2 Authors: Robyn V. McGregor, M.Sc., P.Eng. Senior Transportation Engineer & Principal Consultant EBA Engineering Consultants Ltd., Calgary Masood Hassan, Ph.D., P.Eng. Senior Transportation Engineer EBA Engineering Consultants Ltd., Edmonton Olivier Lahey, P.Eng. Operations Engineer, Calgary District Alberta Transportation
3 Scope of Presentation This presentation covers: Summary of design aspects Safety experience with the median cable barrier for the 22-month period May 2007 to March 2009.
4 Two Messages Forgiving Roadsides are a good idea. The introduction of median barriers is more complicated than we might think, so we should do our homework.
5 Project Overview Deerfoot Trail (Highway 2), Calgary: Six Lane Divided Freeway Rural X-Section Project length: 10.8 km High Traffic Volume 6:1 or flatter median side slopes 2.4 m (8 ft) paved inside shoulder
6 Pictorial Overview 16 m Median North of 16 th Avenue NE 30 m Median, South of Country Hills Boulevard
7 Defining the Specifications High tension (post-tensioned), 3- or 4-cable median barrier; posts in sockets in concrete foundations Main system: NCHRP Report 350 Test Level 4 (TL-4), tested for 8000 kg single-unit truck End-anchors: TL-4, or TL-3 (tested for 2000 kg pickup) FHWA-approved for 6:1 median side slopes Maximum deflection = 2.4 m (8 ft) Maximum post spacing = 6.1 m (20 ft) Competitive bidding
8 TL-4 Cable Barriers Available in 2006 Approved TL-4 Cable Barriers Available (Spring 2006) Barrier Characteristic Brifen (4 cables) Gibraltar (3 cables) Trinity (3 cables) Date of FHWA Approval- Letter Mar 27, 2005 Sept 9, 2005 Nov 17, 2005 Test: Post Spacing, m Test: Maximum Deflection, m Cable Height from Ground, m Top Cable Middle Cable 4th Cable Bottom Cable FHWA- Approved End Treatment TL-3, TL-4 TL-3 TL-3 Rule for Placement on 6:1 Median Side Slope Do not place on the median side slope between 0.3 m and 2.4 m (1 ft and 8 ft) from ditch bottom.
9 Design Aspect: Lateral Placement Median ditch deemed unsuitable for cable barrier Placed 4.0 m from painted shoulder line in the northbound direction
10 Existing Barriers & Hazards For hazards with existing barriers: cable barrier system runs past existing beam barriers with 0.9 m minimum separation between the two barrier systems For hazards without barriers: cable barrier runs past the hazards with 2.5 m minimum separation
11 Longitudinal Placement of the Barrier
12 Separation from Existing Barriers (0.9 m minimum)
13 Separation from Hazards (2.5 m minimum)
14 Anchor End Terminal (NCHRP 350 TL-3 Approved)
15 Anchor End Terminal Non-Crashworthy
16 Collision Experience May 2007 to March hits 3 penetrations (but did not result in cross over collisions) Mostly PDO Very few minor Injury NO FATALITIES Repaired and back in service within a few hours
17 Northbound Passenger Vehicle (3 Posts)
18 Northbound Pickup Truck
19 Same Northbound Pickup Truck (31 posts)
20 New Developments Dramatic reductions in crossover collisions have made median cable barriers popular worldwide Five current suppliers: Brifen, Gibraltar, Nucor, Safence, Trinity AASHTO Technology Implementation Group has an active cable barrier sub-group MASH-08
21 Future Installations in Alberta 8 km of median cable barrier planned for Alberta Highway 2 in Airdrie in 2010 Alberta Transportation is considering the installation of 124 km of median cable barrier on Alberta Highway 2 between Airdrie and Red Deer and near Leduc New design challenges presented
22 Concluding Comments Forgiving Roadsides are a good idea. The introduction of median cable barriers is more complicated than we might think, so we must do our homework.
23 Our homework. Designers should research and utilize the latest approved products and related guidelines by FHWA and AASHTO. Talk to the vendors and other jurisdictions. Conduct Road Safety Audits. Monitor the performance. Apply what you learn to anything you put in the median and roadside.
24
DESIGN OF A TL-4 MEDIAN CABLE BARRIER FOR DEERFOOT TRAIL, CALGARY
DESIGN OF A TL-4 MEDIAN CABLE BARRIER FOR DEERFOOT TRAIL, CALGARY Robyn V. McGregor, M.Sc., P.Eng. Senior Transportation Engineer and Principal Consultant EBA Engineering Consultants Ltd., Calgary Masood
More informationCABLE MEDIAN BARRIER
A Focus Technology of the American Association of State Highway and Transportation Officials (AASHTO) Technology Implementation Group (TIG) CABLE MEDIAN BARRIER Why Median Barriers 23,139 Road Departure
More informationSuperseded. The average time for a normal repair after a crash is approximately 1.5 to 2 hours for a 3- person crew.
To: Subject: Purpose: All HQ Directors: Operations, Planning and Major Projects All Regional Directors All Regional Managers, Engineering All Regional Traffic Engineers All District Managers Transportation
More information62 nd Annual Missouri Traffic and Safety Conference. M.A.S.H.: The New Safety Hardware Crash Testing Criteria
62 nd Annual Missouri Traffic and Safety Conference M.A.S.H.: The New Safety Hardware Crash Testing Criteria Richard Albin Federal Highway Administration Resource Center Safety and Design Team May, 2011
More informationHigh Tension Cable Median Barrier: A Scanning Tour Report
Civil Engineering Studies Transportation Engineering Series No. 142 Traffic Operations Lab Series No. 18 UILU-ENG-2006-2002 ISSN-0917-9191 High Tension Cable Median Barrier: A Scanning Tour Report By Juan
More informationEvaluation of High-Tension Cable Barriers in Wisconsin Final Report FEP-05-01
Evaluation of High-Tension Cable Barriers in Wisconsin Final Report FEP-05-01 By Xiao Qin, Ph.D., PE Traffic Safety Program Manager Fenghuan Wang, M.S. Transportation Engineer Andrea Bill Traffic Safety
More informationWashington State Cable Median Barrier In-Service Study
Washington State Cable Median Barrier In-Service Study Doug McClanahan Washington State Department of Transportation PO Box 47329 Olympia Washington 98504-7329 Tel: (360) 705-7264 Fax: (360) 705-7330 mcclando@wsdot.wa.gov
More informationTable of Contents (Continued) 13-5.01 Warrants... 13-5(1) 13-5.02 Median Barrier Types... 13-5(1)
December 2003 ROADSIDE SAFETY 13(i) Chapter Thirteen ROADSIDE SAFETY Table of Contents Section Page 13-1.0 DEFINITIONS... 13-1(1) 13-2.0 CLEAR ZONES... 13-2(1) 13-2.01 Background... 13-2(1) 13-2.02 Application...
More informationSession 3: Guardrail Design and Sitespecific. Considerations
FHWA Roadway Departure Technology Transfer Roadside Safety Systems Installer Training : Guardrail Design and Sitespecific Installation Considerations 3-1 Course Topics Session 2 Testing Requirements and
More informationCapital Costs for Roadside/Median Barrier Systems
Capital Costs for Roadside/Median Barrier Systems The following basic costs for different roadside barrier systems were developed for use with Alberta Infrastructure and Transportation s new Roadside Design
More informationHIGH TENSION CABLE BARRIER
Special Provision September 11, 2006 SECTION 02845 S HIGH TENSION CABLE BARRIER PART 1 GENERAL 1.1 SECTION INCLUDES A. Cable barrier materials and installation procedures. 1.2 RELATED SECTIONS A. Section
More informationMalcolm H. Ray, P.E., Ph.D. 186 Staples Hill Road Canton, Maine 04221 508-831-5340 207-514-5474 mhray@wpi.edu. April 26, 2007
Appendix B: Independent expert report, Experience with Cable Median Barriers In Other States, prepared by Malcolm H. Ray, P.E., Ph.D., and selection of newspaper stories from other states collected by
More informationEvaluation of Brifen s Wire Rope Safety Fence. By Dave Ward, PE. Indiana Department Of Transportation. S b 2006
Evaluation of Brifen s Wire Rope Safety Fence By Dave Ward, PE Indiana Department Of Transportation S b 2006 1 2 Brifen Wire Rope Safety Fence Interim Report Experimental Feature Project # Prepared By
More informationTechnical Report Documentation Page 2. Government Accession No. 3. Recipient's Catalog No. 1. Report No. FHWA/TX-09/0-5609-1
1. Report No. FHWA/TX-09/0-5609-1 Technical Report Documentation Page 2. Government Accession No. 3. Recipient's Catalog No. 4. Title and Subtitle PERFORMANCE EVALUATION OF CABLE MEDIAN BARRIER SYSTEMS
More information1What purpose do guard
g u a r d F c a b A l e Q f re q u e n t l y a s k e d q u e s t i o n s 1What purpose do guard cables serve? Cross-Median Fatalities The purpose of high-tension guard cable is to prevent vehicles that,
More informationNu-Guard 31 Steel Guardrail System
A smaller footprint, lighter weight and no requirement for a blockout means the Nu-Guard 31 steel post guardrail system is comparable in cost to traditional post systems and is simpler and quicker to install.
More informationguidance on barrier selection, guidance on barrier design, guidance on barrier placement, and guidance on general system considerations.
1. Report No. FHWA/TX-10/0-5609-2 4. Title and Subtitle DEVELOPMENT OF GUIDELINES FOR CABLE MEDIAN BARRIER SYSTEMS IN TEXAS 7. Author(s) Scott A. Cooner, Yatin K. Rathod, Dean C. Alberson, Roger P. Bligh,
More informationMaryland Department of Transportation. Guidelines for Traffic Barrier. Placement and End Treatment. Design
Maryland Department of Transportation Guidelines for Traffic Barrier Placement and End Treatment Design March 2006 Maryland Department of Transportation State Highway Administration GUIDELINES FOR TRAFFIC
More informationHigh-tension Median Cable In-service Performance Evaluation and Cost Effectiveness Analysis
0 0 0 0 High-tension Median Cable In-service Performance Evaluation and Cost Effectiveness Analysis Xiao Qin, PhD, PE* Assistant Professor Department of Civil and Environmental Engineering South Dakota
More informationCHAPTER 14: GUARDRAIL and BARRIERS
CHAPTER 14: GUARDRAIL and BARRIERS If you have any questions regarding guardrail, end treatments and/or pay items included in your plan, please contact the Project Design Services Unit or the Design Standards
More informationChapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL
Chapter Forty-seven RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL Illinois RURAL TWO-LANE/MULTILANE STATE HIGHWAYS December 2009 2 Illinois
More informationDevelopment of Guidelines for Anchor Design for High-Tension Cable Guardrails
Duplication for publication or sale is strictly prohibited without prior written permission of the Transportation Research Board Paper No. 10-3391 Development of Guidelines for Anchor Design for High-Tension
More informationEvaluation of Wisconsin Cable Median Barrier Systems: Phase 2
Evaluation of Wisconsin Cable Median Barrier Systems: Phase 2 Final Report By John Ash Research Assistant Zhixia Li, Ph.D. Assistant Researcher Andrea Bill Traffic Safety Engineering Program Manager David
More informationVirginia Department of Transportation Guardrail System Upgrade Guidance
GENERAL SUBJECT: BARRIER SYSTEMS SPECIFIC SUBJECT: VIRGINIA DEPARTMENT OF TRANSPORTATION TRAFFIC ENGINEERING DIVISION MEMORANDUM GUARDRAIL SYSTEM UPGRADE Functional Condition Ratings and Upgrading Strategies
More informationBest Practices for Removing Vehicles from Cable Barrier for the NC Guardrail Committee
Best Practices for Removing Vehicles from Cable Barrier for the NC Guardrail Committee Since the last Committee Meeting on March 15, 2006 we have been sending out emails to the AASHTO TIG-CMB team members
More informationNUCOR STEEL MARION, INC. HIGHWAY PRODUCTS Saving Money. Saving Lives.
NUCOR STEEL MARION, INC. HIGHWAY PRODUCTS Saving Money. Saving Lives. Contact us for the Nucor Steel Marion, Inc. Highway Products distributor partner serving your area. Nucor Steel Marion, Inc. Highway
More informationVI. VEHICLE IMPACT WITH CURB-AND-GUARDRAIL SYSTEMS. high-speed roadways, they are often required because of restricted right-of-way, drainage
VI. VEHICLE IMPACT WITH CURB-AND-GUARDRAIL SYSTEMS 6.1 Introduction It is often necessary to use a curb at a particular location that also warrants a traffic barrier. Inadequate design of these curb-and-barrier
More informationMICHIGAN DESIGN MANUAL ROAD DESIGN CHAPTER 7 INDEX APPURTENANCES
7.01 ROADSIDE SAFETY BARRIER 7.01.01 References 7.01.02 Application of Section 7.01 MICHIGAN DESIGN MANUAL CHAPTER 7 INDEX APPURTENANCES 7.01.03 History of Guardrail and Barrier in Michigan 7.01.04 Section
More informationHow To Reduce Work Zone Related Collisions
Work Zones Overview A work zone is a temporary roadway environment that can pose a risk to maintenance and construction workers as well as drivers. These areas are identified by warning signs/signals that
More informationCABLE GUARDRAIL EVALUATION U.S. ROUTE 1 MEDIAN MOORESFIELD ROAD TO GOVERNMENT CENTER SOUTH KINGSTOWN
CABLE GUARDRAIL EVALUATION U.S. ROUTE 1 MEDIAN MOORESFIELD ROAD TO GOVERNMENT CENTER SOUTH KINGSTOWN April 2005 The Department of Transportation Prepared for the Rhode Island Department of Transportation
More informationMotor Vehicle Fatalities Accepted by the Workers Compensation Board
Motor Vehicle Fatalities Accepted by the Workers Compensation Board Year to date, numbers as of January 1, 2008 to December 31, 2008 The fatalities listed represent motor vehicle fatalities that have been
More informationGUARDRAIL CHECKLIST. (most of this information can be found in the Design Scene)
GUARDRAIL CHECKLIST (most of this information can be found in the Design Scene) - When Salvaging Guardrail you need to pay attention to the pay item and what is actually being salvaged. (see other section
More informationAlberta Guidelines for Upgrading Bridgerails and Approach Guardrail Transitions
Alberta Guidelines for Upgrading Bridgerails and Approach Guardrail Transitions Raymond Yu Alberta Transportation Bob Ramsay UMA Engineering Ltd Clive Clarke Alberta Transportation Bill Kenny Alberta Transportation
More informationResearch Digest. Table of Contents. In this Issue: TxDOT Reports
FORWARD ALL REQUESTS TO: The University of Texas at Austin Center for Transportation Research LIBRARY 3208 Red River Suite 115 Austin Texas 78705-2650 Phones: (512) 232-3126 and (512) 232-3138 Fax: (512)
More informationNUCOR U.S. High Tension Cable Barrier System INSTALLATION MANUAL
NUCOR U.S. High Tension Cable Barrier System INSTALLATION MANUAL CONTENTS INSTALLATION CONSDERATIONS... 3 SYSTEM LAYOUT... 3 Site Preparation... 3 Line Posts... 3 Anchor Posts... 4 INSTALLING POSTS...
More informationThe partnership has selected three intersections where enforcement, education, and engineering initiatives are being implemented to improve safety:
Hamilton-Finn Suite 310 Tel. (403) 207-6000 Road Safety 3016 5th Avenue N.E. Fax. (403) 273-3440 Consultants Ltd. Calgary, Alberta dawatt.dawatt.com www.hamiltonfinn.ca January 19, 2005 Mr. Don Szarko,
More informationCONCEPTUAL REHABILITATION ALTERNATIVE
Appendix D While federal law requires preservation/rehabilitation of historic bridges be considered, there is no standard procedure to determine when rehabilitation is appropriate and when replacement
More informationSafety in Road-Construction areas. 360 Conference bro
Safety in Road-Construction areas 360 Conference bro Today s Speaker! Pezzucchi Matteo Norwegian Public Road Administration (NPRA) Control and approval of road equipment: Safety barriers transitions terminals
More informationHow To Use A Tracc Crash Cushion
TRACC Family Product Description Assembly Manual Part No. 620297B Revised January 2007 TRinity Attenuating Crash Cushion TRACC-Family System Manual - 2005 Model - TRACC FasTRACC WideTRACC ShorTRACC A Family
More informationExecutive Summary. In December of 2001, the Region of Durham retained Synectics Transportation Consultants Inc. (Synectics) to prepare a report to:
Guide Rail, End Treatment and Energy Attenuator Selection Guidelines Page 1 Executive Summary About one-third of all fatal crashes in North America each year involve a single vehicle. For crashes in rural
More information2010 A Cooperative Research Project sponsored by the U.S. Department of Transportation Research and Innovative Technology Administration
Report # MATC-UNL: 101 Final Report Foundation Design for High Tension Cable Guardrails John Rohde, Ph.D., P.E. Associate Professor Midwest Roadside Safety Facility (MwRSF) Nebraska Transportation Center
More informationPRECAST CONCRETE BARRIER CRASH TESTING
PRECAST CONCRETE BARRIER CRASH TESTING Final Report SPR 330 PRECAST CONCRETE BARRIER CRASH TESTING Final Report SPR 330 by Daniel J. MacDonald, Standards Engineer Roadway Engineering Section ODOT Highway
More informationBased on the AASHTO: PREPARED FOR
Based on the AASHTO: Ne va da PREPARED FOR Pr oj P R ec t O C Sa E S fety S September 2015 Introduction The Nevada Department of Transportation (NDOT) has as its first department goal to optimize safety
More informationHEART Product Description Assembly Manual
HEART Product Description Assembly Manual Part No. 620293B Revised February 25, 2009 2525 2525 Stemmons Stemmons Freeway Freeway Dallas, Dallas, Texas Texas 75207 75207 IMPORTANT: These These instructions
More informationWhat Every Driver Must Know Review Assignment
What Every Driver Must Know Review Assignment 1. Who is the Michigan Secretary of State? What services does the Secretary of State office offer? What days and hours is your local Secretary of State branch
More informationGeneral Obligation Bond Projects FYE 2013-2018
General Obligation Bond Projects FYE 2013-2018 2009 City of Norman Community Survey Final Report 2011 CTP Survey Results Storm Drainage and Street Widening Projects Combined Storm Water/Transportation
More informationMaintenance Management and Asset Management
Defining and Understanding the Difference Between Maintenance Management and Asset Management Dr. Simon Lewis AgileAssets, Inc. 12th AASHTO-TRB Maintenance Management Conference Annapolis Maryland, July
More informationTHE INFLUENCE OF POLICY ON CRASH RATE OF LONG COMBINATION VEHICLES
THE INFLUENCE OF POLICY ON CRASH RATE OF LONG COMBINATION VEHICLES John Woodrooffe 1, Darryl Anderson 2 and Lloyd Ash 3 1 University of Michigan Transportation Research Institute. 2 Alberta Transportation.
More informationX-Tension TM Guardrail End Terminal
Installation and Maintenance Manual X-Tension TM Guardrail End Terminal Step by Step Instructions for the Tangent, Flared and Median Applications Barrier Systems Sales and Service 3333 Vaca Valley Pkwy,
More informationBusiness Intelligence System for Traffic Data Integration: Linking Roadway, Collision and Traffic Flow Data to Improve Traffic Safety
Business Intelligence System for Traffic Data Integration: Linking Roadway, Collision and Traffic Flow Data to Improve Traffic Safety Stevanus A. Tjandra, Ph.D. City of Edmonton Office of Traffic Safety
More informationNational Transportation Safety Board Washington, D.C. 20594
E PLURIBUS UNUM NATIONAL TRA SAFE T Y N S PORTATION B OAR D National Transportation Safety Board Washington, D.C. 20594 Railroad Accident Brief Accident No.: ATL-00-FR-006 Location: Port Hudson, Louisiana
More informationINITIAL SITE INSPECTION OF MOTORCYCLE COLLISIONS WITH ROADSIDE OBJECTS IN NEW JERSEY
INITIAL SITE INSPECTION OF MOTORCYCLE COLLISIONS WITH ROADSIDE OBJECTS IN NEW JERSEY Allison Daniello Ben Powell Nicholas Schaeffer Aaliyah McClinton Yusuf Mehta Rowan University United States Kimberly
More informationWire Rope Barrier Monitoring System (Load cell communication) An overview
Wire Rope Barrier Monitoring System (Load cell communication) An overview Dua, A. 1, Anderson, C. 1 1 Department of Planning, Transport and Infrastructure (DPTI), South Australia Abstract Application of
More informationRapid Modal Testing System for Live Load Rating of Highway Bridges
Rapid Modal Testing System for Live Load Rating of Highway Bridges Presented by: Jeffrey E. Purdy, PE Pennoni Franklin L. Moon, PhD Pennoni Associate Professor Drexel University Presentation Outline Introduction
More informationEvaluation of Frequency and Injury Outcomes of Lane Departure Crashes
University of Massachusetts Traffic Safety Research Program www.ecs.umass.edu/umasssafe Evaluation of Frequency and Injury Outcomes of Lane Departure Crashes Marta Benavente, Heather Rothenberg, Michael
More informationSIGNING SEQUENCE IN ADVANCE OF VEHICLE INSPECTION. STATIONS (VIS & MIS) Page 1of 3
Issued: JUL 2007 STATIONS (VIS & MIS) Page 1of 3 RECOMMENDED PRACTICES PART SECTION SUB-SECTION HIGHWAY SIGNS TYPICAL SIGNING PLANS General The safety of motorists using Alberta highways, and the maintenance
More informationSummary of ET Plus Guardrail End Treatment Inspections
Summary of ET Plus Guardrail End Treatment Inspections 12/16/2015 Maine Department of Transportation Prepared by Brian Burne, Atlee Mousseau, Clark Sulloway, Doug Gayne, Ulrich Amoussou Guenou & Dale Peabody
More informationTHREE-CABLE MEDIAN BARRIER FINAL REPORT #OR-RD-99-03
THREE-CABLE MEDIAN BARRIER FINAL REPORT #OR-RD-99-03 by Brett Sposito, E.I.T. and Sam Johnston, P.E. for Oregon Department of Transportation Research Unit 200 Hawthorne SE, Suite B-240 Salem, OR 97310
More informationUpdate on Oklahoma Bridges and Highways
Update on Oklahoma Bridges and Highways Oklahoma Department of Transportation November 2013 I-35 at Main Street in Cleveland County Oklahoma Bridges and Highways Oklahoma s State Highway Transportation
More informationDESIGN OF PRESTRESSED BARRIER CABLE SYSTEMS
8601 North Black Canyon Highway Suite 103 Phoenix, AZ 8501 For Professionals Engaged in Post-Tensioning Design Issue 14 December 004 DESIGN OF PRESTRESSED BARRIER CABLE SYSTEMS by James D. Rogers 1 1.0
More informationThe Need for Traffic Incident Management
The Need for Traffic Incident Management With traffic incidents responsible for approximately 50-60% of the congestion delays motorists encounter on the nation s roadways every day, increased roadway capacity
More informationMINIMIZING TRAFFIC-RELATED WORK ZONE CRASHES IN ILLINOIS
CIVIL ENGINEERING STUDIES Illinois Center for Transportation Series No. 12-017 UILU-ENG-2012-2019 ISSN: 0197-9191 MINIMIZING TRAFFIC-RELATED WORK ZONE CRASHES IN ILLINOIS Prepared By Khaled El-Rayes Liang
More information11 p.m. to. Tuesday, June. will remain open. 14. closed
June 3, 2011 CONTACT: Marcia McAllister T: 703 572 0506 C: 571 730 9117 marcia.mcallister@dullesmetro.com Important Lane Closures June 5 11 Include Northbound Beltway Lanes, Eastbound Dulles Airport Access
More informationRelationship of Lane Width to Safety for Urban and Suburban Arterials
Relationship of Lane Width to Safety for Urban and Suburban Arterials Ingrid B. Potts Principal Traffic Engineer Midwest Research Institute 425 Volker Boulevard Kansas City, MO 64110-2299 Tel: (816) 360-5284
More informationEXPERIENCE WITH GEOGRAPHIC INFORMATION SYSTEMS (GIS) / MAPPING
EXPERIENCE WITH GEOGRAPHIC INFORMATION SYSTEMS (GIS) / MAPPING TEC has performed many GPS/GIS inventory projects and studies for the Ohio Department of Transportation (ODOT), Counties, and municipalities.
More informationGUARDRAIL INNOVATION FLOWS FROM HERE
INNOVATION FLOWS FROM HERE ENSURING SAFETY ON CANADIAN HIGHWAYS The economics, versatility, and performance of Guardrail surpass all other roadside barrier systems. Guardrail provides highly-visible protection
More informationSCHEDULE 12 DBFO AGREEMENT EXECUTION VERSION 4. LANDS
SCHEDULE 12 LANDS 1. GENERAL 1.1 Capitalized Terms Capitalized terms used in this Schedule have the definitions as set out in the Agreement to Design, Build, Finance and Operate Southeast Stoney Trail,
More informationTHE ROAD ZIPPER SYSTEM. Moving People. Safer. Faster. Smarter... Better
THE ROAD ZIPPER SYSTEM TM Moving People. Safer. Faster. Smarter... Better BEN FRANKLIN BRIDGE: PHILADELPHIA, PA WHY LINDSAY? INSTALLATIONS ACROSS THE WORLD, INCLUDING Sydney, Australia Philadelphia, PA
More informationASSET MANAGEMENT GUIDE FOR PROJECT DESIGN FORMAT
ASSET MANAGEMENT GUIDE FOR PROJECT DESIGN FORMAT 1. BACKGROUND There has been an increasing awareness of design features, which produce poor whole-of-life costs. These poor whole-of-life costs manifest
More informationHighway Safety Evaluation. What Is Out There
Highway Safety Evaluation What Is Out There Workshop Series Wed. Nov. 6 Wed. Nov. 13 Wed. Nov. 20 Wed. Dec 4 Wed. Dec. 11 Wed. Dec. 18 Wed. Jan. 8 Wed. Jan. 15 Wed. Jan. 22 Wed. Jan. 29 Highway Safety
More informationSafety Risk Analysis and Proposing Risk Mitigation Strategies for Operations and Maintenance Activities in Highways: A Qualitative Method
525 Safety Risk Analysis and Proposing Risk Mitigation Strategies for Operations and Maintenance Activities in Highways: A Qualitative Method Sayanti MUKHOPADHYAY 1, Jennifer S. SHANE, PhD 2, and Kelly
More information11 Guardrail. W-Beam Guardrail Pre-Installation Inspection During Installation Basis for Use. Modified Guardrail. End Treatments and Transitions
11 Guardrail W-Beam Guardrail Pre-Installation Inspection During Installation Basis for Use Modified Guardrail End Treatments and Transitions Footings and Anchors Impact Attenuators Measurement and Payment
More informationROAD SAFETY AUDIT MANAGEMENT
ROAD SAFETY AUDIT MANAGEMENT Transportation Research Record Devin Duranleau, Corresponding Author KPH Turcot, un partenariat S.E.N.C. 4333 Boulevard Grande-Allée Boisbriand, QC J7H 1M7 Tel: 778-838-5711,
More informationHIGHWAY PRODUCTS. Revised January 2008 BUILDING TOMORROW S HIGHWAY SAFETY SOLUTIONS TODAY
TRINITY HIGHWAY PRODUCTS Revised January 008 BUILDING TOMORROW S HIGHWAY SAFETY SOLUTIONS TODAY TABLE OF CONTENTS Crash Cushions 0 Posts Guardrail INNOVATION As an industry leader in the guardrail and
More informationTRAFFIC MANAGEMENT PLAN
NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Road Transport & Highways) Government of India SIX LANING OF CHANDIKHOLE JAGATPUR BHUBANESWAR SECTION OF NH-5 FROM KM 414.000 TO 419.000 AND FROM KM 0.000
More informationGuidelines. Motorcycle and Bicycle Work Zone Safety
Guidelines on Motorcycle and Bicycle Work Zone Safety This document describes work zone conditions that can cause safety concerns for motorcyclists and bicyclists. The document offers recommended practices
More information2015 OPERATIONAL PROGRAMS SCHEDULE
Project Manager Service Provider Timeline/Status DWQMS Internal Audit BluMetric Environmental DWQMS External Audit Off-site audit - November 6th 2015 SAI Global On-site audit - December 15th - 16th 2015
More informationHow To Design A Crash Investigation Site
CHAPTER 7 CRASH INVESTIGATION SITES December, 2000 7. Crash Investigation Sites (CIS) 7.1. Introduction and Usage The idea of "crash investigation sites" or areas outside of the freeway mainline where
More informationANNEX D REVIEW OF INFORMATION RECEIVED FROM HIGHWAYS AGENCY LOCAL AGENTS, BRITPAVE, AND THE VRMA
ANNEX D REVIEW OF INFORMATION RECEIVED FROM HIGHWAYS AGENCY LOCAL AGENTS, BRITPAVE, AND THE VRMA Highways Agency Area 1 Cornwall and Devon Joint response: Richard Tift, Parsons Brinckerhoff and Clive Park,
More informationENERGY ABSORPTION SYSTEMS
SRT-350 8 POST Guardrail End Treatment Assembly Manual Part No. 620296B Revised June 24, 2008 ENERGY ABSORPTION SYSTEMS SRT-350 8 POST System Guardrail End Treatment Installation, Maintenance, and Repair
More informationMeasuring the Street:
Measuring the Street: New Metrics for 21st Century Streets 1 Measuring the Street: New Metrics for 21st Century Streets New York City s streets are constantly called on to the meet new and varied needs
More informationNorthwest Region Division of Transportation Bureau of Indian Affairs
Northwest Region Division of Transportation Bureau of Indian Affairs Cinco D. Cronemeyer 911 NE 11 th Avenue Portland, OR 97232-4169 (503) 872-2872 cinco.cronemyer@bia.gov Strategic Highway Safety Plan
More informationUnit Price Averages Reports
Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation
More informationHERS_IN. HIGHWAY ECONOMIC REQUIREMENTS SYSTEM (for) INDIANA. AASHTO Transportation Estimator Association Conference October 16, 2001
AASHTO Transportation Estimator Association Conference October 16, 2001 HERS_IN HIGHWAY ECONOMIC REQUIREMENTS SYSTEM (for) INDIANA OVERVIEW HERS Background System Planning Tool Development HERS_IN Structure
More informationSpatial Distribution and Characteristics of Accident Crashes at Work Zones of Interstate Freeways in Ohio
Proceedings of the IEEE ITSC 26 26 IEEE Intelligent Transportation Systems Conference Toronto, Canada, September 17-2, 26 WB7.5 Spatial Distribution and Characteristics of Accident Crashes at Work Zones
More informationDOT HS 809 360 October 2001
U.S. Department of Transportation National Highway Traffic Safety Administration DOT HS 809 360 October 2001 Technical Report This document is available to the public from the National Technical Information
More informationTransportation Management Plan Template
DATE: TO: FROM: SUBJECT: Date Name Position Transportation Service Center Name Position Transportation Service Center Transportation Management Plan Job Number(s) Control Section(s) Route Details County
More informationJune 22, 2011 New distracted driving law comes into effect September 1
June 22, 2011 New distracted driving law comes into effect September 1 Edmonton... The most comprehensive distracted driving legislation in Canada will soon be implemented in our province. Alberta s new
More informationThe Relationship Between Asset Management and Performance Management
The Relationship Between Asset Management and Performance Management NCHRP 20-24, Task 58 Requested by: American Association of State Highway and Transportation Officials (AASHTO) Prepared by: Cambridge
More informationFALSE CLAIMS ACT COMPLAINT QUI TAM
Case 2:12-cv-00089-JRG Document 1 Filed 03/06/12 Page 1 of 10 PageID #: 1 IN THE UNITED STATES DISTRICT COURT FOR THE EASTERN DISTRICT OF TEXAS MARSHALL DIVISION JOSHUA HARMAN, on behalf of The UNITED
More informationA Review of Serious Casualty Motorcycle Crashes in Tasmania
A Review of Serious Casualty Motorcycle Crashes in Tasmania D epart ment of Infrastructure, Energy and Resources A Review of Serious Casualty Motorcycle Crashes in Tasmania Traffic and Infrastructure Branch
More informationBeginner s Permit. Survival Guide. Compliments of. (843) 263-5023 www.123drivedrivingacademy.com info@123drivedrivingacademy.com
Beginner s Permit Survival Guide Compliments of (843) 263-5023 www.123drivedrivingacademy.com info@123drivedrivingacademy.com Please use this study guide to assist you in studying for your written knowledge
More informationHow To Improve Safety
Collision Diagrams Collision diagrams are used to display and identify similar accident patterns. They provide information on the type and number of accidents; including conditions such as time of day,
More information1.1 1.2 1.3 1.4 1.4.1 1.5 1.6 ARC:
Alberta Transportation Third Party Auditor (TPA) Certification Program January 2015 (ARC Version 6) ii Table of Contents Module 1 Alberta Audit Process and Reporting Practices 1 1.1 Introduction 1.2 Definitions
More informationThe Relationship Between Asset Management and Performance Management
The Relationship Between Asset Management and Performance Management NCHRP 20-24(58) Requested by: American Association of State Highway and Transportation Officials (AASHTO) Prepared by: Cambridge Systematics,
More informationINDIANA DEPARTMENT OF TRANSPORTATION BRIDGE INSPECTION PROGRAM CODING GUIDE
INDIANA DEPARTMENT OF TRANSPORTATION BRIDGE INSPECTION PROGRAM CODING GUIDE BRAGI Bridge Reporting for Appraisal & Greater Inventory Volume III: Other INDOT Items November 2011 Item Number Item Name BRAGI
More informationTECHNICAL MEMORANDUM SUMMARY REPORT:
Texas Transportation Institute The Texas A&M University System 3135 TAMU College Station, TX 77843-3135 979-845-6375 Fax: 979-845-6107 http://tti.tamu.edu TECHNICAL MEMORANDUM Contract No.: T4541-AO Test
More informationCrash Analysis. Identify/Prioritize. Gather Data. Analyze Crashes and Identify Improvements. Review Funding Options. Implement Improvements
Crash Analysis Identify/Prioritize 1. Find high crash areas 2. Review citizen input 3. Access City/County Safety Improvement Candidate Locations Gather Data 1. Use DOT-provided crash analysis programs
More informationIncident Management Response Plan Hampton Roads Highway Incident Management Committee
Incident Management Response Plan Hampton Roads Highway Incident Management Committee Multi-Jurisdictional Memorandum of Understanding Highway Incident Management Plan This memorandum of understanding
More information