SEWER PIPELINE AND MANHOLE REHABILITATION FOR VARIOUS LOCATIONS WITHIN THE CITY OF BEVERLY HILLS, CALIFORNIA CITY OF BEVERLY HILLS

Size: px
Start display at page:

Download "SEWER PIPELINE AND MANHOLE REHABILITATION FOR VARIOUS LOCATIONS WITHIN THE CITY OF BEVERLY HILLS, CALIFORNIA CITY OF BEVERLY HILLS"

Transcription

1 SEWER PIPELINE AND MANHOLE REHABILITATION FOR VARIOUS LOCATIONS WITHIN THE CITY OF BEVERLY HILLS, CALIFORNIA CITY OF BEVERLY HILLS RESPONSE TO BIDDER S QUESTIONS Question #1: Is the Contractor required to reinstate Capped laterals? Or just active/opened laterals? Response #1: The Contractor is required to reinstate all laterals. Question #2: Please confirm that the City will allow the CIPP to be installed using air pressure and cured using steam. With very few exceptions, CIPP in these diameters is now almost always installed using air pressure and cured with steam. CIPP manufacturer s recommendations and current versions of ASTM standards F1216 & F1743 for installation of the product support allowing installation with air pressure and cure with steam. Response #2: The Contractor is required to install liner in compliance with ASTM F1216 and F1743. Question #3: Section C on page 3 3 says that Testing of the installed CIPP liner is required for this project per Section However, section only calls for samples to be taken as directed by the engineer and as specified in the Special Provisions with physical properties verified through a field sampling procedure in accordance with ASTM F1216 or ASTM F1743 and in accordance with ASTM

2 D5813. I have not researched what ASTM F1743 specifies for testing since we do not use a pull in process, but ASTM F1216 states that for each inversion length designated by the owner in the Contract documents or purchase order, samples shall be prepared for testing. ASTM D5813 also says samples shall be prepared for each CIPP length designated by the purchaser. Basically, all these standards circle back to requiring the specifics of sampling and testing to be called out by the Owner in the Special Provisions for the project. Testing can be quite costly, so defining your requirements clearly will ensure all bidders are bidding to the same set of requirements instead of being able to make assumptions. Please clarify how often samples will be required to be taken and tested by the Contractor once every install? Every 2,000 LF per diameter? Every 5,000 LF per diameter? Please clarify who will be responsible for conducting the testing of the samples Contractor performs testing at Contractor s expense and provides results to Owner? Contractor provides samples to Owner that Owner tests at Owner s expense? If testing is to be performed by the Contractor, will the testing need to be performed at a certified independent (third party) laboratory? Or can it be performed at a lab or facility that the Contractor or the manufacturer supplying the Contractor may control? Response #3: One sample shall be taken for each 5,000 feet per diameter. The samples shall be tagged with information including, but not limited to, the location of samples, date, pipe diameter and written verification by the on site inspector. The samples shall be submitted to a certified laboratory which has been pre approved by the Engineer, and tested in accordance with ASTM D790 for flexural strength and modulus, and ASTM D638 for tensile strength and modulus. All costs incurred for testing shall be borne by the Contractor. Test results are due within 14 calendar days from the date the samples were taken. The Contractor shall be responsible for repairing non compliant pipe liner and no time extension will be granted. Question #4: Section 1.01 on page 1 1 makes a reference to the replacement of sewer manhole frames and covers being included in the contract. While the last paragraph of section on page 2 15 seems to be making a reference to the type of restoration that would be required if manhole frames and covers were replaced, there does not appear to be any actual mention in any of the items on pages 2 14 & 2 15 or in section 3 08 on pages 3 7 & 3 8 to the manhole frames and covers being required to be replaced. Is the intent of the specifications for manhole frames and covers to be replaced? If so, which manholes will require this work and what bid item will it be paid under? Response #4: Replacement of manhole frames and covers shall not be required.

3 Question #5: The last paragraph of Section on page 2 15 says the Contractor shall provide written notification of work activities to all local users and provide interim sewer services, as specified by the City. Please clarify what type of interim sewer services are expected to be required? Is this providing temporary toilet facilities to residents whose laterals are temporarily blocked during construction, and if so, how many (1 per lateral, 1 per every 5 laterals, etc.)? If the Contractor is able to get the lateral re opened within the 8 10 hour period allowed (prior to 6PM), are interim sewer services still required to be provided? Response #5: Interim sewer services include providing one (1) portable toilet for every 10 laterals. These services shall be provided during the entire working period. Question #6: I saw several references in the specs to the use of slurry backfill. Is it the intention of the specifications to only allow the use of slurry backfill for all the open cut spot repairs? Or is this only required in specific situations or locations? Response #6: Trenches shall be backfilled per Detail BH 114. Slurry backfill is an option. Question #7: The last sentence of the second to last paragraph on page P 6, which is the subcontractor listing page in the proposal, says all subcontractors listed shall attach copies of the Certificate of Insurance naming the Contractor as additional insured as part of their policy coverage. By placing this requirement on the proposal subcontractor listing page, is it the intention of the City for these subcontractor certificates of insurance to be submitted with the bid? Please confirm that the subcontractor certificates of insurance do not need to be submitted with the bid. Response #7: Subcontractor certificates of insurance are not required. Question #8: In section on page SCR 14 and in Exhibit F, the documents indicate that 45 days prior written notice is required for insurance changes. I believe current insurance industry standards only provide for 30 days prior written notice. I am not sure a 45 day notice can be obtained or provided within the insurance industry. Would it be possible to revise this requirement to 30 days written notice?

4 Response #8: No, this requirement will not be revised. Question #9: Can you confirm the day working hours? (Are they 8AM 6PM?) Response #9: Working hours are from 8 am to 6 pm, Monday through Friday. Question #10: Can the City confirm what the night time working hours will be once a variance permit (after hours permit) is approved? Response #10: Night time working hours are anytime other than normal working hours (8 am to 6 pm Monday through Friday). Question #11: Section of the specifications states that a $ charge will be assessed per hour for service lateral that has not received a preliminary opening to relieve flow by 6PM the same day of the liner installation. Will the contractor be held to this requirement? What is the reason for this charge? Response #11: The Contractor will be held to this requirement. Question #12: Will capped laterals (plugged laterals) have to be reinstated if cap is visible on the pre video inspection, or will only live laterals be required to be reinstated? Response #12: The Contractor is required to reinstate all laterals. Question #13: Confirm that vinylester resin ("Greenbook") will be required for all the Cured In Place Pipe liners.

5 Response #13: Per Greenbook Section , the Contractor has the option to use either an approved epoxy or epoxy vinyl ester resin impregnated flexible fabric tube. Question #14: Section 3 08 Manhole Rehabilitation states that the manhole rehabilitation shall be in accordance with Greenbook section Construction of the air placed concrete and polyurethane lining shall be in accordance with Greenbook section Will the City allow any NON Greenbook approved products be submitted as substitutes or will ONLY Greenbook approved products be allowed to submit a proposal for the manhole rehabilitation? Response #14: Only Greenbook approved products will be allowed for submittal. Question #15: What will be the working hours on Coldwater Canyon Blvd for Saturday and Sunday work? Response #15: Working hours on Coldwater Canyon Blvd. are from 9 am to 5 pm, Saturday and Sunday.

INSTALLATION OF INSITUFORM LINER

INSTALLATION OF INSITUFORM LINER PART 1 GENERAL 1.1 SCOPE: A. This item shall include all work and materials to install, insert a flexible polyester felt liner saturated with a thermo-setting resin into the existing sewer line for rehabilitation

More information

REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542

REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542 1.0 INTENT REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES 1.01 It is the intent of this specification to provide for the reconstruction of pipelines and conduits by the installation of a resin-impregnated

More information

Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology

Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology 2007 Pumper & Cleaner Environmental Expo International Wednesday February 7, 2007 Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology What is Cured-In-Place Pipe (CIPP)

More information

PORTLAND BES ADVANCES IN SEWER MAINTENANCE AND REPAIRS BY OPERATING MULTIPLE CIPP CREWS.

PORTLAND BES ADVANCES IN SEWER MAINTENANCE AND REPAIRS BY OPERATING MULTIPLE CIPP CREWS. North American Society for Trenchless Technology 2007 No-Dig Conference & Exhibition San Diego, California April 15-20, 2007 Paper # PORTLAND BES ADVANCES IN SEWER MAINTENANCE AND REPAIRS BY OPERATING

More information

Water Main Lining A Sustainable Alternative to Open Cut Replacement

Water Main Lining A Sustainable Alternative to Open Cut Replacement Water Main Lining A Sustainable Alternative to Open Cut Replacement Sean O Dell, PE Baxter & Woodman, Inc. B&W Client Seminar, Crystal Lake May 1, 2014 Agenda Why, What, When, Where, Who, How Reduction

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by

More information

GENERAL SPECIFICATIONS AND GUIDELINES FOR INSTALLATION MASTERLINER CURED-IN-PLACE PIPE SYSTEMS

GENERAL SPECIFICATIONS AND GUIDELINES FOR INSTALLATION MASTERLINER CURED-IN-PLACE PIPE SYSTEMS GENERAL SPECIFICATIONS AND GUIDELINES FOR INSTALLATION OF MASTERLINER CURED-IN-PLACE PIPE SYSTEMS 34 TABLE OF CONTENTS 1.00 INTRODUCTION 2.00 SITE WORK PREPARATIONS 3.00 THE PRODUCT AND COMPONENT MATERIALS

More information

City of Missoula Wastewater Division Public Works Department 435 Ryman Street, Missoula, Montana 59802

City of Missoula Wastewater Division Public Works Department 435 Ryman Street, Missoula, Montana 59802 City of Missoula Wastewater Division Public Works Department 435 Ryman Street, Missoula, Montana 59802 REQUEST FOR COMPETITIVE SEALED PROPOSALS (CSP) For Installation of 200 Feet of 12 inch Diameter Cure

More information

Rehabilitation Alternatives. MWEA Collection System Seminar October 1, 2009

Rehabilitation Alternatives. MWEA Collection System Seminar October 1, 2009 Rehabilitation Alternatives MWEA Collection System Seminar October 1, 2009 Overview Types of Rehabilitation Trenchless Categories On-Line Replacement In-Situ Options Selecting the Best Solution Types of

More information

Large Bore Rectangular Box Culvert and Non Circular Rehabilitation with CIPP

Large Bore Rectangular Box Culvert and Non Circular Rehabilitation with CIPP North American Society for Trenchless Technology 2007 No-Dig Conference & Exhibition San Diego, California April 16-19, 2007 Large Bore Rectangular Box Culvert and Non Circular Rehabilitation with CIPP

More information

SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D

SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS Appendix D RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: Riverdale Road - Rumbi Grill -

More information

Special Specification 7021 Water Main and Sewer Line Replacements

Special Specification 7021 Water Main and Sewer Line Replacements Special Specification 7021 Water Main and Sewer Line Replacements 1. DESCRIPTION Furnish, install, or replace water pipe, water valves, water meters and boxes, water service connections, fire hydrant assemblies,

More information

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) 1 Intent: The intent of trenchless sewer pipe Insertion is to rehabilitate the existing sewer

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS 854.1 DESCRIPTION: This item shall govern sanitary sewer laterals installed in accordance with these

More information

LS 2540 SEWER LATERALS AND INSPECTION TEES

LS 2540 SEWER LATERALS AND INSPECTION TEES LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal

More information

Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority

Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Abstract The United States Virgin Islands Waste Management Authority

More information

02780 LINER FOR SEWER REHABILITATION

02780 LINER FOR SEWER REHABILITATION Section 02780 Liner for Sewer Rehabilitation Page 02780-1 (Revised 11/06/09) 02780 LINER FOR SEWER REHABILITATION SELECTED LINKS TO SECTIONS WITHIN THIS SPECIFICATION Part 1 GENERAL Part 2 PRODUCTS Part

More information

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

Storm Sewer Trenchless Upgrade Alternatives and Recommendations Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for

More information

Presented by: Scott E. Belz Project Manager- URS Corporation Robert P. Kelly, P.E. Director of Engineering-City of Westlake James J. Smolik, P.E.

Presented by: Scott E. Belz Project Manager- URS Corporation Robert P. Kelly, P.E. Director of Engineering-City of Westlake James J. Smolik, P.E. Presented by: Scott E. Belz Project Manager- URS Corporation Robert P. Kelly, P.E. Director of Engineering-City of Westlake James J. Smolik, P.E. Engineer-City of Westlake City of Westlake Facts Founded

More information

THE ECOLOGICAL IMPLICATIONS OF TRENCHLESS PIPE REHABILITATION

THE ECOLOGICAL IMPLICATIONS OF TRENCHLESS PIPE REHABILITATION THE ECOLOGICAL IMPLICATIONS OF TRENCHLESS PIPE REHABILITATION Bridget Donaldson Research Scientist Virginia Transportation Research Council Transportation Infrastructure Deterioration of pipes is a growing

More information

CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General

CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General General All sanitary sewers, manholes and force mains shall be acceptance tested, as hereinafter specified in the presence of a City representative. Acceptance testing shall be performed after backfilling

More information

Sewer Water Pipeline Replacement with CERTA LOK RESTRAINED JOINT PVC PIPE

Sewer Water Pipeline Replacement with CERTA LOK RESTRAINED JOINT PVC PIPE 1.0 GENERAL 1.1 DESCRIPTION This section addresses the procedures to be employed for pipe bursting existing water/sewer pipelines, as identified on the drawings, and replacing with new Restrained Joint

More information

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions. SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings

More information

CIPP for Large Diameter Pressure Pipes. Water Research Foundation Large Diameter Pipe Rehabilitation Seminar 20 January 2016 George Bontus, P.Eng.

CIPP for Large Diameter Pressure Pipes. Water Research Foundation Large Diameter Pipe Rehabilitation Seminar 20 January 2016 George Bontus, P.Eng. CIPP for Large Diameter Pressure Pipes Water Research Foundation Large Diameter Pipe Rehabilitation Seminar 20 January 2016 George Bontus, P.Eng. Pressure Pipe Lining What Does it Mean? What is It? No

More information

Let Us Give Utilities the Respect that they Deserve.

Let Us Give Utilities the Respect that they Deserve. Water & Sewer Utilities Miscellaneous Design and Plan Preparation Guidelines Issued by: Ray Mowla, P.E. Jefferson Parish Department of Engineering, Utilities Section The purpose of issuing these miscellaneous

More information

Section 2320 Cured-In-Place Pipe Lining

Section 2320 Cured-In-Place Pipe Lining Section 2320 Cured-In-Place Pipe Lining PART 1: General 1.1 Description 1.1.1 Provide all materials, equipment, labor and incidentals for the installation and testing of cured-in-place pipe lining (CIPPL)

More information

SECTION XXXXXX TECHNICAL SPECIFICATIONS FOR INSTALLATION OF PROTECTIVE COATINGS FOR MANHOLES, WETWELLS, AND OTHER SANITARY SEWER STRUCTURES

SECTION XXXXXX TECHNICAL SPECIFICATIONS FOR INSTALLATION OF PROTECTIVE COATINGS FOR MANHOLES, WETWELLS, AND OTHER SANITARY SEWER STRUCTURES 1.00 PART 1 GENERAL 1.01 SCOPE A. It is the intent of this contract to install a 100% solids epoxy monolithic coating to the walls, benches and inverts of all manholes and the specified surfaces of other

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located

More information

PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY

PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY Cured-In-Place Pipe Pressure & Gravity Lines Pipe Splitting Trenchless Pipe Replacement EcoCast Advanced

More information

Introduction to Pressure Pipe Rehabilitation with CIPP

Introduction to Pressure Pipe Rehabilitation with CIPP Introduction to Pressure Pipe Rehabilitation with CIPP Founded in early 1990 s RS Technik is a global leader in the rehabilitation of underground pipes RS Technik uses Cured-in- Place (CIPP) technology

More information

by Leonard Friesenhahn, P.E.

by Leonard Friesenhahn, P.E. by Leonard Friesenhahn, P.E. of sight, out of mind is an adage your top administrators may apply to your campus Out wastewater collection system but as a facilities professional, you know how serious a

More information

RESPONSIBLE DEPARTMENT: ADDITIONAL DIRECTOR (S): ASSISTANT CITY MANAGER: JIM CALLAWAY

RESPONSIBLE DEPARTMENT: ADDITIONAL DIRECTOR (S): ASSISTANT CITY MANAGER: JIM CALLAWAY CITY COUNCIL AGENDA REQUEST AGENDA OF: 07-01-14 AGENDA REQUEST NO: IV-D INITIATED BY: GREG NICHOLS PROJECT MANAGER RESPONSIBLE DEPARTMENT: ENGINEERING PRESENTED BY: TIMOTHY JAHN, P.E. SENIOR ENGINEER DIRECTOR:

More information

Industrial Pipeline Integrity Management & Remote Polyurea Pipe Lining Systems.

Industrial Pipeline Integrity Management & Remote Polyurea Pipe Lining Systems. Industrial Pipeline Integrity Management & Remote Polyurea Pipe Lining Systems. Aging pipeline infrastructure and industry s inability to evaluate and inspect has left many engineers and plant managers

More information

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe 1. GENERAL The following supplemental sewer main specifications are intended to address the installation of high-density polyethylene

More information

CITY OF DAYTON DEPARTMENT OF WATER 42-INCH SANITARY SEWER REHABILITATION

CITY OF DAYTON DEPARTMENT OF WATER 42-INCH SANITARY SEWER REHABILITATION CITY OF DAYTON DEPARTMENT OF WATER 42-INCH SANITARY SEWER REHABILITATION 42-INCH SANITARY SEWER REHABILITATION WHAT WE WILL DISCUSS TODAY: Project Justification & Evolution (high level/not a chemistry

More information

Ultraviolet (UV) Light Cured Fiberglass Reinforced Cured-In-Place Pipe (CIPP) It is not just for sanitary sewer rehabilitation

Ultraviolet (UV) Light Cured Fiberglass Reinforced Cured-In-Place Pipe (CIPP) It is not just for sanitary sewer rehabilitation Ultraviolet (UV) Light Cured Fiberglass Reinforced Cured-In-Place Pipe (CIPP) It is not just for sanitary sewer rehabilitation Dan Broderick Director of Pipeline Rehabilitation ACHEN-GARDNER ENGINEERING,

More information

Trouble Shooting for Trenchless Liner Installation During Sewer Line Rehabilitation

Trouble Shooting for Trenchless Liner Installation During Sewer Line Rehabilitation Trouble Shooting for Trenchless Liner Installation During Sewer Line Rehabilitation Salam Khan*, P.E. and Christoph Dobson, P.E. Sacramento County Sanitation District 1 (CSD-1) 10545 Armstrong Avenue,

More information

CLEANING, INSPECTION, AND TESTING OF SEWERS

CLEANING, INSPECTION, AND TESTING OF SEWERS CLEANING, INSPECTION, AND TESTING OF SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Cleaning, Inspecting, and Testing Sanitary Sewers B. Cleaning, Inspecting, and Testing Storm Sewers C. Cleaning and

More information

EI- MH06-204 TO MH06-209 LINER

EI- MH06-204 TO MH06-209 LINER EI- MH06-204 TO MH06-209 LINER TABLE OF CONTENTS PART ONE: PROJECT-SPECIFIC CONDITIONS 101 PROJECT DESCRIPTION 102 SCOPE OF WORK 103 ESTIMATED FLOWS 104 PROJECT SCHEDULE 105 HIGH WATER USERS PART TWO:

More information

SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL. 1.01 Testing - General

SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL. 1.01 Testing - General SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL 1.01 Testing - General Testing shall be of the type and frequency described in each section and summarized in Item 1 of this section. In addition to

More information

Private Sewer Lateral Inspection Program Administrative Guidelines Santa Barbara Municipal Code Chapter 14.46

Private Sewer Lateral Inspection Program Administrative Guidelines Santa Barbara Municipal Code Chapter 14.46 Santa Barbara Municipal Code Chapter 14.46 (Revised 01/11/07) TABLE OF CONTENTS Page Section I When Inspection Required 1 Section II Qualified Inspection Companies 3 Section III Procedures for Managing

More information

City of Balch Springs, Texas. Request for Proposal (RFP 2016-2-15) Pipe Bursting Sewer Line Replacement

City of Balch Springs, Texas. Request for Proposal (RFP 2016-2-15) Pipe Bursting Sewer Line Replacement City of Balch Springs, Texas Request for Proposal (RFP 2016-2-15) Pipe Bursting Sewer Line Replacement Balch Springs is a city in Dallas County, Texas, United States. It is a suburb of Dallas and part

More information

Section 2100-Trenching and Tunneling

Section 2100-Trenching and Tunneling SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial

More information

MEMORANDUM GEOFF ENGLISH, PUBLIC WORKS DIRECTOR MIKE LINN, ASSISTANT CITY ENGINEER

MEMORANDUM GEOFF ENGLISH, PUBLIC WORKS DIRECTOR MIKE LINN, ASSISTANT CITY ENGINEER MEMORANDUM TO: FROM: BY: SUBJECT: CITY COUNCIL GEOFF ENGLISH, PUBLIC WORKS DIRECTOR MIKE LINN, ASSISTANT CITY ENGINEER CONSIDERATION OF AN AWARD OF CONTRACT TO D-KAL ENGINEERING, INC. FOR THE CROWN TERRACE

More information

Rehabilitation or Replacement? That Is The Question

Rehabilitation or Replacement? That Is The Question Rehabilitation or Replacement? That Is The Question Chris L. Windley PE Greg Anderson, PE 94th Annual Conference November 18, 2014 Overview Project Background Existing Sewer Condition Flow Projections

More information

SECTION 02400 - STORM DRAIN SYSTEM

SECTION 02400 - STORM DRAIN SYSTEM SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And

More information

CITY OF COOS BAY CITY COUNCIL Agenda Staff Report

CITY OF COOS BAY CITY COUNCIL Agenda Staff Report CITY OF COOS BAY CITY COUNCIL Agenda Staff Report MEETING DATE August 4, 2015 AGENDA ITEM NUMBER TO: Mayor Shoji and City Councilors FROM: Aaron Real, Engineering Technician THROUGH: Jim Hossley, Public

More information

The Environmental Implications of Road Culvert Repair Technologies. Bridget Donaldson Senior Research Scientist

The Environmental Implications of Road Culvert Repair Technologies. Bridget Donaldson Senior Research Scientist The Environmental Implications of Road Culvert Repair Technologies Bridget Donaldson Senior Research Scientist Presentation Overview Culvert repair technologies Past and ongoing research by VCTIR Cured-in-Place

More information

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation 644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING

More information

CONSTRUCTION PERMIT REQUIREMENTS

CONSTRUCTION PERMIT REQUIREMENTS CONSTRUCTION PERMIT REQUIREMENTS Any work to be done in the City right-of-way (ROW), in a utility easement, and certain work on private property, requires an Engineering Inspection Permit from the Department

More information

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 SECTION B1: PREPARATION GUIDE B1.1 INTRODUCTION... B1-1

More information

TABLE OF CONTENTS. Notice to Bidders... N-1 to N-5 Proposal Form... P-1 to P-8

TABLE OF CONTENTS. Notice to Bidders... N-1 to N-5 Proposal Form... P-1 to P-8 TABLE OF CONTENTS BIDDING AND CONTRACTUAL DOCUMENTS PAGE Notice to Bidders... N-1 to N-5 Proposal Form... P-1 to P-8 SPECIFICATIONS Section 1 General Provisions 1-01 Work to be Done... 1-1 1-02 Standard

More information

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes)

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes) SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes) Maintenance Office Administrative Office Billing Office 530-426-7802 530-426-7800 916-332-4872

More information

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe. SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price

More information

REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS. Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC

REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS. Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC What is really out there? DO YOU DIG IT? INDUSTRY CONCERNS UNEXPECTED DEVELOPMENTS

More information

IS THAT LINER THICK ENOUGH?

IS THAT LINER THICK ENOUGH? IS THAT LINER THICK ENOUGH? Philip McFarlane, Opus International Consultants Ltd ABSTRACT The amount of pipeline rehabilitation being undertaken in New Zealand is increasing each year. Larger diameter

More information

Construction Management Program

Construction Management Program Use and Limitation: The Sponsor may use this document as a guide in preparing a construction management program for their specific project. Sponsors and Consultants are cautioned that the provision of

More information

EXHIBIT A SCOPE OF SERVICES WATER SERVICE REPLACEMENT PROJECT. BROWARD OPERATIONS CENTER 5548 NW 9 th AVENUE FORT LAUDERDALE, FLORIDA 33309

EXHIBIT A SCOPE OF SERVICES WATER SERVICE REPLACEMENT PROJECT. BROWARD OPERATIONS CENTER 5548 NW 9 th AVENUE FORT LAUDERDALE, FLORIDA 33309 EXHIBIT A SCOPE OF SERVICES WATER SERVICE REPLACEMENT PROJECT BROWARD OPERATIONS CENTER 5548 NW 9 th AVENUE FORT LAUDERDALE, FLORIDA 33309 FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT FOUR 1.0 SCOPE OF

More information

Business Entire Plumbing Contractions And Reviews

Business Entire Plumbing Contractions And Reviews MODIFICATIONS TO TUCSON WATER STANDARD WATERWORKS SPECIFICATION NO. 1445, PRIVATE PLUMBING REMOVE THE ENTIRE SECTION AND REPLACE WITH THE FOLLOWING: 1445.0100 1445.0101 GENERAL Description of Work The

More information

REHABILITATION OR REPLACEMENT? THAT IS THE QUESTION

REHABILITATION OR REPLACEMENT? THAT IS THE QUESTION REHABILITATION OR REPLACEMENT? THAT IS THE QUESTION ABSTRACT Chris L. Windley PE, McKim & Creed, Inc. Ben R. Latino, Jr., PE, McKim & Creed, Inc. Greg Anderson, PE, McKim & Creed, Inc. When designing to

More information

CURED-IN-PLACE PIPE MINIMIZING RISK BY DEFECT CODING

CURED-IN-PLACE PIPE MINIMIZING RISK BY DEFECT CODING North American Society for Trenchless Technology 2007 No-Dig Conference & Exhibition San Diego, California April 16-19, 2007 CURED-IN-PLACE PIPE MINIMIZING RISK BY DEFECT CODING Robert K. Lee, P.E. 1 1

More information

epros DrainLiner Program

epros DrainLiner Program epros DrainLiner Program All Liner Types At A Glance epros DrainLinerPP (mit PP-Beschichtung) 3 In trenchless rehabilitation methodology, a general distinction is made between sectional or part repairs

More information

PRODUCT CATALOGUE. for. SMARTPHONE / WEBSITE / DIGITAL EDITION / BOOK / ipad / GPS

PRODUCT CATALOGUE. for. SMARTPHONE / WEBSITE / DIGITAL EDITION / BOOK / ipad / GPS PRODUCT CATALOGUE for This product catalogue has been downloaded from COSSD.com. Listed products/services and their descriptions are shown as supplied by the title company COSSD does not guarantee the

More information

--------------------------------------------------------------------------------------------------------------------------

-------------------------------------------------------------------------------------------------------------------------- Request for Bid Front Street & Mud Island Interceptor Rehab Addendum # 1 to RFB No. 179821.71.0404 January 19, 2016 The following information encompasses Addendum # 1 for the above referenced RFB. Bidders

More information

ADDENDUM NO. 1. Manchester Boston Regional Airport, City of Manchester, NH

ADDENDUM NO. 1. Manchester Boston Regional Airport, City of Manchester, NH Hoyle, Tanner Project No. 093145 ADDENDUM NO. 1 Manchester Boston Regional Airport, City of Manchester, NH Construct Relocated Roadway Airport Service Rd. Outside Runway Object Free Area (ROFA); Construct

More information

Module 6: QUALITY MANAGEMENT FOR CONSTRUCTION PROJECTS. Submodule 1: Introduction. Objectives: After completing this submodule, you will be able to:

Module 6: QUALITY MANAGEMENT FOR CONSTRUCTION PROJECTS. Submodule 1: Introduction. Objectives: After completing this submodule, you will be able to: Module 6: QUALITY MANAGEMENT FOR CONSTRUCTION PROJECTS Submodule 1: Introduction Objectives: After completing this submodule, you will be able to: Define the function and importance of Construction Quality

More information

Tuesday Jan 30, 2007Track V = Sewer QA:QC/ Asset Management/ European & Japanese Quality Standards

Tuesday Jan 30, 2007Track V = Sewer QA:QC/ Asset Management/ European & Japanese Quality Standards Underground Construction Technology International Conference & Exhibition January 30 - February 1, 2007 George R. Brown Convention Center Houston, Texas Tuesday Jan 30, 2007Track V = Sewer QA:QC/ Asset

More information

Proposed Sanitary Sewer No. 5787A, CIP 2007-02-01 TRENCHLESS TECHNOLOGY (REHABILITATION OF EXISTING SANITARY AND COMBINED SEWERS BY LINING PROCESS)

Proposed Sanitary Sewer No. 5787A, CIP 2007-02-01 TRENCHLESS TECHNOLOGY (REHABILITATION OF EXISTING SANITARY AND COMBINED SEWERS BY LINING PROCESS) Proposed Sanitary Sewer No. 5787A, CIP 2007-02-01 TRENCHLESS TECHNOLOGY (REHABILITATION OF EXISTING SANITARY AND COMBINED SEWERS BY LINING PROCESS) Detailed Provisions PAGE PART I. GENERAL 1 PART II. SPECIAL

More information

SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE

SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE PART 1 - GENERAL 1.01 WORK INCLUDED A. This section covers the initial and final cleaning, and the initial and final

More information

STANDARD SANITARY SEWER REHABILITATION SPECIFICATIONS

STANDARD SANITARY SEWER REHABILITATION SPECIFICATIONS STANDARD SANITARY SEWER REHABILITATION SPECIFICATIONS MATERIAL SPECIFICATIONS FOR SANITARY SEWER REHABILITATION Unless superseded or modified in the Detailed Specifications, all materials, apparatus, supplies,

More information

2015 Calendar Year. Residential Accounts. Residential Accounts. Department of Water Resources (DWR) Rates & Fees

2015 Calendar Year. Residential Accounts. Residential Accounts. Department of Water Resources (DWR) Rates & Fees Rates & Fees Residential Accounts Residential Accounts 2015 Calendar Year Initial Charges New Construction or Irrigation 3 Base Meter 2 Account Activation Fee System Development Charge 1 Size Meter Fee

More information

For Construction of the Sandy Suburban Improvement District 2013 Pipeline Rehabilitation Project

For Construction of the Sandy Suburban Improvement District 2013 Pipeline Rehabilitation Project DOCUMENTS For Construction of the Sandy Suburban Improvement District 2013 Pipeline Rehabilitation Project February 11, 2013 OWNER Sandy Suburban Improvement District 8855 South 700 West Sandy, UT 84070

More information

TOWN of NEW BOSTON. Bid Package. Refurbishment and Upgrade of Basement of the New Boston Town Hall

TOWN of NEW BOSTON. Bid Package. Refurbishment and Upgrade of Basement of the New Boston Town Hall TOWN of NEW BOSTON Bid Package Refurbishment and Upgrade of Basement of the New Boston Town Hall Your bid Envelope must be marked with Basement Upgrade at Town Hall and the due date and time. If you send

More information

The information contained in this report was compiled for the use of the Vermont Agency of

The information contained in this report was compiled for the use of the Vermont Agency of The information contained in this report was compiled for the use of the Vermont Agency of Transportation. Conclusions and recommendations contained herein are based upon the research data obtained and

More information

SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS

SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS PART 1: GENERAL 1.01 SECTION INCLUDES A. Abandonment in place, by cutting and capping, of existing sewers, junction structures, manholes, service lines, and

More information

City of Regina Standard Construction Specification SECTION 1320 SEWERMAIN TESTING

City of Regina Standard Construction Specification SECTION 1320 SEWERMAIN TESTING 1.0 GENERAL 1.1 Scope 2.0 PRODUCTS 1.1.1 The work shall consist of testing wastewater and/or storm mains to ensure construction conforms to the proper line, grade, cross section and performance. 2.1 The

More information

1.3.2 Method of construction and restoration of existing water service connections. This shall include:

1.3.2 Method of construction and restoration of existing water service connections. This shall include: 1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting

More information

Colorado State University. Durrell Center Roof Repair

Colorado State University. Durrell Center Roof Repair Colorado State University Durrell Center Roof Repair SPECIFICATION: POLYURETHANE FOAM ROOFING l.0 GENERAL REQUIREMENTS The successful application of a polyurethane foam roofing system is dependent upon

More information

Structural Lining for Water Mains. Presenters: Stephen Marcino, PE and Micah Blate, EIT (JMT)

Structural Lining for Water Mains. Presenters: Stephen Marcino, PE and Micah Blate, EIT (JMT) Structural Lining for Water Mains Presenters: Stephen Marcino, PE and Micah Blate, EIT (JMT) 2015 PA-AWWA Annual Conference Thursday, April 23 rd, 2015 Agenda 1. Introduction 2. Purpose of Lining 3. Lining

More information

Exhibit A. Rules and Regulations for House Connections and Sewer Extensions

Exhibit A. Rules and Regulations for House Connections and Sewer Extensions The purpose of this application example is to provide assistance to small and medium sized rural communities in the drafting of documents necessary for the efficient operation of water, wastewater, and

More information

3. Amend the following: Item 410 Traffic Compacted Surface, Type C to Item 446 Cold Patch.

3. Amend the following: Item 410 Traffic Compacted Surface, Type C to Item 446 Cold Patch. To Prospective Bidders: CITY OF TOLEDO, OHIO PARKSIDE AREA SSO ELIMINATION PHASE 2 GRAVITY RELIEF SEWER NO. 2011 Addendum No. 2 December 8, 2011 Information disclosed and/or questions raised since issuing

More information

Acceptance Codes APPENDIX - A. Acceptance Criteria

Acceptance Codes APPENDIX - A. Acceptance Criteria 1111 Receipt of a satisfactory Test Report from WSDOT Materials Laboratory is required indicating the lot (or lots) or batch of material meets the requirement of the specifications under which it is listed.

More information

SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD

SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD 21.01 SCOPE: It is the intent of the Specification to define the approved methods and materials

More information

Annular Space Grouting of Slipline Products

Annular Space Grouting of Slipline Products Annular Space Grouting of Slipline Products by David Gellings(, M.APWA & John Jurgens(, M.WWCPA Traditional methods of using neat cement slurries, (Portland cement and water, cement with fly ash or cement

More information

SECTION 18 REHABILITATION OF SANITARY SEWER MAINS BY THE CURED-IN-PLACE (CIPP) METHOD MOBILE AREA WATER AND SEWER SYSEM

SECTION 18 REHABILITATION OF SANITARY SEWER MAINS BY THE CURED-IN-PLACE (CIPP) METHOD MOBILE AREA WATER AND SEWER SYSEM MOBILE AREA WATER AND SEWER SYSEM SECTION 18 REHABILITATION OF SANITARY SEWER MAINS BY THE CURED-IN-PLACE (CIPP) METHOD 18-0 Cured-In-Place Pipe Lining Rev 01/13 Rev 11 /13 Table of Contents TABLE OF CONTENTS...

More information

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors. SUBDRAINS AND FOOTING DRAIN COLLECTORS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subdrains B. Subdrain Cleanouts and Outlets C. Footing Drain Collectors D. Storm Sewer Service and Connections 1.02 DESCRIPTION

More information

Sewer Rehabilitation Design Requirements

Sewer Rehabilitation Design Requirements Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Sewer Rehabilitation Design Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared

More information

Specification for the Cured-In-Place Pipe Lining of Watermains

Specification for the Cured-In-Place Pipe Lining of Watermains Toronto Water Division Standard Specifications for Sewers and Watermains TS 7.60 January 2015 Specification for the Cured-In- Watermains Table of Contents TS 7.60.01 Scope... 3 TS 7.60.02 Information to

More information

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20

More information

All other provisions of the contract documents, plans and specifications shall remain unchanged.

All other provisions of the contract documents, plans and specifications shall remain unchanged. B. Supplementary Conditions a. Reference Page CS-5, Section 11.0 Insurance, Section C3.3-11 Insurance Item c.7: Delete paragraph and replace with the following: Environmental Impairment Liability Coverage

More information

Defense Technical Information Center Compilation Part Notice

Defense Technical Information Center Compilation Part Notice UNCLASSIFIED Defense Technical Information Center Compilation Part Notice ADP017712 TITLE: Rehabilitation of TCE-Contaminated Underground Storm Water System Using Trenchless Technology DISTRIBUTION: Approved

More information

CHAPTER 6 - SANITARY SEWER

CHAPTER 6 - SANITARY SEWER CHAPTER 6 - SANITARY SEWER 6.1 GENERAL This section covers the requirements for PVC plastic sewer pipe materials and installation in sanitary sewer construction. 6.2 PIPE PVC gravity sewer pipe and fittings

More information

SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES

SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES SECTION 33 05 16.13 PRECAST CONCRETE PART 1 - GENERAL 1.01 SECTION INCLUDES A. This item shall consist of the construction of both sanitary and storm sewer precast concrete manholes in accordance with

More information

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial

More information

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION ITEM 866 SEWER MAIN TELEVISION INSPECTION 866.1 DESCRIPTION: The Contractor shall furnish all labor, materials, equipment, and incidentals to provide the televising and a NASSCO-(PACP) standard video,

More information

Platte River Interceptor Slipline Rehabilitation

Platte River Interceptor Slipline Rehabilitation Platte River Interceptor Slipline Rehabilitation Owner: Metro Wastewater Reclamation District Contractor: American West, Denver CO Slipline Pipe Manufacturer : Hobas Pipe USA Presented by: Tom Furie, Area

More information

TRENCHLESS SEWER SERVICE REHABILITATION ANNUAL CONTRACTING SERVICES

TRENCHLESS SEWER SERVICE REHABILITATION ANNUAL CONTRACTING SERVICES CITY OF BRENTWOOD REQUEST FOR PROPOSALS (RFP) TRENCHLESS SEWER SERVICE REHABILITATION ANNUAL CONTRACTING SERVICES RFP ISSUANCE DATE - October 13, 2011 I. NAME OF SOLICITING PUBLIC BODY City of Brentwood,

More information

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, Storm Drain Installation, of these Standard Provisions. SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and

More information

SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS

SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS 1 SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS TABLE OF CONTENTS I. Introduction II. General Information and Requirements A. Applying for Sewer connection B. Excavation C. Cutting Concrete and Asphalt

More information