THIS PAGE IS INTENTIONALLY LEFT BLANK

Size: px
Start display at page:

Download "THIS PAGE IS INTENTIONALLY LEFT BLANK"

Transcription

1

2 THIS PAGE IS INTENTIONALLY LEFT BLANK

3 HA COMMONWEALTH OF MASSACHUSETTS Addendum No. 1, March 24, 2016 CONTRACT DOCUMENTS AND SPECIAL PROVISIONS PROPOSAL NO P.V. = $3,887, PLANS NO FOR Scheduled and Emergency Bridge Repairs (Including Painting) Br. No. L Interstate 90 over Route 20 & the Housatonic River and Other Various Locations In the Town of LEE In accordance with the 1988 English Edition of the STANDARD SPECIFICATIONS For HIGHWAYS and BRIDGES and the Supplemental Specifications dated July 1, 2015 This Proposal to be opened and read: TUESDAY, MAY 3, 2:00 P.M.

4 THIS PAGE IS INTENTIONALLY LEFT BLANK

5 DOCUMENT Addendum No. 1, March 24, 2016 NOTICE TO CONTRACTORS Electronic proposals for the following project will be received through the internet using Bid Express until the date and time stated below and will be posted on forthwith after the bid submission deadline. No paper copies of bids will be accepted. All Bidders must have a valid Digital ID issued by MassDOT in order to bid on projects. Bidders need to apply for a Digital ID at least 14 days prior to a scheduled bid opening date with Bid Express. TUESDAY, MAY 3, 2016 at 2:00 P.M. ** LEE Scheduled and Emergency Bridge Repairs (Including Painting) Br. No. L Interstate 90 over Route 20 & the Housatonic River and Other Various Locations **Date Subject to Change PROJECT VALUE = $3,887, Bidders must be pre-qualified by the Department in the BRIDGE-CONSTRUCTION OR PAINTING-STRUCTURAL categories to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by the Department prior to the opening of Proposals. All prospective Bidders who intend to bid on this project must obtain Request for Official Proposal Form (R109). The blank Request for Official Proposal Form (R109) can be obtained at: Select the link Request for Official Proposal Form (R-109 Form). All prospective Bidders must complete and an electronic copy of Request for Official Proposal Form (R109) to the MassDOT Director of Prequalification for approval: [email protected]. Upon approval, the Official Bidders will be entitled to receive an officially numbered Compact Disc (CD) containing the Plans and Specifications, free of charge. Other interested parties may receive an informational copy of the Compact Disc (CD) containing the Plans and Specifications, free of charge. Only officially numbered Compact Disc (CD) shall be used for bidding purposes. Bids will be considered, and the contract awarded in accordance with statutes governing such contracts Massachusetts General Laws Chapter 30 39M

6 NOTICE TO CONTRACTORS (Continued) All parties who wish to have the CDs mailed to them must provide a completed mailing label with an approved carrier account number for mail service (i.e. Federal Express, UPS, etc) to the Bid Document Distribution Center. Bid Document Distribution Center MassDOT 10 Park Plaza - Suite 6261 Boston, MA Attn: Frank Kucharski, P. E., Construction Contracts Engineer A Proposal Guaranty in the amount of 5% of the value of the bid is required. This project is subject to the schedule of prevailing wage rates as determined by the Commissioner of the Massachusetts Department of Labor and Workforce Development, and the Division of Occupational Safety. Plans will be on display and information will be available at the MassDOT Boston Office and at the District Office in LENOX

7 NOTICE TO CONTRACTORS (Continued) Addendum No. 1, March 24, 2016 PRICE ADJUSTMENTS This Contract contains price adjustments for hot mix asphalt and Portland cement mixtures, diesel fuel, and gasoline. For this project the base prices are as follows: liquid asphalt $ per ton, Portland cement $ per ton, diesel fuel $1.478 per gallon, and gasoline $1.392 per gallon. MassDOT posts the Price Adjustments on their s website at under the following link sequences: Doing Business With Us Construction Price Adjustments This Contract contains Price Adjustments for steel. See Document PRICE ADJUSTMENT FOR STRUCTURAL STEEL AND REINFORCING STEEL of the Special Provisions for their application. The Base Prices for these items on this project are as follows: Rebar ASTM A615/A615M Grade 60 (AASHTO M31 Grade 420) Reinforcing Steel = $0.32 per pound Structural Steel ASTM A709 (AASHTO M270) Grade 36 Structural Steel Plate = $0.52 per pound ASTM A709 (AASHTO M270) Grade 36 Structural Steel Shapes = $0.37 per pound MassDOT projects are subject to the rules and regulations of the Architectural Access Board (521 CMR 1.00 et seq.) Prospective bidders and interested parties can access this information and more via the internet at BY: Stephanie Pollack, Secretary and CEO, MassDOT Thomas J. Tinlin, Administrator, MassDOT SATURDAY, FEBRUARY 20,

8 THIS PAGE IS LEFT BLANK INTENTIONALLY

9 DOCUMENT Addendum No. 1, March 24, 2016 ELECTRONIC REPORTING REQUIREMENTS CIVIL RIGHTS PROGRAMS AND CERTIFIED PAYROLL Implemented on March 2, 2009 Revised March 14, 2016 The Massachusetts Department Of Transportation (MassDOT) has replaced the CHAMP reporting system with Equitable Business Opportunity Solution (EBO), a new web-based civil rights reporting software system. This system is capable of handling both civil rights reporting requirements and certified payrolls. The program s functions include the administration of Equal Employment Opportunity (EEO) requirements, On-The-Job Training requirements (OJT), Disadvantage Business Enterprise (DBE) and/or Minority / Women s Business Enterprise (M/WBE) subcontracting requirements, and the electronic collection of certified payrolls associated with MassDOT projects. In addition, this system is used to generate various data required as part of the American Recovery and Reinvestment Act (ARRA). Contractors are responsible for all coordination with all sub-contractors to ensure timely and accurate electronic submission of all required data. Contractor and Sub-Contractor EBO User Certification All contractors and sub-contractors must use the EBO software system. The software vendor, Internet Government Solutions (IGS), has developed an online EBO Training Module that is available to contractors and sub-contractors. This module is a self-tutorial which allows all users in the company to access the training, complete the tutorial, and become certified as EBO users for a one time fee of $ This is the only cost to contractors and sub-contractors associated with the EBO software system. The online EBO Training Module can be accessed at Click the Register My Company button on the login page to begin your training registration. Questions regarding EBO online training should be directed to Gerry Anguilano, IGS at (866) MassDOT will track contractors and sub-contractors who have successfully completed the on-line training module. All persons performing civil rights program and/or certified payroll functions should be EBO certified. Vetting of Firms and Designated Firm Individuals Contractors must authorize a Primary Log-In ID Holder who has completed EBO on-line training to have access to the EBO system by completing and submitting the Request For EBO System Log-In/Password Form located on the MassDOT website at: m/obtainingaloginpassword.aspx Contractors must also agree to comply with the EBO system user agreement located on the MassDOT website. All subcontracts entered into on a project must include language that identifies the submission and training requirements that the sub-contractor must perform. Sub-contractors will be approved by the respective District Office of MassDOT through the existing approval process. When new sub-contractors, who have not previously worked for MassDOT, are initially selected by a general contractor, the new sub-contractor must be approved by the District before taking the EBO on-line training module. Interim Reporting Requirements Until MassDOT is satisfied that the EBO system is fully operational and functioning as designed, contractors and sub-contractors will be required to submit certified payrolls manually. There will be a transition period where dual reporting, through manual and electronic submission, will be required. MassDOT, however, will notify contractors and sub-contractors when they may cease manual submission of certified payrolls. *** END OF DOCUMENT ***

10 THIS PAGE INTENTIONALLY LEFT BLANK

11 ITEM COMPOST FILTER TUBES FOOT (Revised December 2015) The work under this Item shall conform to the relevant provisions of Sections751 and 767 of the Standard Specifications and the following. The purpose of this item is to provide a linear, compost-filled tube for filtering suspended sediments and improve water quality from storm water flow. MATERIALS Material for the filter tubes shall be compost meeting M1.06.0, except that no manure or biosolids shall be used. In addition, no kiln-dried wood or construction debris shall be allowed. Particle size analysis: 98% shall pass through a 3 inch (75mm) sieve; 30-50% shall pass 3/8 inches (10mm) sieve. Tubes for compost filters shall be a minimum of 12 inches (300 mm), a maximum of 18 (450mm) in diameter. Tube material shall be a knitted mesh with 1/8-3/8 (3-10 mm) openings, and made of biodegradable (cotton or jute) materials. Additional tubes shall be used at the direction of the Engineer. Stakes for anchors, if required, shall be nominal 2 x 2 stakes. CONSTRUCTION METHODS Tubes of compost may be filled on site or shipped. Tubes shall be placed, filled and staked in place as required to ensure stability against water flows. All tubes shall be tamped to ensure good contact with soil. Stakes shall not puncture compost tubes. The Contractor shall ensure that the filter tubes function as intended at all times. Tubes shall be inspected after each rainfall and at least daily during prolonged rainfall. The Contractor shall immediately correct all deficiencies, including, but not limited, to washout, overtopping, clogging due to sediment, and erosion. The contractor shall review location of tubes in areas where construction activity causes drainage runoff to ensure that the tubes are properly located for effectiveness. Where deficiencies exist, such as overtopping or wash-out, additional staking or compost material shall be installed as directed by the Engineer. Contractor shall remove sediment deposits as necessary to maintain the filters in working condition. The functional integrity of filter tubes shall be maintained in sound condition at all times. Filter tubes that are decomposing, cut, or otherwise compromised shall be repaired or replaced as directed by the Engineer and be incidental to this item. Filter tube fabric and stakes shall be removed by the Contractor when site conditions are sufficiently stable to prevent surface erosion, and after receiving permission to do so from the Engineer. All biodegradable tube fabric shall be cut and laid flat in place to decompose on-site at the direction of the Engineer. Tube fabric that is not decomposing satisfactorily shall be removed and disposed off-site by the Contractor. At the direction of the Engineer, the Contractor may rake out and seed compost so that it is no greater than 2 inches (50 mm) in depth on soil substrate. A

12 ITEM (Continued) Addendum No. 1, March 24, 2016 COMPENSATION Measurement for this item will be per FOOT of Compost Filter Tube installed, approved, and maintained in place. Payment will be per FOOT which price shall be full compensation for all labor, equipment and materials necessary to complete the work specified above, including, but not limited to, stakes and tube fabric, compost mulch wedge along top of tubes, removal and disposal of fabric and stakes, raking and seeding of compost. ITEM TEMPORARY BARRIER REMOVED AND RESET FOOT Work under this item shall consist of removing, transporting and resetting temporary barrier systems and limited deflection temporary barrier systems from alignments established along the roadway to new alignments in accordance with the details shown on the plans, as required by the construction and staged construction operations and as required by the Engineer for the channelization of traffic and/or work zone protection. The work shall also include furnishing and installing all hardware and associated materials per the details and/or manufacturer s specifications for anchored or restrained temporary barrier systems. The work shall also include necessary patches and repairs caused by the temporary barrier system to damaged pavement surfaces or any adjacent longitudinal barrier once the system has been removed. CONSTRUCTION METHODS Temporary barrier systems and limited deflection temporary barrier systems shall be removed from existing locations and reset in accordance to the Construction Methods stated in Item Damage to the pavement surface or adjacent permanent barriers caused by removing or resetting temporary barrier shall be repaired as directed by the Engineer at the Contractor s expense. METHOD OF MEASUREMENT AND BASIS OF PAYMENT Item shall be measured by the foot, in place. Payment for work under this item shall be made at the Contract price per Foot, which shall provide full compensation for removing, relocating, resetting, realigning, and transporting maintaining the temporary barrier system and/or limited deflection temporary barrier system. A

13 ITEM (Continued) Addendum No. 1, March 24, 2016 The Contractor will be paid for this item each time the barrier is relocated either to a new work zone, to off-season storage, or back to the project from storage. The Contractor will not be separately compensated for any work necessary to maintain or re-align units or replace damaged units. No payment will be made for removing and resetting barriers for the purpose of gaining access to the construction work zone. No payment will be made for removing, relocating and resetting any barriers moved for the convenience of the Contractor. For temporary barrier systems that require anchorage systems, the cost of furnishing, installing and removing the anchorage and hardware and the restoration of pavement surfaces or adjacent permanent barrier systems to facilitate anchorage shall be considered incidental to the cost of the item. ITEM TEMPORARY BARRIER LIMITED DEFLECTION (TL-3) FOOT Work under this item shall consist of furnishing, installing, maintaining and final removal of limited deflection TL-3 temporary barrier systems for channelization of traffic and/or work zone protection. Limited deflection temporary barrier systems shall have a maximum dynamic deflection of 24 inches or less and shall be used in areas where the available clear area behind the barrier system is 24 inches or less. MATERIALS The following limited deflection temporary barrier systems are acceptable for use: 1. BarrierGuard 800; Highway Care International J-J Hooks F-Shape Temporary Concrete Barrier; Easi-Set Industries ZoneGuard; Hill & Smith, Inc Texas DOT X-Bolt F-Shaped Concrete Safety Barrier The Contractor may submit alternate materials to the Engineer for approval if the limited deflection temporary barrier system meets the following criteria: 1. The system has been tested by an independent laboratory that is accredited by FHWA to crash test roadside hardware; 2. The system meets the minimum requirements of the AASHTO Manual on Assessing Safety Hardware (MASH) at Test Level (TL) 3 or higher; and 3. The system has a federal-aid eligibility letter from FHWA. A A

14 ITEM (Continued) Addendum No. 1, March 24, 2016 Copies of the testing results and the federal-aid eligibility letter shall be submitted and approved by the Engineer prior to procurement of an alternate temporary barrier system. The Contractor shall supply shop drawings to confirm the available clear area behind the barrier equals or exceeds the maximum dynamic deflection of MASH Test 3-11 during testing procedures taken at an independent laboratory that is accredited by FHWA to crash test roadside hardware. Delineators shall be installed on all limited deflection temporary barrier systems in conformance with the relevant provisions of Section and shall be incidental to the temporary barrier systems. Temporary impact attenuators that are listed on the Qualified Traffic Control Equipment List shall be used whenever a blunt end of the limited deflection temporary barrier system is facing traffic within the clear zone unless it is protected by a second barrier system or secured to a separate barrier system or bridge railing by a method approved by the manufacturer. CONSTRUCTION METHODS Limited deflection temporary barrier systems shall be placed in line with the drawings. Installation shall be per the manufacturer s specifications, details, and the approved shop drawings. The Contractor shall not place any breaks in the limited deflection temporary barrier system that will result in sections that are shorter than the stated minimum length-of-need (LON) under MASH Test Exceptions shall be allowed for gate systems or changeable length segments placed over expansion joints if those barrier segment types have been tested and meet the minimum requirements of MASH Test 3-11 with the adjoining limited deflection barrier system. Within the LON section, limited deflection temporary barrier systems shall only be placed on paved surfaces unless otherwise tested and certified under MASH TL-3 for those conditions. Damage to the pavement surface caused by the limited deflection temporary barrier during installation, while in service, and/or during removal shall be repaired as directed by the Engineer at the Contractor s expense Limited deflection temporary barrier systems that require anchorage systems shall conform with the relevant provisions of Section A B

15 ITEM (Continued) Addendum No. 1, March 24, 2016 METHOD OF MEASUREMENT AND BASIS OF PAYMENT Item shall be measured by the Foot, in place. Payment for work under this item shall be made at the Contract price per Foot for limited deflection temporary barrier installed in place, including all incidental items. This price shall include the cost of furnishing, installing, maintaining and final removal of all limited deflection temporary barrier systems. For limited deflection temporary barrier systems that require anchorage systems, the cost of furnishing and installing the anchorage and hardware and the restoration of pavement surfaces or adjacent permanent barrier systems to facilitate anchorage shall be considered incidental to the cost of the item. Payment for limited deflection temporary barrier removed and reset will be made under Item A C

16 Addendum No. 1, March 24, 2016 ITEM TEMPORARY IMPACT ATTENUATOR (TL-3) EACH ITEM TEMPORARY IMPACT ATTENUATOR (TL-3) EACH REMOVED AND RESET Work under these items shall consist of furnishing, installing, maintaining and final removal of temporary impact attenuator systems for protection of the ends of temporary barrier and other roadside hazards in work zones. All work shall be in conformance with the specifications of the manufacturer and in close conformance with the locations, lines, and grades shown on the plans. Installation, removal and resetting, and final removal will be at the direction of the Engineer. MATERIALS The Contractor shall supply a temporary attenuator that meets the same or higher crash Test Level (TL) as the adjacent temporary barrier, unless otherwise shown on the plans. The temporary attenuator shall be listed on the Department s Qualified Traffic Control Equipment List. The temporary impact attenuator shall be designed to fit within reasonably close tolerance of the dimensions given on the plans. The Contractor shall supply shop drawings for the temporary attenuator and for any anchorage system and for any transitions or connections between the temporary attenuator and the adjacent barrier or other roadside hazard. CONSTRUCTION METHODS The side of the temporary attenuator that faces traffic shall include a Type 3 Object Marker that conforms to the language found in Sections 2C.64 and 2C.65 of the Manual on Uniform Traffic Control Devices. The work shall also include necessary patches and repairs caused by the temporary impact attenuator system to damaged pavement surfaces or any adjacent longitudinal barrier once the system has been removed. Installation means and methods shall be per the manufacturer s specifications and/or drawings. Excavation for temporary attenuator foundations and anchorage shall be made to the required depth and to a width that will permit the installation and bracing of forms where necessary. All soft and unsuitable material shall be replaced with compacted gravel borrow. The Contractor shall supply the Engineer instructions for installation and the manufacturer s recommended routine inspection and maintenance program. The cost of inspection and maintenance of temporary attenuators shall be considered incidental in nature. A D

17 Addendum No. 1, March 24, 2016 ITEMS and (Continued) Damaged temporary impact attenuators shall be replaced by the Contractor within 24 hours or as directed by the Engineer, at the Contractor s expense. A truck mounted attenuator that meets the same or higher TL, or other means of protecting the damaged temporary impact attenuator, shall be deployed until the repairs or replacement has been completed, at the Contractor s expense. METHOD OF MEASUREMENT AND BASIS OF PAYMENT Items shall be measured as a single unit Each furnished and installed in place. Item shall be measured by Each unit, which shall provide full compensation for removing, relocating, resetting, transporting, and maintain the impact attenuator. The Contractor will be paid for Item each time the temporary impact barrier is relocated to a new work zone and shall not be separately compensated for any work to replace damaged units. The Contractor shall not be paid for removing, relocating, and resetting any impact attenuators for the convenience of the Contractor. Payment for work under these Items shall be made at the Contract unit price each. This price shall include the cost of all labor and materials for furnishing, foundations and anchorages, installation, maintenance and final removal, and all incidental work necessary to complete the work as specified. A E

18 Addendum No. 1, March 24, 2016 ITEM SLOTTED PAVEMENT MARKINGS ONE-WAY WHITE EACH REMOVED AND REPLACED Work under this Item shall consists of removing old Slotted Pavement Markings at the direction of the Engineer and at the completion of the work assignment placing new Slotted Pavement Markings, at the direction of the Engineer. The work to be done under this item shall consist of furnishing and installing one-way white reflectorized pavement markers (slotted in pavement) in accordance with the relevant provisions of Traffic Standard TR.6.5 Typical Pavement Markings for Conventional Roadways, and the following: One-way white markers shall be installed along the broken white lane lines (skip lines) at the midway point between successive skip lines at 80 foot intervals on the mainline. CONSTRUCTION METHODS The work shall include cutting the tapered pavement slot to the dimensions specified by the chosen manufacturer for the one-way markers, application of the manufacturer s recommended epoxy adhesive, and placing the reflectorized pavement marker in the proper position within the slot so that the reflective face is visible and perpendicular to oncoming traffic and so that the top of the marker is set 1/8± inch below the top of the adjacent pavement. Only motorized vehicles with specialized grinding equipment intended for these purposes shall be used to grind out the slots for the recessed pavement markers. No manually-propelled or walk behind carts will be allowed. Equipment that does not produce slots that remain in true alignment with the striping centerline shall be replaced with satisfactory equipment as directed by the Engineer. Surface preparation and installation shall be strictly in accordance with the manufacturer s instructions. Pavement markers shall not be placed on pavement surfaces that show evidence of cracking, checking, spalling or failure of underlying base material. If during the laying out process, it is determined that the marker would be installed at a point with one of the aforementioned surface defects or at a pavement construction joint, then the marker shall be relocated a distance not to exceed 10% of the typical marker spacing. If the marker cannot be located within this 10% margin then this marker shall be deleted. The minimum pavement surface temperature at the time of application shall be that recommended by the epoxy manufacturer. No markers shall be installed if the pavement surface or precut slots are wet. A F

19 ITEM (Continued) Addendum No. 1, March 24, 2016 The marker shall be protected against traffic until the adhesive has hardened. The following table may be used as a guideline. Ambient Air Temp Minimum Period Protected F from Traffic (Minutes) * 45 *No installation will be made at a lower temperature than 50 F unless the epoxy manufacturer can guarantee his produce will harden sufficiently at this lower temperature to withstand traffic in 45 minutes. MATERIALS Reflectorized pavement markers shall be 3M Series 290, Ennis Flint Stimsonite C80, Rayolite Model 2004 or an approved equal. METHOD OF MEASUREMENT AND BASIS OF PAYMENT Item will be measured for payment by the Each slotted pavement markings one-way white removed and replaced complete in place. Item will be paid at the Contract unit price per Each, which price shall include removal and disposal of existing slotted pavement marker, cutting the tapered pavement slot, furnishing and installation of the reflectorized markers, including all necessary materials, labor, equipment and incidental costs required to complete the work. A

20 ITEM PSI, 3/8 IN., 660 CEMENT CONCRETE CUBIC YARD All work shall conform to the relevant provisions of Section 901 of the Standard Specifications and the following: a) The work under this item consists of furnishing and placing 4,000 PSI, 3/8 IN., 660 Cement Concrete Masonry to repair bridge decks, superstructures, substructures, and culverts, as directed. b) The Contractor shall have the approval of the Engineer certifying that the existing concrete has been removed to the required limits and that adequate surface preparation has been achieved before any concrete is placed. c) Bonding Agent: Immediately prior to all concrete pours, the Contractor will apply an approved bonding agent to the excavated surfaces of the concrete. The bonding agent will be worked into the surfaces with stiff brushes or brooms in accordance with Sub-Section C BONDING TO CONCRETE ALREADY SET section at the beginning of these special provisions. Bonding Agent will be considered incidental to this Item. When directed, the Contractor shall use specialized materials, equipment, and crews to pour the concrete in accordance with the Standard Specifications in Section 901. This specialized work includes, but is not limited to, the following: Motorized Screed: When so directed, the Contractor shall use an approved motorized screed to properly finish a deck pour. This will only be required for large deck pours as required by the Engineer. Concrete Pump Truck: When so directed, the Contractor shall use an approved concrete pump truck to properly place the concrete. The pump truck will also be used to prevent a lane closure in the lane adjacent to the pour. Under no circumstances, will the pump truck be driven over a deck that is partially excavated. Finishing Crew: When so directed, the Contractor will use a specialized finishing crew to properly finish the deck pours. Additionally, any concrete cracks caused by shrinkage or temperature stresses during the curing of new concrete, poured under this item and exposed to traffic, shall be sealed. This work includes: 1. Before sealing, the concrete must be dry, clean and free of contaminants. The concrete shall then be blown clean using oil free compress air immediately prior to applying the sealer. 2. The cracks shall be v-notched to a minimum depth of ½ inch or a ¼ inch bead of caulk shall be placed on both sides of the crack creating a trough. The crack sealer shall then be poured into the v-notch or trough. The crack shall then be observed for seepage of crack sealer and shall be refilled as necessary to ensure the crack is completely filled. A

21 M Addendum No. 1, March 24, 2016 Project # Location Contract # : LEE Description : Scheduled and Emergency Bridge Repairs (Including Painting) Br. No. L Interstate 90 over Route 20 & the Housatonic River and Other Various Locations. ITEM # M 100. QUANTITY 1 ITEM WITH UNIT BID PRICE WRITTEN IN WORDS SCHEDULE OF OPERATIONS - FIXED PRICE $33500 UNIT PRICE AMOUNT $33, $33, AT Thirty Three Thousand Five Hundred Dollars LUMP SUM BASE LABOR RATE PER HOUR BRIDGE CURB REMOVED AND RESET PER FOOT CRIBBING PER BEAM END EACH SHORING PER BEAM END (L ) EACH SHORING PER BEAM END REMOVED & RESET (L ) EACH PRESSURE INJECTION OF CRACKS PER FOOT ,571 STRUCTURAL STEEL REPAIRS PER POUND UNCLASSIFIED EXCAVATION PER CUBIC YARD CMS104 - Report Run Date: 3/24/ :17 AM Page 2 B

22 Project # Contract # Location : LEE Description : Scheduled and Emergency Bridge Repairs (Including Painting) Br. No. L Interstate 90 over Route 20 & the Housatonic River and Other Various Locations. ITEM # QUANTITY ITEM WITH UNIT BID PRICE WRITTEN IN WORDS REINFORCED CONCRETE EXCAVATION UNIT PRICE AMOUNT PER CUBIC YARD REINFORCED CONCRETE EXCAVATION (SUBSTRUCTURE) PER CUBIC YARD REINFORCED CONCRETE DECK EXCAVATION (FULL DEPTH) PER SQUARE YARD REINFORCED CONCRETE DECK EXCAVATION (PARTIAL DEPTH) PER CUBIC YARD ,760 OLD PAVEMENT EXCAVATION PER SQUARE YARD OLD ASPHALTIC PLUG JOINT REMOVED & DISCARDED PER FOOT ,320 PAVEMENT MILLING (QUALITY ASSURANCE) PER SQUARE YARD GRAVEL BORROW - TYPE C PER CUBIC YARD POLYVINYLCHLORIDE DRAIN PIPE PER FOOT CMS104 - Report Run Date: 3/24/ :17 AM Page 3 B

23 Project # Contract # Location : LEE Description : Scheduled and Emergency Bridge Repairs (Including Painting) Br. No. L Interstate 90 over Route 20 & the Housatonic River and Other Various Locations. ITEM # QUANTITY ITEM WITH UNIT BID PRICE WRITTEN IN WORDS SAFETY SIGNING FOR TRAFFIC MANAGEMENT UNIT PRICE AMOUNT PER SQUARE FOOT ,760 TEMPORARY BARRIER REMOVED AND RESET PER FOOT ,040 TEMPORARY BARRIER - LIMITED DEFLECTION (TL-3) PER FOOT TRUCK MOUNTED ATTENUATOR PER DAY TEMPORARY IMPACT ATTENUATOR (TL-3) EACH TEMPORARY IMPACT ATTENUATOR (TL-3) REMOVED AND RESET EACH ,260 TEMPORARY PAVING MARKINGS - 6 INCH (PAINTED) PER FOOT ,780 PAVEMENT MARKING REMOVAL ARROW BOARD PER SQUARE FOOT PER DAY CMS104 - Report Run Date: 3/24/ :17 AM Page 6 B

24 Project # Contract # Location : LEE Description : Scheduled and Emergency Bridge Repairs (Including Painting) Br. No. L Interstate 90 over Route 20 & the Housatonic River and Other Various Locations. ITEM # QUANTITY ITEM WITH UNIT BID PRICE WRITTEN IN WORDS PORTABLE CHANGEABLE MESSAGE SIGN UNIT PRICE AMOUNT PER DAY ,250 REFLECTORIZED DRUM PER DAY ,200 6 INCH REFLECTORIZED WHITE LINE (PAINTED) PER FOOT ,360 6 INCH REFLECTORIZED YELLOW LINE (PAINTED) PER FOOT SLOTTED PAVEMENT MARKINGS ONE WAY WHITE REMOVED AND REPLACED EACH PSI, 3/8 IN., 660 CEMENT CONCRETE PER CUBIC YARD CEMENTITIOUS MORTAR FOR PATCHING PER SQUARE FOOT ,538 STEEL REINFORCEMENT FOR STRUCTURES - EPOXY COATED PER POUND ,615 CLEAN (FULL REMOVAL) AND PAINT STEEL BEAM ENDS AND BEARINGS (L ) PER SQUARE FOOT CMS104 - Report Run Date: 3/24/ :17 AM Page 7 B

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted 02-20-14)

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted 02-20-14) POLYMERIC CONCRETE BRIDGE DECK OVERLAY (Adopted 02-20-14) Description The polymeric concrete bridge deck overlay shall consist of an epoxy polymer that acts together with special aggregate to form an overlay

More information

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE 311.1 DESCRIPTION: This item shall consist of a cement treated subgrade base course composed of a mixture of local soil, portland

More information

WILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued)

WILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued) BIDDER'S PROPOSAL (continued) Item Estimated No. Description Quantity Unit Unit Cost Total Cost BASE BID 1 Traffic Control 1 LS $ $ 2 Construction Area Signs 1 LS $ $ 3 Excavation Safety 1 LS $ $ 4 Reset

More information

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains

More information

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1 6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT

More information

C. Section 014510 TESTING LABORATORY SERVICE.

C. Section 014510 TESTING LABORATORY SERVICE. SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,

More information

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND.

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. 623.10.1 Description. This work shall consist of preparing the surface,

More information

SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES

SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES 1. DESCRIPTION. Asphalt Waterproofing Mix (AWM) is a highly elastomeric, polymermodified, impermeable asphalt

More information

LOWELL REGIONAL WASTEWATER UTILITY SPECIFICATIONS FOR THE LOWELL MA CONCRETE FLOODWALL REPAIRS

LOWELL REGIONAL WASTEWATER UTILITY SPECIFICATIONS FOR THE LOWELL MA CONCRETE FLOODWALL REPAIRS Concrete Repairs LOWELL REGIONAL WASTEWATER UTILITY SPECIFICATIONS FOR THE LOWELL MA CONCRETE FLOODWALL REPAIRS PART 1 - GENERAL 1.01 DESCRIPTION OF WORK A. The work will occur within the City of Lowell

More information

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS Section Page 36-1 GENERAL... 36.1 36-2 PIPEMAKING EQUIPMENT... 36.1 36-3 TRENCH EXCAVATION... 36.1 36-4 SPECIAL FOUNDATION TREATMENT...

More information

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional

More information

Wastewater Capital Projects Management Standard Construction Specification

Wastewater Capital Projects Management Standard Construction Specification CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,

More information

CONSTRUCTION PERMIT REQUIREMENTS

CONSTRUCTION PERMIT REQUIREMENTS CONSTRUCTION PERMIT REQUIREMENTS Any work to be done in the City right-of-way (ROW), in a utility easement, and certain work on private property, requires an Engineering Inspection Permit from the Department

More information

SECTION 02400 - STORM DRAIN SYSTEM

SECTION 02400 - STORM DRAIN SYSTEM SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And

More information

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

SECTION 02845 GUARDRAILS

SECTION 02845 GUARDRAILS SECTION 02845 GUARDRAILS PART 1 - GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals necessary and repair, replace or install all types of guardrails as specified herein

More information

Table 4.9 Storm Drain Inlet Protetion Applicable for

Table 4.9 Storm Drain Inlet Protetion Applicable for BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection

More information

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

Section 02702 SEWER PIPE INSTALLATION AND TESTING

Section 02702 SEWER PIPE INSTALLATION AND TESTING PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. SCOPE. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete

More information

HIGH TENSION CABLE BARRIER

HIGH TENSION CABLE BARRIER Special Provision September 11, 2006 SECTION 02845 S HIGH TENSION CABLE BARRIER PART 1 GENERAL 1.1 SECTION INCLUDES A. Cable barrier materials and installation procedures. 1.2 RELATED SECTIONS A. Section

More information

SECTION 02630 STORM DRAINAGE SYSTEM

SECTION 02630 STORM DRAINAGE SYSTEM SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE

More information

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20

More information

Construction Specifications for Keyhole Pavement Coring and Reinstatement

Construction Specifications for Keyhole Pavement Coring and Reinstatement F I N A L Construction Specifications for Keyhole Pavement Coring and Reinstatement Gas Technology Institute 1700 S. Mount Prospect Rd. Des Plaines, Illinois 60018 www.gastechnology.org Version 13 October

More information

NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE

NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE GENERAL a. These specifications may be used in whole or in part by any party without

More information

Asphaltic Wedge Paving

Asphaltic Wedge Paving OFFICIAL NOTICE ADVERTISEMENT FOR BIDS Notice is hereby given by the Town of Oregon, Dane County, Wisconsin, will receive sealed bids for Road Construction as listed in this request until 4:00 P.M., Local

More information

SC-07 STORM DRAIN INLET PROTECTION

SC-07 STORM DRAIN INLET PROTECTION Greenville County Technical Specification for: SC-07 STORM DRAIN INLET PROTECTION 1.0 Storm Drain Inlet Protection 1.1 Description Provide Storm Drain Inlet Protection at all existing and newly installed

More information

DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION MATERIALS CONSTRUCTION REQUIREMENTS

DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION MATERIALS CONSTRUCTION REQUIREMENTS 304.06 DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION 304.01 This work consists of furnishing and placing one or more courses of aggregate and additives, if required, on a prepared subgrade.

More information

Tabulation of Bids. Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date: 03/04/14

Tabulation of Bids. Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date: 03/04/14 Solcitation No: DTFH71-14-B-00008 Division: Eastern Federal Lands State: DC County: Federal Land: 1 out of 9 Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date:

More information

Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS

Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS TABLE OF CONTENTS 2.18 CONCRETE AND/OR CORRUGATED STEEL STORM SEWER... 1 2.18.1 GENERAL... 1 2.18.2 MATERIALS... 1 2.18.2.1 Storm Sewer Pipe... 1 2.18.2.2 Cement Mortar... 1 2.18.2.3 Granular Materials...

More information

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION Design Criteria Drainage Area The drainage area for storm drain inlets shall not exceed one acre. The crest elevations of these practices shall

More information

STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES

STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES CITY OF PETALUMA STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES AUGUST 1999 Revised 10/98 City of Petaluma Petaluma, California STORM DRAIN INSTALLATION DETAIL

More information

September 1, 2003 CONCRETE MANUAL 5-694.900 CONCRETE PAVEMENT REHABILITATION 5-694.900

September 1, 2003 CONCRETE MANUAL 5-694.900 CONCRETE PAVEMENT REHABILITATION 5-694.900 September 1, 2003 CONCRETE MANUAL 5-694.900 5-694.901 GENERAL CONCRETE PAVEMENT REHABILITATION 5-694.900 Concrete Pavement Rehabilitation is an extremely valuable tool of the Minnesota Department of Transportation

More information

CLEANING, INSPECTION, AND TESTING OF SEWERS

CLEANING, INSPECTION, AND TESTING OF SEWERS CLEANING, INSPECTION, AND TESTING OF SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Cleaning, Inspecting, and Testing Sanitary Sewers B. Cleaning, Inspecting, and Testing Storm Sewers C. Cleaning and

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 CITY OF SAN ANTONIO Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 (010) FORMAL INVITATION FOR BIDS (IFB) to CONTRACT 2016-2017 TASK ORDER CONTRACT

More information

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 1 PLAN SUBGRADES Geotechnical Bulletin GB1 was jointly developed by the Offices

More information

Storm Drain Inlet Protection - IP

Storm Drain Inlet Protection - IP Storm Drain Inlet Protection - IP DEFINITION A temporary protective device formed around a storm drain drop inlet to trap sediment. PURPOSE To prevent sediment from entering storm drainage systems, prior

More information

Safe & Sound Bridge Terminology

Safe & Sound Bridge Terminology Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries

More information

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation 644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING

More information

SE-10 STORM DRAIN INLET PROTECTION. Objectives

SE-10 STORM DRAIN INLET PROTECTION. Objectives STORM DRAIN INLET PROTECTION SE-10 Objectives Erosion Control - EC Sediment Control - SE Tracking Control - TC Wind Erosion Control - WE Non-Storm Water Management - NS Waste and Materials Management -

More information

FDOT Specifications List

FDOT Specifications List FDOT Specifications List TABLE OF CONTENTS DIVISION II CONSTRUCTION DETAILS CLEARING CONSTRUCTION SITE 110 Clearing and Grubbing... 152 EARTHWORK AND RELATED OPERATIONS 120 Excavation and Embankment...

More information

CHAPTER 14: GUARDRAIL and BARRIERS

CHAPTER 14: GUARDRAIL and BARRIERS CHAPTER 14: GUARDRAIL and BARRIERS If you have any questions regarding guardrail, end treatments and/or pay items included in your plan, please contact the Project Design Services Unit or the Design Standards

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks

More information

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING. 16.1 General...16-1. 16.2 Materials...16-1. 16.3 Equipment...

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING. 16.1 General...16-1. 16.2 Materials...16-1. 16.3 Equipment... SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING TABLE OF CONTENTS 16.1 General...16-1 16.2 Materials...16-1 16.3 Equipment...16-1 16.4 Installation...16-2 16.4.1 Traffic Restrictions...16-2

More information

Section 402. STORM SEWERS

Section 402. STORM SEWERS 402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide

More information

SECTION 02100 SITE PREPARATION

SECTION 02100 SITE PREPARATION SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division

More information

ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT

ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT Description: This work shall consist of furnishing all materials, equipment and labor necessary for conducting an Osterberg Cell (O-Cell) Load

More information

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA.

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA. STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA October 21, 2011 888.01 General 888.02 Materials 888.03 Concrete Proportioning 888.04

More information

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General

More information

City of Shelbyville Site Inspection Checklist

City of Shelbyville Site Inspection Checklist City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather

More information

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing

More information

SECTION 1 GENERAL REQUIREMENTS

SECTION 1 GENERAL REQUIREMENTS Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located

More information

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions. SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings

More information

CA-48 TECHNICAL SPECIFICATION

CA-48 TECHNICAL SPECIFICATION CA-48 TECHNICAL SPECIFICATION SafeLane surface overlay Pavement Substrate A Cargill Deicing Technology Product Providing customers with deicing solutions that save lives and enhance commerce. Helping to

More information

2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS

2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS 2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS GENERAL 10/16/2008 The listed average unit prices are based on the

More information

CONCRETE REPAIR GUIDELINES. Concrete repairs can be broken down into four basic types, plus special repairs and planing.

CONCRETE REPAIR GUIDELINES. Concrete repairs can be broken down into four basic types, plus special repairs and planing. CONCRETE REPAIR GUIDELINES Concrete repairs can be broken down into four basic types, plus special repairs and planing. Note: It is recommended that investigation into soundness of pavement be performed

More information

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development

More information

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11 Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;

More information

TECHNICAL SPECIFICATIONS CONCRETE SIDEWALKS, DRIVEWAYS AND CURB AND GUTTER

TECHNICAL SPECIFICATIONS CONCRETE SIDEWALKS, DRIVEWAYS AND CURB AND GUTTER TECHNICAL SPECIFICATIONS CONCRETE SIDEWALKS, DRIVEWAYS AND CURB AND GUTTER I. Scope of Work Work done under this item shall consist of the construction, reconstruction, or alteration of a one-course Portland

More information

BRIDGE FIELD PAINTING, REPAINTING, 412 AND PAINT RESIDUE CONTAINMENT. A. Field Painting, Bridge Repainting and Residue Containment:

BRIDGE FIELD PAINTING, REPAINTING, 412 AND PAINT RESIDUE CONTAINMENT. A. Field Painting, Bridge Repainting and Residue Containment: 412.1 DESCRIPTION BRIDGE FIELD PAINTING, REPAINTING, 412 This specification contains the requirements for the removal, containment, and disposal of existing paint on steel surfaces, preparing the steel

More information

DIVISION 4300 STORM DRAINAGE

DIVISION 4300 STORM DRAINAGE DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES

More information

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 Section Subsection Name Date Modification Division 1 All subsections General Provisions

More information

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING

More information

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. BMP-7 BMP: STORM DRAIN INLET PROTECTION Definition A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. To prevent sediment from entering storm drainage systems

More information

Division 2 Section 32 14 13.19 Section 02795

Division 2 Section 32 14 13.19 Section 02795 Note: The text must be edited to suit specific project requirements. It should be reviewed by a qualified civil or geotechnical engineer, or landscape architect familiar with the site conditions. Edit

More information

ASPHALT & CONCRETE SPECIFICATIONS

ASPHALT & CONCRETE SPECIFICATIONS ASPHALT REPAIR & RESURFACE GENERAL PARAMETERS The intent of these specifications is to provide detailed specifications for contractors to fallow for parking lot repairs. The property manager or construction

More information

Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS

Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS 1 Proposal & Plans Received? 2 Review Proposal, highlight important facts. Know proposal well to be able to find answers quickly.

More information

No allowance will be made for classification of different types of material encountered.

No allowance will be made for classification of different types of material encountered. PROJECT : Repair/ Maintenance of Flood Control and Drainage Structures Along Butuan City Cagayan de Oro City Iligan City Road LOCATION : San Antonio, Jasaan, Misamis Oriental SUBJECT : General Notes and

More information

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS The (NRDCA) has prepared this document to provide customers and installers information that the industry

More information

Catch Basin Rehabilitation Road Commission for Oakland County, Michigan

Catch Basin Rehabilitation Road Commission for Oakland County, Michigan Date: Location: September 14, 2011, 9:45a.m. start East side of street in front of 4656 Maura Lane, West Bloomfield Participants: Oakland County Michelle Belanger, Rick Hall, Matt Mountain, Gary Flounory,

More information

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS CCU Engineering Specifications Section 003300 Effective Date: Nov. 1st, 2011 Page 1 of 5 PRECAST CONCRETE PRODUCTS PART 1 - GENERAL The following specification is intended for use for the design, selection

More information

SECTION 13 REPLACEMENT AND CLEANUP 13.01 SCOPE OF WORK

SECTION 13 REPLACEMENT AND CLEANUP 13.01 SCOPE OF WORK 13.01 SCOPE OF WORK Under this item, the Contractor will restore all lawns, trees, gardens, landscape plantings, sidewalks, ramps, trails, fences, commercial signs, water courses and sand, gravel, dirt,

More information

Chapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling

Chapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling Asphalt Pavements 7-7 Chapter 7 Pavement Rehabilitation Pavement rehabilitation can be accomplished

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-31 31 16.19 (February 2016) -------------------------------- Preparing Activity: NAVFAC Superseding UFGS 31 31 16.19 (August 2014) UFGS 31 31 16.20 (April 2006) UFGS

More information

STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS

STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for cleaning and lining existing cast iron and ductile iron water mains

More information

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses. 4.5-p DRAIN INLET PROTECTION Alternative Names: DI protection, Drop Inlet Protection DESCRIPTION Storm drain inlet (DI) protection slows and ponds stormwater, and filters sediment and debris before it

More information

MATERIALS DIVISION MEMORANDUM

MATERIALS DIVISION MEMORANDUM MATERIALS DIVISION MEMORANDUM GENERAL SUBJECT: Precast Concrete SPECIFIC SUBJECT: Quality Control Plan Review Check list; Approved list Nos. 26 and 34; Precast Repair Manual NUMBER: MD 286-06 DATE: December

More information

Resurfacing Concrete. Page 1 of 5

Resurfacing Concrete. Page 1 of 5 Resurfacing Concrete Materials List QUIKRETE Concrete Resurfacer (No. 1131) (see calculator on page 5 for quantity needed) QUIKRETE Concrete and Stucco Wash (No. 8601) QUIKRETE Concrete Sealer (No. 8800)

More information

SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS

SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS PART 1: GENERAL 1.01 SECTION INCLUDES A. Abandonment in place, by cutting and capping, of existing sewers, junction structures, manholes, service lines, and

More information

Acceptance Codes APPENDIX - A. Acceptance Criteria

Acceptance Codes APPENDIX - A. Acceptance Criteria 1111 Receipt of a satisfactory Test Report from WSDOT Materials Laboratory is required indicating the lot (or lots) or batch of material meets the requirement of the specifications under which it is listed.

More information

Installation PowerPoint for Grasscrete Formers

Installation PowerPoint for Grasscrete Formers Installation PowerPoint for Grasscrete Formers 1 This document describes the two single-use tools utilized to create the Grasscrete product. The original Former is a vacuum formed light gauge plastic mold

More information

Preventing Storm Water Pollution: What We Can Do

Preventing Storm Water Pollution: What We Can Do Preventing Storm Water Pollution: What We Can Do ~Employee Training Series~ Streets and Drainage Maintenance PREPARED IN COOPERATION WITH THE Texas Commission on Environmental Quality AND U.S. ENVIRONMENTAL

More information

SECTION 33 31 00.11 GRAVITY SANITARY SEWERS

SECTION 33 31 00.11 GRAVITY SANITARY SEWERS SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit

More information

SECTION 33 41 00 REINFORCED CONCRETE PIPE. A. The following is a list of SPECIFICATIONS, which may be related to this section:

SECTION 33 41 00 REINFORCED CONCRETE PIPE. A. The following is a list of SPECIFICATIONS, which may be related to this section: SECTION 33 41 00 REINFORCED CONCRETE PIPE PART 1 GENERAL 1.01 SECTION INCLUDES A. This section includes construction of reinforced concrete pipe for storm drainage, culverts, and sanitary sewer, including

More information

Outlet stabilization structure

Outlet stabilization structure Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural

More information

SECTION 4Aggegate Subbase

SECTION 4Aggegate Subbase The contractor shall moist-cure the completed Lime Treated Subbase for a minimum of days before allowing any traffic on the compacted surface. The contractor shall be responsible for repairing any damages

More information

C. Remove all existing asphalt shingles, underlayment and any loose debris into contractor provided dumpsters.

C. Remove all existing asphalt shingles, underlayment and any loose debris into contractor provided dumpsters. SCOPE OF WORK Project Title: Replace Deteriorated Roof Singles at Cape Lookout National Seashore Maintenance Shop PMIS # 159350 Prepared By: Mike Baker Cape Lookout National Seashore 131Charles St Harkers

More information

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, Storm Drain Installation, of these Standard Provisions. SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and

More information

SPECIFICATIONS. INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP)

SPECIFICATIONS. INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP) SPECIFICATIONS INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP) Part 1 General 1.1 CONFORMITY Conforms to the requirements of the general conditions of the contract.

More information

Minor Cracks in Horizontal Surfaces

Minor Cracks in Horizontal Surfaces Cracks, chips and broken or flaking areas in concrete are not only unsightly, they can lead to further deterioration of the surface. The result is a costly replacement project as opposed to a simple repair.

More information

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial

More information