FP fatality review. Safety initiative involving all Personnel
|
|
- Caren Cooper
- 8 years ago
- Views:
Transcription
1 FP fatality review Safety initiative involving all Personnel
2 16 Fatalities over the period (including 3 road accidents) Algeria / Enafor 21 / fall of rack Qatar / Key Hawaï / hit by side entry sub Libya / BD1 / fall of stabbing board Argentina / Aguada Pichana / line whipping (2) Nigeria / Jack Ryan / fall during crane load test Gabon / SMP 102 / struck by flare line Nigeria / MG Hulme / fall of samson post Iran / Kharg / truck accident Libya / supply vessel / hit by venting hose Gabon / truck accident UAE / Gus Androes / hit by pressurized carter Yemen / truck accident Nigeria / Sedco 700 / fall thru elevator UK / GSF Magellan / man riding accident Nigeria / Jack Ryan / fall of tea-cosy
3 Common causes at origin If we exclude the road accidents, there were 13 fatalities directly linked to our metier. These accidents are of different nature, nevertheless we can find some recurrent causes: Operations were wrongly considered as Routine Hazards were not thoroughly evaluated Some basic procedures were not respected Preparation was incomplete Fall from Height 15% Categories of fatal accidents ( ) Man Riding 8% Dropped Objects 31% Hidden Energy 46% The following review of each accident allows to identify major weaknesses 3 - FP Fatality review -
4 UK GSF Magellan 09/10/2000 Man riding accident Man rider was crushed to death inside the mouse hole housing. Man rider not in direct view of tugger operator BOP area man riding tugger not used as in bad position and not rigged up JSA and PJM not properly conducted. Man riding to be done only when no other solutions exist. Special care to be applied in job preparation (JSA & PJM) Rig Contractor Supervision to be present Under Rig Floor (URF) operations to be managed from URF. 4 - FP Fatality review October 2010
5 Nigeria Transocean MG Hulme 18/03/2003 Samson post failure The Assistant Driller was found on the deck with severe head injuries. Alongside him was a Samson Post (pipe rack post) which had fallen from its vertical position. Fixation of post to deck not appropriate and not inspected (failure of the circumferential weld at base of Post) Crack in post weld was noticed before accident but no action was initiated Posts are receiving repeated shock impacts but are not included in PMS for inspection. Posts strengthening / fixation to deck to be designed and adapted to supported efforts Posts to be included in PMS Use of Anomaly reporting program (eg. STOP cards) Hazard not evaluated Reporting system not effective 5 - FP Fatality review October 2010
6 Libya Al Jurf NICO Raysut supply vessel 01/08/2003 Venting hose whiplash A 4 hose was lowered over the side of the vessel into the sea to prevent dust clouds during venting. To keep the hose submerged, extra weight had been secured to its outboard end. Pressure was suddenly released causing hose to whip out of the sea onto the deck. A crewman was struck at head by weight. Poor working practices No detailed written procedures and no JSA conducted Previous incidents of hoses whipping reported in the fleet but not acted on by management Lack of safety awareness among the crew Poor communications, level of supervision and management of operations onboard. Hose venting procedures to be detailed (validated by JSA) and followed Crew training program to be provided to develop safety awareness Hose laid overboard Hose after it whipped back onto the deck Details of weight attached to hose Approx. position of man when struck by hose Poor level of supervision Procedures not prepared 6 - FP Fatality review October 2010
7 Algeria ENAFOR 21 21/03/2004 Rack fall over A storage rack had been placed on its side for repair. While maneuvering, a forklift truck hit the rack which toppled over and struck a Floorman. Storage rack Placement of rack in a vertical position without securing it Maneuvering a large forklift with limited visibility Personnel not trained to drive forklift Organization of work on site not controlled Safety awareness, qualification and training of personnel deficient. Gas cylinders Position of roughneck Forklift to be operated only by qualified drivers Enforce culture of job preparation (Risk Analysis / Permit to Work / Pre-Job Meeting) Promote use of Anomalies reporting Implement effective site supervision and daily site inspection. Workshop container 7 - FP Fatality review October 2010 No job preparation No anomalies / UAC reporting No effective Supervision
8 Qatar GSF Key Hawaii 05/07/2004 Side Entry Sub accident A Side Entry Sub (SES) was made up to test string and test assembly connected. The back up tong placed above the SES could not grip. When applying torque with TDS the SES quickly rotated and test assembly struck the Floorman who was holding the tong. Reconstruction Lack of job preparation (Testing procedure incomplete, JSA only generic / JSA process not fully understood / PJM with crew not done / Supervision and organization deficient) Lack of risk awareness Difficult communication within the crew members. No attachment of testing assembly to SES until all string connections are made up to full torque Promote safety and risk awareness Call for Time Out for Safety in doubt During PJM Supervisors to ensure instructions are understood and JSA used as support to highlight hazards. 8 - FP Fatality review October 2010
9 Libya Saipem AZ /10/2004 Fall of casing board While running casing the stabbing board dropped and fell some 14 m on the floor hitting the Driller. No JSA conducted / no PTW issued No respect of procedures / no basic safety precautions applied Use of non certified lifting equipment Stabbing board and Safety devices not included in rig's PMS. Back-up anti-fall device is recommended to prevent board fall Safety dogs to be inspected / tested as per PMS Adequate training to use the board to be given & recorded JSA & PTW to be carried out before job Stabber safety line to be attached to derrick structure (not to stabbing board) Derrick track stops to be installed and able to support impact of falling board. Hazard not evaluated Lack of job preparation Non respect of procedures 9 - FP Fatality review October 2010
10 UAE Noble Gus Androes 10/10/2006 Pressurized gear box failure The objective was to partially drain a gear box in order to move its level sight glass to a lower position. A scaffolding was erected to allow Roustabout to monitor the oil level drop. Suddenly, a huge bang was heard. Roustabout was found unconscious on the scaffolding and died soon after. Victim was unaware of pressure hazard and took an uncontrolled initiative (use of 8 bar rig air supply to speed-up gear box draining) Lack of direct supervision PTW & JSA did not cover draining task considered as non-hazardous Poor understanding of safety messages due to language issue on rig. Procedure not respected Role of Supervisors critical in ensuring their teams are working safely Supervisors to conduct PJM to ensure instructions are clear and JSA used to highlight job hazards to the team FP Fatality review October 2010
11 Nigeria Transocean Jack Ryan 05/10/2008 Dropped Object from Xmas Tree While landing a Xmas tree (XT) on trolley, the crane main hoist hydraulic motor failed. The 50 ton XT free fell on trolley and tea cosy bounced off its pedestal. Toolpusher was struck by the tea cosy. Tea Cosy pedestal White circle : Tea Cosy : - in crane control: Main motor replaced by an incorrectly sized motor a week before No deep investigation done following first failure. - in operational control: Tea cosy not fully secured on pedestal as not considered necessary Sudden shock due to XT free fall not identified as a hazard and XT free fall not considered in JSA. PMS spare traceability to be audited to detect failures Design process of XT not only to focus on final use of product, but also on packaging, fastening, lifting, transportation and installation conditions & hazards Tea Cosy final position Position of victim 11 - FP Fatality review October 2010
12 Nigeria Transocean Sedco /09/2009 Fall through hatch The Night Barge Master entered column elevator to access to ballast pump room and stepped inside the elevator. He fell through the hatch down to the bottom of the elevator shaft (40 m high) Poor visibility inside elevator cabin Hatch not identified as a critical part in elevator inspection program Elevator not certified Access to column was a routine task Anomaly reporting procedure not effective (hatch cover hinges were previously broken and failures had not been reported) Elevators to be certified by Contractor approved 3 rd Party and specific maintenance & inspection standards to be defined and applied Any hatch on rig to have a Contractor approved design Column Entry Procedure to be respected Incident / Anomaly Reporting Program to be in force A Corrective Action Tracking System to be implemented to address unsafe acts or conditions. Hazard & Criticality of equipment not evaluated Access considered as routine Hatch opening 12 - FP Fatality review -
13 Argentina Aguada Pichana Field 26/01/2010 Temporary line whiplash / 2 victims A wireline team was trying to retrieve gauges without success. It was decided to vent the well to free the tool. During the flaring process through a temporary line, a strong blast occurred and the temporary line suddenly whipped out of control and hit 2 operators. Temporary line not anchored and not properly connected to wellhead No means to immediately and remotely stop the flow due to the absence of a Surface Safety Valve. Poor Risk Analysis performed Non respect of operations working procedures (temporary line not secured) Non respect of Work Permit procedures Lack of Safety awareness from the wireline team. Excess of confidence of team. Hazard not evaluated Operation considered as Routine 13 - FP Fatality review -
14 Nigeria Transocean Jack Ryan 31/07/2010 Crane failure during load tests During a dynamic load test on Crane the crane boom collapsed overboard tearing out the crane cabin & causing the fall overboard of 3 personnel. 2 injured personnel were rescued but the surveyor was reported missing. Poor Risk Appreciation Lack of Supervision / Management Control Crane Operator required for another job and replaced by Deck Pusher without proper handover Test performed under field conditions with static values. Criticality of load test activity underestimated: Preparation and Supervision not adapted Dynamic charts should always be used for lifts from / to vessels Crane load tests not to be done in open seas but in sheltered waters or harbor conditions RCI calibration to be done regularly and verified before load tests are conducted. Criticality of job underestimated Preparation & Supervision inadequate 14 - FP Fatality review -
15 Gabon SMP /09/2010 Company Man hit by flare line Drilling Supervisor was walking beside a truck to show to the driver where to offload equipment. The truck crossed a flare line, temporarily laid, but trailer wheels could not pass over pipe and dragged it. The Supervisor was hit from behind and fell. The pipe was dragged by the truck over his body. Work overload for the Supervisor (supervision of Civil Works and Logistics operations in addition to his standard duties) Simultaneous works conducted on Site Lack of safety awareness of truck driver Pipe laid and not buried without any indication of restricted access. Reconstruction Platform location to be ready prior rig arrival and formally handed over to drilling crew Specific supervision to be assigned to non drilling operations Operations in progress must be completed prior access is given to area Everybody has the right (and the duty) to stop an operation when the level of safety observed is considered insufficient. Position of Supervisor when hit 15 - FP Fatality review -
16 Synthesis All main findings were classified in 3 categories corresponding to 3 major Steps of a job: Evaluation / Preparation / Realization, in order to draw main Guidelines for each Step Common findings Step 1 - Evaluation Job considered as routine Hazards not evaluated Step 2 - Preparation Procedures not implemented / respected Preparation & Supervision inadequate Step 3 - Realization UAC Reporting system ineffective TOFS not implemented 16 - FP Fatality review -
17 Questions / Answers To apply the previous lessons, we decided to use the question/answer format to involve all Personnel, help them to understand our concerns and improve individual behaviour 1- What is the most important part of Job Evaluation? Answer: An analysis of the associated Risks 2- What are the most important parts of Job Preparation? Answer: Work Permit and Pre Job Safety Meeting 3- What must you do if the Job does not go as Planned? Answer: Stop and reevaluate the Risks The objective by mid-year 2011 is that all Personnel on Sites are able to answer correctly to the above 3 questions FP Fatality review -
18 18 - FP Fatality review - Drilling & Wells Division thanks you for your attention and your cooperation in building a safe environment
A Casebook of Fatal Accidents Related to Work-at-Height
A Casebook of Fatal Accidents Related to Work-at-Height Occupational Safety and Health Branch Labour Department Occupational Safety and Health Council This casebook is prepared by the Occupational Safety
More informationWorking safely under motor vehicles being repaired
Working safely under motor vehicles being repaired Working safely under motor vehicles being repaired Health and Safety Introduction This leaflet is aimed at owners, managers and supervisors of motor vehicle
More informationSITE SPECIFIC FALL PROTECTION PLAN
1 THIS PLAN IS SPECIFIC TO: PROJECT & ADDRESS 1.1 THIS PLAN IS SPECIFIC TO THE FOLLOWING AREA(S) ON SITE: Parkade level: Typical level: Other: Between G/L: 1.2 THIS PLAN IS APPLICABLE TO THE FOLLOWING
More informationAUTOMATIC HYDRAULIC DRILLING RIGS HH Series HH Series hydraulic hoist series The drilling industry is actively involved in developing new technologies to solve common problems, such as increasing safety
More informationDrilling Rig Hazard Recognition Training for Supervisors and Employees
Drilling Rig Hazard Recognition Training for Supervisors and Employees This 3-day packed course takes on every aspect of drilling and related hazards. However, it does not follow any other course layout.
More informationEngineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since.
Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since. Liftech is the structural review engineer of record for most
More informationFATAL CRANE INCIDENT 22 nd nd October 2007
FATAL CRANE INCIDENT 22 nd nd October 2007 Germano Construction Site Brazil LESSONS LEARNED INCIDENT DESCRIPTION DATE: 22 nd October 2007 TIME: 1126 hours. Incident Description: During the construction
More informationCONTRACTOR SAFETY AND ENVIRONMENTAL REQUIREMENTS
CONTRACTOR SAFETY AND ENVIRONMENTAL REQUIREMENTS A. Purpose and Scope A.1 The purpose and scope of these requirements is to establish safety and environmental requirements for contractors to be able to
More informationGuiding employers through workers compensation. n Was there when it happened. n Is accountable for the people and equipment.
Guiding employers through workers compensation Preventing injuries Minnesota Iowa Nebraska South Dakota Wisconsin Accident Analysis Learn from accidents so you can prevent them from happening again George,
More informationWorkplace Incident Fatalities Accepted by the Workers Compensation Board in 2014
Workplace Incident Fatalities Accepted by the Workers Compensation Board in 2014 Workplace Incident Fatalities Year to date, numbers as of December 31, 2014 Workplace Incident fatalities are cases where
More informationOwner s Manual Gantry Cranes
Owner s Manual Gantry Cranes Fixed Height Gantry Crane MODEL NUMBER: SERIAL NUMBER: CAPACITY IN TONS: Telescoping Gantry Crane Bushman AvonTec 262-790-4200, 800338-7810, Fax 262-790-4200 www.bushmanavontec.com
More informationWORK AT HEIGHT UNIT 4
WORK AT HEIGHT UNIT 4 WHAT IS WORKING AT HEIGHT? The Working At Height Regulations 2005 define working at height as:- Any work above or below ground level where a fall would result in personal injury.
More informationMATERIAL HANDLING PROGRAM (Section 10)
MATERIAL HANDLING PROGRAM (Section 10) OVERVIEW (WMI Facility) (1) Only certified personnel will operate powered industrial lifts. (2) Training will be provided to those who require to be certified or
More informationVideos for Safety Meetings
Videos for Safety Meetings 2474 2005, ERI Safety Videos OPERATING ELECTRIC PALLET JACKS SAFELY This easy-to-use Leader s Guide is provided to assist in conducting a successful presentation. Featured are:
More informationLevel 1 Award in Health and Safety in a Construction Environment
Level 1 Award in Health and Safety in a Construction Environment Student notes (sample) www.britsafe.org Membership Training Qualifications Audit and Consultancy Audit and Policy Consultancy and Opinion
More informationSTOUCO Drilling Equipment
STOUCO Drilling Equipment Auxiliary Pipe Handling System Type :Stouco.APHS.H.50.C.6 SWL : 5 T travel speed : 0 30 m/min (0-98 ft/min) travel mode : AFT to FWD / FWD to AFT travel distance : ~17 mtr Lift
More informationCAREER OPPORTUNITIY IN THE ENERGY SECTOR
Energy for the nation CAREER OPPORTUNITIY IN THE ENERGY SECTOR Kenya Electricity Generating Company Limited (KenGen) is the leading power producer in Kenya. The company has embarked on a transformation
More informationCOMPARISON OF DRILLING TECHNOLOGIES BETWEEN TOP DRIVE AND ROTARY TABLE IN GEOTHERMAL FIELDS: A CASE STUDY OF OLKARIA GEOTHERMAL FIELDS.
Proceedings 5 th African Rift geothermal Conference Arusha, Tanzania, 29-31 October 2014 COMPARISON OF DRILLING TECHNOLOGIES BETWEEN TOP DRIVE AND ROTARY TABLE IN GEOTHERMAL FIELDS: A CASE STUDY OF OLKARIA
More informationDeepwater Horizon Accident Investigation Report
Deepwater Horizon Accident Investigation Report September 8, 2010 This is the report of an internal BP incident investigation team. The report does not represent the views of any individual or entity other
More informationTHE UNIVERSITY OF SHEFFIELD WORK AT HEIGHT POLICY
THE UNIVERSITY OF SHEFFIELD WORK AT HEIGHT POLICY CONTENTS Page No 1 INTRODUCTION 2 2 LEGISLATION 2 3 HIERARCHY OF CONTROL 2 4 WORK AT HEIGHT POLICY 3 5 ROLES AND RESPONSIBILITIES 3 6 RISK ASSESSMENTS
More informationTotal s Golden rules
Total s Golden rules Golden rule No. 10: Work at height A century ago Shocking, right? And yet it s still happening today Foreword The Group s activities all involve work at height, at varying frequencies.
More informationSafety Management System Manual Guidebook
Safety Management System Manual Guidebook Developed by: Commandant (G-MSO-2) U.S. Coast Guard Table of Contents Chapter 1: Introduction 1 Chapter 2: Safety and Environmental Protection Policy 3 Chapter
More informationInvestigation of Fatal Accident V-Door Guide Post Failure Chandeleur Block 31, Well No. 1 OCS-G 27214 18 July 2006
OCS Report MMS 2008-016 Investigation of Fatal Accident V-Door Guide Post Failure Chandeleur Block 31, Well No. 1 OCS-G 27214 18 July 2006 Gulf of Mexico Off the Louisiana Coast U.S. Department of the
More informationRESPONSIBILITIES IN MOBILE CRANE OPERATIONS CONSTRUCTION SAFETY ASSOCIATION OF ONTARIO
RESPONSIBILITIES IN MOBILE CRANE OPERATIONS CONSTRUCTION SAFETY ASSOCIATION OF ONTARIO MOBILE CRANE OPERATIONS WHO IS RESPONSIBLE? The question of who is responsible for the various aspects of a crane
More informationOSHA GUIDANCE DOCUMENT FALL PROTECTION IN RESIDENTIAL CONSTRUCTION
OSHA GUIDANCE DOCUMENT FALL PROTECTION IN RESIDENTIAL CONSTRUCTION OSHA GUIDANCE DOCUMENT FALL PROTECTION IN RESIDENTIAL CONSTRUCTION Table of Contents Executive Summary... 1 Introduction... 1 Installing
More informationHow To Prevent Accidents At Work
2 Preventing vehicle accidents Construction work is considered to be one of the most hazardous industrial activities in the EU. The rate of injury in the construction industry is higher than in other industries.
More informationAnnual Report on Accident Statistics and Analyses for Public Works Contracts 2014
Annual Report on Accident Statistics and Analyses for Public Works Contracts 2014 This report provides a summary of the accident statistics and analysis of the accidents occurred in public works construction
More informationEMERGENCY PREPAREDNESS
EMERGENCY PREPAREDNESS Page 1 SECTION 11 EMERGENCY PREPAREDNESS CONSIDERATIONS FOR APPROPRIATE EMERGENCY PREPAREDNESS...3 EMERGENCY PREPAREDNESS POLICY Emergency Preparedness Policy - Sample...5 EMERGENCY
More informationConstruction Safety: Accident Case Studies & Enforcement Analysis
Construction Safety: Accident Case Studies & Enforcement Analysis Eric Tan Kun Tien Group Head (Operations Branch) Occupational Safety and Health Division 31 March 2011 Construction demand increased 14%
More informationPALLET RACKING INSPECTION PROGRAM
PALLET RACKING INSPECTION PROGRAM PREPARED BY: RYAN GOEDE MARCH 2009 D IV. O F 1619621 O NTA R I O IN C. 1378 S ANDH I LL DRIVE UNIT 7 ANCAS TER O NT A RIO L9G 4V5 P HONE: 8 66.304.9858 FAX: 905.304.3362
More informationSample Fall Rescue Plan for Bridge Work
This document is intended to provide guidance for developing fall rescue plans for bridge contractors. The Occupational Safety and Health Administration s (OSHA) regulation 29 CFR 1926.502(d)(20) states:
More informationTBA 100 A Performance Study of the New Generation 100-ton Advanced Technology Rig. Maximilian Trombitas, Product Manager Bauer Deep Drilling GmbH
TBA 100 A Performance Study of the New Generation 100-ton Advanced Technology Rig Maximilian Trombitas, Product Manager Bauer Deep Drilling GmbH Outline Field study Lessons learned Rig design changes Mechanization
More informationTechnical Advisory for Safe Operation of Lifting Equipment. Programme-Based Engagement
Technical Advisory for Safe Operation of Lifting Equipment Programme-Based Engagement Contents 1. Introduction and Background 03 2. Case Studies of Accidents Involving Lifting Equipment 05 3. Common Systemic
More informationCareer on a drilling rig
Career on a drilling rig - A world of opportunities - Highly demanding technological workplace - 24-hour operations MÆRSK INSPIRER At work in the rough conditions in the North Sea. A drilling rig operates
More informationBOP PRESSURE TESTING PROCEDURE
0 Discuss Operator BOP requirements WITH RIG MANAGER. Insure that all Romfor's BOP equipment is tested consistent with Romfor's policy. This may require Nabors to incur the cost for the testing subcontractor
More informationHow To Ensure Safety Of Lifting Equipment
1 of 12 2 of 12 CONTENTS 1.0 OBJECTIVES... 3 2.0 SCOPE... 3 3.0 DEFINITION OF TERMS... 3 3.2.1 Loose Lifting Tackle... 3 3.2.2 Examination... 4 3.2.3 Inspection... 4 4.0 RESPONSIBILITIES & AUTHORITIES...
More informationTransportation and Lifting of Liquefied Gas Dewars
Transportation and Lifting of Liquefied Gas Dewars FN000475/OJ 1 Fermilab uses liquefied gasses or cryogenics in various forms around the lab. These liquefied gasses are sometimes transported in large
More informationGulf of Mexico Safe Work Practices
To: All Project Vendors & Contractors RE: PROSPECT (Area/Block Well No. ) EMERGENCY RESPONSE/OPERATIONAL SAFETY PROCEDURES INTERFACE DOCUMENT This Interface Document is supplemental to an Apache /Drilling
More informationOffshore Structures. Offshore Drilling Equipment
Offshore Structures Offshore Drilling Equipment The drill string is lowered through a conduit (riser). The drill string consists of a drill bit, drill collar and drill pipe. Drill pipe sections are added
More informationELEVATED WORK POLICY
ELEVATED WORK POLICY 1.0 BACKGROUND The purpose of this program is to prevent accidents and injuries to workers from falls and to provide employees with the information for the safe use of fall protection
More informationSAFE WORK PROCEDURE SWP 015 WORKING AT HEIGHT SEPTEMBER 2013 DOC. NO. D13/248399
Operation Brief Description of Activity Limitations MORELAND CITY COUNCIL Operations Centre 7-9 Walter Street Hadfield Vic 3046 Tel: 8311 4300 Working at height Approved by the Walter Street OHS committee
More informationMEASURES TO PREVENT ACCIDENTS WITH LIFEBOATS
INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020 7587 3152 Fax: 020 7587 3210 IMO E Ref. T4/4.01 MSC.1/Circ.1206 26 May 2006 MEASURES TO PREVENT ACCIDENTS WITH LIFEBOATS
More information11.4 Hazard register. Hazard identification. Steps to minimise. Isolate Yes No Yes No Yes No Yes No. Hazard
11.4 Hazard register Hazard identification Event courses Significant Hazard Road cycle and mountain bike Competitor being physically injured due to: collision with other competitor, stray animal or falling
More informationFALL PROTECTION PROGRAM RESCUE PLAN
GLOBAL LEADER IN FALL PROTECTION Capital Safety 95 Derby Street Silverwater, NSW 2128 Tel: 02 8753 7600 Fax: 02 8753 7603 FALL PROTECTION PROGRAM RESCUE PLAN IMPORTANT: This document is intended to provide
More informationGENERAL OCEAN TOW RECOMMENDATIONS FOR JACKUP DRILLING UNITS International Association of Drilling Contractors (I.A.D.C.) February 13, 1991
GENERAL OCEAN TOW RECOMMENDATIONS FOR JACKUP DRILLING UNITS International Association of Drilling Contractors (I.A.D.C.) February 13, 1991 Manning 1. Manning should comply with U.S. Coast Guard regulations
More informationThe Blocks and Drilling Line
rotary drilling series Unit I, Lesson 5 The Blocks and Drilling Line Third Edition, Revised By L. D. Davis Published by PETROLEUM EXTENSION SERVICE The University of Texas at Austin Division of Continuing
More informationTremline Pty Ltd trading as The Hills Bark Blower
JSA No: Rev: 10011 Date: 10010 ABN 1 07 880 6 Website: wwwbarkblowercomau Job Number Start Time: Vehicle : Max Length Hose Date: Company Name: Product: Quantities Depth Job site address: Description of
More informationSlips, Trips and Falls. AR 2012 DMME Division of Mineral Mining
Slips, Trips and Falls AR 2012 DMME Division of Mineral Mining It Doesn t Take Much Since the beginning of 2008, 14 miners have died from injuries sustained in falls at M/NM mines. Several were wearing
More informationSITE CONTRACTOR PROCEDURES
SITE CONTRACTOR PROCEDURES Asset Collection Type B Assets are considered High risk ; the site activities must be in accordance with Graysonline contractor procedures and are to be collected by appointment
More informationChapter 3: Fall Protection/ Scaffolding Safety
Chapter 3: Fall Protection/ Scaffolding Safety Learning Objectives In this chapter you will learn to: recognize the hazards commonly associated with work on or around scaffolds; be aware of common scaffold-related
More informationManagement of mobile equipment maintenance audit. guide
Management of mobile equipment maintenance audit guide November 2015 1 Adelaide Terrace, East Perth WA 6004 Postal address: Mineral House, 100 Plain Street, East Perth WA 6004 Telephone: (08) 9358 8002
More informationCR-SERIES CARPET POLES INSTRUCTION MANUAL
VESTIL MANUFACTURING CORP. 2999 North Wayne Street, P.O. Box 507, Angola, IN 46703 Telephone: (260) 665-7586 -or- Toll Free (800) 348-0868 Fax: (260) 665-339 www.vestilmfg.com e-mail: sales@vestil.com
More informationThis material was produced under grant number SH-17792-08-60-F-48 Occupational Safety and Health Administration, U.S. Department of Labor.
Big Four Construction Hazards: Fall Hazards This material was produced under grant number SH-17792-08-60-F-48 Occupational Safety and Health Administration, U.S. Department of Labor. It does not necessarily
More informationRESCUE PLAN FALL PROTECTION PROGRAM
RESCUE PLAN IMPORTANT: This document is intended to provide guidance only for developing site-specific rescue plans for working at heights. GLOBAL LEADER IN FALL PROTECTION RESCUE PLAN This document is
More informationReport of Investigation into the fatal accident happened on board m.v. Najran at Kwai Chung Container Terminal on 15 May 2008
Report of Investigation into the fatal accident happened on board m.v. Najran at Kwai Chung Container Terminal on 15 May 2008 Purpose of Investigation This incident is investigated, and published in accordance
More informationRecommendations to improve the safety of existing lifts
Recommendations to improve the safety of existing lifts Lift & Escalator Industry Association Lift Safety an introduction Lifts are amongst the very few modes of transport available for continuous unsupervised
More informationCHARACTERISTIC DATA ANALYSIS OF OCCUPATIONAL ACCIDENT IN HEAVY ENGINEERING INDUSTRY
CHARACTERISTIC DATA ANALYSIS OF OCCUPATIONAL ACCIDENT IN HEAVY ENGINEERING INDUSTRY K.Dhanasekar 1, V.S.Manigandan 2, H. Abdul Zubar 3, K.Visagavel 4 1 PG Research Scholar, Department of Industrial Safety
More informationMini Pallet Jack OWNER S MANUAL
Mini Pallet Jack OWNER S MANUAL WARNING: Read carefully and understand all ASSEMBLY AND OPERATION INSTRUCTIONS before operating. Failure to follow the safety rules and other basic safety precautions may
More informationPowered Industrial Truck Safety Program
Powered Industrial Truck Safety Program TABLE OF CONTENTS Forklift Safety Program 1.0 Overview... 3 2.0 Policy.....3 3.0 Requirements 3 4.0 Purpose. 3 5.0 Scope......4 6.0 Forklift Procedures 4 6.0 Responsibilities.....6
More informationNear Miss Reporting. Loss Causation Model
Near Miss Reporting Loss Causation Model Define what is a near miss Defined so everyone is on the same page. Practical reporting How do we apply this and make it work? Objective Accident An unplanned event
More informationCHAPTER I INTRODUCTION
CHAPTER I INTRODUCTION 1.1 Introduction Construction accidents are the third most likely cause of work-related injury, after mining and agriculture. For every 100,000 workers in the construction industry,
More informationThis presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report analysis nor is it intended to provide the sole
More informationDiscPlus DX195 and DX225 Air Disc Brakes
Revised 11-04 Technical Bulletin Revised 1 Technical 11-04 Bulletin DiscPlus DX195 and DX225 Air Disc Brakes Inspection, Installation and Diagnostics Air Disc Brake Inspection Intervals and Procedures
More informationHEALTH, SAFETY AND ENVIRONMENT HANDBOOK HSE
HEALTH, SAFETY AND ENVIRONMENT HANDBOOK HSE CNOOC Limited 1 Message from CEO Dear Colleagues, CNOOC Limited is the largest producer of offshore oil & gas in China and is one of the largest oil & gas exploration
More informationRISK MANAGEMENT IN THE NATIONAL SYSTEM A PRACTICAL GUIDE
RISK MANAGEMENT IN THE NATIONAL SYSTEM A PRACTICAL GUIDE RISK MANAGEMENT IN THE NATIONAL SYSTEM A PRACTICAL GUIDE Contents Introduction 2 Terms associated with risk management 3 The risk management process
More informationF.A.C.E. INVESTIGATION REPORT
F.A.C.E. INVESTIGATION REPORT Fatality Assessment and Control Evaluation Project FACE #97-NJ-059-01 Air Conditioning Worker Dies After Falling From a Fixed Ladder New Jersey Department of Health and Senior
More informationAccident Report. Injury Pacific Way. 26 November 2005 Class A
Accident Report Injury Pacific Way 26 November 2005 Class A SUMMARY Pacific Way Injury A crewmember suffered an injury to his wrist when the handle connected to the manually powered windlass that he was
More information2010 APPLICATION REFERENCE GUIDE
2010 APPLICATION REFERENCE GUIDE INDEX QUALITY POLICY 2 ERGO ASSIST STANDARD 4-13 CUSTOM 14-18 END EFFECTORS 19-24 LIFT ASSIST 25-41 FIXTURED TOOLS 42-53 FIXTURES 54-63 ASSEMBLY TABLES 64-72 CARTS/ DUNNAGE
More informationPROFESSIONAL CONTRACTORS INSURANCE PACKAGE
PROFESSIONAL CONTRACTORS INSURANCE PACKAGE MASTER CERTIFICATE NO. TLD/CC/01/00924 NAME: Individual Contractors being any individual temporary worker whether trading in his/her own name or as a Limited
More informationHYDRAULIC TABLE CART 500-LB.
HYDRAULIC TABLE CART 500-LB. OWNER S MANUAL WARNING: Read carefully and understand all MACHINE ADJUSTMENT AND OPERATION INSTRUCTIONS before operating. Failure to follow the safety rules and other basic
More informationENVIRONMENT, HEALTH & SAFETY
ORACLE ENVIRONMENT, HEALTH AND SAFETY: CONTRACTOR SAFETY PROGRAM Oracle has a comprehensive and structured approach to sourcing third-party companies and contractors ( contractors ) to perform a variety
More informationTHE INSTRUCTIONS PRESENTED HERE ARE ORIENTED TO USERS OF CNG CYLINDERS AS WELL AS TO TECHNICIANS IN CHARGE OF THEIR INSTALLATION
FOREWORD THE INSTRUCTIONS PRESENTED HERE ARE ORIENTED TO USERS OF CNG CYLINDERS AS WELL AS TO TECHNICIANS IN CHARGE OF THEIR INSTALLATION CAUTION! READ THIS BEFORE This guide only has the objective of
More informationACCIDENT INVESTIGATION REPORT
UNITED STATES DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT SERVICE GULF OF MEICO REGION ACCIDENT INVESTIGATION REPORT 1. OCCURRED DATE: 20-FEB-2008 TIME: 0915 2. OPERATOR: McMoRan Oil & Gas LLC REPRESENTATIVE:
More informationWORK AT HEIGHT. STFC Safety Code No 9. Rev. 1.4, Issued April, 2015
WORK AT HEIGHT STFC Safety Code No 9 Rev. 1.4, Issued April, 2015 Note - This document may have been superseded by a more recent version. Revisions 1 Initial Launch November 2007 1.1 Amendments to training
More informationCourse Description List
Course Description List Arc Flash This course is used to raise awareness about the specific electrical hazards of an arc flash. This course will also introduce a new CSA Standard on workplace electrical
More informationDegree/ Higher Education Jobs:
Ohio s Natural Gas and Crude Oil Industry Degree/ Higher Jobs Job Title Degree/ Higher Jobs: for field positions may require 2 to 4 year, or higher degrees that are industry specific and/ or technical
More informationMaersk Resilient. Maximised drilling efficiency and uptime. Optimised for concurrent activities
Maersk Resilient Maximised drilling efficiency and uptime Optimised for concurrent activities Maersk Resilient TYPE MSC CJ50-X100 MC, 350 ft jack-up drilling rig BUILT Keppel FELS, 2008 CLASS American
More informationFailure to comply with the following cautions and warnings could cause equipment damage and personal injury.
1.0 IMPORTANT RECEIVING INSTRUCTIONS Visually inspect all components for shipping damage. Shipping Damage is not covered by warranty. If shipping damage is found, notify carrier at once. The carrier is
More informationTECHNICAL INFORMATION
Page: 1/6 This checklist recognizes the major accident hazards found by experience of previous HAZID studies. It is not intended to be totally exhaustive and feedback from users should be incorporated
More informationGUIDE TO TOWER CRANES 1
1 This Guide provides information on siting, erecting and using tower cranes and selferecting tower cranes in the workplace and supports the General guide for cranes. This Guide forms part of a series
More informationPCOC Loss Control Focus Focusing on the three top injury areas for our employees* Issue 1 of 12
Issue 1 of 12 Area of Focus: All loss areas INSPECT YOUR JOBSITE PRIOR TO STARTING WORK: When we service any facility, especially residences, one of the largest hazards we face are the many trip, fall
More informationAccident/Incident Investigation & Reporting Procedure
Accident/Incident Investigation & 1. Overview The recognises its obligation to ensure that all accidents and incidents are reported, recorded and investigated. We are committed to identifying corrective
More informationCrane Lifts vs. Risks
Forensic Accident Investigations: The Team Approach Jim D. Wiethorn, P.E. Haag Engineering Co. Crane Lifts vs. Risks Despite all the training, planning and hazard analysis taken in preparation of a crane
More informationA Review of Recent Tower Crane Accidents and the Lessons Learned
A Review of Recent Tower Crane Accidents and the Lessons Learned Tim Watson Tim Watson Consulting Limited Tower Crane Accidents 130 Accidents Worldwide 1989 2012 Only Major Accidents Considered Significant
More informationEntry Level Award in Workplace Hazard Awareness
Entry Level Award in Workplace Hazard Awareness Student resource sheets www.britsafe.org Membership Training Qualifications Audit and Consultancy Audit and Policy Consultancy and Opinion Policy Awards
More informationConstruction Safety. Mark Reising, Tetra Tech, Inc. NARPM Training Program nd Annual nd Annual NARPM Training Program. NARPM Training Program
Construction Safety Mark Reising, Tetra Tech, Inc. 22 nd Annual 22 22 NARPM Training Program nd Annual nd Annual NARPM Training Program NARPM Training Program 0 Construction Concerns Excavations Confined
More informationOil and Coolant Circulating Heating System. Model - OCSM
Oil and Coolant Circulating Heating System Model - OCSM Installation & Operation Manual 216280-000 REV 2 Identifying Your System The HOTSTART heating system is designed to heat fluids for use in marine
More informationPrevention through Design: Eliminating Confined Spaces and Minimizing Hazards
Prevention through Design: Eliminating Confined Spaces and Minimizing Hazards American Industrial Hygiene Association Developed by the AIHA Confined Spaces Committee Approved by the AIHA Board of Directors
More informationGood practice. Enclosed lifeboat launching. It s your ship and equipment look after them and they will look after you GOOD PRACTICE
Enclosed lifeboat launching NUMBER 72 Counterweight rigged correctly, externally All crew aware of operation through drills and lecture Monthly checks as per SMS The brake wire should fall free from the
More informationThere is no water, surface tension cracks, nor other environmental conditions present that reduce the stability of the excavation.
Part 1926 Subpart P Introduction The Occupational Safety and Health Administration (OSHA) issued its first Excavation and Trenching Standard in 1971 to protect workers from excavation hazards. Since then,
More informationWorkSafe Guidance Document FALL PROTECTION IN RESIDENTIAL CONSTRUCTION
WorkSafe Guidance Document FALL PROTECTION IN RESIDENTIAL CONSTRUCTION WorkSafe Guidance Document Fall Protection in Residential Construction Table of Contents Executive Summary... 1 Introduction... 1
More informationCLASSIFICATION SERIES: Mine Safety Inspector MAJOR AGENCIES: Natural Resources
STATE OF OHIO (DAS) CLASSIFICATION SPECIFICATION CLASSIFICATION SERIES: Mine Safety Inspector MAJOR AGENCIES: Natural Resources SERIES NO.: 2471 02/26/2012 SERIES PURPOSE: The purpose of the mine safety
More informationSafety Flash. IMCA Safety Flash 18/13 December 2013. 1 Fatality During Lifting Operations
AB Safety Flash IMCA Safety Flash 18/13 December 2013 These flashes summarise key safety matters and incidents, allowing wider dissemination of lessons learnt from them. The information below has been
More informationFinal Report on the Study on Safety Management for Construction Work in Japanese ODA Project. Workers Training Materials for Hazard Prediction
Final Report on the Study on Safety Management for Construction Work in Japanese ODA Project Workers Training Materials for Hazard Prediction February 2012 JAPAN INTERNATIONAL COOPERATION AGENCY(JICA)
More informationDoes this topic relate to the work the crew is doing? If not, choose another topic.
TRAINING GUIDE FALL PROTECTION 2001 Before you begin the meeting... Does this topic relate to the work the crew is doing? If not, choose another topic. Did you read this Training Guide and fill in the
More informationSkanska Sweden s General Conduct and Safety Rules. Content
1 (8) Note In case of issues regarding interpretation of this document, the Swedish original document prevails. Content Our work environment 2 Risks at work 2 Safe behaviour 3 Information and qualifications
More informationBrief Analysis of Site Accident Cases
Brief Analysis of Site Accident Cases This publication is produced by the Occupational Safety and Health Branch of the Labour Department This edition February 2013 Brief Analysis of Site Accident Cases
More informationAugust 2009 WORKING AT HEIGHT HSEW. Safety H S E W A WAY OF LIVING. Standards for professionals, be aware!
WORKING AT H S E W August 2009 HEIGHT A WAY OF LIVING Safety He alth Well-being Environment HSEW Standards for professionals, be aware! Work safely or don t work at all Familiarise yourself as quickly
More informationHSE and Quality Assurance System
HSE and Quality Assurance System Diversified Well Logging management strongly believes that mud logging is about service and communication. DWL commits that all field and support personnel will ensure
More information