Capital Costs for Roadside/Median Barrier Systems



Similar documents
62 nd Annual Missouri Traffic and Safety Conference. M.A.S.H.: The New Safety Hardware Crash Testing Criteria

HIGH TENSION CABLE BARRIER

DESIGN OF A TL-4 MEDIAN CABLE BARRIER FOR DEERFOOT TRAIL, CALGARY

Table of Contents (Continued) Warrants (1) Median Barrier Types (1)

CHAPTER 14: GUARDRAIL and BARRIERS

11 Guardrail. W-Beam Guardrail Pre-Installation Inspection During Installation Basis for Use. Modified Guardrail. End Treatments and Transitions

CABLE MEDIAN BARRIER

How To Use A Tracc Crash Cushion

Safety Performance of the Median Cable Barrier. Deerfoot Trail, Calgary, Alberta UPDATE

GUARDRAIL CHECKLIST. (most of this information can be found in the Design Scene)

Session 3: Guardrail Design and Sitespecific. Considerations

SKT-SP Tangent Terminal

VDOT 2001 Road and Bridge Standards Section Guardrail, Fences, and Markers

Executive Summary. In December of 2001, the Region of Durham retained Synectics Transportation Consultants Inc. (Synectics) to prepare a report to:

Features. Armco Guardrail. Type D1 reflector. Type V reflector. Guardrail on posts

HEART Product Description Assembly Manual

Summary of ET Plus Guardrail End Treatment Inspections

X-Tension TM Guardrail End Terminal

HIGHWAY PRODUCTS. Revised January 2008 BUILDING TOMORROW S HIGHWAY SAFETY SOLUTIONS TODAY

Washington State Cable Median Barrier In-Service Study

High Tension Cable Median Barrier: A Scanning Tour Report

ARIZONA DEPARTMENT OF TRANSPORTATION

Unit Price Averages Reports

VI. VEHICLE IMPACT WITH CURB-AND-GUARDRAIL SYSTEMS. high-speed roadways, they are often required because of restricted right-of-way, drainage

MICHIGAN DESIGN MANUAL ROAD DESIGN CHAPTER 7 INDEX APPURTENANCES

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

Maryland Department of Transportation. Guidelines for Traffic Barrier. Placement and End Treatment. Design

SIGNING SEQUENCE IN ADVANCE OF VEHICLE INSPECTION. STATIONS (VIS & MIS) Page 1of 3

Advancements in GPR for a Sustainable Tomorrow

Division of Transportation Planning. Cost-Benefit Analysis of Park & Ride/Intermodal Strategies within the State Highway System in Southern California

TS 813 GROUNDING AND BONDING TTD TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD CONTROLLER CABINET GROUNDING

Best Practices for Removing Vehicles from Cable Barrier for the NC Guardrail Committee

INITIAL SITE INSPECTION OF MOTORCYCLE COLLISIONS WITH ROADSIDE OBJECTS IN NEW JERSEY

guidance on barrier selection, guidance on barrier design, guidance on barrier placement, and guidance on general system considerations.

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING General Materials Equipment...

Development of Guidelines for Anchor Design for High-Tension Cable Guardrails

Fall Protection System: A system put in place to protect workers from falling. (i.e. installation of guardrails, fall arrest, fall restraint, etc.

CULVERT AND STORM SEWER PIPE MATERIAL POLICY ON FEDERALLY FUNDED LOCAL AGENCY PROJECTS UPDATED March 2013

Nu-Guard 31 Steel Guardrail System

Safe & Sound Bridge Terminology

ASSET MANAGEMENT GUIDE FOR PROJECT DESIGN FORMAT

Report on. Wind Resistance of Signs supported by. Glass Fiber Reinforced Concrete (GFRC) Pillars

TECHNICAL MEMORANDUM SUMMARY REPORT:

Nebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY

Fixed Access Ladders. Table of Contents. 1. Legislative Requirements

INFORMATION HANDOUT MATERIALS INFORMATION FOR CONTRACT NO: 05-0L7014 PROJECT ID: ALTERNATIVE CRASH CUSHION SYSTEM

KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS

SECTION GUARDRAILS

SECTION 724 PIPE CULVERTS

Alberta Guidelines for Upgrading Bridgerails and Approach Guardrail Transitions

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES

CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW)

CURRICULUM VITAE. DEAN L. SICKING, Ph.D., P.E. Computational Mechanics Race Track and Roadside Safety

NCHRP. Web-Only Document 157: Volume I: Evaluation of Existing Roadside Safety Hardware Using Updated Criteria Technical Report

Introduction to Minimal Excavation Foundations

Chaudière Crossing Bridge Rehabilitation

Virginia Department of Transportation Guardrail System Upgrade Guidance

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

Duraslot Surface Drains

Cat. Sizes to fit Cat Skid Steer Loaders, Wheel Loaders, Telehandlers, Backhoe Loaders, and most other manufacturers models.

THIS PAGE IS INTENTIONALLY LEFT BLANK

TRAFFIC MANAGEMENT PLAN

SECTION STORM DRAIN SYSTEM

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

Premium Conventional. General Tire Information. High quality; low operating cost. Pneumatic ride in extreme conditions.

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

Transmission Foundations Case History : Helical piles Hydro One Networks Inc.

RHODE ISLAND TURNPIKE AND BRIDGE AUTHORITY NEWPORT/PELL BRIDGE APRIL 1, 2014 TEN YEAR RENEWAL AND REPLACEMENT PLAN (IN 2013 DOLLARS)

SECTION STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

Section 2100-Trenching and Tunneling

ITS specification Jointing chambers and pull pits (ITS-02-02)

Definitions. For the purposes of this rule chapter the following definitions shall apply unless the context clearly shows otherwise:

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

SECTION SUPPORT OF EXCAVATION

Pipeline design. concrete for life

Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS

GUARDRAIL INNOVATION FLOWS FROM HERE

Managing North Carolina's MSE Wall Assets through Design, Construction and Performance

Granger Bay Boulevard and Green Point Roundabout

REACT 350 II. Product Description Assembly Manual

Technical Report Documentation Page 2. Government Accession No. 3. Recipient's Catalog No. 1. Report No. FHWA/TX-09/

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

DESIGN OF PRESTRESSED BARRIER CABLE SYSTEMS

Chapter 22. Lump Sum Project Guidelines

Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.

Value of Instrumentation Systems and Real-Time Monitoring: An Owner s Perspective

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

Transcription:

Capital Costs for Roadside/Median Barrier Systems The following basic costs for different roadside barrier systems were developed for use with Alberta Infrastructure and Transportation s new Roadside Design Guide. These costs can be used by designers to compare costs and to do cost-benefit-analysis of different roadside barrier systems, and for budget purposes. The costs are presented in two sets of tables (one set for post-mounted barrier systems and one set for concrete barrier systems). The tables show a base cost per metre and modification cost for site/job specific features such as soil condition, short-runs and remoteness of location. Separate costs are provided for end treatments of the different barrier systems. The costs were determined using both average unit prices from past contracts and cost estimates provided by contractors specializing in the installation of barrier systems. For the post-mounted systems, a contractor provided current (2007 dollars) estimates for the four post-mounted barrier systems. For the weak post W-beam and the strong post W-beam, there was sufficient AIT contract unit price data to compare with the estimate received from the contractor. Allowing for inflation, the contractor estimated unit price is fairly consistent with the contract unit price data. For the Modified Thrie beam and High Tension Cable Systems, there was practically no AIT contract unit price data. The contractor s estimates for these systems were compared with some earlier estimates of these systems and a discussion was carried with a contractor that recently installed a High Tension Cable System. Using a combination of this information and data received, unit prices were arrived at for the Modified Thrie Beam and High Tension Cable Systems. For the concrete barrier systems, a contractor specializing in installation of concrete barriers provided current (2007 dollars) estimate for six concrete barrier systems (two pre-cast and four slip-formed shapes). Recent AIT contract unit price data on concrete barrier was very limited. However, there was some older contract data on the F-Shape Barrier. This information was adjusted for inflation to 2007 dollars and compared to the contractor s estimate for the F-Shape Barrier. Using a combination of contractor s and AIT s unit price contract data, unit cost were arrived at for the F-Shape Barrier. The unit costs for the other shapes were adjusted to be proportional to the prices received from the contractor. These unit costs are believed to be relatively accurate for comparison of the different systems and for cost-benefit analysis. These costs should be revised as more contract price data become available on future projects. RPT1-070519700-4.6.1-CapitalCosts-070607.doc 6/8/2007 Page 1 of 5

Capital Cost Comparison of Alterative POST-MOUNTED Barrier Systems for use on Alberta Transportation Projects Barrier System: Weak Post W-Beam Barrier Strong Post W-Beam Barrier Modified Thrie Beam Barrier High Tension Cable Barrier Drawing Reference: (TEB-3.12) (TEB-3.09) (no RDG dwg) (TEB 3.70) (no RDG dwg) (See note 3) Application 2 : Roadside Roadside Median Roadside Median Roadside/Median NCHRP Report 350 Test Level: TL - 3 TL - 3 TL - 3 TL - 4 TL - 4 TL - 4 system Base Rate 1 : $ 90/ m $ 135/ m $165/ m $ 225/ m $300/ m $ 110/ m 4 Premium for Rocky Soil Conditions add $20/ m Premium for Short Run (less than 200 m of barrier) add $25/ m add $35/ m add $35/ m add $45/ m add $45/ m add $65/ m Premium for Semi-Remote Installation (based on 4 hour Premium for Remote Installation (based on 6 hour commute oneway) add $10/ m add $10/ m add $10/ m add $10/ m add $10/ m add $10/ m add $15/ m add $15/ m add $15/ m add $15/ m add $15/ m add $15/ m 1 Note: "Base Rate" is based on the following conditions: - Barrier system installed in engineered backfill material (granular base course) along edge of pavement. - Pavement road structure already in place. - Runs of at least 200 m in length. - Cost of barrier end treatments (such as energy or non-energy barrier terminal) not included. -Traffic Accommodation not included. 2 Note: Roadside application is an application where the barrier is intended for impact from one side only. On divided highways, these barriers are normally used on the right side of the roadway or on the left (median) side of the roadway for wide medians where the barrier is located outside of the clear zone for opposing direction of traffic. Median application is an application where the barrier is intended for impact from both sides. These barriers are normally used for application on the median side of divided highways with narrow medians. For Strong Post W-Beam and Thrie Beam barriers, a median application has guardrail on both sides of the post. 3 Note: AIT has currently approved the following three proprietary High Tension Cable Barrier Systems for use on Alberta highways: 1) Brifen, 2) Gibraltar, and 3) Trinity CASS. Drawings may be downloaded from the proprietor's website. 4 Note: AIT has tendered one 10 km long job for a High Tension Cable System. The price for this job was $61.25/m plus $20,000 per end anchor. However, this price is not considered typical. Cost of Alternative Post Mounted Barrier Systems-070607-Page2.xls Page 2 of 5

Capital Cost Comparison of Alterative End Treatments for POST-MOUNTED Barriers for use on Alberta Transportation Projects Non-Energy Absorbing End Treatments End Treatment: W-Beam Cable Anchor 3 Thrie Beam Cable Anchor 3 High Tension Cable End Barrier System: (W-Beam Barrier) (Thrie Beam Barrier) (High Tension Cable Barrier) Drawing Reference: (RDG-B1.1) (RDG-B5.1) (Refer to Proprietor's Dwgs) Application 2 : Roadside/Median Roadside/Median Roadside/Median NCHRP Report 350 Test Level: N/A N/A TL-3 Base Rate 1 (Per End): $2,500 $3,500 $6,500 Energy Absorbing End Treatments 4 End Treatment: ET PLUS / ET 2000 FLEAT 350 FLEAT MT SKT 350 CAT 350 Thrie Beam Bullnose Barrier System: (W-Beam Barrier) (W-Beam Barrier) (W-Beam Barrier) (W-Beam Barrier) (W-Beam Barrier) (Thrie Beam Barrier) Drawing Reference: (RDG-B1.4) (RDG-B1.5) (RDG-B1.6) (see note 5) (RDG-B1.7) (TEB-3.60 sheets 1 to 9) Application 2 : Roadside Roadside Median Roadside Roadside/Median Roadside/Median NCHRP Report 350 Test Level: TL-3 TL-3 TL-3 TL-3 TL-3 TL-3 Base Rate 1 (Per End): $6,500 $6,500 $7,900 $8,500 $16,500 $15,000 - Pavement road structure already in place. - The contractor who installed the barrier system is the same contractor installing the barrier end treatment. - Therefore, premium for travel cost to remote and semi-remote locations covered in premium for barrier installation. - Traffic Accommodation cost not included. 2 Note: Roadside application is an application where the barrier is intended for impact from one side only. On divided highways, these barriers are normally used on the right side of the roadway or on the left (median) side of the roadway for wide medians where the barrier is located outside of the clear zone for opposing direction of traffic. Median application is an application where the barrier is intended for impact from both sides. These barriers are normally used for application on the median side of divided highways with narrow medians. For Strong Post W-Beam and Thrie Beam barriers, a median application has guardrail on both sides of the post. 3 Note: For use on the leaving end of a W-Beam/Thrie Beam barrier only or on the approach end when installed at or beyond the clear zone. 4 Note: For use on the approach end of a W-Beam/Thrie Beam barrier when installed inside the clear zone. 5 Note: Details of the Sequential Kinking Terminal (SKT) are available on the proprietor's website for Road Systems, Inc. Cost of Alternative ENERGY and NON-ENERGY Absorbing Barrier End Treatments for POST MOUNTED BARRIER SYSTEMS-070607-Page3.xls Page 3 of 5

Capital Cost Comparison of Alterative CONCRETE Barrier Systems for use on Alberta Transportation Projects Barrier System: PRECAST Concrete "F-Shape" Barrier (810 mm high) PRECAST Concrete "Single Slope" Barrier (910 mm high) "F-Shape" Barrier (810 mm high) "Single Slope" Barrier (900 mm high) "Tall Wall" Barrier (1050 mm high) Drawing Reference: (CB6-4.2M16) (see note 3) (CB6-4.3M3) (RDG-B6.1) (see note 4) Application 2 : Roadside/Median Roadside/Median Roadside/Median Roadside/Median Roadside/Median NCHRP Report 350 Test Level: TL - 3 TL - 3 TL - 4 TL - 4 TL - 5 Base Rate 1&5 : $ 335/ m $ 375/ m $ 275/ m $ 310/ m $ 345/ m Premium for Short Run (less than 200 m of barrier) Premium for Semi-Remote Installation (based on 4 hour add $25/ m add $25/ m add $35/ m Premium for Remote Installation (based on 6 hour add $40/ m add $45/ m add $40/ m add $45/ m add $55/ m - Pre-grading already in place. Barriers supported on existing granular base course of road structure or placed directly on the finished wearing surface. - Runs of at least 200 m in length. - Cost of barrier end treatments (such as tapered end or crash cushion) not included. - Traffic Accommodation not included. - Cost does not include initial cost of forms. 2 Note: Roadside application is an application where the barrier is intended for impact from one side only. On divided highways, these barriers are normally used on the right side of the roadway or on the left (median) side of the roadway for wide medians where the barrier is located outside of the clear zone for opposing direction of traffic. Median application is an application where the barrier is intended for impact from both sides. These barriers are normally used for application on the median side of divided highways with narrow medians. For Strong Post W-Beam and Thrie Beam barriers, a median application has guardrail on both sides of the post. 3 Note: Alberta Infrastructure and Tranpsortation does not currently have a typical barrier drawing for the precast concrete single slope barrier. Details of this portable barrier may be found on the California Department of Transportation website under the standard plan titled "Portable Concrete Barrier (Type 60K)". This reinforced barrier comes in 4.0 m long precast segments 'connected together using two 31.8 mm diameter steel pins 760 mm long at each joint. The FHWA has approved this barrier as meeting the requirements of TL - 3. 4 Note: The Tall Wall barrier was developed by the Ministry of Transportation of Ontario (MTO) and has been approved by the FHWA as meeting the requirements of TL - 5. Details of this unreinforced barrier are available on the MTO's website as standard drawing OPSD-911.132 Type TW. 5 Note: Consideration should be given to the lower maintenance cost of concrete barrier systems when evaluating life cycle costing. Cost of Alternative Concrete Barrier Systems-070607-Page4.xls Page 4 of 5

Capital Cost Comparison of Alterative End Treatments for CONCRETE Barriers 3 for use on Alberta Transportation Projects Energy Absorbing End Treatments 4 End Treatment: QuadTrend 350 Quadguard CZ Quadguard HS/Elite Quadguard LMC TRACC TAU II CAT 350 Sand Barrel System Drawing Reference: (RDG-B6.9) (RDG-B6.9) (RDG-B6.9) (RDG-B6.9) (RDG-B6.8) (no RDG dwg) (RDG-B1.7 & RDG-B6.12) (TEB-3.19) Application 2 : Roadside/Median Roadside/Median Roadside/Median Roadside/Median Roadside/Median Roadside/Median Roadside/Median Roadside/Median NCHRP Report 350 Test Level: TL - 3 TL - 3 TL - 3 TL - 3 TL - 3 TL - 3 TL - 3 TL - 3 Base Rate 1 (Per End): $24,000 $56,000 $73,000 $116,000 $57,500 $41,300 $16,500 $11,500 - Installation is for the end of a concrete median barrier. - Pre-grading of granular base course of road structure already in place. - The contractor who installed the barrier system is the same contractor installing the barrier end treatment. - Therefore, premium for travel cost to remote and semi-remote locations covered in premium for barrier installation. - Traffic Accommodation cost not included. - Test level ratings greater than TL-3 are available for some energy absorbing end treatments. Refer to proprietor drawings. 2 Note: Roadside application is an application where the barrier is intended for impact from one side only. On divided highways, these barriers are normally used on the right side of the roadway or on the left (median) side of the roadway for wide medians where the barrier is located outside of the clear zone for opposing direction of traffic. Median application is an application where the barrier is intended for impact from both sides. These barriers are normally used for application on the median side of divided highways with narrow medians. For Strong Post W-Beam and Thrie Beam barriers, a median application has guardrail on both sides of the post. 3 Note: Roadside concrete barriers may be terminated using post-mounted energy absorbing barrier end treatments if a transition to a Thrie Beam and then a Strong Post W-beam is provided. Refer to drawings RDG-B6.12, RDG-B6.13 and RDG-B6.15. 4 Note: For use on the approach end of a concrete barrier system. Concrete barriers may be terminated with a blunt end on the leaving end for roadside applications. Terminating with a blunt end on the leaving end may also be used for median applications when installed at or beyond the clear zone for the opposing direction of traffic. Cost of Alternative Energy Absorbing Barrier End Treatments for CONCRETE BARRIER SYSTEMS-070607-Page5.xls Page 5 of 5