Buildings Construction Procurement Strategy



Similar documents
QS 004 DEPARTMENT OF PUBLIC WORKS REPUBLIC OF SOUTH AFRICA BUILDING COST DATABASE

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

CHAPTER 2 QUANTITY TAKE-OFF

ModuSec. Secure and efficient IT room solutions. Turnkey Modular Construction Fast clean build to any size or shape

5. Financial requirements The relevant financial requirements in the board s policies.

Design and Build of Passenger Terminal Building North Extension At Macau International Airport (RFQ-198) Section 6 Bill of Quantities

PROJECT COST ESTIMATES & FEASIBILITIES

The integrity evaluation of the reactor building at unit4 in the Fukushima Daiichi nuclear power station

MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #5

TARIFF CODE and updates standard

Replacement of Heating, Ventilation, Air Conditioning (HVAC) Units In Apartments Located at 641 Fifth Avenue. Photo Essay

Standards Committee T echnical Technical Conference

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION

How To Build A Luxury Apartment Complex In London

If stepping is required, step at 180mm as seen in this picture.

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

21.1 Functions, Basic Configuration, and Interfaces

WORK SCOPE. Domains in which we work:

B-1 Buildings & Service Maintenance

Machine Foundation Design

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

C-2 Construction, Inc. - NAICS Codes

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

STEP-BY-STEP. construction guide. Delivering better priced Conservatories, Sun Lounges and Garden Rooms via the Internet.

MARKET SCOUT CONTRACTORS QUESTIONNAIRE (complete in addition to an Acord application) 1. Applicant:

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

Olkiluoto 3 Project. AREVA Suppliers Day Warsaw October 4, 2011

Cold Room & Refrigeration System (Casserole Assembly) No of units: 1

Marketing Coordinator Bootcamp Session 2: ABCs of AEC

Chapter 3 Pre-Installation, Foundations and Piers

ITER Organization Future Call for Tenders

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

APEC CAPABILITIES PROJECT MANAGEMENT / SUPPORT

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

BUILDING CONSTRUCTION

CONTE NT DESIGN PROCESS. Appendix. 01 First Issue. 02 Revision A. 03 Revision B. 04 Co-ordination. 05 Panel Thicknesses. 06 Panel Surface Quality

Building Condition Assessment Report

City of Fort Smith Building Permit Process Frequently Asked Questions

Page & Turnbull imagining change in historic environments through design, research, and technology

Construction Technologies Career Field Pathways and Course Structure

Seattle Public Schools Building Excellence IV Projects Under Construction

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

Design Development Quality Management Phase Checklist Project Phase Checklist Series

BUILDING PERMIT SPECIFICATIONS

Unit Price Averages Reports

Uniform Construction Code (UCC) Manufactured Homes. Modular Homes. Building Permit Application Package

Dulles Corridor Metrorail Project

INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE.

Project : CONSTRUCTION OF BUILDING(including electrical and plumbing works) FOR NATIONAL CENTRE FOR SUSTAINABLE COASTAL MANAGEMENT,CHENNAI

BROWACOM PRODUCTS. Our web-pages can be found from:

Does Wall Township require an inspection by the building department on resale of a home?

The ACR : Advanced Design Features for a Short Construction Schedule

Technical Summary. Contract for Procurement of Piping and Fittings (IO/14/CFT/9560/ACS CP/1)

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

C I T Y O F P E A R S A L L

HOUSE BUILDING DIGEST

ASHULIA APPARELS LTD. Client Summary Report

MEMORANDUM. General: Foundation:

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

OPERATOR - FACILITY ADDRESS - DATE

Requirements for Building Application Submission

Building Code Inspections and Fees

NEW YORK CONTRACTORS SUPPLEMENTAL APPLICATION (Excluding Residential Contractors)

PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY

CITY OF SELMA, TEXAS Inspection Checklist: Commercial

TOWN of NEW BOSTON. Bid Package. Refurbishment and Upgrade of Basement of the New Boston Town Hall

Scope of EN Clarification Document

Development Services Guidelines

ADMINISTRATIVE CODE CHAPTER 1

Practice Note

FOR RENT PRODUCTION AND COMMERCIAL FACILITIES ALONG WITH A SOCIAL AND OFFICE SURFACE MARR BUSINESS PARK 10 NAD DRWINĄ STREET IN KRAKÓW

Separation of common services (above and below ground) INDUSTRY BULLETIN. Background. Separation distances. Proximity of services below ground

Lot Number. City. Architect Name SUBCONTRACTORS - COMPLETE AND ATTACH LIST ON PAGE 4

Vision Home Inspection

Guidelines for Rights of Way

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

DESIGNERS GUIDE TO DOMESTIC CONSERVATORIES

SERVER ROOM CABINET INSTALLATION CONCEPTS

KS 60, (785) (785) E-

Capital Expenditure. The common definition of capital expenditure is

RESIDENTIAL/COMMERCIAL

Proposed A&A work at E-Commerce Air-Hub at SATS Airfreight Terminal 1 (AFT1)

FLAT ROOF BOX SPAN CARPORTS

Gas Meter Clearances and Service Installation Requirements

Building Condition Assessment Report

Sample Drawing Package for One and Two Family Dwelling Applications

How To Build The Burj Dubai Tower

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

LONDON BOROUGH OF HACKNEY BUILDING SERVICES ENGINEER REPORT GAS HOUSE, SPRINGFIELD PARK, HACKNEY

Sisal Composite Ltd. Apparel 4 Ltd. JM Knit Ltd. Natun Para, Hemayetpur, Savar, Dhaka-1340 ( N, E)

Frequently Asked Questions

October 30, Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR. Report of Findings, Structural Investigation, Benton, Arkansas, Dear Mr.

Transcription:

Buildings Construction Procurement Strategy Graham Strickleton Site, Buildings and Power supplies Procurement Manager JOURNEE DEDIEE AUX INDUSTRIELS ET AUX MEMBRES DU RESEAU A.P.I Disclaimer: these slides should be taken into consideration along with the oral comments which were made during the presentation

Agenda 1. General Organization 2. Work in progress 3. Overview of the Procurement Packages 4. How to submit a tender ITER Buildings Procurement Strategy F4E-ENGAGE 22

1. General organization Implementation Assistance to the Owner owner Legal inspection Internal and External experts Architect Engineer F4E Buildings team Fidic Engineer Operational link Health and Safety coordination Support to the Owner Main contractors 3

1. General organization Office building F4E Antenna at Cadarache: B23 building taken over in June 2010 The 1 st and 2 nd floors are used by F4E staff and F4E contractor s staff 170 workplaces already occupied out of 200 available 4

2. Work in Progress Preliminary Works: TB0: Excavation Tokamak Complex, Retaining Wall, Basemats (lower & upper), Seismic Bearings, Assembly Hall Basemat West North face Works ongoing 125m South face 86m East face Seismic pit 3D view TB01: Site Adaptation works. Expressions of interest under evaluation 55

2. Work in Progress 6

2. Work in Progress Excavations Tokamak Excavations & Retaining Wall Contract signed with GTM Sud Consortium 30 contractor s staff now at Cadarache Excavations: from August until December 2010 Rockblasting: every day during 7 weeks, ended last October. Tokamak excavation works Length: 120 m Width: 80 m Depth: 20 m 7

2. Work in Progress Excavations Already 200 000 m 3 of rock removed Tokamak retaining wall and lower basemat will be constructed from January to December 2011 8

2. Work in Progress PF Coils Manufacturing Building D&B PF Coils Manufacturing Building Contract signed with Spie Batignolles Consortium 50 contractor s staff at Cadarache - Construction from Aug 2010 until Dec 2011 Erection of the reinforced pillars to support the steel frame and the crane PF Coils Manufacturing Building Length: 257 m Width: 49 m Height: 17 m Columns: 62 9

2. Work in Progress PF Coils Manufacturing Building Installation of beams Pouring of the slabs 10

2. Work in Progress Anti-Seismic Bearings Fabrication of 500 Seismic Isolators Contractor s staff arriving mid 2011 at Cadarache Fabrication from July 2010 until end of 2011 Neoprene (6 layers) Upper basemat 18cm Cross section on a bearing Steel plate 900mm x 900mm Lower basemat 3D view of a plinth and an isolator on top 11

2010 TB0: Tokamak Excavation & Foundation TB1: Site Adaptation 2011 TB02: Long Lead Mechanical Handling TB03: Main Civil & Finishing TB04: Main M&E/Services TB06 & 08: D&B Packages TB07: HV Electrical Equipment TB09: Site Infrastructure 2013 TB10: Hot Cells civil TB11: Hot Cells M&E Handling TB12: Completion 3. Overview of the Procurement Packages 12 12

3. Overview of the Procurement Packages TB6 D&B TB10 TB3 TB3 TB8 D&B 13

Scope of Supply: Cask Transfer Lift & Tokamak Cranes - < 50m TB02 Mechanical Handling Long Lead Items 2 cranes 750t (span 45.2m and lifting height 49m) 1 Cask Transfer Lift, 120t capacity, 30m vertical travel Procurement Process: Competitive Dialogue Key dates: Expression of Interest Dialogue Phase Award Contract Signature Dec 2010 Apr 2011- Oct 2011 Dec 2011 Jan 2012 14 14

TB03 Civil Engineering & Finishes Scope of Supply: > 150m Tokamak Complex (buildings 11, 14 & 74) Assembly Hall (13), Cleaning Facility (17), RF Heating (15) Fuel Storage, Emergency Power, Medium Voltage (42-47) Cryoplant Compressor (51-52), Resistors (75), Site Services (61), Main AC Distribution (36), Control Building (71) 15 15

Scope of Supply: TB03 Civil Engineering & Finishes Excavation (not Tokamak) and Buildings (Concrete & Structural Steelwork etc..) Finishing (roofing, cladding, doors, windows, lifts..) Port Cell Doors (specialist sub-contractor named by applicants) Procurement Process: Competitive Dialogue Input: Tender Design (+ Construction Design for Tokamak Complex) Type of contract: FIDIC Red Book Key dates: Expression of Interest Dialogue Phase Award Contract Signature Dec 2010 Apr 2011- Oct 2011 Dec 2011 Jan 2012 16 16

Scope of Supply: > 150m Tokamak Complex (buildings 11, 14 & 74) TB04 Mechanical & Electrical Installations Assembly Hall (13), Cleaning Facility (17), RF Heating (15) Fuel Storage, Emergency Power, Medium Voltage (42-47) Cryoplant Compressor (51-52), Resistors (75), Site Services (61), Main AC Distribution (36), Control Building (71) 17 17

Scope of Supply: HVAC (including nuclear) Electrical (for building systems not ITER process) Fire Detection & Protection Networks Mechanical Handling (non nuclear) Supply, installation and commissioning TB04 Mechanical & Electrical Installations Procurement Process: Restricted Tender Procedure Input: Tender Design Type of contract: FIDIC Key dates: Expression of Interest Tender Award Contract Signature Q3 2011 Q4 2011 Q3 2012 Q3 2012 18 18

TB06 & 08 Design & Build Scope of Supply: : < 50m Magnet Power Conversion Buildings (32-33), AC Distribution Building (38) TB06 Cold Basin & Cooling Towers (67), Pumping Stations (68), Heat Exchangers (69) TB08 19 19

TB06 & 08 Design & Build Procurement Process: Restricted Tender Procedure Input: Functional Specification Type of contract: FIDIC Yellow Book Key dates: Expression of Interest Tender Award Contract Signature Q3 2011 Q4 2011 Q2 2012 Q2 2012 20 20

Scope of Supply: < 50m Installation (not supply) of Substation Area Equipment Supply and installation of load centres & distribution from substation area Procurement Process: Restricted Tender Input: Tender Design Type of Contract: FIDIC TB07 HV Electrical Installations Key dates: Expression of Interest Tender Award Contract Signature Q3 2011 Q4 2011 Q2 2012 Q3 2012 21 21

Scope of Supply: < 50m Fencing and gates Landscaping Drainage (industrial, rainwater & sanitary) Roads & Footpath Service trenches, pipe bridges Lighting TB09 Infrastructure Work Procurement Process: Restricted Tender Procedure Input: Tender Design Type of Contract: FIDIC Red Book Key dates: Expression of Interest Tender Award Contract Signature Q3 2011 Q4 2011 Q2 2012 Q3 2012 22 22

TB10 Civil Engineering & Finishes Scope of Supply: 50-150m Hot Cell Complex (buildings 21, 23, 24) & Neutral Beam Power Supply (building 34 & 37) 23 23

TB10 Civil Engineering & Finishes Scope of Supply: Excavation Buildings (Concrete & Structural Steelwork etc..) Finishing (roofing, cladding, doors, windows..) Procurement Process: Restricted Tender Procedure Input: Construction Design Type of contract: FIDIC Red Book Key dates: Expression of Interest Tender Award Contract Signature Q1 2013 Q2 2013 Q1 2014 Q1 2014 24 24

Scope of Supply: 50-150m Hot Cell Complex (buildings 21, 23, 24) and Neutral Beam Power Supply (buildings 34 & 37) TB11 Mechanical & Electrical Installations 25 25

Scope of Supply: HVAC (nuclear) Electrical Fire Detection & Protection Networks Mechanical Handling (nuclear & non-nuclear) Containment Doors TB11 Mechanical & Electrical Installations Procurement Procedure: Restricted Tender Procedure Input: Tender Design Type of contract: FIDIC Key dates: Expression of Interest Tender Award Contract Signature Q1 2013 Q2 2013 Q1 2014 Q1 2014 26 26

TB12 Completion Contract Scope of Supply: < 50m Buildings 11, 13-17, 36, 42-47, 51-53, 61, 71, 74, 75, 32, 33, 35, 38, 39, 41, 21, 23, 24, 34, 37 27 27

TB12 Completion Contract Scope of Supply: Final fixings and finishing Fire seals/ stopping Final paint / cleaning Attendance of M&E and commissioning Procurement Process: Restricted Tender Procedure Type of contract: FIDIC Key dates: Expression of Interest Tender Award Contract Signature Q1 2013 Q2 2013 Q4 2013 Q1 2014 28 28

4. How to Submit a Tender F4E Industrial Portal: the main and essential source of information: https://industryportal.f4e.europa.eu Where all our new calls are published Where all Call for Tenders can be downloaded Where all updates and any Questions & Answers related to the calls are published For access to our key reference documents Your Contact Person: Responsible Procurement Officer

Conclusion The ITER site in July 2010 Architect view of the future buildings 30

Thank you for your attention 3131