYURETHANE COATINGS HYDRAULIC ANALYSIS OF PIPE LINED WITH MADISON S 100% SOLIDS STRUCTURAL POLYURETHANE COATINGS Shiwei William Guan, Ph.D. Vice President, R&D and International Business Madison Chemical Industries Inc. 490

More information

SECTION 810 SEWER LINE CLEANING

SECTION 810 SEWER LINE CLEANING SECTION 810 SEWER LINE CLEANING I. GENERAL 1.1 DESCRIPTION OF WORK The work covered by this section consists of providing all labor, equipment, material and supplies and performing all operations required

More information

FY15 Gravity Sewer and Manhole Rehabilitation

FY15 Gravity Sewer and Manhole Rehabilitation Contract Drawings For FY15 Gravity Sewer and Manhole Rehabilitation TRAVELERS REST TAYLORS Frazier Project No. -030 BASIN 850 Greenville, South Carolina April 2015 BASIN 700A GREENVILLE BASIN 700B FIVE

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by

More information

Repair or Replacement - Band-Aids vs. Surgery

Repair or Replacement - Band-Aids vs. Surgery Repair or Replacement - Band-Aids vs. Surgery Using RCP for the Replacement of Failed or Undersized Culverts www.concrete-pipe.org Introduction and Background Our Nation s infrastructure owners are facing

More information

SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING

SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING 812-1 SCOPE OF WORK: SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING a. The Contractor shall provide all labor, materials, equipment, and incidentals necessary to perform the cleaning of sewer lines,

More information

BULK WATER HAULING GUIDELINES

BULK WATER HAULING GUIDELINES BULK WATER HAULING GUIDELINES Under The Public Health Act regulations, Bulk Water Haulers must obtain a permit to sell or convey water for sale for domestic purposes. For the purposes of this guideline,

More information

SECTION 33 12 19 FIRE HYDRANTS

SECTION 33 12 19 FIRE HYDRANTS SECTION 33 12 19 FIRE HYDRANTS PART 1: GENERAL 1.01 SCOPE A. Fire hydrants. B. Adjustment of fire hydrants and gate valves. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 - Submittals.

More information

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing

More information

812-3 LIMITATIONS: b. No fire hydrant shall be obstructed or used when there is a fire in the area.

812-3 LIMITATIONS: b. No fire hydrant shall be obstructed or used when there is a fire in the area. 812-1 SCOPE OF WORK: SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING a. The Contractor shall provide all labor, materials, equipment, and incidentals necessary to perform the cleaning of sewer lines,

More information

Construction Specification for Sewer Bypass Flow Pumping

Construction Specification for Sewer Bypass Flow Pumping Engineering and Construction Services Division Standard Specifications for Sewers and Watermains TS 4.01 April 2013 Pumping Table of Contents TS 4.01.01 SCOPE... 2 TS 4.01.02 REFERENCES... 2 TS 4.01.03

More information

ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING

ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING 1.0 General 1.1 The work covered by this section consists of providing all labor, equipment, material and supplies, insurance, accessories, tools, transportation,

More information

Greensboro s Pilot Program for Water Pipe Bursting Leads to Expanded City Wide Program

Greensboro s Pilot Program for Water Pipe Bursting Leads to Expanded City Wide Program North American Society for Trenchless Technology (NASTT) NASTT s 2013 No-Dig Show Sacramento, California March 3-7, 2013 TA-T3-05 Greensboro s Pilot Program for Water Pipe Bursting Leads to Expanded City

More information

Sewer Water Pipeline Replacement with CERTA LOK RESTRAINED JOINT PVC PIPE

Sewer Water Pipeline Replacement with CERTA LOK RESTRAINED JOINT PVC PIPE 1.0 GENERAL 1.1 DESCRIPTION This section addresses the procedures to be employed for pipe bursting existing water/sewer pipelines, as identified on the drawings, and replacing with new Restrained Joint

More information

Structural Lining for Water Mains. Presenters: Stephen Marcino, PE and Micah Blate, EIT (JMT)

Structural Lining for Water Mains. Presenters: Stephen Marcino, PE and Micah Blate, EIT (JMT) Structural Lining for Water Mains Presenters: Stephen Marcino, PE and Micah Blate, EIT (JMT) 2015 PA-AWWA Annual Conference Thursday, April 23 rd, 2015 Agenda 1. Introduction 2. Purpose of Lining 3. Lining

More information

Utilizing Trenchless Technology to Achieve Watermain Asset Management Objectives

Utilizing Trenchless Technology to Achieve Watermain Asset Management Objectives North American Society for Trenchless Technology (NASTT) NASTT s 2015 No-Dig Show Denver, Colorado March 15-19, 2015 MM-T6-05 Utilizing Trenchless Technology to Achieve Watermain Asset Management Objectives

More information

Where life interacts with infrastructure.

Where life interacts with infrastructure. Where life interacts with infrastructure. Nu Flow Technologies began as a new technology company in 1998, manufacturing and installing trenchless drain and sewer lining solutions. Today, Nu Flow Technologies

More information

SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD

SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD 21.01 SCOPE: It is the intent of the Specification to define the approved methods and materials

More information

Specification for the Cured-In-Place Pipe Lining of Watermains

Specification for the Cured-In-Place Pipe Lining of Watermains Toronto Water Division Standard Specifications for Sewers and Watermains TS 7.60 January 2015 Specification for the Cured-In- Watermains Table of Contents TS 7.60.01 Scope... 3 TS 7.60.02 Information to

More information

SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL. 1.01 Testing - General

SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL. 1.01 Testing - General SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL 1.01 Testing - General Testing shall be of the type and frequency described in each section and summarized in Item 1 of this section. In addition to

More information

SECTION 15041 DISINFECTION OF PIPE AND WATER STORAGE FACILITIES

SECTION 15041 DISINFECTION OF PIPE AND WATER STORAGE FACILITIES SECTION 15041 DISINFECTION OF PIPE AND WATER STORAGE FACILITIES PART 1 GENERAL 1.01 DESCRIPTION This section describes requirements for disinfection by chlorination of potable water mains, services, pipe

More information

Section C-1 Pipes and Fittings

Section C-1 Pipes and Fittings Section C-1 Pipes and Fittings C1.00 Work Included The work under this Division of the Specifications shall include all labor, materials, and equipment necessary to furnish and install all piping, pipelines,

More information

THE ECOLOGICAL IMPLICATIONS OF TRENCHLESS PIPE REHABILITATION

THE ECOLOGICAL IMPLICATIONS OF TRENCHLESS PIPE REHABILITATION THE ECOLOGICAL IMPLICATIONS OF TRENCHLESS PIPE REHABILITATION Bridget Donaldson Research Scientist Virginia Transportation Research Council Transportation Infrastructure Deterioration of pipes is a growing

More information

Waste Collection Systems

Waste Collection Systems Waste Collection Systems System Maintenance and Repair Maintenance and Repair Training Objectives To gain an understanding of: System Maintenance and Repair vocabulary System Maintenance and Repair techniques

More information

CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General

CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General General All sanitary sewers, manholes and force mains shall be acceptance tested, as hereinafter specified in the presence of a City representative. Acceptance testing shall be performed after backfilling

More information

CURED-IN-PLACE PIPE MINIMIZING RISK BY DEFECT CODING

CURED-IN-PLACE PIPE MINIMIZING RISK BY DEFECT CODING North American Society for Trenchless Technology 2007 No-Dig Conference & Exhibition San Diego, California April 16-19, 2007 CURED-IN-PLACE PIPE MINIMIZING RISK BY DEFECT CODING Robert K. Lee, P.E. 1 1

More information

DRAIN BUSTERS PLUMBING SOLUTIONS ~SOLUTIONS THROUGH EXPERIENCE~

DRAIN BUSTERS PLUMBING SOLUTIONS ~SOLUTIONS THROUGH EXPERIENCE~ DRAIN BUSTERS ~SOLUTIONS THROUGH EXPERIENCE~ DRAIN BUSTERS Ptumblng P.O. Box 455 Garfield, NJ 07026 S~l.!tiom.., Inc: Tel: 973-340-0066 Fax: 973-340-9204 To Whom It May Concern: Realizing how busy you

More information

Rehabilitation Alternatives. MWEA Collection System Seminar October 1, 2009

Rehabilitation Alternatives. MWEA Collection System Seminar October 1, 2009 Rehabilitation Alternatives MWEA Collection System Seminar October 1, 2009 Overview Types of Rehabilitation Trenchless Categories On-Line Replacement In-Situ Options Selecting the Best Solution Types of

More information

Defense Technical Information Center Compilation Part Notice

Defense Technical Information Center Compilation Part Notice UNCLASSIFIED Defense Technical Information Center Compilation Part Notice ADP017712 TITLE: Rehabilitation of TCE-Contaminated Underground Storm Water System Using Trenchless Technology DISTRIBUTION: Approved

More information

Rehabilitation or Replacement? That Is The Question

Rehabilitation or Replacement? That Is The Question Rehabilitation or Replacement? That Is The Question Chris L. Windley PE Greg Anderson, PE 94th Annual Conference November 18, 2014 Overview Project Background Existing Sewer Condition Flow Projections

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20

More information

Amendment 1 Preliminary Engineering Report for the City of Salida

Amendment 1 Preliminary Engineering Report for the City of Salida Amendment 1 Preliminary Engineering Report for the City of Salida Galleries Water Tank Rehabilitation Project February 11, 2010 Prepared by 1.0 Executive Summary The work of this Preliminary Engineering

More information

kalox-pool draft 231 repairing refurbishing and finishing KALOX-POOL Waterproof cement-based mortar for protecting and finishing concrete.

kalox-pool draft 231 repairing refurbishing and finishing KALOX-POOL Waterproof cement-based mortar for protecting and finishing concrete. kalox-pool draft 231 KALOX-POOL Waterproof cement-based mortar for protecting and finishing concrete. repairing refurbishing and finishing 8-30 C Trowel / Spray 4 mm kalox-pool EN 1504-2 MAIN FEATURES

More information

Repair and Disinfection of Water Mains Water Protection Program fact sheet

Repair and Disinfection of Water Mains Water Protection Program fact sheet Repair and Disinfection of Water Mains Water Protection Program fact sheet 9/2012 Every year waterborne disease outbreaks occur in the United States as a result of public water distribution system defi

More information

Close-Out Documents... 9

Close-Out Documents... 9 Water and Sanitary Sewer Service Connection Requirements Service Connection Requirements... 1 Application for Services... 2 Water Meter Application... 2 Wet Tap/Tie-in Connection Requirements... 3 Meter

More information

SANITARY GRAVITY SEWER LINE TESTING. B. Section 02732 CCTV Inspection of Gravity Sewer Lines

SANITARY GRAVITY SEWER LINE TESTING. B. Section 02732 CCTV Inspection of Gravity Sewer Lines PART 1 GENERAL 1.1 SECTION INCLUDES A. Low Pressure Air Test B. Deflection Test 1.2 RELATED SECTIONS A. Section 02730 Sanitary Gravity Sewer Lines B. Section 02732 CCTV Inspection of Gravity Sewer Lines

More information

PORTLAND BES ADVANCES IN SEWER MAINTENANCE AND REPAIRS BY OPERATING MULTIPLE CIPP CREWS.

PORTLAND BES ADVANCES IN SEWER MAINTENANCE AND REPAIRS BY OPERATING MULTIPLE CIPP CREWS. North American Society for Trenchless Technology 2007 No-Dig Conference & Exhibition San Diego, California April 15-20, 2007 Paper # PORTLAND BES ADVANCES IN SEWER MAINTENANCE AND REPAIRS BY OPERATING

More information

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 Section Subsection Name Date Modification Division 1 All subsections General Provisions

More information

INDIAN STANDARDS FOR NATURAL GAS PIPELINE SYSTEM

INDIAN STANDARDS FOR NATURAL GAS PIPELINE SYSTEM INDIAN STANDARDS FOR NATURAL GAS PIPELINE SYSTEM 1. IS 15663(Part 1):2006 This code covers requirements and recommendations for the design, materials, construction and testing of pipelines made of steel

More information

Meeting the Challenge of Pipeline Emergency Repair

Meeting the Challenge of Pipeline Emergency Repair Meeting the Challenge of Pipeline Emergency Repair Michael R. McReynolds, PE, SE 1 Tao Peng, PE, SE 2 ABSTRACTS The Metropolitan Water District of Southern California (MWD) is the nation s largest provider

More information

CIPP for Large Diameter Pressure Pipes. Water Research Foundation Large Diameter Pipe Rehabilitation Seminar 20 January 2016 George Bontus, P.Eng.

CIPP for Large Diameter Pressure Pipes. Water Research Foundation Large Diameter Pipe Rehabilitation Seminar 20 January 2016 George Bontus, P.Eng. CIPP for Large Diameter Pressure Pipes Water Research Foundation Large Diameter Pipe Rehabilitation Seminar 20 January 2016 George Bontus, P.Eng. Pressure Pipe Lining What Does it Mean? What is It? No

More information

REPAIRS TO DAMAGED SEWERS

REPAIRS TO DAMAGED SEWERS REPAIRS TO DAMAGED SEWERS A digout is the replacement of sewer or storm water pipes that are either broken or blocked due to tree roots, ground movement or ageing of pipes. When the use of high-pressure

More information

Force Main Condition Assessment: New Technologies & Case Studies

Force Main Condition Assessment: New Technologies & Case Studies Force Main Condition Assessment: New Technologies & Case Studies Andy Dettmer, Ph.D., P.E. CMOM Workshop August 19, 2014 2 1 Three takeaways 1. Most of your force mains are good 2. We can pinpoint the

More information

The AQUAFIN Approach to Concrete Repair

The AQUAFIN Approach to Concrete Repair Concrete Repair Building Product Systems Waterproofing & Concrete Restoration Decorative Coatings Moisture Vapor Remediation & Flooring Injection Grouting The AQUAFIN Approach to Concrete Repair www.aquafin.net

More information

SIDE SEWER CONDITION ASSESSMENT AND REPAIR RECOMMENDATIONS

SIDE SEWER CONDITION ASSESSMENT AND REPAIR RECOMMENDATIONS SIDE SEWER CONDITION ASSESSMENT AND REPAIR RECOMMENDATIONS Introduction City of Tacoma property owners are responsible for the construction, maintenance and repair of private side sewers, which connect

More information

Water CIPP What to Do When You re Between a Fence and a Hard Place

Water CIPP What to Do When You re Between a Fence and a Hard Place What to Do When You re Between a Fence and a Hard Place 1, Marty S. Paris, P.E. 2, and Anthony Parker 3 1 Kimley Horn and Associates, Inc. 12750 Merit Drive, Suite 1000, Dallas, TX 75251 Tel (972) 776-1785;

More information

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified. Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

More information

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel

More information

Corrosivity of Water Supplies

Corrosivity of Water Supplies WD-DWGB-3-4 2009 Corrosivity of Water Supplies What is meant by Corrosivity? Corrosive water can be defined as a condition of water quality which will dissolve metals from metallic plumbing at an excessive

More information

Inspection and Testing of Water-Based Systems

Inspection and Testing of Water-Based Systems Inspection and Testing of Water-Based Systems Standard Model/Computer-Based Testing Level III Content Outline The candidate for NICET certification at Level III in the Inspection and Testing of Water-Based

More information

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION ITEM 866 SEWER MAIN TELEVISION INSPECTION 866.1 DESCRIPTION: The Contractor shall furnish all labor, materials, equipment, and incidentals to provide the televising and a NASSCO-(PACP) standard video,

More information

Western Canada Water Conference and Exhibition September 17-20, 2013 Edmonton Alberta

Western Canada Water Conference and Exhibition September 17-20, 2013 Edmonton Alberta Western Canada Water Conference and Exhibition September 17-20, 2013 Edmonton Alberta CONDITION ASSESSMENT AND REHAB: A HOLISTIC APPROACH David E. Russell, President, PICA Corporation, 4909 75 Ave., Edmonton,

More information

General Guidelines for Repairing Buried PE Potable Water Pressure Pipes

General Guidelines for Repairing Buried PE Potable Water Pressure Pipes 515 General Guidelines for Repairing Buried PE Potable Water Pressure Pipes Introduction Traditional piping systems have gasket-sealed bell and spigot joints every 20 feet, which can be a potential maintenance

More information

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, Storm Drain Installation, of these Standard Provisions. SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and

More information

STANDARD SPECIFICATIONS SECTION 02959 SEWER MAIN AND LATERAL CONNECTION SEALING BY CHEMICAL GROUT

STANDARD SPECIFICATIONS SECTION 02959 SEWER MAIN AND LATERAL CONNECTION SEALING BY CHEMICAL GROUT STANDARD SPECIFICATIONS SECTION 02959 SEWER MAIN AND LATERAL CONNECTION SEALING BY CHEMICAL GROUT PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for rehabilitation of defective mainline

More information

COMPREHENSIVE DRINKING WATER SOURCE-TO-TAP ASSESSMENT GUIDELINE

COMPREHENSIVE DRINKING WATER SOURCE-TO-TAP ASSESSMENT GUIDELINE COMPREHENSIVE DRINKING WATER SOURCE-TO-TAP ASSESSMENT GUIDELINE MODULE 4 EVALUATE WATER SYSTEM MANAGEMENT, OPERATION AND MAINTENANCE PRACTICES Source Protection Emergency Response Training Treatment Multiple

More information

Oil and Gas Pipeline Design, Maintenance and Repair

Oil and Gas Pipeline Design, Maintenance and Repair Oil and Gas Pipeline Design, Maintenance and Repair Dr. Abdel-Alim Hashem Professor of Petroleum Engineering Mining, Petroleum & Metallurgical Eng. Dept. Faculty of Engineering Cairo University aelsayed@mail.eng.cu.edu.eg

More information

CLEANING, INSPECTION, AND TESTING OF SEWERS

CLEANING, INSPECTION, AND TESTING OF SEWERS CLEANING, INSPECTION, AND TESTING OF SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Cleaning, Inspecting, and Testing Sanitary Sewers B. Cleaning, Inspecting, and Testing Storm Sewers C. Cleaning and

More information

SECTION 33 11 00.15 DUCTILE IRON PIPE AND FITTINGS

SECTION 33 11 00.15 DUCTILE IRON PIPE AND FITTINGS SECTION 33 11 00.15 DUCTILE IRON PIPE AND FITTINGS PART 1: GENERAL 1.01 COORDINATION OF WORK Connection to existing pipelines may require shutdown of AW facilities. Closely coordinate construction work

More information

The surface roughness of the polyurethane lining is 10 times lower than cement-lined pipes.

The surface roughness of the polyurethane lining is 10 times lower than cement-lined pipes. QUALITY INSIDE When it comes to long life piping for drinking water, sewage, industrial water or gas, there is one name that continues to lead the way - ECOPUR by vonroll. Delivering precision-engineered

More information

City of Hilshire Village Pine Creek Ln Reconstruction

City of Hilshire Village Pine Creek Ln Reconstruction City of Hilshire Village Pine Creek Ln Reconstruction OVERVIEW The City will be soliciting bids for the Pine Creek Reconstruction Project with construction scheduled to begin in January 2015. This project

More information

POLYURETHANE LINING AND COATING ON PIPE RAW WATER

POLYURETHANE LINING AND COATING ON PIPE RAW WATER POLYURETHANE LINING AND COATING ON PIPE RAW WATER PART 1 -- GENERAL 1.1 THE REQUIREMENT A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents. 1.2

More information

Effective Microbial Control Strategies for Main Breaks and Depressurization

Effective Microbial Control Strategies for Main Breaks and Depressurization Effective Microbial Control Strategies for Main Breaks and Depressurization Project 4307 Sponsored by the Water Research Foundation and the U.K. Drinking Water Inspectorate Presented by: Pierre Kwan, PE

More information

Trenchless Construction Technology and Issues

Trenchless Construction Technology and Issues Trenchless Construction Technology and Issues Dr. Mohammad Najafi, P.E., F. ASCE Director, Center for Underground Infrastructure Research & Education (CUIRE) Professor and Director of Construction Engineering

More information

Transformer Deluge Systems

Transformer Deluge Systems Transformer Deluge Systems How Do Transformer Fires Ignite? Common causes of transformer failure: Weather-related events such as lightning Short circuits in electrical equipment The most common cause is

More information

Good Boards = Results

Good Boards = Results Section 2: Printed Circuit Board Fabrication & Solderability Good Boards = Results Board fabrication is one aspect of the electronics production industry that SMT assembly engineers often know little about.

More information