Cooperation scheme from application Activity/pilot project area A (Belgische Middenkust, B) B (Zeeland, B+NL) C (Terschelling, NL) D (Borkum, D) E (Schleswig + SouthJutland, D+DK) F (Egebjerg, DK) G (Aarhus River, DK) IP and DC Uni Braunschweig/AU AU AU MRS AU AU LIAG LIAG SkyTEM AU AU Airborne EM BGR BGR BGR Ground TEM Seismic surveys LIAG LIAG (P+S, VSP)/AU Gravity MCR GPR or MEP GEUS GEUS GEUS LIAG/GEUS Uni Münster/GEUS GEUS GEUS VES LIAG LIAG Ellog GEUS GEUS GEUS GEUS GEUS GEUS GEUS Drillings UGent Deltares Deltares LIAG RM RM pump tests UGent LIAG/GEUS RM RM Well Logging UGent GEUS GEUS LIAG/GEUS LIAG / GEUS GEUS GEUS Age dating GEUS GEUS GEUS LIAG/GEUS GEUS GEUS GEUS Geological/geophysical model UGent Deltares Deltares LIAG LLUR / MCR /GEUS RM RM Groundwater analyses UGent GEUS GEUS LIAG/GEUS GEUS GEUS GEUS Groundwater flow modelling UGent UGent/Deltares Deltares LIAG/GEUS GEUS RM RM Technical background report all project partner (LIAG and LLUR editor)
Cooperation scheme from application Partners: RM = Region Midtjylland LIAG GEUS RS = Region Syddanmark LLUR Deltares MCA = Environment Centre Aarhus MCR = Environment Centre Ribe AU = University of Aarhus UGENT = Ghent University Seecon MH = Municipality of Horsens BGR VITENS PFR= Province Frysland WFR= Wetterskip Fryslan Subcontractors/external experts Universität Braunschweig Universität Münster Activity IP = induced polarization MRS = magnetic resonance sounding VES = vertical electrical sounding MEP = multi-electrode profiling GPR = ground penetrating radar EM = electromagnetic method TEM = transient electromagnetic method Seismic: i P=compressional waves, S=shear waves, VSP = vertical seismic profile
/2008 pilot project area A (Belgische Middenkust) B (Zeeland) C (Terschelling and Fryslan) E (Schleswig + D(Borkum) SouthJutland + Hørløkke) F(Egebjerg) G (Aarhus River) Belgium Belgium and the Netherlands The Netherlands Germany Germany and Denmark Denmark Denmark Luc Lebbe Gualbert Oude Essink Arjen Kok Helga Wiederhold Wolfgang Scheer / Steen Thomsen Klaus Petersen / Rolf Johnsen Tom Birch Hansen 2008 September SKYTEM (Leck and Föhr; LIAG) Status report (RM) October November December Drillings, 15.12.2008 (RM)
/2009 pilot project area A (Belgische Middenkust) B (Zeeland) C (Terschelling and Fryslan) D (Borkum) E (Schleswig + SouthJutland + F (Egebjerg) g) G (Aarhus River) Hørløkke) Belgium Belgium and the Netherlands The Netherlands Germany Germany and Denmark Denmark Denmark 2009 Luc Lebbe Gualbert Oude Essink Arjen Kok Helga Wiederhold January February March preparation drilling site (contact and agreement farmers, land owners etc) (UGent) drillings part 1 (UGent) 27.-29.01.: CLIWAT board meeting Borkum Wolfgang Scheer / Steen Thomsen 11./12.2. Borehole logging and sampling (Hørløkke, GEUS) February 16./17. Workshop on Fieldwork in Hannover 22.3.: Day for Water (publicity) 16.-22.03: sampling and pump tests (LIAG) Klaus Petersen / Rolf Johnsen Drillings Poppelvej and Tordenskjoldsgade (RM) 04.02.: Drillings Banegrøften (RM) 03.03: Logger setup, water level, temp. cond. (RM) Tom Birch Hansen 21.-23.1. & 28.-29.1.: Borehole logging and sampling (GEUS) 24./25.2.: Borehole logging and sampling (GEUS) 13.03.09: IP and DC method (AAU) April drillings part 2 (UGent) 15-16.04.09 IP and DC Method Setup of loggers, Water level, l temp (RM) May June July EM39 measurements (UGent) water samples (UGent) 4.-15.05.2009: seismic survey (LIAG) 15.05.: stakeholder information (publicity) 11-15.5 Borehole logging and sampling (Schleswig, GEUS)?? 22.-26.06.2009 (29.6.- 2.7.2009): HEM survey 15.-26.6.2009: area Vojens/Hørløkke groundwater observation, (BGR) conductivity (LIAG)??-??.6 Borehole logging and sampling (S. Jutland. GEUS)?? Drillings Horsens city Water sampling, chemical analysis (RM)??-??.6 Borehole logging and sampling (GEUS) IP and DC method (AAU)
/2009 pilot project area A (Belgische Middenkust) B (Zeeland) C (Terschelling and dfryslan) D(Borkum) E (Schleswig + SouthJutland + F(Egebjerg) G (Aarhus River) Hørløkke) Belgium Belgium and the Netherlands The Netherlands Germany Germany and Denmark Denmark Denmark Wolfgang Scheer / Klaus Petersen / Rolf Luc Lebbe Gualbert Oude Essink Arjen Kok Helga Wiederhold 2009 Steen Thomsen Johnsen 17.-21.08.2009 (24.- 10.-14.8 Borehole 10.-14.08.2009: HEM 28.8.2009): logging and sampling survey area Schouwen HEM survey area Fryslan August (GEUS) and Perkpolder (BGR) 10.-21.08.2009: seismic and Terschelling (BGR) shallow boreholes for 17.-21.8. Borehole survey (LIAG) Student-fieldwork pumping test (UGent) logging and sampling mainland of Fryslan (GEUS) (Deltares) 31.8-18.9: Borehole logging and sampling, slug tests) (GEUS) 31.8.-4.9.: Ground penetrating radar (LIAG) Sky-TEM 9.-17.9.: Borehole September October pumping test (UGent) temperature logs in the bore holes (UGent) Fieldwork for calibration HEM (Deltares) Student-fieldwork mainland of Fryslan (Deltares)??-??.10 Borehole logging and sampling (GEUS)?? Student-fieldwork mainland of Fryslan (Deltares) logging (GEUS/LIAG) 8.-18.9.: Vertical electrode chain (LIAG) 6.-18.9.: Groundwater observation, pumping tests (LIAG) 7.-11.9.: Drillings for pumping tests (RM) Water sampling, chemical analysis (RM) Tom Birch Hansen Pump test (RM/LIAG) November December
/2010 pilot project area A (Belgische Middenkust) B (Zeeland) C (Terschelling and Fryslan) D (Borkum) E (Schleswig + SouthJutland + Hørløkke) F (Egebjerg) G (Aarhus River) Belgium Belgium and the Netherlands The Netherlands Germany Germany and Denmark Denmark Denmark 2010 Luc Lebbe Gualbert Oude Essink Arjen Kok Helga Wiederhold Wolfgang Scheer / Steen Thomsen Klaus Petersen / Rolf Johnsen Tom Birch Hansen January February Water sampling, chemical analysis (RM) March April May June July August September October November December
/2011 pilot project area A (Belgische Middenkust) B (Zeeland) C (Terschelling and dfryslan) D(Borkum) E (Schleswig + SouthJutland + F(Egebjerg) G (Aarhus River) Hørløkke) Belgium Belgium and the Netherlands The Netherlands Germany Germany and Denmark Denmark Denmark Luc Lebbe Gualbert Oude Essink Arjen Kok Helga Wiederhold Wolfgang Scheer / Steen Thomsen Klaus Petersen / Rolf Johnsen Tom Birch Hansen 2011 January February March April May June July August
Objectives from application Objectives To develop concepts for data collection in the pilot project areas To develop common standards for field work (field layout) To implement the data collection concepts and conduct geophysical and hydrochemical data collection in the case study areas To develop work flows for data processing and for identification of parameters for modelling To disseminate geophysical results via the GEOMIND web portal Goes hand in hand with WP5
Deliverables from application Deliverables (brief description and month of delivery) D 4.1 Technical reports of field work (12-30) D 4.2 Input data for geological and hydrological modelling(12-30) D43 4.3 Data, maps, cross sections (12-30) D 4.4 Technical background report (33) D 4.5 Metadata on geophysical measurements in CLIWAT uploaded to GEOMIND (30) References / reports: Status report on Eskelund: Central Denmark Region, Eskelund Status report, September 2008 Please, give me the information on references
Deliverables from application Technical background report All project partner (LIAG and LLUR editor) Suggestion: analog to BURVAL Let s start the discussion on contents on the next partner meeting
Documentation of field work of working together
Publicity media response
Field demonstrations