1 1 A Roof Damaged condenser fins at CU-1, CU-1A, and CU-2A. Rake all condenser fins at CU-1, CU-1A, and CU-2A units 2 A Roof Unacceptable/damaged paint finish at sheet metal parapet Sand/re-paint entire length of parapet flashing and wall-to-curb expansion joint 68 See Descrip. cap flashing and expansion joint flashing flashing from parapet wall to parapet wall 3 A Roof Exterior refrigerant lines are improperly jacketed/insulated. Scope of work is to replace/correct existing jacketing/insulation at the units exterior refrigerant lines servicing data/electrical room fan coils at Wing A roof per Specification Section A Roof (W) Improperly sealed/set threshold at door to elevator Remove existing door threshold and re-set in bed of sealant Location machine room 5 A1 107 Aircuity power supply incorrectly mounted (laying on the floor) Provide metal shelf system sufficient to support power supply; Provide surface mounted unistrut backing to support shelf; backing to span a minimum of two (2) studs; paint backing and metal shelf to match wall 6 1 Location 6 A1 109 (W) Water damaged ceiling tiles Replace water damaged ceiling tile (2 locations); Ceiling tile specification: 2 x 4 Kinetics Noise Control system (gypboard back tile) with Armstrong Ultima Beveled Tegular #1914 face tile. Contractor shall purchase full carton of ceiling tile and return unused tile to the Owner for stock. 7 A1 Tape and glue/adhesive at elevator doors Remove tape and glue/adhesive from doors/frames; Scope limited to 3 openings at Wing A elevator 8 A1 Missing/incomplete window system Repair/replace loose window mullion at type A3 window near GL E (Wing A east side) 9 A1 Fasteners/fastener holes in exterior finish due to incorrectly anchored downspout Remove screws as applicable; Provide caulk/sealant at holes and paint to match existing finish 221 See Descrip Openings 16 1 Location 17 1 Downspout location 10 A1 Missing/incomplete window system Repair/replace missing window mullion at south end of A3 window type near 18 1 Location GL E. 11 A2 203 Missing corner trim at FRP Furnish and Install corner trim at FRP; match existing 22 1 Location 12 A2 204 Electrical covers at ceiling not painted Paint electrical box covers/plates at ceiling to match ceiling color 23 2 locations 13 A2 Incomplete paint at bottom of Stairs Cut-in paint at bottom side of second floor landing where it meets the south wall/soffit of Wing A; match existing 46 See Descrip. 1 of 7

2 14 A2 220C Missing locks at access door Provide new locks at access panel or procure new access panel with key lock at Contractor's option. Model: non-fire rated flush steel door and flanged frame for gyp board wall. Milcor, Inc. Model "DW" or equal; paint to match 15 A2 220G Dented Door Frame Door frame may be replaced in its entirety, or the damaged section may be removed and replaced at the Contractors option. Paint frame to match existing and patch/repair wall as necessary. 40 See Descrip Location 16 A3 304 (W) Water leak at in-slab trap primer to floor drain Provide all demolition & repair/replacement of finishes as required to 222 See Descrip. properly repair the in-slab leak of the trap primer servicing the floor drain. Remove and replace damaged/moldy section of gypboard ceiling below leak (Room A204) and refinish ceiling 17 A3 306 Crack in gypboard wall above door Repair crack and refinish/paint to match 56 1 Location 18 A3 309 (W) Water damaged ceiling tile & HVAC diffuser Replace water damaged ceiling tile (3 locations); Replace rusted HVAC 223 See Descrip. diffuser (1 location); Ceiling tile specification: Armstrong Ultima Beveled Tegular #1914. Contractor shall purchase full carton of ceiling tile and return unused tile to the Owner for stock. Diffuser Specification: Price Model 530, louvered face return grille, steel construction, 45 degree deflection, 3/4" blade spacing, standard B12 white finish 19 A3 310 Crack in gypboard wall above door Repair crack and refinish/paint to match 58 1 Location 20 A3 311 (W) Missing masonite cabinet backing Provide 1/4" masonite cabinet backing; cut-to-fit; mechanically fasten Location 21 A3 314 Missing handle at fire extinguisher cabinet Provide missing handle at fire extinguisher cabinet Location 22 A3 308, 309, Unfinished/exposed gypboard corner at perimeter window 310, 311, heads 312, B Roof (W) Improperly sealed/set threshold at door to elevator machine room Properly finish exposed, unfinished gypboard corner typical at interior window heads; Scope limited to 4 rooms on the 3rd level of Wing A; All window openings in these 4 rooms require correction; At Contractor's option, corner may be finished with sheet metal angle flashing; painted to match walls Rooms Remove existing door threshold and re-set in bed of sealant Location 2 of 7

3 24 B Roof (W) Improperly sealed pipe penetration through concrete topping slab/waterproof membrane at elevator lobby Saw-cut & remove concrete section (approximately 24" x 24"); re-apply waterproof membrane and seal waterproof membrane to pipe penetration per manufacturer's specifications (Contractor responsible for ensuring compatibility of waterproof membrane); water test penetration to Owner' satisfaction; patch back concrete (3,000psi) to match existing; wipe clean (approx. 32 lf, for the full width of the corridor) the interior (ceiling space) and exterior surface of metal ceiling at the level below the elevator lobby to remove surface stains/mildew. Waterproofing Specification: Grace Products, Bituthene 3000 system 225 See Descrip. 25 B1 143 Dirt marks/stains/streaks on wall Re-paint entire wall elevation 79 1 wall 26 B1 143 Missing sealant at wall to floor sink Provide sealant between wall and floor sink 80 1 sink 27 B1 143 Incomplete FRP trim installation at around floor sink Provide missing FRP trim; caulk/seal joint 81 1 sink 28 B1 155 Paint / texture overspray at west end door Remove overspray/texture; replace aluminum door stop as necessary 87 1 door 30 B1 Missing/incomplete window system Repair/replace loose window mullion above spandrel at type B13 type 90 1 Location window just west of GL 6 31 B1 132 Projector screen conflicts with door in open position Relocate door stop to eliminate conflict with projection screen. Relocated 73 1 Location stop must allow for door to open a minimum of 90 degrees. If relocated stop is not able to cover existing hole in carpet, carpet must be patched/repaired. Carpet Specification: Tandus C+A Explorer 'Sunscape' 32 B2 Tape/glue at window Remove tape / glue at window area just west of GL Location 33 B2 Damaged stucco finish Repair cement board stucco system at window jamb just east of GL 5; paint Location to match 34 B3 337 (W) Water damaged ceiling tiles Replace water damaged ceiling tiles at 3 locations. Ceiling tile specification: Armstrong Ultima Beveled Tegular #1914. Contractor shall purchase full carton of ceiling tile and return unused tile to the Owner for stock locations 3 of 7

4 35 C Roof Unacceptable/incomplete finish at corner of parapet wall Provide galvanized sheet metal corner flashing; paint to match adjacent surface; secure with sheet metal screws in sealant to existing corner flashing; extend flashing behind stucco bead/edge cap, under cap flashing, and seal/caulk transitions for weathertight installation Location 36 C Roof Clogged canopy drains at two locations Disassemble/re-assemble as necessary to unclog/clear screens and remove locations debris 37 C Roof Exhaust Fans EF-1C and EF-2C are not provided with labels. Provide permanent equipment tags similar to existing equipment locations 38 C Roof Damaged fins at condenser units Rake all condenser fins of CU-1C, CU-2C, and CU units 39 C Roof Exterior refrigerant lines are improperly jacketed/insulated. Scope of work is to replace/correct existing jacketing/insulation at the units exterior refrigerant lines servicing data/electrical room fan coils at Wing C roof per Specification Section C Roof (W) Failed sealant joint at fire sprinkler pipe penetration Remove failed sealant and replace with appropriate backer/sealant; paint to Location match 41 C Roof (W) Improperly sealed/set threshold at door to elevator Remove existing door threshold and re-set in bed of sealant Location machine room 42 C Roof (W) Improperly sealed pipe penetration through concrete Saw-cut & remove concrete section (approximately 24" x 24"); re-apply 229 See Descrip. topping slab/waterproof membrane at elevator lobby waterproof membrane and seal waterproof membrane to pipe penetration per manufacturer's specifications (Contractor responsible for ensuring compatibility of waterproof membrane); water test penetration to Owner' satisfaction; patch back concrete (3,000psi) to match existing; wipe clean (approx. 32 lf, for the full width of the corridor) the interior (ceiling space) and exterior surface of metal ceiling at the level below the elevator lobby to remove surface stains/mildew. Waterproofing Specification: Grace Products, Bituthene 3000 system 43 C1 161 Unacceptable/incomplete finish at window sills Repair gyp bd at window jambs near sills for finished look where currently gaps and joint tape are visible; patch/repair/re-finish, paint at 5 locations 130 See Descrip. 4 of 7

5 44 C1 161 Incomplete caulk/sealant at window system Caulk gaps between window sills and jambs locations 45 C1 161 Unacceptable/incomplete finish Repair/refinish gypboard at emergency light fixture; paint to match adjacent Location surface 46 C1 161 Unacceptable/incomplete finish Repair/refinish wall at screw pops at gypsum wall near clock at east wall Location 47 C1 162 Incomplete caulk/sealant between store front window Entire perimeter; north, south and west storefront window systems; provide 138 See Descrip. system and wall backer rod/caulk/sealant; 48 C1 162 Exposed mecho shade cabling at north and south storefront Provide Wiremold brand or equal system to "hide" exposed cabling at elevations window systems; system shall be finished/painted to match color of window system. Alternate solutions may be proposed after bid, however Contractor's base bid shall be based upon a Wiremold system. 49 C1-C3 Flashing over restroom vents on exterior wall not painted Paint galvanized flashing to match existing wall color locations as specified 50 C2 271 Unacceptable/incomplete finish at window sills Provide caulk/sealant at transition between window sill and jamb locations 51 C2 271 Incomplete anchorage at metal hand/guard rails Furnish & install single missing expansion bolt; cut all bolts flush; paint all bolts for entire length of rail to match 157 See Descrip. 52 C2 273 Unacceptable finish at metal hand/guard rails Cut all bolts flush; remove rust; prepare surfaces as necessary prior to painting; paint all exposed bases for full length of rail to match 163 See Descrip. 5 of 7

6 53 C2 273 Unacceptable gypboard finish at the the FP1 flush-wall mounted steplights mounted on the North and South walls in this Lecture Room Scope of work is to re-finishing/paint gypboard at 1 light fixture location per Exhibit Location 54 C3 355 Incomplete anchorage at metal hand/guard rails Furnish & install two (2) missing bolts; Cut all bolts flush and paint all bolts the entire 174 See Descrip. length of handrail to match 55 C3 356 Unacceptable finish at metal hand/guard rails Paint and touch up hand rail post/ base for full length of rail 182 See Descrip. 56 C3 Exterior Incomplete caulk/sealant at exterior lights Provide caulk/sealant at holes and paint to match existing finish locations 57 C3 Exterior (W) Incomplete sealant joint at exterior finish Provide backer/sealant (color to match existing) at exterior joint located at Location Wing C, 3rd level, West Elevation at North Canopy 58 General Exterior Incorrectly installed fire extinguisher signs Remove wall anchors/inserts, caulk/seal holes, refinish & paint at 5 sign locations; 194 See Descrip. mechanically fasten signs at 4 locations 59 General Exterior Unacceptable building finish Scope limited to the refinish of 2 wall areas as identified per Exhibit; paint finish shall walls be feathered as necessary to blend in with adjacent wall finish 60 General Exterior Unacceptable finish at stair guardrails Re-finish (grind / remove surface rust / prep & re-paint) transition from guardrail posts to stair stringer at the Wing A, C-South and B stairways; all levels. Only one (1) stair may be completed at at time and the Contractor is responsible for installing barriers/signage as necessary to re-direct the public. Contractor shall complete a single mid-level guardrail as a "mock-up" for District approval, prior to proceeding with repairs. Paint shall be compatible with existing powdercoat finish. 197 See Descrip. 6 of 7

7 61 General Various Phoenix valve system labels/thermostats need to be updated with new room numbers. Re-label thermostats at all locations with correct room numbers; reference ASI locations 62 Roof Clogged canopy drains at the southeast corner canopy Disassemble/re-assemble as necessary to unclog/clear screens and remove debris 63 Site Unacceptable/damaged concrete at corners of vault box Saw-cut & replace damaged concrete at 2 corners of vault lid; smooth epoxy-set toward north end of west side access road. (2 corners) dowels shall be provided to existing concrete edges; replacement concrete shall be 3500 psi, colored concrete ("Light Bark") to match existing. Existing concrete was supplied by 711 Materials 64 Site Unused precast manhole rings Scope of work limited to loading and properly disposing 3 circular precast concrete manhole extensions from the C5 parking lot 65 Site Incomplete drain composite board (detail 10/L7.1) behind Art Yard retaining wall Remove/replace soil/landscape as necessary; provide composite drain board along length of wall to a depth of approximately 18-24" locations locations 207 See Descrip LF 7 of 7

Irvinton Village Apartments 2901 Fulton Houston, Texas 77009 Houston Housing Authority J. Allen Management Managing Agent

Irvinton Village Apartments 2901 Fulton Houston, Texas 77009 Houston Housing Authority J. Allen Management Managing Agent Irvinton Village Apartments 2901 Fulton Houston, Texas 77009 Houston Housing Authority J. Allen Management Managing Agent Scope for Irvinton Village Unit #512 Overall Scope: Demolition, Renovation, and

More information

COMPREHENSIVE PROPERTY INSPECTIONS

COMPREHENSIVE PROPERTY INSPECTIONS COMPREHENSIVE PROPERTY INSPECTIONS Thank you for selecting CPI for your Deficiency Observation. A full home inspection was not performed on this property at the buyers request. This inspection is a limited

More information

EAST LYME HIGH SCHOOL

EAST LYME HIGH SCHOOL Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed

More information

SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront PART 1 GENERAL 1.01 Work Included SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS System 402 Flush-Glazed Screw Spline Storefront A. Furnish and install aluminum architectural storefront system

More information

March 14, 2007. Installation of Bay, Bow and Garden Windows

March 14, 2007. Installation of Bay, Bow and Garden Windows March 14, 2007 Re: Installation of Bay, Bow and Garden Windows Attached are the Atrium Companies, Inc recommendation for the installation of bay, bow and garden windows. These instructions were developed

More information

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table

More information

Facility Assessment Report, Montgomery Independent School District

Facility Assessment Report, Montgomery Independent School District THE LEARNING CENTER CAMPUS DATA THE LEARNING CENTER 700 Dr. Martin Luther King Jr. Drive, Montgomery TX 77356 Year Built 1958 Approx. Total Square Footage Grades Served Current Enrollment 22,050 n/a n/a

More information

CONSERVATION MAINTENANCE WORKSHEET Universal Checklist

CONSERVATION MAINTENANCE WORKSHEET Universal Checklist 3.1 SITE 1 Concrete curbs Check for cracks, spalling, growth from joints X 2 Stone curbs Check for cracks, spalling, growth from joints X 3 Concrete walkways Look for uneven surfaces, ponding, growth from

More information

Window Installation Instructions

Window Installation Instructions Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for

More information

Sun Windows General Information Sun New Construction Window Installation Instructions

Sun Windows General Information Sun New Construction Window Installation Instructions Sun Windows General Information Section 1 G F H H H A. Apply Weather Resistive Barrier B. Apply Sill Flashing Tape C. Place Waterproof Sill Shims D. Caulk Back of Nail Fin Sides & Top, Set Window, Fasten

More information

March 19, 2014. Ms. Jean McDonald CAP Management 910 16th Street, Suite 1010 Denver, Colorado 80202

March 19, 2014. Ms. Jean McDonald CAP Management 910 16th Street, Suite 1010 Denver, Colorado 80202 Ms. Jean McDonald CAP Management 910 16th Street, Suite 1010 Denver, Colorado 80202 Re: Prospector s Point Walkway/Façade Repairs Martin/Martin, Inc Project No.: 13.0358.S.02 Ms. McDonald: Per your request

More information

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C.

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C. CLIENT Inspection Report 271 Front St. Alert Bay, B.C. Island Building Inspections 2013 V ANCOUVER I SLAND B. C. Elevation Photos For the Property at 271 Front Street Alert Bay, BC ELEVATION PICTURES Front

More information

INSTALLATION OF A BAY WINDOW

INSTALLATION OF A BAY WINDOW INSTALLATION OF A BAY WINDOW Installation of a Bay Window These instructions relate to the replacement of an existing bay window or replacement of a straight window with a new bay window, in an opening

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

Total Home Inspection Checklist

Total Home Inspection Checklist Total Home Inspection Checklist Use a checklist like this to make sure that you are looking at all parts of the house. Check off those items that are in good condition and make notes about those that are

More information

SECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here) SECTION 08332 COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Counter Fire Doors. 1.2

More information

Orlando Home Inspection Services

Orlando Home Inspection Services PLEASE NOTE: Orlando Home Inspection Services Serving Central Florida since 1999 P O Box 915451, Longwood, Florida, 32791-5451 Phone: (321) 228-2493 Fax: (407) 374-8505 Web: http://www.orlando-home-inspections.com

More information

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer

More information

Clad Direct Glaze Window Installation Instructions

Clad Direct Glaze Window Installation Instructions Clad Direct Glaze Window Installation Instructions Sill flashing and sealing: 2. An overview of the proper flashing sequence is shown in figure 1. Please read entire installation instructions carefully

More information

Burns Home Services SUMMARY REPORT. 7/18/2006 Start: 9:00 am End: 12:30 pm

Burns Home Services SUMMARY REPORT. 7/18/2006 Start: 9:00 am End: 12:30 pm Burns Home Services Service Makes the Difference 2620 W Grovers Ave, Phoenix, AZ 85053 Tel: 602-889-6970 Fax: 602-870-4563 Mobile: 602-291-7138 Garryh@burnshomeservices.com SUMMARY REPORT Client: John

More information

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 MINORITY AND WOMEN S BUSINESS ENTERPRISE PARTICIPATION

More information

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

ST. MONICA FOOD PANTRY HOUSTON, TEXAS PROJECT MANUAL FOR ST. MONICA FOOD PANTRY HOUSTON, TEXAS OWNER: ST. MONICA CATHOLIC CHURCH 8421 W. MONTGOMERY ROAD HOUSTON, TEXAS 77088 ARCHITECT: C SIX ARCHITECTURE, LLC 4606 F.M. 1960 WEST, STE 400 HOUSTON,

More information

NATIONAL INSTITUTE OF BIOLOGICALS

NATIONAL INSTITUTE OF BIOLOGICALS Short Term Notice Inviting Quotations Quotations No. S.1-36/07/NIB/Engg. (Civil) Invitation to short term quotations for Repairing of damaged gypsum board false ceiling and painting with epoxy paint in

More information

WASHROOM UPGRADE SIR CHARLES TUPPER BUILDING 2250 RIVERSIDE DRIVE, OTTAWA, ON SIR CHARLES TUPPER BUILDING A0.0 COVER SHEET / DRAWING LIST

WASHROOM UPGRADE SIR CHARLES TUPPER BUILDING 2250 RIVERSIDE DRIVE, OTTAWA, ON SIR CHARLES TUPPER BUILDING A0.0 COVER SHEET / DRAWING LIST 0 RIVERSIDE DRIVE, OTTAWA, ON A0.0 COVER SHEET / DRAWING LIST A0. LEGEND AND GENERAL NOTES A0. GENERAL NOTES A0. GENERAL NOTES A0. TYPICAL WASHROOM WALL/SINK SECTION A0. DETAIL - CONTROL JOINT A0. DETAIL

More information

Important Information for Installer & Homeowner

Important Information for Installer & Homeowner Important Information for Installer & Homeowner Homeowner: Please keep this information for your records, do not discard! Installation Instructions for Wood Frame Construction Replacement (See other side

More information

Packaged Terminal Air Conditioner Wall Sleeve Installation

Packaged Terminal Air Conditioner Wall Sleeve Installation Installation & Maintenance Data IM 1196 Group: PTAC Part Number: 910141799 Date: October 2013 Packaged Terminal Air Conditioner Installation x 42" PGAN with Top-Mounted Hydronic Heat Note: Installation

More information

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit. Important Information for New Construction Installations Attention Installer! We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden

More information

Roof Inspection. Summary Report

Roof Inspection. Summary Report www.real-estate-inspections.com Roof Inspection Summary Report Subject Property Prepared for: File Number: Client in Detroit 05-15-RF-004 Inspector: Craig Milliken, PE # 32779 CPM Real Estate Inspections,

More information

Cascade Remodeling Inc. PO Box 25687 Portland, OR 97298 Catalyzing Euphoria Phone (503) 297-2055, FAX (503) 297-0579 CCB # 67007

Cascade Remodeling Inc. PO Box 25687 Portland, OR 97298 Catalyzing Euphoria Phone (503) 297-2055, FAX (503) 297-0579 CCB # 67007 SPECIFICATIONS For Sample Customer SCOPE OF WORK: The contractor will provide labor and/or materials for the work as outlined in the estimate and the following specification. The contractor s estimate

More information

Brick Veneer Construction

Brick Veneer Construction Brick Veneer Construction Check list of suggested tools & support items Claw hammer Tape measure 3/4" [19 or 20] Wood chisel Wood or plastic shims Pry bar Utility knife Caulking and caulking gun Power

More information

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS HIGH SCHOOL REPAIRS AND UPGRADES SITE Construction Estimate = $100,000

More information

Building Condition Assessment Report

Building Condition Assessment Report Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.

More information

SECTION 00335 EXISTING HAZARDOUS MATERIALS CONDITIONS

SECTION 00335 EXISTING HAZARDOUS MATERIALS CONDITIONS PART 1 GENERAL 1.01 SUMMARY SECTION 00335 EXISTING HAZARDOUS MATERIALS CONDITIONS A. This section provides a list of known and assumed hazardous materials that may be impacted during renovation, demolition,

More information

Building Condition Assessment Report

Building Condition Assessment Report C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses

More information

Water Leak 1: Intrusion Policy

Water Leak 1: Intrusion Policy Water Leak 1: Intrusion Policy {Non-Casualty) 1. Determine Source of Leak Roof Leak- 11 See roof leak" Pressured Pipe leak- 11 See pressured pipe leak" Water Intrusion- See 11 see Water Intrusion leak"

More information

Inspecting to a higher standard.

Inspecting to a higher standard. Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com rob@protec-inspections.com

More information

Water Damage & Repair

Water Damage & Repair Water Damage & Repair Chinatown Preservation Talks 2015 James Engler, P.A Glenn Mason, AIA Mason Architects Program Outline Terminology & Waterproofing Basics Discussion of why this is important Below

More information

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development

More information

School Construction Authority Architecture & Engineering

School Construction Authority Architecture & Engineering SCOPING GUIDELINES 1.0 GENERAL GUIDELINES 2.0 BUILDING ENVELOPE SCOPING GUIDELINES 3.0 CATEGORIES AND COMPONENTS: The Flood Elimination/Below Grade Capital Category may include some or all of the following

More information

Architectural Condition Survey

Architectural Condition Survey Architectural Condition Survey Santa Fe Railroad / AMTRAK Depot, Lawrence. Kansas for the City of Lawrence, 2002 Survey: (student) PI: William Carswell, Associate Dean, School of Architecture, University

More information

IMPROVEMENT COST ESTIMATE powered by HomeFixers

IMPROVEMENT COST ESTIMATE powered by HomeFixers IMPROVEMENT COST ESTIMATE powered by HomeFixers 123 Main St, Anytown, USA 12345 2000 SF $ 45,041.06 100.0% $22.52 per sq. ft. Stage 1: Pre-Construction $ 1,461.00 3.2% 1 House Secured $ 106.00 0.2% Lockbox

More information

Residential Decks. Planning and Development Services Department

Residential Decks. Planning and Development Services Department Building Safety Division 8500 Santa Fe Drive Overland Park, KS 66212 (913) 895-6225 Fax (913) 895-5016 Email: permitservices@opkansas.org Planning and Development Services Department Residential Decks

More information

17,280 square feet Overview:

17,280 square feet Overview: CENTRAL OFFICE Located at 167 Boston Post Road, East Lyme, Connecticut, the Central Office was built in 1916 as the original Flanders Elementary School and remains connected to the current school. The

More information

The Brickstone Condominiums At Minington. Transition Punch List 2008

The Brickstone Condominiums At Minington. Transition Punch List 2008 The Brickstone Condominiums At Minington Transition Punch List 2008 February 4, 2008 The Brickstone Condominiums At Minington February 4, 2008 Table of Contents IMPROVEMENTS LIMITATIONS INTRODUCTION ROOF

More information

Inspection Item COMMENTS

Inspection Item COMMENTS APPENDIX 9 AFFORDABLE HOUSING PROGRAM INSPECTION CHECKLIST Participating Jurisdiction: Homeowner Name: Assisted Property Address: Date of Physical Inspection of Property: Total Square Footage of Property:

More information

Braselton Bros. Store Redevelopment 5134 HWY 53 BRASELTON, GA 30548 LEVEL 0 - DEMO & NEW PLAN. Room. Room. Room. Room. Room. Room. Room. Room.

Braselton Bros. Store Redevelopment 5134 HWY 53 BRASELTON, GA 30548 LEVEL 0 - DEMO & NEW PLAN. Room. Room. Room. Room. Room. Room. Room. Room. 1.d 2.d 3.d 4.d 1.d 2.d 3.d 4.d REMOVE, REPAIR, & REPLACE EXISTING STOREFRONT SYSTEMS D.1 D.2 REMOVE, REPAIR, & REPLACE EXISTING STOREFRONT SYSTEMS D.1 D.2 REMOVE STAIR & INFILL WALL C.1 REMOVE DOOR &

More information

How To Check For A Deficiency

How To Check For A Deficiency UPCS in Pictures The following pictures are not all inclusive nor does it cover every deficiency. The pictures, however are some of the most commonly cited deficiencies on REAC inspections. Erosion The

More information

Vision Home Inspection

Vision Home Inspection Vision Home Inspection 324 Rams Run Shepherdsville KY 40165-7877 Inspector: James McFadden Property Inspection Report Client(s): Property address: Inspection date: View report summary This report is the

More information

Prestige Home Inspection LLC

Prestige Home Inspection LLC Cover Page Prestige Home Inspection LLC IAC2/ESA - Mold Assessment and Water Damage Report 555 W. Brook ave., Client's town MI, 48059 Inspection prepared for: Client's name Inspection Date: 10/15/2012

More information

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE - The original section of this building was constructed in 1941. The exterior walls are built of good quality stone. In the early 1980 s a similar addition was added to the north elevation. The exterior

More information

How to Install GoBoard:

How to Install GoBoard: How to Install GoBoard: A Step-by-Step Guide Durable, Ultra-Lightweight, Waterproof Tile Backer Board Introducing GoBoard Every tiling project requires a durable, waterproof surface under the tile, called

More information

Milestones Primary. Early Start. Orig Dur. Early Finish. Act ID. Description NOTICE TO PROCEED START CONSTRUCTION

Milestones Primary. Early Start. Orig Dur. Early Finish. Act ID. Description NOTICE TO PROCEED START CONSTRUCTION Milestones Primary M1500 NOTICE TO PROCEED 0 11/01/ * M1510 START CONSTRUCTION 0 01/02/ * M1550 SUBSTANTIAL COMPLETION [ALL WORK IN PLACE] 0 04/15/ M1600 CERT OF OCCUP 0 04/15/ M1650 FINAL COMPLETION /

More information

HfHMD uses LP SmartSide siding and trim.

HfHMD uses LP SmartSide siding and trim. HfHMD uses LP SmartSide siding and trim. These products are: More durable than cement fiber board. Much more volunteer-friendly to install. When installed correctly, have a 5/50- year pro-rated warranty.

More information

PART 1 GENERAL 1.1 SECTION INCLUDES

PART 1 GENERAL 1.1 SECTION INCLUDES J-1 Section 09110 Long Form Specification INTERIOR METAL STUD FRAMING This section includes lightweight, usually 0.036 inch (0.9 mm) thick or lighter, non-axial load bearing metal stud framing including

More information

RODENT PROOFING CHECKLIST

RODENT PROOFING CHECKLIST RODENT PROOFING CHECKLIST The most important part of a rodent control job is a thorough inspection of the problem areas/building. Since we warranty the control of rodents with our standard pest control

More information

Clear Fork Valley Local School District. Roofing Repairs Spring/Summer 2015

Clear Fork Valley Local School District. Roofing Repairs Spring/Summer 2015 Clear Fork Valley Local School District Roofing Repairs Spring/Summer 2015 Instructions to Bidders: Public Notice To Bidders (ORC 3313.46) Notice is hereby given that sealed bids will be received at the

More information

MUNICIPALITY OF THAMES CENTRE COMMUNITY SERVICES AND DEVELOPMENT RECREATION

MUNICIPALITY OF THAMES CENTRE COMMUNITY SERVICES AND DEVELOPMENT RECREATION REPORT NO. PR-019-15 MUNICIPALITY OF THAMES CENTRE COMMUNITY SERVICES AND DEVELOPMENT RECREATION TO: Mayor and Members of Council FROM: Liz Murray Recreation and Facilities Manager DATE: July 13, 2015

More information

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl windows with an integral nailing fin. While the use of these installation instructions

More information

8629 S. Kimbark, Chicago, IL PROJECT SPECIFIC SCOPE:

8629 S. Kimbark, Chicago, IL PROJECT SPECIFIC SCOPE: 8629 S. Kimbark, Chicago, IL PROJECT SPECIFIC SCOPE: General: Remove existing base molding and install new 4-1/4 base molding throughout and spray white Remove existing window and door trim and install

More information

Superform Products Ltd.

Superform Products Ltd. TYPICAL CORNER REINFORCING NOTE : SEE ENGINEERED REBAR SCHEDULES SUPPLIED BY THE MANUFACTURER STEEL REINFORCEMENT WALL CORNER 90 Copyright 2012 Sept. 2012 5.1.1 Rebar Spacing 6" 12" Max. Load LB./FT. 2000

More information

Reference: BRM-00220488-A0 July 18 th, 2014. Cursory Visual Review of Various Below Grade Spaces and Exposed Foundation Walls

Reference: BRM-00220488-A0 July 18 th, 2014. Cursory Visual Review of Various Below Grade Spaces and Exposed Foundation Walls Reference: BRM-00220488-A0 July 18 th, 2014 Toronto Catholic District School Board 80 Sheppard Avenue East Toronto, Ontario M2N 6E8 Re: 1.0 Introduction Exp Services Inc. (exp) was retained by the Toronto

More information

PEPPER VINER HOMES WARRANTY GUIDELINES

PEPPER VINER HOMES WARRANTY GUIDELINES PEPPER VINER HOMES WARRANTY GUIDELINES All non-emergency warranty and customer service requests MUST be made in writing. This provides you with documentation and allows Pepper Viner to operate efficiently.

More information

REDI-EXIT COMMERCIAL FIRE DOOR AND EXTERIOR DOOR KITS INSTALLATION GUIDELINES

REDI-EXIT COMMERCIAL FIRE DOOR AND EXTERIOR DOOR KITS INSTALLATION GUIDELINES REDI-EXIT COMMERCIAL FIRE DOOR AND EXTERIOR DOOR KITS INSTALLATION GUIDELINES Tools Required Tape Measure Hammer Slotted Screw Driver #2 & #3 Philips Screw Driver 3-4 Foot Level 12 Pry Bar Cold Chisel

More information

How to secure your property after a disaster

How to secure your property after a disaster How to secure your property after a disaster The Red Guide to Recovery HOuse secured properly Board-Up of Windows, Doors and Roof Hole. Lot secured with Perimeter Fencing. Fires, floods, tornadoes, hurricanes,

More information

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space) COST OF WORK FORM All costs shown are estimates using base grade materials, taxes, and labor. For houses where a higher quality is indicated, the costs should be increased for work requiring upgraded materials.

More information

City of San Diego, CWP Guidelines

City of San Diego, CWP Guidelines PART 1 -- GENERAL SECTION 08520-1.1 WORK OF THIS SECTION City of San Diego, CWP Guidelines A. The WORK of this Section includes providing aluminum windows with frames, bracing, glazing attachments, screens,

More information

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows americancraftsmanwindows.com Project Requirements: Read

More information

OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003

OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003 OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003 No. Discipline Sent to Name Item Date Noted Date Resolved How item was resolved Electrical Contractor

More information

3. Tile used in the toilets is generally in good shape, though somewhat dated looking. The floor tile is slippery when wet.

3. Tile used in the toilets is generally in good shape, though somewhat dated looking. The floor tile is slippery when wet. Architectural Elements Support Facilities A. System Description 1. Architectural support facilities include the lobby, classroom, fitness room, office area, staff toilet/showers, public toilet/lockers,

More information

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit. Important Information for New Construction Installations Attention Installer! We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden

More information

Tundra Series Windows January 2016

Tundra Series Windows January 2016 Tundra Series Windows January 2016 New Construction Installation Instructions Nail Fin, J-Fin and Brickmold Aplications product. ATTENTION! Read and understand all installation instructions before installing

More information

Gramercy Place Condo Association, Inc.

Gramercy Place Condo Association, Inc. Gramercy Place Condo Association, Inc. UNIT MODIFICATION REQUEST Date of Application: Name of Owner (s): Telephone: (Home) (Cell) E-Mail: Anticipated start date: Anticipated ending date: Permission is

More information

www.citiesinspection.com October 5, 2015 Dear Client,

www.citiesinspection.com October 5, 2015 Dear Client, www.citiesinspection.com October 5, 2015 Dear Client, On 9/14/2015, Cities Inspection Service, Inc. completed a building inspection of the property located at 123 Oak Street, Someplace, Minnesota for you.

More information

Home Inspection Report

Home Inspection Report Report# 21009 Page 1 of 24 Home Inspection Report Property Address: 123 Maple Lane, St. Augustine, FL 32092 Prepared For: Mr. Smith Prepared By: EDGE Inspections www.edgeinspections.com PO Box 601055 Jacksonville,

More information

Installation Instructions

Installation Instructions Installation Instructions READ BEFORE INSTALLING UNIT For Low Profile Window Air Conditioner INSTALLATION WARNINGS AND CAUTION Carefully read the installation manual before beginning. Follow each step

More information

#1) BEFORE Purchasing Land Here Is A Checklist Of Things You Should Check

#1) BEFORE Purchasing Land Here Is A Checklist Of Things You Should Check #1) BEFORE Purchasing Land Here Is A Checklist Of Things You Should Check Zoning laws Deed restrictions on home size, foundation style, roof pitch, etc. Suitability (slope, wetland issues, etc.) Accessibility

More information

RRIO Checklist. Use of checklist: Definitions: Limitations

RRIO Checklist. Use of checklist: Definitions: Limitations CITY OF SEATTLE RENTAL REGISTRATION AND INSPECTION ORDINANCE (RRIO) RRIO Checklist Use of checklist: Property owners will use the RRIO Checklist to confirm that their rental housing properties and units

More information

Wastewater Capital Projects Management Standard Construction Specification

Wastewater Capital Projects Management Standard Construction Specification CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,

More information

What Causes Foundation Leaking?

What Causes Foundation Leaking? A home's foundation has the odds stacked against it from the day it's built. When a home is excavated to make room for the foundation walls, space is left between the outer edge of the foundation wall

More information

SECTION 14 20 10 - FREIGHT & PARKING GARAGE ELEVATORS PART I - GENERAL

SECTION 14 20 10 - FREIGHT & PARKING GARAGE ELEVATORS PART I - GENERAL SECTION 14 20 10 - FREIGHT & PARKING GARAGE PART I - GENERAL 1.1 SECTION INCLUDES [NOTE to AE: The following lists requirements that are specific to freight elevators. These requirements are in addition

More information

Inspection Report Atlanta Strip Mall Commercial Building Property Address:

Inspection Report Atlanta Strip Mall Commercial Building Property Address: Page 1 of 25 Inspection Report Atlanta Strip Mall Property Address: Smyrna GA 30082 Page 2 of 25 South East Building Consultants Ray Thoroman Serving the entire State of Georgia 6 678-410-3005 Page 3 of

More information

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No. Classification: Cluster: Location: Total Area: No. of Stories Aquarium Acreage Owned: Acquired: 1904 Most Recent Improvements: THE AQUARIUM Close to junction of Inselrhue and Loiter Way, Belle Isle Two

More information

PROPOSED SCOPE OF WORK Repair Building 1005 Exterior & Interior, New Post Chapel 25 April 2005

PROPOSED SCOPE OF WORK Repair Building 1005 Exterior & Interior, New Post Chapel 25 April 2005 Project Number KK00110-5J Architectural Scope of Work: PROPOSED SCOPE OF WORK Repair Building 1005 Exterior & Interior, New Post Chapel 25 April 2005 1. Remove the two trees marked as photograph 1 and

More information

Designing Schools To Reduce On-Going And Future Maintenance and Repair Costs

Designing Schools To Reduce On-Going And Future Maintenance and Repair Costs Designing Schools To Reduce On-Going And Future Maintenance and Repair Costs Charles H. Johnson, Consultant School Facilities Planning Division California Department of Education March 7, 2001 1 Designing

More information

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number

More information

Historic Preservation Certification Application Part 2 343-345 Main Street West South Haven, Vermont NPS Project No. 12345

Historic Preservation Certification Application Part 2 343-345 Main Street West South Haven, Vermont NPS Project No. 12345 Exterior Features 1 site and drainage 2 foundation 3 wood siding and trim 4 exterior doors 5 windows / storm windows 6 porches front and rear 7 chimneys 8 roofing Interior Features 9 frame 10 basement

More information

Inspection Tech. (330) 310-6559 http://www.inspectiontech.us a_westerburg@inspectiontech.us Inspected By: Aaron Westerburg

Inspection Tech. (330) 310-6559 http://www.inspectiontech.us a_westerburg@inspectiontech.us Inspected By: Aaron Westerburg Inspection Tech (330) 310-6559 http://www.inspectiontech.us a_westerburg@inspectiontech.us Inspected By: Aaron Westerburg Inspection Tech Home Inspection Report Prepared For: Mr. & Mrs. Homebuyer Property

More information

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Printed On: 2003/04/03 St Patrick CES, 7932 Study [03.3-050 Plumbing Piping Systems] Study condition, remaining service

More information

Basement Window Installation Guide Hopper and Sliding

Basement Window Installation Guide Hopper and Sliding Basement Window Installation Guide Hopper and Sliding americancraftsmanwindows.com Project Requirements: Installation must comply with all applicable building codes. Existing window frame, wall and weatherresistant

More information

The WANZ Guide to Window Installation

The WANZ Guide to Window Installation The WANZ Guide to Window Installation as described in E2/AS1 Amendment 5 Ver. 1.1 Page 2 of 74 Contents Overview Page 5 Objective Page 5 Scope Page 5 Opening Preparation Page 7 Step P1 Preliminary Check

More information

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin americancraftsmanwindows.com Project Requirements: Failure to follow these instructions may void product

More information

I NI NP R Inspected Items

I NI NP R Inspected Items 6/ /07 The Inspection of the property listed above must be performed in compliance with the rules of TREC. The inspection is of conditions which are present and visible at the time of the inspection, and

More information

VOLUME I PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

VOLUME I PROCUREMENT AND CONTRACTING DOCUMENTS GROUP 11044 1 VOLUME I PROCUREMENT AND CONTRACTING DOCUMENTS GROUP DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 31 32 Geotechnical Data 00 70 00 General Conditions 00 73 00 Supplementary Conditions

More information

Property Condition Assessment

Property Condition Assessment Property Condition Assessment Business, Wisconsin Inspection Date: 8/2009 Prepared For: Business Owner Report Number: TD999909 Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar

More information

costs and billing Facilities Services State-Funded and Billable Services Centrally Funded Services for State Supported Spaces Billable Services

costs and billing Facilities Services State-Funded and Billable Services Centrally Funded Services for State Supported Spaces Billable Services Facilities Services State-Funded and Facilities Services receives funding to provide maintenance in eligible state-supported areas. State-supported areas, equipment, and facilities are those that are utilized

More information

Building Condition Assessment: 109-111 North Howard Street Baltimore, Maryland

Building Condition Assessment: 109-111 North Howard Street Baltimore, Maryland KPA The Joint Venture of EBA Engineering, Inc. and Kennedy Porter & Associates, Inc. 4813 Seton Drive, Baltimore, MD 21215 Phone: (410-358-7171) Fax: (410)358-7213 Building Condition Assessment: Baltimore,

More information

Roof Inspection. Summary Report

Roof Inspection. Summary Report Phone: (561) 866 9956 www.real-estate-inspections.com Roof Inspection Summary Report Subject Property File Number: 05-15-RF-002 Inspector: Craig Milliken, PE CPM Real Estate Inspections, Inc. Date of Inspection:

More information

Architectural Inspection Site Structures

Architectural Inspection Site Structures 0141 Freestanding Shelters Open air shelters not attached to the building. Bike rack shelter with bike racks: This 8'x30' structure is located on the north east side of the building on the wooded landscape

More information

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal. 2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other

More information

How To Repair A Boat Landing Deck With A Boat Bed

How To Repair A Boat Landing Deck With A Boat Bed RESIDENTIAL INSULATED SHEATHING INSTALLATION GUIDE Residential Insulated Sheathing Installation Guide ROXUL COMFORTBOARD IS Table of Contents Slab-on-grade-to Above Grade Wall...1 Foundation Wall at Footing

More information