Inspection and Rehabilitation

Size: px
Start display at page:

Download "Inspection and Rehabilitation"

Transcription

1 Inspection and Rehabilitation

2 Moffatt & Nichol, internationally recognized experts in waterfront structural engineering and marine design, provides clients with engineering services directed towards the extension of service life. The focus of these efforts is on existing marine structures, bridges and other engineered structures for port, military, and transportation clients. The firm offers service life/durability modeling capabilities to provide significant added value to projects. Services are performed by registered engineers and engineer-divers who understand the structural significance of observed degradation and damage. The result is effective assessments and engineered solutions for cost-conscious clients. The recommendations are commonly translated into construction projects resulting in rehabilitation and/or facility modernization.

3 TABLE OF CONTENTS Above Water Inspection 2 Below Water Inspection 4 Material Sampling and Testing 6 Service Life Modeling 7 Bridge Inspection 8 Rehabilitation and Upgrade Engineering Design 9 Construction Phase Services 10 Inspection and Rehabilitation in Action 11 Inspection and Rehabilitation - a Global Practice 16 Inspection and Rehabilitation

4 Above Water Inspection Moffatt & Nichol personnel approach each inspection and rehabilitation project with a solid methodical and analytical engineering-based process. Experienced in a wide variety of structures and diverse environments, the company is well equipped to carry out inspections from simple, straightforward tasks to more intricate projects that require complex material sampling and testing regimens. Inspection of structures requires a safe, well thought-out approach, particularly in difficult-access scenarios commonly found underneath pier and bridge structures; with in-roadway inspection; and other hard-to-access locations. Services include concrete degradation surveys; above and below deck inspection of piers, wharves and bridges; material sampling and testing; excavation and testing of buried structures; inspection of mechanical and electrical utilities; and cathodic protection system inspection. Hard-to-access Structures Confined-space entry and bridge snoopers are commonly used during inspection Below Deck Inspection Using a manlift to perform underdeck inspection portion of field notes shown below Navy Pier Rehabilitation, Unified Port of San Diego 2

5 Above Water Inspection Above and below deck inspection of piers, wharves and bridges Corrosion-related concrete damage surveys Manlift for access to timber pier Hands-on inspection and testing of structural members Documenting below deck damage Material sampling/mooring hardware inspection Excavation and testing of buried structures Extracting concrete cores for petrographic analysis Inspection of mooring hardware and foundations Inspection of mechanical and electrical utilities Inspection of tierods and deadman structures Excavating to expose a closed-cell steel sheet pile cofferdam Examination of cathodic protection systems Typical utilities include steam, compressed air, waste water, potable water, oily waste, electrical switchgear and transformers Inspection and assessment of coatings and life-cycle performance of steel structures in the marine environment Inspection and Rehabilitation 3

6 Below Water Inspection Below water structural engineering inspections are conducted with a dual emphasis - safe diving operations and the placement of experienced structural engineers in the marine environment. Moffatt & Nichol maintains a team of more than 40 strategically-located engineer-divers, ready to respond to below water inspection assignments throughout the U. S. and around the globe. LEVEL I INSPECTION General reconnaisance ( swim-by ) of structure The firm s personnel perform dive operations with a careful assessment of safety, environmental and task requirements in a wide variety of above and below water climatic conditions, including limited visibility (turbid water), currents, confined conditions and extremely cold water. Moffatt & Nichol maintains strategically located dive vessels and support craft to enable personnel to gain access to most operational facilities. Below water inspections are conducted in strict accordance with the firm s in-house Safe Diving and Vessel Operations Manual. Moffatt & Nichol is certified by the Association of Diving Contractors International (ADCI) and performs diving operations in compliance with ADCI, OSHA and Army Corps of Engineer requirements. Engineer-Divers Moffatt & Nichol places engineers in the water to evaluate engineering problems. The firm s divers have the expertise, equipment and experience to safely inspect and assess submerged structures. These inspections produce innovative repairs leading to rehabilitation and extension of service life of vital infrastructure. Below Water inspection work is based upon The American Society of Civil Engineers Standard Practice Manual No. 101, Underwater Investigations. Three Moffatt & Nichol principals were contributing authors. LEVEL II INSPECTION Close visual examination (removal of marine growth) of structural elements LEVEL III INSPECTION Material sampling and/or testing 4

7 Below Water Inspection Moffatt & Nichol s engineer-divers routinely perform inspections of piers and wharves; seawalls and bulkheads; graving docks; cable arrays and ranges; rock structures (revetments and breakwaters); marinas; debris surveys; outfalls; and miscellaneous marine facilities. Timber Structures Concrete Structures Steel Structures Timber pile remnant after marine borer attack. Remnants of a hollow pre-stressed concrete pile damaged by delayed ettringite formation. Uneven corrosion pattern on steel H-pile. Debris Survey Portion of demolished ship superstructure located as part of a debris survey. Locating steel beams, cable and rope to be removed prior to sheet pile installation Inspection and Rehabilitation 5

8 Material Sampling and Testing The effect of the marine environment on structural materials can be harsh and unforgiving. The service life and structural capacity of elements composed of reinforced concrete, structural steel, timber, and composites are affected by limited inspection and lack of routine maintenance. Moffatt & Nichol s engineers are highly skilled in the above and below water sampling, testing and assessment of materials. This Inspection and Rehabilitation (I&R) skillset, coupled with structural engineering expertise, allows for the evaluation and diagnosis of material degradation - ultimately resulting in innovative rehabilitation schemes aimed at maintaining or increasing load capacity; extension of service life; and return-on-investment. Sampling and testing techniques include: Concrete core sampling compressive strength testing chloride ion testing petrographic analysis scanning electron microscopy concrete chemistry transport properties corrosion mapping (ASTM C-876) reinforcing bar location and concrete cover readings corrosion damage assessment reinforcing bar sampling and testing corrosion rate measurement Structural Steel ultrasonic thickness measurements coating evaluations half-cell potential measurements coupon extraction and testing cathodic protection system inspection and evaluation Timber dissolved oxygen testing core sampling creosote retention wood type / property / strength testing 6

9 Service Life Modeling Moffatt & Nichol uses Stadium, a service life prediction modeling software, as a design tool. This validated software achieves a reliable and quantifiable estimate of service life for new concrete infrastructure and the remaining service life of existing structures. Tailored design recommendations can be produced to suit clients needs, assuring optimum return on their investments. Using state-of-the art inspection and forensic techniques, Moffatt & Nichol can reliably forecast future performance of a given concrete structure. Stadium software combines the ion migration of chlorides with solid phase concrete degradation mechanisms. Through field sampling and laboratory testing, existing and potential degradation mechanisms can be identified, and intervention alternatives determined. These tools supplement detailed condition assessments and help predict service life, allowing life cycle costing of future maintenance and repairs that meet client expectations. This work typically involves: Field Sample Collection and Testing coring for chloride ion sampling corrosion measurements coring for petrographic analysis coring for transport properties Laboratory Testing chloride ion testing petrographic / scanning electron microscopy concrete transport properties Deterioration Mechanisms chloride ion - induced corrosion carbonation - induced corrosion external sulfate attack delayed ettringite formation Identification of Intervention Alternatives sealants cathodic protection system internal coatings external coatings / jackets / wraps chloride extraction Drying test apparatus Typical screen menu from STADIUM service life modeling software Inspection and Rehabilitation 7

10 Bridge Inspection Fort Madison Bridge, IA Moffatt & Nichol provides bridge inspection services to the U. S. Navy, numerous departments of Transportation (DOTs) and other infrastructure owners. This work typically involves aspects of above and below water inspection; material sampling and testing; and specific inspection related to fracturecritical members and bridge scour. The firm has numerous engineering personnel holding National Bridge Inspection Standards (NBIS) certification as Inspection Team Leader as developed by the National Highway Institute. This work is often accomplished in association with Moffatt & Nichol s well-established Transportation Practice the firm having developed significant experience in bridge design throughout the United States and internationally as represented by landmark projects such as San Francisco - Oakland Bay Bridge and Virginia Dare Bridge. Admiral Clarey Bridge to Ford Island, Pearl Harbor, HI Highway 24 Bridge over the Columbia River, WA Shockoe Bottom Viaduct, Richmond, VA Use of bridge snooper for below deck inspection 8

11 Rehabilitation and Upgrade Engineering Design O nce Moffatt & Nichol engineer-diver personnel have established the above and below water condition of a structure, and have overseen any necessary follow-on material sampling and testing, the same personnel are in a position to prepare reports, plans, specifications and cost estimates (PS&E) for execution of repairs. These repairs are made on the basis of facility sustainment, rehabilitation or modernization. State-of-the-art PS&Es are prepared by the same engineer-divers that performed investigations. These qualified personnel are in a unique position to expertly and efficiently translate findings and deliver cost-effective PS&E - ensuring that nothing is lost in the process. These materials can be used for soliciting construction services to execute the work in either conventional design-bid-build or design-build procurement methods. Rehabilitation and Upgrade Engineering Design Services include: structural repair - timber/steel/concrete complete facility rehabilitation / modernization structural analysis / load capacity of existing structures (pile-supported structures, cranes/ forklifts and mooring hardware) berthing and mooring analysis (mooring hardware load-testing) preparation of design/build RFP solicitation packages existing facility assessment Inspection and Rehabilitation 9

12 Rail Construction Phase Services The repair methodology that is developed after the inspection process involves the application of unique processes in adverse locations and environments. This work is typically associated with above and below water construction often in response to fluctuating tidal and weather conditions. The same personnel that are responsible for the inspection, assessment and design of repairs supervise the rehabilitation process. Moffatt & Nichol engineer-divers routinely monitor the progress and quality of contractor efforts in the field to verify that the work is in compliance with the plans and specifications, removing uncertainty from the construction process. Efforts are made to ensure economical use of unit-price materials and protection of the environment resulting in effective repairs designed to extend the service life of the structure. This work may involve: confined space entry below water inspection night-time tide-related observation rapid deployment of engineer-divers quick response to emergent conditions general construction observation Inspection of concrete repair and restoration is a specialty of the firm and includes: mark-out of concrete repair areas measurement of demolition and repair quantities 28-day follow-on inspection 10

13 Inspection and Rehabilitation in Action Rail Partial List of Clients US Navy US Coast Guard City of Norfolk Port of Los Angeles The Port Authority of New York & New Jersey Port of Long Beach Port of San Diego Port of Seattle North Carolina State Port Authority Port Metro Vancouver Port of Tacoma Tampa Port Authority The projects illustrated on the following pages showcase facilities where the Moffatt & Nichol Inspection and Rehabilitation process has been successfully implemented Georgia Port Authority Philadelphia Regional Port Authority New York City Economic Development Corporation Washington State Department of Transportation ExxonMobil ConocoPhillips BP Chevron British Gas, Tunisia Kuşadasi Port, Turkey Atlantic LNG, Trinidad Inspection and Rehabilitation 11

14 Inspection and Rehabilitation in Action Repair, Rehabilitation & Preservation I&R Services Extends Service Life of Port of San Diego s 10th Avenue Marine Terminal Project highlights included: engineer-divers materials testing engineering reports plans specifications and cost estimates construction period services concrete placed below water using anti-washout mixture The Port of San Diego s 10th Avenue Marine Terminal was constructed in 1956 by placing a mass rock and concrete wall (cyclopean seawall) to retain a 96-acre land mass. Forty years later, the seawall was found to be severely compromised with 3 4 ton rocks falling out of the face - creating large voids. Moffatt & Nichol Blaylock engineer-divers performed Inspection & Rehabilitation services to define the problem, assess the severity, develop the solution, and monitor the construction. This $16 million award-winning project was completed six months ahead of schedule and $1 million under budget. The I&R-based engineering solution resulted in a 50 year extension of service life as opposed to costly demolition and replacement Repair Process Drill 20 diameter hole Drive 30 long steel H-pile Form and place below water concrete Remove marine growth Set steel sheet pile Drill and place steel wale Place cementitious backfill Form and cast concrete cap Place new foam-filled fenders Dredge to MLLW Place closed-cell concrete mat 12 Inspection and Rehabilitation 13

15 Inspection and Rehabilitation in Action Repair, Rehabilitation & Preservation New Deck Approach Rehabilitates World War II-Era Piers 1, 3, 4 and 5 at Naval Base San Diego Repair existing pile cap and piles The Naval Facilities Engineering Command had scheduled Pier 1 for conventional cut and patch concrete repairs. This was done to address extensive reinforcing steel corrosion-related damage and general deterioration of the facility. Moffatt & Nichol performed above and below water field investigations and, after preliminary engineering analysis, proposed an alternate engineering solution that consisted of the following: Abandon existing concrete deck and beams Place new pile cap dowels Remove existing top side utilities. Place new concrete deck Pier 4 Before Rehabilitation of substructure (piling and pile caps) Construction of new reinforced concrete deck (on top of the old deck) Improvement of pier deck load capacity for mobile truck cranes Upgrade of utility services (steam, potable water, compressed air, waste water and electrical). Upgrade of mooring hardware and fender systems Repair Process 5 6 Install new electrical/ mechanical utilities Place new fender systems The result of this process was the modernization of mission critical pier facilities with extended service life at a fraction of the cost associated with demolition and construction of new piers. Pier 4 After repair inspection new deck 14 Inspection and Rehabilitation 15

16 Inspection and Rehabilitation, A Global Practice Moffatt & Nichol engineer-divers are strategically located to mobilize on a local or global basis Marine Oil Terminal, Clifton Ridge, Lake Charles, LA LNG Facility, Cove Point, MD Embarcadero Facilities, Unified Port of San Diego, CA Pearl Harbor, HI LNG Dock, Tunisia Victor Wharf, Guam 16 June 2010

17

18 Corporate Office: 3780 Kilroy Airport Way, Suite 750 Long Beach, California phone: fax:

Failing Coastal Wood Infrastructure on the Great Lakes

Failing Coastal Wood Infrastructure on the Great Lakes University of Wisconsin Sea Grant Institute Contact Gene Clark grclark@aqua.wisc.edu 715-392-3246 Failing Coastal Wood Infrastructure on the Great Lakes Gene Clark/UW Sea Grant Institute Introduction Many

More information

MEMORANDUM. 1509 West Swann Avenue, Suite 225 Tampa, Florida 33606 Phone (813) 258-8818 Fax (813) 258-8525

MEMORANDUM. 1509 West Swann Avenue, Suite 225 Tampa, Florida 33606 Phone (813) 258-8818 Fax (813) 258-8525 1509 West Swann Avenue, Suite 225 Tampa, Florida 33606 Phone (813) 258-8818 Fax (813) 258-8525 To: From: Date: Subject: Mr. Thomas Gibson, City of St. Petersburg Jeffrey D. Malyszek, PE and Deborah C.

More information

Evaluating the Condition of Seawalls/Bulkheads

Evaluating the Condition of Seawalls/Bulkheads Volume 2 Evaluating the Condition of Seawalls/Bulkheads By: Coastal Systems International, Inc. Typical bulkhead under construction Seawalls and bulkheads (walls) provide shoreline stabilization for many

More information

Job Description Project Management/Estimating Support

Job Description Project Management/Estimating Support Ballard Diving & Salvage 800 NE Tenney Rd. Ste 110-530 Vancouver, WA 98685 866.782.6750 Job Description Project Management/Estimating Support Job Purpose: Assists team with completing construction projects

More information

STADIUM Software Overview. Durability and Service Life of Concrete Structures

STADIUM Software Overview. Durability and Service Life of Concrete Structures STADIUM Software Overview Durability and Service Life of Concrete Structures Eric Samson Cementitious Barriers Partnership SIMCO Technologies Inc. August 2014 Who we are SIMCO is a specialized engineering

More information

WATERFRONT FACILITIES MAINTENANCE MANAGEMENT SYSTEM INSPECTION GUIDELINES MANUAL OCTOBER 1999

WATERFRONT FACILITIES MAINTENANCE MANAGEMENT SYSTEM INSPECTION GUIDELINES MANUAL OCTOBER 1999 WATERFRONT FACILITIES MAINTENANCE MANAGEMENT SYSTEM INSPECTION GUIDELINES MANUAL OCTOBER 1999 PREPARED FOR: PREPARED BY: NEW YORK CITY ECONOMIC DEVELOPMENT CORPORATION WATERFRONT FACILITIES MAINTENANCE

More information

Safe & Sound Bridge Terminology

Safe & Sound Bridge Terminology Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries

More information

ENTRY FORM. DVASE 2015 Excellence in Structural Engineering Awards Program

ENTRY FORM. DVASE 2015 Excellence in Structural Engineering Awards Program ENTRY FORM DVASE 2015 Excellence in Structural Engineering Awards Program PROJECT CATEGORY (check one): Buildings under $2M Buildings Over $100M Buildings $2M-$10M X Other Structures Under $5M Buildings

More information

CP40: FRP/Concrete Piles

CP40: FRP/Concrete Piles Purdue University Purdue e-pubs ECT Fact Sheets Emerging Construction Technologies 1-1-2007 CP40: FRP/Concrete Piles Purdue ECT Team Purdue University, ectinfo@ecn.purdue.edu Follow this and additional

More information

Role of Underwater Substructure Inspections in Bridge Management

Role of Underwater Substructure Inspections in Bridge Management Role of Underwater Substructure Inspections in Bridge Management R. RICHARD AVENT MOHAMED ALAWADY DAVID J. MUKAI Louisiana State University INTRODUCTION In the past, the condition of underwater substructures

More information

Construction. Pile Restoration Timber/Concrete Pile Repair

Construction. Pile Restoration Timber/Concrete Pile Repair Construction Pile Restoration Timber/Concrete Pile Repair s Methods/ Products that Comprise Sika Pile Restoration Systems Scenario 1 Dry (Over Land) Symptoms Decayed Core, Fungal Attack (Outer Layer Intact)

More information

About the Port. Created as an act of state legislation 1962. Five member cities. Coronado. San Diego. Coronado. National City.

About the Port. Created as an act of state legislation 1962. Five member cities. Coronado. San Diego. Coronado. National City. Port of San Diego About the Port Created as an act of state legislation 1962 Coronado San Diego National City Chula Vista Five member cities Chula Vista Coronado Imperial Beach National City San Diego

More information

Ali Akbar Sohanghpurwala. CONCORR, Inc. CONCRETE CORROSION SPECIALISTS

Ali Akbar Sohanghpurwala. CONCORR, Inc. CONCRETE CORROSION SPECIALISTS Ali Akbar Sohanghpurwala CONCORR, Inc. CONCRETE CORROSION SPECIALISTS The Goals of the Synthesis Examine the extent of the use of cathodic protection technology on reinforced concrete structures. Ascertain

More information

STRATEGIC ASSET MANAGEMENT POLICY. For Real Property Assets

STRATEGIC ASSET MANAGEMENT POLICY. For Real Property Assets STRATEGIC ASSET MANAGEMENT POLICY For Real Property Assets August 8, 2013 TABLE OF CONTENTS Page Port Management. Sources of Information. ii iii Introduction.. 1, 2 General Provisions. 3 Portfolio Management

More information

By Chris Gorman, PE M.ASCE PROBLEM:

By Chris Gorman, PE M.ASCE PROBLEM: Improving Bridge Inspection, Scour Monitoring and Infrastructure Management for DOTs using the Echoscope - A true 3D, High-Definition and Real-Time imaging tool. PROBLEM: By Chris Gorman, PE M.ASCE Preserving

More information

Facing an Uncertain Future: Increasing Resilience at Marinas and Harbors. Recreational Boating Educational Conference December 11, 2014

Facing an Uncertain Future: Increasing Resilience at Marinas and Harbors. Recreational Boating Educational Conference December 11, 2014 Facing an Uncertain Future: Increasing Resilience at Marinas and Harbors Recreational Boating Educational Conference December 11, 2014 Operators Face Change and Challenges Environmental Conditions Fluctuating

More information

NYC Small Business Services Waterfront Permits Unit

NYC Small Business Services Waterfront Permits Unit NYC Small Business Services Waterfront Permits Unit DOB Training Presentation - March 2015 Maryam Khabbazian Plan Examiner Officer www.nyc.gov/waterfrontpermits NYC Small Business Services (SBS) Jurisdiction

More information

ENGINEERING SERVICES FOR CONTRACTORS

ENGINEERING SERVICES FOR CONTRACTORS ENGINEERING SERVICES FOR CONTRACTORS COMPANY PROFILE Joseph W. Belt, P.E. in 1989 began an engineering division within Belt Construction Corp of Tampa. After years of growth and success, the engineering

More information

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Jeff R. Hill, P.E. Hayward Baker Inc. 111 W. Port Plaza Drive Suite 600 St. Louis, MO 63146 314-542-3040 JRHill@HaywardBaker.com

More information

Ross River Suspension Bridge Ross River, Yukon. Life Cycle Cost Analysis

Ross River Suspension Bridge Ross River, Yukon. Life Cycle Cost Analysis DNA project managers planners architects engineers David Nairne + Associates Ltd Suite 250 171 W Esplanade North Vancouver British Columbia Canada V7M 3J9 T 604 984 3503 F 604 984 0627 E dna@ davidnairne.com

More information

Regional Maritime Law Enforcement Training Center

Regional Maritime Law Enforcement Training Center Regional Maritime Law Enforcement Training Center In Partnership with: Department of Homeland Security (DHS) United States Coast Guard State of California Los Angeles County Sheriff Long Beach Police Department

More information

GARDEN CITY SKYWAY SUBSTRUCTURE REHABILITATION

GARDEN CITY SKYWAY SUBSTRUCTURE REHABILITATION GARDEN CITY SKYWAY SUBSTRUCTURE REHABILITATION Issam ElKhatib, P.Eng., Dennis Baxter, P.Eng. Totten Sims Hubicki Associates, Canada Abstract The rehabilitation history of the Garden City Skyway Bridge

More information

REHABILITATION PACKAGE 1-a

REHABILITATION PACKAGE 1-a 1-a WINONA BRIDGE (BRIDGE 5900) REHABILITATION PACKAGE 1-a Rehab option 1-a is a rehabilitation package whereby all spans of the existing structure would be rehabilitated to the degree feasible and strengthened

More information

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL. STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill

More information

Underwater Bridge Repair, Rehabilitation, and Countermeasures

Underwater Bridge Repair, Rehabilitation, and Countermeasures Underwater Bridge Repair, Rehabilitation, and Countermeasures Publication No. FHWA-NHI-10-029 Pre-Publication Edition NOTICE This document is disseminated under the sponsorship of the Department of Transportation

More information

MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore MD 21230 410-537-3000 1-800-633-6101 www.mde.state.md.

MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore MD 21230 410-537-3000 1-800-633-6101 www.mde.state.md. MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore MD 21230 410-537-3000 1-800-633-6101 www.mde.state.md.us Martin O Malley Governor Robert M. Summers, Ph.D. Secretary Anthony G.

More information

2000 Bachelor of Science in Civil Engineering University of Central Florida, Orlando, Florida

2000 Bachelor of Science in Civil Engineering University of Central Florida, Orlando, Florida ENGINEER: CIVIL/STRUCTURAL NICHOLAS K. PONTILLO, P.E. Engineering Design & Testing Corp. Post Office Box 40026 Overland Park, Kansas 66204-0926 Telephone: (913) 859-9580 npontillo@edtkc.com EDUCATION:

More information

CAPPELEN MEMORIAL BRIDGE REHABILITATION

CAPPELEN MEMORIAL BRIDGE REHABILITATION CAPPELEN MEMORIAL BRIDGE REHABILITATION Owner: Hennepin County Engineering: HNTB with Olson-Nesvold Engineering (ONE) and others Section 106 Historical Committee: Hennepin County, MnDOT Cultural Resources

More information

The A in America s ACE 6/26/2015

The A in America s ACE 6/26/2015 The A in America s ACE 6/26/2015 Moffatt & Nichol Background Established in 1945 in Long Beach, California, currently: Offices in the Americas, Europe, Middle East and Pacific Rim Practices: Goods Movement,

More information

SECTION 02630 STORM DRAINAGE SYSTEM

SECTION 02630 STORM DRAINAGE SYSTEM SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE

More information

Strategies for Minimising the Whole of Life Cycle Cost of Reinforced Concrete Bridge Exposed to Aggressive Environments.

Strategies for Minimising the Whole of Life Cycle Cost of Reinforced Concrete Bridge Exposed to Aggressive Environments. Strategies for Minimising the Whole of Life Cycle Cost of Reinforced Concrete Bridge Exposed to Aggressive Environments. M. Humphreys, S. Setunge, J. Fenwick, S. Alwi ABSTRACT In design of bridge structures,

More information

Los Angeles Port Police Maritime Law Enforcement Training Center

Los Angeles Port Police Maritime Law Enforcement Training Center Los Angeles Port Police Maritime Law Enforcement Training Center In Partnership with: Department of Homeland Security United States Coast Guard Federal Law Enforcement Training Center U.S. Department of

More information

How To Repair A Steel Pier With A Watertight Frame

How To Repair A Steel Pier With A Watertight Frame INNOVATIVE FRP PILING REPAIR WITHOUT THE USE OF COFFER DAMS Steve Bazinet, Larry Cercone, Franz Worth Air Logistics Corporation Field-Applied Composite Systems Group Pasadena, California 91107 ABSTRACT

More information

2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS

2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS 2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS GENERAL 10/16/2008 The listed average unit prices are based on the

More information

Classification Appeal Decision Under Section 5112 of Title 5, United States Code

Classification Appeal Decision Under Section 5112 of Title 5, United States Code U.S. Office of Personnel Management Office of Merit Systems Oversight and Effectiveness Classification Appeals and FLSA Programs Atlanta Oversight Division 75 Spring Street, SW., Suite 972 Atlanta, GA

More information

CONCRETE BRIDGE DECK CONDITION ASSESSMENT GUIDELINES

CONCRETE BRIDGE DECK CONDITION ASSESSMENT GUIDELINES Report No. UT-05.01 CONCRETE BRIDGE DECK CONDITION ASSESSMENT GUIDELINES Prepared For: Utah Department of Transportation Research and Development Division Submitted By: Brigham Young University Department

More information

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES All searches and notifications on Bid4Michigan are based on National Institute of Government Purchasing (NIGP) codes. It

More information

IH-635 MANAGED LANES PROJECT, SEG. 3.2

IH-635 MANAGED LANES PROJECT, SEG. 3.2 IH-635 MANAGED LANES PROJECT, SEG. 3.2 Location: Dallas, Texas Owner: Texas Department of Transportation Client: Ferrovial Agroman Construction Cost: $1 Billion Construction Completion Date: December,

More information

Building Foundation and Structure

Building Foundation and Structure Building Foundation and Structure Overview The construction of the Hall of Waters building began in 1936, and was constructed over the original site of the Siloam and Sulpho-Saline Springs. The original

More information

KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER

KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER The New York State Department of Transportation (NYSDOT) is preparing an Environmental Impact Statement (EIS) to evaluate alternatives for the rehabilitation or

More information

REHABILITATION AND EXTENSION PROJECT FOR PORT OF LOBITO

REHABILITATION AND EXTENSION PROJECT FOR PORT OF LOBITO REHABILITATION AND EXTENSION PROJECT FOR PORT OF LOBITO Advantages of Port Lobito (1) Predominant geological locations Facing the Atlantic, Port Lobito locates around 30km north to Beguela City, and it

More information

Asset Maintenance Bridge Emergency Response

Asset Maintenance Bridge Emergency Response FDOT Districts 1 & 7 Structures and Facilities Office Asset Maintenance Bridge Emergency Response Bridge No. 100300 Gandy Boulevard (US 92) over Tampa Bay, FL Jose Pepe Garcia, P.E., Florida DOT David

More information

Remote Monitoring of Soil Pressures on Bridge Footings

Remote Monitoring of Soil Pressures on Bridge Footings More Info at Open Access Database www.ndt.net/?id=18252 Remote Monitoring of Soil Pressures on Bridge Footings Michael DAVIDSON 1, Zhihui ZHU 2, Issam HARIK 3, Charlie SUN 4, Kevin SANDEFUR 5 1 Bridge

More information

ITEM 8(a) MANAGEMENT COMMITTTE 2 JUNE 2015

ITEM 8(a) MANAGEMENT COMMITTTE 2 JUNE 2015 ITEM 8(a) MANAGEMENT COMMITTTE 2 JUNE 2015 APPENDIX Report from Harbour Management Board -1April 2015 Weymouth Harbour Walls Remediation Work Harbour Management Board 1 April 2015 Weymouth Harbour Walls

More information

SECTION 03400 PRECAST CONCRETE STRUCTURES

SECTION 03400 PRECAST CONCRETE STRUCTURES SECTION 03400 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for precast concrete structures, including fabrication and erection. 1.02 REFERENCE STANDARDS A. American Society for

More information

Review of Recent Bridge Asset Management Systems

Review of Recent Bridge Asset Management Systems Review of Recent Bridge Asset Management Systems Takeshi Hanji 1 and Kazuo Tateishi 1 1. EcoTopia Science Institute, Nagoya University, Nagoya, Japan Abstract: A number of transportation agencies throughout

More information

MLD: Domestic Maritime Transport Project

MLD: Domestic Maritime Transport Project Environmental Monitoring Report Project Number: 37265 December 2010 MLD: Prepared by Japan Port Consultants Co., Ltd. Malé, Maldives For Ministry of Finance and Treasury Ministry of Transport and Communication

More information

Port of Rotterdam. More than 50 kilometres!

Port of Rotterdam. More than 50 kilometres! Port of Rotterdam More than 50 kilometres! 3 Development of the port 2008-2030 1960-1970 1906-1922 1929 1949 1400-1800 1800-1900 1970 2008 1948-1957 1934-1946 4 Salinity in the port 5 Port in figures Total

More information

Preservation, Repair and Rehabilitation of Concrete Bridges, Pavements and Tunnels in Virginia

Preservation, Repair and Rehabilitation of Concrete Bridges, Pavements and Tunnels in Virginia Preservation, Repair and Rehabilitation of Concrete Bridges, Pavements and Tunnels in Virginia International Concrete Repair Institute Spring Convention Reno, Nevada March 20, 2014 Michael Sprinkel, PE.,

More information

Offshore Wind Operations. Fife, at the heart of renewable energy development in Scotland

Offshore Wind Operations. Fife, at the heart of renewable energy development in Scotland Offshore Wind Operations AND Maintenance Fife, at the heart of renewable energy development in Scotland Location of choice Fife s strategic location, company expertise, skilled workforce and excellent

More information

Page & Turnbull imagining change in historic environments through design, research, and technology

Page & Turnbull imagining change in historic environments through design, research, and technology DCI+SDE STRUCTURAL EVALUATIONS OFFICE BUILDING, TOOL SHED & WATER TANK, AND BLACKSMITH & MACHINE SHOP BUILDINGS SAN FRANCISCO, CALIFORNIA [14290] PRIMARY PROJECT CONTACT: H. Ruth Todd, FAIA, AICP, LEED

More information

Chaudière Crossing Bridge Rehabilitation

Chaudière Crossing Bridge Rehabilitation Chaudière Crossing Bridge Rehabilitation Douglas K. Lowry P. Eng., Armtec Infrastructure Incorporated David Delicate, P.Eng. Public Works and Government Services Canada (Retired) Prepared for presentation

More information

Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since.

Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since. Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since. Liftech is the structural review engineer of record for most

More information

FX-70 Structural Repair and Protection System

FX-70 Structural Repair and Protection System FX-70 Structural Repair and Protection System (800) 999-5099 www.strongtie.com Innovative, Versatile Solutions with FX-70 In 1970, the FX-70 Structural Repair and Protection System made in-place repair

More information

Source: Port Mann Bridge Plans Unveiled Today, CBC News, February 4, 2009.

Source: Port Mann Bridge Plans Unveiled Today, CBC News, February 4, 2009. Total project cost $2.5 billion (Canadian) Financed by tolls about $3 each direction. Total project length 37 km (McGill St in Vancouver to 216 th in Langley) The new Port Mann bridge 10 lanes (existing

More information

Evaluating. A Case Study

Evaluating. A Case Study A Case Study Evaluating by Richard B. Stoddard, Washington State Department of Transportation In December 2002, a railroad tanker collision caused a fire under a prestressed concrete girder bridge crossing

More information

Makah Tribe January 28, 2010

Makah Tribe January 28, 2010 PROGRESS REPORT ON PROJECT NWIFC 09 EPA PSP 408: -The pollution sources of Cape Flattery: possible interactions between atmosphere, ocean, and local dump (7/1/2009-12/31/2009) By Makah Tribe January 28,

More information

Mersin, TURKEY. Port extension project

Mersin, TURKEY. Port extension project Mersin, TURKEY Port extension project Mersin is situated on the Mediterranean Sea, on the southeast coast of Turkey. Several international contracting companies were invited to bid for the upgrading of

More information

The Council of the City of New York. Economic Development Corporation

The Council of the City of New York. Economic Development Corporation Hon. Melissa Mark-Viverito Speaker of the Council Hon. Julissa Ferreras Chair, Committee on Finance Hon. Daniel R. Garodnick Chair, Committee on Economic Development The Council of the City of New York

More information

Acceptance Codes APPENDIX - A. Acceptance Criteria

Acceptance Codes APPENDIX - A. Acceptance Criteria 1111 Receipt of a satisfactory Test Report from WSDOT Materials Laboratory is required indicating the lot (or lots) or batch of material meets the requirement of the specifications under which it is listed.

More information

1-800-327-8276 www.jfcson.com

1-800-327-8276 www.jfcson.com Trenchless Cost Effective Internal Pipe Rehabilitation 101 East Broadway, Hackensack, N.J. 07601 Folsom, NJ Linden, NJ Beltsville, MD Sylmar, CA 1-800-327-8276 www.jfcson.com In-Weg Internal Joint Sealing

More information

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted 02-20-14)

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted 02-20-14) POLYMERIC CONCRETE BRIDGE DECK OVERLAY (Adopted 02-20-14) Description The polymeric concrete bridge deck overlay shall consist of an epoxy polymer that acts together with special aggregate to form an overlay

More information

University of Missouri Hospitals and Clinics. Structural Repair and Protection of Post-tensioned Parking Garage

University of Missouri Hospitals and Clinics. Structural Repair and Protection of Post-tensioned Parking Garage University of Missouri Hospitals and Clinics Structural Repair and Protection of Post-tensioned Parking Garage 1 University of Missouri Project The University of Missouri Health Care Patient and Visitor

More information

Stone Arch Bridges of Washington County, MD

Stone Arch Bridges of Washington County, MD Stone Arch Bridges of Washington County, MD Presentation for the County Engineers Association of Maryland (CEAM) 2009 Spring Conference May 14, 2009 Scott Hobbs, P.E. Capital Projects Engineering John

More information

Boskalis: at home in the Middle East

Boskalis: at home in the Middle East Boskalis: at home in the Middle East Boskalis Westminster Middle East Ltd ( Boskalis ) has been active in all countries of the Middle East since the Oil States emerged in the early seventies. Dredging

More information

Date: 10/10/2014 Initiated by: AAS-100

Date: 10/10/2014 Initiated by: AAS-100 U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Airport Pavement Management Program (PMP) Date: 10/10/2014 Initiated by: AAS-100 AC No: 150/5380-7B Change:

More information

Capital Improvement Project Status Report October 2015 (Actuals through August 2015) Percent Design Complete. Design Finish. Construction Finish

Capital Improvement Project Status Report October 2015 (Actuals through August 2015) Percent Design Complete. Design Finish. Construction Finish Title I. Terminals Berth 90-93 - World Cruise Center 1. B. 93 - Cruise Terminal - Customs and Border Protection Improvements (2525300) 06/30/16 80% 02/28/18 0% $2,740,000 $181,831 7% 2. B. 91-93 - Alternative

More information

Non-Destructive Testing

Non-Destructive Testing Non-Destructive Testing Bureau Veritas is one of the largest Testing, Inspection and Certification service providers in the world. First established in 1828, Bureau Veritas now spans the globe with a network

More information

Muddy River Flood Risk Management & Environmental Restoration Project Phase 1 Construction Activities Next 90 Days August 2015

Muddy River Flood Risk Management & Environmental Restoration Project Phase 1 Construction Activities Next 90 Days August 2015 Muddy River Flood Risk Management & Environmental Restoration Project Phase 1 Construction Activities Next 90 Days August 2015 General: The Muddy River Flood Risk Management (FRM) & Environmental Restoration

More information

C. Section 014510 TESTING LABORATORY SERVICE.

C. Section 014510 TESTING LABORATORY SERVICE. SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,

More information

Measuring the Condition of Prestressed Concrete Cylinder Pipe

Measuring the Condition of Prestressed Concrete Cylinder Pipe Measuring the Condition of Prestressed Concrete Cylinder Pipe John Marshall, P.E.I, I J.W. Marshall and Associates, and Paul S. Fisk, President NDT Corporation Introduction Prestressed Concrete Cylinder

More information

The unit costs are based on the trend line of the 3 low bids for the average quantity.

The unit costs are based on the trend line of the 3 low bids for the average quantity. Page 1 of 8 COST ESTIMATE GENERAL INSTRUCTIONS The unit costs are based on the trend line of the 3 low bids for the average quantity. Apply the Unit Costs to ordinary structures. Unit Costs should generally

More information

Successful Approach to the Repair of Reinforced Concrete Support Structures in Delayed Coking Units

Successful Approach to the Repair of Reinforced Concrete Support Structures in Delayed Coking Units Successful Approach to the Repair of Reinforced Concrete Support Structures in Delayed Coking Units Thomas Kline Director- Concrete Repair Solutions STRUCTURAL TECHNOLOGIES, LLC Houston, Texas USA November

More information

STRATEGIC ASSET MANAGEMENT AT THE PORT OF MELBOURNE

STRATEGIC ASSET MANAGEMENT AT THE PORT OF MELBOURNE STRATEGIC ASSET MANAGEMENT AT THE PORT OF MELBOURNE by by Domenic (Mick) Lo Bianco 1 and Barry Giddings 2 ABSTRACT The objective of this paper is to discuss the Port of Melbourne s journey and experiences

More information

V. ENVIRONMENTAL IMPACT ANALYSIS E. Hazardous Materials

V. ENVIRONMENTAL IMPACT ANALYSIS E. Hazardous Materials E. HAZARDOUS MATERIALS An Environmental Site Assessment Phase I Update was performed on the subject properties by California Environmental Inc. in March 2000 1. This report is included in Appendix E of

More information

ANSI Accredited Standards Developer ANS Percent of ANS American Concrete Institute 0 American Fence Association 0 American Orthotic and Prosthetic

ANSI Accredited Standards Developer ANS Percent of ANS American Concrete Institute 0 American Fence Association 0 American Orthotic and Prosthetic ANSI Accredited Standards Developer ANS Percent of ANS American Concrete Institute 0 American Fence Association 0 American Orthotic and Prosthetic Association 0 American Society of Plumbing Engineers 0

More information

Strategic Design. To learn more about the Naval Facilities Engineering Command, please visit us at www.navfac.navy.mil and www.facebook.

Strategic Design. To learn more about the Naval Facilities Engineering Command, please visit us at www.navfac.navy.mil and www.facebook. To learn more about the Naval Facilities Engineering Command, please visit us at www.navfac.navy.mil and www.facebook.com/navfac Strategic Design Naval Facilities Engineering Command 1322 Patterson Avenue,

More information

SUSTAINABLE RETURN ON INVESTMENT SROI

SUSTAINABLE RETURN ON INVESTMENT SROI SUSTAINABLE RETURN ON INVESTMENT U.S. Army Corps of Engineers New Orleans, LA; Hurricane Storm Damage Risk Reduction System Sustainable Return on Investment () Can Help Get Projects Funded This is a time

More information

SECTION XXXXXX TECHNICAL SPECIFICATIONS FOR INSTALLATION OF PROTECTIVE COATINGS FOR MANHOLES, WETWELLS, AND OTHER SANITARY SEWER STRUCTURES

SECTION XXXXXX TECHNICAL SPECIFICATIONS FOR INSTALLATION OF PROTECTIVE COATINGS FOR MANHOLES, WETWELLS, AND OTHER SANITARY SEWER STRUCTURES 1.00 PART 1 GENERAL 1.01 SCOPE A. It is the intent of this contract to install a 100% solids epoxy monolithic coating to the walls, benches and inverts of all manholes and the specified surfaces of other

More information

STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA

STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA STRUCTURAL ASSESSMENT FOR Full Metal Jacket Building 0 Prince Street, Prepared by: ALPHA CORPORATION (Alpha) 1850 S. Loudoun Street, Suite 200 Winchester, VA 22601 540-723-0704 September 22, 2010 J. Michael

More information

The Original Carbon Fiber Reinforced Polymer System

The Original Carbon Fiber Reinforced Polymer System Infrastructure The Original Carbon Fiber Reinforced Polymer System Phone: 52.292.39 Toll Free: 866.38.269 Fax: 52.48.5274 282 E. Fort Lowell Rd. Tucson, AZ 8576 www.dowaksausa.com Test results are supported

More information

Superior Pipe Restoration Solutions. Proven, state-of-the-art technology that saves money, time and inconvenience. belcopipe.com

Superior Pipe Restoration Solutions. Proven, state-of-the-art technology that saves money, time and inconvenience. belcopipe.com Superior Pipe Restoration Solutions Proven, state-of-the-art technology that saves money, time and inconvenience. belcopipe.com About Us Belco Pipe Restoration was founded with the concept of using British

More information

REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE

REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE A.Rito Proponte, Lda, Lisbon, Portugal J. Appleton A2P Consult, Lda, Lisbon, Portugal ABSTRACT: The Figueira da Foz Bridge includes a 405 m long cable stayed

More information

WILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued)

WILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued) BIDDER'S PROPOSAL (continued) Item Estimated No. Description Quantity Unit Unit Cost Total Cost BASE BID 1 Traffic Control 1 LS $ $ 2 Construction Area Signs 1 LS $ $ 3 Excavation Safety 1 LS $ $ 4 Reset

More information

MILMAN & ASSOCIATES STRUCTURAL CONSULTING ENGINEERS/ PROJECT MANAGERS

MILMAN & ASSOCIATES STRUCTURAL CONSULTING ENGINEERS/ PROJECT MANAGERS MILMAN & ASSOCIATES STRUCTURAL CONSULTING ENGINEERS/ PROJECT MANAGERS May 29, 2013 Revision B Structural Guideline for Design and Installation Holes in Composite Floor Slab Terminal 3, Departure Level

More information

CIRCULAR LETTER 2007-20 Page 2 of 5 November 30, 2007

CIRCULAR LETTER 2007-20 Page 2 of 5 November 30, 2007 CIRCULAR LETTER 2007-20 PPC DECK BEAM NEW SHAPE IMPLEMENTATION, STANDARD BRIDGE PLAN RETIREMENT, AND PPC DECK BEAM INSPECTION COUNTY ENGINEERS/SUPERINTENDENTS OF HIGHWAYS MUNICIPAL ENGINEERS/DIRECTORS

More information

The Society of American Military Engineers

The Society of American Military Engineers The Society of American Military Engineers PRESIDENT Colonel Richard L. Hansen, USA VICE PRESIDENT & CAO Richard C. Entwisle, P.E. FIRST VICE PRESIDENT Anthony F. Goodgion, P.E. TREASURER Jennifer M. Snape,

More information

GEORGE J. CAMBOURAKIS, P.E., C. ENG. PRESIDENT & CHIEF STRUCTURAL ENGINEER

GEORGE J. CAMBOURAKIS, P.E., C. ENG. PRESIDENT & CHIEF STRUCTURAL ENGINEER GEORGE J. CAMBOURAKIS, P.E., C. ENG. PRESIDENT & CHIEF STRUCTURAL ENGINEER Professional Experience: Pride and Passion in the Art of Structural Engineering since 1979. Professional Registration: Professional

More information

Cuyahoga County s Clean Ohio Revitalization Fund Round 5 Application Great Lakes Shipyard Expansion Project Attachment A1 Application Summary Document

Cuyahoga County s Clean Ohio Revitalization Fund Round 5 Application Great Lakes Shipyard Expansion Project Attachment A1 Application Summary Document Cuyahoga County s Clean Ohio Revitalization Fund Round 5 Application Great Lakes Shipyard Expansion Project Attachment A1 Application Summary Document A1-1 ATTACHMENT A1 Great Lakes Shipyard Expansion

More information

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional

More information

High Strain Dynamic Load Testing of Drilled Shafts

High Strain Dynamic Load Testing of Drilled Shafts Supplemental Technical Specification for High Strain Dynamic Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 3, 2015 1.0 GENERAL This work shall consist of performing high-strain

More information

-SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION

-SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION -SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION -Unit number- 4420798 -Unit title- CONSTRUCTION TECHNOLOGY 2: SUBSTRUCTURE AND REMEDIAL WORKS -Superclass category-

More information

Owner Controlled Insurance Program (OCIP) Overview

Owner Controlled Insurance Program (OCIP) Overview Owner Controlled Insurance Program (OCIP) Overview Prepared for Caltrans Oakland Touchdown Outreach Presented by: Willis One Bush Street, Suite 900 San Francisco CA 94104 (415) 981-1141 WHAT IS AN OCIP

More information

LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD

LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD www.norcalpug.com LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD Bob Fisher and Lance Stracner Ameron Protective Lining J.R. Pipeline Co Inc. Abstract: The

More information

Managing Our Water Retention Systems

Managing Our Water Retention Systems Managing Our Water Retention Systems 29th Annual USSD Conference Nashville, Tennessee, April 20-24, 2009 Hosted by Corps of Engineers On the Cover Wolf Creek Dam is on the Cumberland River in South Central

More information

Construction Spending, Labor & Materials Outlook. July 13, 2015 Ken Simonson Chief Economist, AGC of America simonsonk@agc.org

Construction Spending, Labor & Materials Outlook. July 13, 2015 Ken Simonson Chief Economist, AGC of America simonsonk@agc.org Construction Spending, Labor & Materials Outlook July 13, 2015 Ken Simonson Chief Economist, AGC of America simonsonk@agc.org Construction spending & employment, 2006-15 Total spending, March 2006 (peak)-may

More information

SECTION 1 GENERAL REQUIREMENTS

SECTION 1 GENERAL REQUIREMENTS Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,

More information

R Y I N C. E S RETAINED EXECUTIVE SEARCH

R Y I N C. E S RETAINED EXECUTIVE SEARCH A V E R Y I N C. J A M E S RETAINED EXECUTIVE SEARCH THE CITY THE PORT Majestically located on the Pacific Ocean between Los Angeles and Orange County, the City of Long Beach, California (population 461,564)

More information

Life-365 Service Life Prediction Model Version 2.0

Life-365 Service Life Prediction Model Version 2.0 Originally printed in Concrete International and posted with permission from the American Concrete Institute (www.concrete.org). Life-365 Service Life Prediction Model Version 2.0 Widely used software

More information

LIFE-CYCLE COST COMPARISON FOR MUNICIPAL ROAD PAVEMENTS

LIFE-CYCLE COST COMPARISON FOR MUNICIPAL ROAD PAVEMENTS LIFE-CYCLE COST COMPARISON FOR MUNICIPAL ROAD PAVEMENTS HEIN, David K., P.Eng. Applied Research Associates, Inc., 5401 Eglinton Avenue West, Suite 105, Toronto, ON, CANA- DA, M9C 5K6. Tel: 416-621-9555

More information