TerraWave Solutions MIMO Site Survey Battery Pack (Part # TW-SSBP-007) Instructions For Use



Similar documents
ADA COMPLIANT BOX STYLE TELEPHONE INSTALLATION, PROGRAMMING AND OPERATING INSTRUCTIONS FOR MODEL PBX

Installation & Weatherproofing Guide for ENCOM Broadband Radios

Table of Contents TO OPERATE THE 12.0 VOLT POWER PACK: THIS OPERATES ONLY OFF THE UNIT S RECHARGEABLE BATTERY, NOT OFF YOUR VEHICLE S BATTERY.

Setting Up the Cisco Unified IP Phone

ScreenLogic Wireless Connection Kit. Installation Guide. pool/spa control system

User Manual. Instructions for installing the Sure Stitch on the Next Generation Quilting Frame. Parts Included:

IEEE 802.3af 4-Port Power over Ethernet Injector Hub POE-400. User s Manual

Setting Up the Cisco Unified IP Phones

Advantium 2 Plus Alarm

DES-1005P 5-Port 10/100Mbps with 1-Port PoE Unmanaged Switch

Setting Up the Cisco IP Phone

UIM-2T1 T1 Loop Bonding Uplink Interface Module

Recommended Tools and Supplies: Small Flat Blade Screwdriver, 35mm x 7.5mm DIN Rail. Qwik Install

8-Port PoE Network Switch

CRYPTOPAY QUICK START GUIDE

HP UPS R1500 Generation 3

Setting Up the Cisco Unified IP Phone

NeoGate TG Series Installation Guide

AXIS T81B22 DC 30W Midspan

IPX AUTOMATIC IP NETWORK LOSS BACKUP A/B SWITCH INSTRUCTION BOOK IB

Power over Ethernet (PoE)

Installation Guide. Wireless N Access Point EAP110/EAP120/EAP220

2 Mega-Pixel PoE Plus Speed Dome Internet Camera ICA-HM620. Quick Installation Guide

ECR Shelf System Installation Guide Centralized Rack Mount Call Recording

Model 201 Wiegand Touchpad Reader Installation Guide

Quick Installation Guide 24-port PoE switch with 2 copper Gigabit ports and 2 Gigabit SFP ports (af Version 15.4W)

NeoGate TA Series Quick Installation Guide

Outdoor 33.6W Dual Port Passive Power-over-Ethernet Midspan For External Security Cameras and Wireless Access Points

PowerSense Products. Table of Contents

M7250P. PoE Powered. Gigabit Ethernet Media Converter 1000BASE-TX TO 1000BASE-SX/LX. Installation Guide

ADSL Modem Installation Guide. Model # 36R515 Part # Rev. D Revision Date 12/2000. ADSL Modem Installation Guide

Cisco Unified IP Conference Phone 8831 Installation

Cisco Unified IP Phone Power Injector

Triple Expansion Chassis

Zebra RW 420 Mobile Battery Eliminator Kits

13 Watt PORTABLE SOLAR POWER KIT

About the HotWire Slot Standalone Shelf

SCREENLOGIC INTERFACE WIRELESS CONNECTION KIT

PRO 5000 CPE 1D Quick Installation Guide

AXIS 291 1U Video Server Rack Installation Guide

TRIMBLE TX5 3D LASER SCANNER QUICK START GUIDE

FriendlyNet Hub 5-Port or 8-Port Ethernet Hub User s Manual

Express5800/120Ed. Rack Mount Kit Installation Procedures PN:

Instruction Manual. 2in1 LAN Tester & Multimeter. Model: LA-1011

XTEND 900 MHZ WIRELESS MODEM For use with VEEDER-ROOT EMR³ DATALINK INSTALLATION INSTRUCTIONS Manual , Rev. B

Instruction Manual RT-94845SL RR-94845SL Forty-Eight Channel Video Multiplexer With Bi-directional Ethernet Data

PL-1, Pocket Logger B

SSW-iLM Keypad. Wire Harness Configuration. Note: This product is designed to be installed and serviced by security and lock industry professionals

LST In-Dash Digital Sonar Gauge. Installation & Operation Instructions

STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION TRENTON, NEW JERSEY METRIC SPECIFICATIONS FOR RS232 LEASED LINE MODEMS (LOW SPEED MODEL 400)

33.6W Power over Ethernet Waterproof Adapter PoE Plus Single Port Injector for Outdoor Application

1080P. Extender for HDMI over one CAT5. GTV-HDBT-CAT5 User Manual. gefentv.com

HM-W536 Install Guide

Vertical Phone System Upgrades Scope of Work

Foodservice Equipment Specialists P.O. Box 880 Saco, ME. / U.S.A * FAX (207)

Digital echo-charge. Owner s Manual. Xantrex Digital echo-charge Battery Charger

Indoor/Outdoor Color Camera with Built-in 2.4 GHz Wireless Transmitter, plus X10 controlled power supply, and Video Receiver.

HG600/HG800. Hydro-Power Unit. Installation and Operation Guide

Universal Vehicle Power Supply 9007AX01. Installation Instructions

User's Manual. 8-Port 10/100Mbps with 4-Port PoE Fast Ethernet Switch FSD-804P - 1 -

Laserlyte-Flex Alignment System

BroadBand PowerShield. User Manual

16-Port and 24-Port 10/100 Switches

16/32 Channel 1U Rack Mount CCTV Power Supply

AGS. Owner's Manual. Xantrex Automatic Generator Start Control System

LevelOne IFE Port PoE + 1-Port TP Industrial Fast Ethernet Switch User Manual

How To Install A Cisco Cisco 520-T1 Router On A Network Card (Cisco) With A Network Cable (Cio) And A Network (Cnet) (Coconc) (Net) And An Ipo (

ATS Overhead Table Shelf System INSTRUCTION MANUAL

VOICE RECORDING SYSTEM ISDN PRI / BRI

LOSB9595 1/36 th Brushless ESC and 10250Kv Motor Combination

Installation Instructions

Solar Power Systems Models: PVS220W-24 and PVS220W-48 Installation Manual

LDG SLS-2 Two-Port RJ45 Switch

IFS SP-PoE Splitter User Manual

High PoE Midspans NPD-6001A NPD-9501A. en Installation Manual

Home Signal Distribution Kit for Satellite TV Plus SIRIUS

Name of Equipment Silver King Model SKMCD1P/C1. This equipment chapter is to be inserted in the appropriate section of the Equipment Manual.

Solar Home System. User Manual. AEH-SHS01-10W2L Solar Home System 2 Lamps

PagePac PAGEPAL V

123 Industrial Loop Road Paynesville, MN Phone: MASTER MANUFACTURING MASTER GARDNER

BX7000 Multi-Access Gateway Getting Started Guide

Programming and Installation Instructions. Passed ISO international system ratification

Configuring an A Series LED Sign Controller for your Network

EAGLE Power over Ethernet Products for IP Powering Applications. Flexibility, Simplicity and Value LAN POWER SYSTEMS. Trend Datacom USA, Inc.

STEALTH I DC MANUAL TECH SUPPORT WEB BLACK UNIT IS 24/36 ONLY

MAC FAUCETS. Owner s Manual. Models: FA444

Part Name/Description Part Number Quantity. Power Cable

Manual for Fire Suppression & Methane Detection System

HP 36-Port InfiniBand Switch Cable Management Kit Installation Guide

INSTALLATION AND OPERATION MANUAL

Model SRMD Setra Remote Monitoring Display

Verbatim PowerBay 4-Bay RAID Multi-Interface Drive Version 1.00

3 WATT LED SPOTLIGHT Model No. SLM

BODi rs BD004 Series Bandwidth-on-Demand Internet with Reliability and Survivability. Quick Start Guide NOTES

MDI/MDIX) FEP-32008T-3

2014 AT&T Intellectual Property. All rights reserved. AT&T, Globe logo and other marks are trademarks of AT&T Intellectual Property.

Design Guidelines for PoE Based Security Systems. Carlos Carle, P.E. SignaMax Systems, Inc.

VIEW. SLX300 SpeakerLinX IP Zone. Amplifier Installation and Setup Guide. AVoIP

Square D Clipsal DIN-Rail Four-Channel Auxiliary Input Unit

Operating Precautions: User configuration options:

Transcription:

Standard Shipping Contents of the TW-SSBP-007: 1 qty Site Survey Battery Pack (Diagram 1) 1 qty Charger (Diagram 2) 1 qty RJ-45 Red (802.3af) POE Cable (Diagram 3) 1 qty 2 56 Volt Power Cord (Diagram 4) 1 qty 20 56 Volt Power Cord (Diagram 4) 1 qty Bag of mounting plate fastening screws Diagram 1: Site Survey Battery Pack Version 1.1 - Page 1

Diagram 2: Charger Diagram 3: RJ-45 Red (802.3af) POE Cable This cable is intended for use for all access points that are 802.3af POE compliant. Version 1.1 - Page 2

Diagram 4: 56v power cable w/barrel connector AP1252 This cable is intended for use with the Cisco AP1252. Diagram 5: 56v power cable w/barrel connector AP1252 This cable is intended for use with the Cisco AP1252. Diagram 6: 48v POE for patch cable This cable is intended for use with 802.3af complaint Access Points only. Version 1.1 - Page 3

Diagram 7: Access Point Mounting Holes on Lid of Site Survey Battery Pack S2 P1 S1 P1 S1 P1L S2 S1L,, P1, S2 = 8-32 threaded Front Edge (Above switches) S1L, P1L = 10-32 threaded S1 = 6-32 threaded Hole Usage Chart: Hole Screws to Use Access Point 2 qty 8-32 Pan-head x 3/8 long Cisco AP1142, AP124x and 125x ** Note - only 2 holes are needed can use horizontal pair or vertical pair 4 qty 8-32 Flat-head x 3/8 long Cisco AP113x S1 2 qty 6-32 Pan-head x 3/8 long Symbol 4131 S1L 1 qty 10-32 Locking Post To secure Symbol 4131 S2 2 qty 8-32 Pan-head x 3/8 long Symbol 5131 P1 2 qty 8-32 Pan-head x 3/8 long Proxim AP P1L 1 qty 10-32 Locking Post To secure Proxim AP Version 1.1 - Page 4

Key Points to Understand: 1. Site Survey Battery Pack should power any access point or bridge for at least 6-8 hours given that the Site Survey Battery Pack has been fully charged. 2. The POE port is designed to power 48 Volt POE access points only. 3. When not in use, turn the switch (labeled Switch in Diagram 1) to the Off / Charge or LEFT position and the Master Battery On/Off switch to the Off or RIGHT position to switch the battery pack completely off. Do NOT store the battery pack in 56v or 48v switch positions. Also turning the Master Battery On/Off switch to the Off position will ensure that there is no drain on the battery and will help extend battery life. 4. The Charger (shown in Diagram 2) is designed to be international power capable. If it is going to be used outside of North America, then the appropriate adapter for that country should be used. 5. The Site Survey Battery Pack supports only 802.3af compliant access points and does not support the legacy Cisco power protocol solutions. Disclaimer: TerraWave Solutions is not liable for any damages to equipment, property or persons by the improper use of this Site Survey Battery Pack in any manner. It is imperative to know the proper use of this device. Warranty: The Site Survey Battery Pack and Charger are covered by a 6 month warranty. The warranty period starts from the date of purchase and does not cover damage to the unit from misuse, physical abuse or improper charging. Damages to the case are also not covered. TerraWave Solutions will replace the unit within the first month of purchase if it is deemed necessary. Within the six month warranty period, TerraWave Solutions will repair the unit if it is determined that the problem is caused by a manufacturer defect or malfunction. Instructions for proper storage of the Site Survey Battery Pack: The Site Survey Battery Pack utilizes a 12V sealed lead acid battery. Sealed lead acid batteries should not be stored on their side for a long period of time. The sealed lead acid battery inside the Site Survey Battery Pack is mounted on its side if the Site Survey Battery Pack is sitting on its rubber feet. While this is fine for days of use, the Site Survey Battery Pack should be normally stored while sitting on its back side with all ports facing up to ensure the longest battery life. Version 1.1 - Page 5

Charging Instructions: 1. The Site Survey Battery Pack must be charged before each use. It is recommended to charge the Site Survey Battery Pack immediately upon receipt and before any expected use. 2. Turn the Master Battery On/Off switch to the On position for charging to commence. 3. Turn the switch (labeled Switch in Diagram 1) to the Charge / Off or LEFT position. 4. Plug the Charger (Diagram 2) into a proper AC power source. 5. Plug the barrel connector end of the Charger (shown in Diagram 2) to the Charge Port (shown in Diagram 1) of the Site Survey Battery Pack. Turn the Master Battery Pack On/Off switch to the On position and then the light on the battery pack should turn red, indicating that the battery is charging. 6. The Charge Indicator light will show the status of the Charging process. It should start out Red, indicating that the battery is charging. It will then progress to Green, indicating the battery is fully charged. 7. The Charger is designed to switch to maintenance charge cycle once the Site Survey Battery Pack has reached full charge (Green in color). Leaving the Charger connected longer will NOT harm the Site Survey Battery Pack. Instructions for Use (802.3af Compliant Cisco 1252 Access Point): There are two ways to power up a Cisco AP1252 Described below: A.) Important! The battery pack will support the 802.3af compliant Cisco AP 1252 for up to eight hours when using one radio at a time. There are two options to achieve this: Power down the AP and physically remove the 2.4 GHz radio or the 5 GHz radio. The battery pack will support the remaining radio within the AP. Turn off one radio within the AP. The battery pack will support the remaining active 2.4 GHz or 5 GHz radio. To turn off a radio: AP1252 (config) #interface dot11radio 0 AP1252 (config-if) #shutdown To turn a radio back on: AP1252(config) #interface dot11radio 0 AP1252(config-if) #no shutdown Note: Here the 0 indicated the radio in slot 0, typically the 2.4 GHz radio. To control the 5 GHz radio (slot 1) substitute "1" For use with the 802.3af compliant AP 1252 with both radios active and powered using 48 volts, please execute the following from a console session on the AP: Configuration Instructions: AP1252 (config) #power inline negotiation injector override Version 1.1 - Page 6

CAUTION! The aforementioned instructions allow the use of both radios with the AP powered by the 48V PoE connection (see instructions below). This method is for site survey purposes only. DO NOT use an AP in a production environment with these settings. Using this method in a production environment will likely cause damage to the AP and / or switch. B.) The battery pack will support the 802.3af compliant AP 1252for up to 6 hours when using the 56v port and barrel connector (Diagram 4 & 5). Attach the 2 or 20 adaptor / power cable to the battery pack by aligning the internal three prong connectors (Diagram 4 & 5). Plug the right angle barrel connector into the power port on the Cisco AP 1252. Slide the switch on the battery pack to the 56v position. Slide Master Battery On/Off switch to the On position. You should then see the Cisco AP 1252 begin to boot up. Instructions for Use (All Other Access Points): 1. The Site Survey Battery Pack will allow access points and bridges to be mounted to the top of the Site Survey Battery Pack. 2. Before connecting the AP to the Site Survey Battery Pack, make sure that the Switch (labeled Switch in Diagram 1) is in the left or Charge / Off position and that the Master Battery On/Off switch is in the Off position. 3. The access point being powered and the power adapter cable being used will determine which of the powered ports that will be used. Each of the 2 powered ports has a unique connector that will only allow the proper adapter cable to be connected to the proper powered port. The 2 powered ports offer two different DC voltages. Only 1 of the 2 powered ports is live or powered at a time. It is dependent upon the positioning of the Switch (labeled Switch in Diagram 1). If you are trying to power a 56VDC access point, you must have the proper cable from TerraWave that plugs into the 56 Volt. The 56VDC port uses a 3-pin microphone connector on the Site Survey Battery Pack side of the adapter cable. The POE port will use a RJ-45 to RJ-45 cable to connect the Site Survey Battery Pack to the access point. These RJ-45 adapter cables are not standard patch cord or crossover pin-outs. 4. Make sure to use the appropriate TerraWave Solutions adapter cable for your AP. Plug the cable into the appropriate power port of the Site Survey Battery Pack and place the Switch (labeled Switch in Diagram 1) into the corresponding power setting position. 5. Plug the other end into the AP in the appropriate power port. For POE connected AP s, this will be the Ethernet port of the POE capable access point. NOTE: The battery pack will send a 48 Volt test pulse to ensure that the connected device can accept the 48 Volt power. 6. Now, verifying that all connections have been made properly, you should now see the AP start the boot up sequence. Once the boot up sequence is completed, you can start your Site Survey, assuming the AP is configured properly. Version 1.1 - Page 7