Standardised Decommissioning Cost Estimating of WWER-440 Nuclear Power Plants (SCE)



Similar documents
International Action Plan On The Decommissioning of Nuclear Facilities

nuclear science and technology

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL

NUCLEAR SECURITY CULTURE IN PRACTICE: IAEA GLOBAL APPROACH 20 March 2014, Amsterdam

Nuclear Development. Decommissioning. Nuclear Power Plants. Policies, Strategies and Costs

HLG_p( )_117 ENSREG_REPORT_2013. Report of the European Nuclear Safety Regulator's Group ENSREG

IAEA Recommendations on a Decommissioning Plan (DP)

Decommissioning Considerations for New Nuclear Power Plants

International Structure

Code of Conduct on the Safety and Security of Radioactive Sources

Security and Safeguards Considerations in Radioactive Waste Management. Canadian Nuclear Safety Commission

8 Emergency Operating Procedures (EOPs) and Severe Accident Management Guidelines (SAMGs) - Issue 06

European and other examples of bilateral and multilateral cooperation in waste management

Educational Programme in Nuclear Security

Project Management and Planning

NSS 2014 UK NATIONAL PROGRESS REPORT. March 2014

ENSREG Conference Programme 2015

Overview of Worldwide Nuclear Decommissioning

RADIOACTIVE WASTE MANAGEMENT PROGRAMMES IN OECD/NEA MEMBER COUNTRIES AUSTRALIA NATIONAL NUCLEAR ENERGY CONTEXT

Call for tenders. Integrated Projects of the EU Social Dialogue

IAEA Safety Standards for Regulatory Activities

Technical Meeting on the Implications of the Fukushima Daiichi Accident on the Safety of Fuel Cycle Facilities. IAEA Headquarters Vienna, Austria

Human Resource Management in Nuclear Safety

RADIOACTIVE WASTE MANAGEMENT AND DECOMMISSIONING IN FINLAND

Report. Radioactive Waste Disposal Facilities Safety Reference Levels

Radioactive Waste Management at Paks NPP

Working Group on Public Communication of Nuclear Regulatory Organisations

The European Entrepreneur Exchange Programme

MDEP Generic Common Position No DICWG 02

A Reviewof AkkuyuNPP Project in Turkey After Fukushima Daiichi Accident

CORDEL Cooperation in Reactor Design Evaluation and Licensing

Decommissioning of nuclear facilities

IAEA Action Plan on Nuclear Safety 1

Post- Fukushima accident. Peer review report. Stress tests performed on European nuclear power plants. Stress Test Peer Review Board

Technical Meeting on Fire Protection Approaches and Experiences in Nuclear Power Plants

Financing Nuclear Power Projects: Challenges and IAEA Assistance in Capacity Building

Nuclear Energy of Ukraine - History

Nuclear third-party insurance and liability.

RC-17. Alejandro V. Nader National Regulatory Authority Montevideo - Uruguay

Office for Nuclear Regulation

How To Decommission A Nuclear Plant

MISSION REPORT ON THE INTEGRATED NUCLEAR INFRASTRUCTURE REVIEW (INIR)

Draft IAEA Action Plan on Nuclear Safety

Activities of Nuclear Damage Compensation & Decommissioning Facilitation Corporation (NDF) Yasuharu Igarashi

Improving regulatory practices through the OECD-NEA Stress Corrosion Cracking and Cable Ageing Project (SCAP)

Information Sheet. Ref. No: J0-TR-51611

Decommissioning of Nuclear Facilities in Sweden

Working Party on Decommissioning and Dismantling (WPDD)

Studsvik, Nyköping, Sweden April 8 10, 2014

IAEA 2015 INTERNATIONAL CONFERENCE ON COMPUTER SECURITY IN A NUCLEAR WORLD

RADIOACTIVE WASTE MANAGEMENT PROGRAMMES IN OECD/NEA MEMBER COUNTRIES MEXICO [2005] NATIONAL NUCLEAR ENERGY CONTEXT

International Nuclear Law Essentials. Programme

Seoul Communiqué 2012 Seoul Nuclear Security Summit

Managing. Nuclear Knowledge. A Pocket Guide. Helping You Understand What, How, and Why to Manage. Atoms for Peace

COMMISSION DECISION. of XXX

Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management

Nuclear Safety Council Instruction number IS-19, of October 22 nd 2008, on the requirements of the nuclear facilities management system

Radioactive Waste Management the French case

EU Customs Detection Technology Expert group Towards rational use of detection technology

CSNI Technical Opinion Papers

IMPLEMENTING THE REGULATORY AUTHORITY INFORMATION SYSTEM (RAIS)

New units at the Paks NPP background of the project and human resource issues

RENCEE SAFETY MARIES

NUCLEAR ENGINEERING AT ISIB, BRUSSELS, BELGIUM

Office for Nuclear Regulation

Russian approach to organization of international cooperation in the field of nuclear infrastructure (NI)

Nuclear Power Plants Tackling the Investment Dilemma. A EURELECTRIC contribution to the PINC (Nuclear Illustrative Programme)

SINGLE RESOLUTION BOARD VACANCY NOTICE DOCUMENT MANAGEMENT OFFICER (DMO) (SRB/AST/2014/008)

Legal Affairs Nuclear Law Bulletin. No. 87. Volume 2011/1

SINGLE RESOLUTION BOARD VACANCY NOTICE ICT PROJECT MANAGER AND BUSINESS ANALYST (SRB/AD/2015/017)

PECS IMPLEMENTATION PECS. Bernard Zufferey Head of the PECS Office Phone:

HUMAN RESOURCE DEVELOPMENT FOR AN INNOVATIVE NUCLEAR PROGRAM IN AN EMERGING COUNTRY

CDTEG- Use of Modern technology supports customs controls

SINGLE RESOLUTION BOARD VACANCY NOTICE DOCUMENT MANAGEMENT OFFICER (SRB/AST/2016/003) Corporate Services IT

Republic of Turkey. Date of acceptance: 9 November 2007 PART 1. Goal, scope, definitions and abbreviations. Goal and scope.

Training Meeting on Post-Fukushima Research and Development Strategies and Priorities

English text only NUCLEAR ENERGY AGENCY COMMITTEE ON NUCLEAR REGULATORY ACTIVITIES

Contribution to the online consultation July 2007

Joint Radiation Emergency Management Plan of the International Organizations

3.2.2 National cluster management concepts

EMBO Short Term Fellowships Information for applicants

Introductions: Dr. Stephen P. Schultz

Council conclusions on strengthening the external dimension of the EU energy policy

COMMISSION DECISION. of

ROK s Assistance Programs for New comers

Transcription:

COMMISSION OF THE EUROPEAN COMMUNITIES (5th Framework Programme) Standardised Decommissioning Cost Estimating of WWER-440 Nuclear Power Plants (SCE) Topical Information Meeting on Decommissioning of Nuclear Installations (EURATOM FP-6 6 / NUCTECH-2003 2003-3.4.3.1-4) 4) March 10, 2003 Brussels 1

GENERAL INFORMATION Project started on October 1, 2001 Partners ~ DECOM Slovakia (Slovak Republic) ~ Public Agency for Radioactive Waste Management (Hungary) ~ Belgoprocess (Belgium), co-ordination 2

MAIN OBJECTIVES OF THE PROJECT To organise, manage a Standardised Decommissioning Cost Estimate of WWER-440 Reactors based on the Proposed Standardised List of Items for Costing Purposes developed by the IAEA, the OECD/NEA and the EC To present existing and valuable national cost studies for the decommissioning of WWER-440 reactors based on expert assessment, using one specific cost estimation model for plants in various countries To facilitate the exchange of experience and to provide assistance to member states and candidate countries in nuclear power plant decommissioning and economic analyses 3

ACTIVITIES WITHIN THE PROJECT 6 work packages defined in order ~ To facilitate the implementation of the project ~ To be used as a practical guide to follow the progress of work 4

WORK PACKAGE 1 Description of the decommissioning studies and cost estimation methodologies for immediate dismantling after shutdown and safe storage of WWER-440 nuclear power plants in Slovak Republic and Hungary as reference countries ~ Information collected in individual documents and reviewed 5

WORK PACKAGE 2 Definition of the detail of the ~ Required input data (technology and building material inventory, radiological data) relating to WWER-440 nuclear power plants ~ The technologies used for the decommissioning of the WWER-440 nuclear power plants The detail discussed and agreed ~ Draft report Draft report relating to the requirements has been prepared ~ The reference level is the level indicated in the Proposed Standardised List of Items for Costing Purposes (PSL) 6

WORK PACKAGE 2 Invitation letter prepared in order to get data about building inventory, equipment and radiological characteristics of WWER-440 nuclear power plants In all contacts, it is stressed that ~ The data are treated in a fully confidential way ~ In case of a positive and valuable co-operation A reimbursement for the required work may be granted A free copy of the resulting report with conclusions from the study will be provided as a net benefit for the co-operation 7

WORK PACKAGE 3 Development of a reference cost calculation model First version of a reference cost calculation model developed Based on characteristics of the model, it is considered that ~ Collecting available information and data on WWER-440 nuclear power plants can be made compatible with the PSL ~ Data collection requires time and a specific methodology A dedicated manual for manual for supporting electronic data collection electronic data collection is prepared ~ Mainly to provide user friendly data collection (prepared file) 8

WORK PACKAGE 4 Develop contacts with nuclear power plants and organisations from European and other countries to collect data and to encourage participation in the exchange of information and experience Data are available from the ~ Slovak nuclear power plants V-1 (type 230) and V-2 (type 213) ~ Hungarian Paks plant (type 213) The first calculation results for these power plants are investigated 9

WORK PACKAGE 4 Contacts have been developed with other organisations to get additional data Invitation will be sent out ~ When the manual for electronic data collection is finalised ~ The list of required input data and technologies used for decommissioning is available in an electronic format A workshop will be held with the co-operating organisations in order to discuss the results of the data collection 10

WORK PACKAGE 5 Co-ordination ordination of model cost calculation with reference data, and discussion and comparison of the results with available cost estimates First calculation results for Slovak power plants V-1 and V-2, and for Hungarian Paks plant as references are available ~ Results have to be evaluated for consistency ~ Based on the discussions and when data from other organisations will be available, the additional cost calculations may be carried out A matrix is prepared for statistical analysis and comparison of the results of the calculations at the level indicated in the PSL 11

WORK PACKAGE 6 Specific report about the final results Considerations about ~ Difficulties encountered in Collecting information about methodologies Providing coherent data/practical values (building inventories, equipment, radiological characteristics, cost figures, ) ~ Solutions adopted in order to cope with the related problems ~ Recommendations for the future 12

LESSONS FOR THE FUTURE Good progress could be made since start of the project thanks to ~ The individual contacts between the partners ~ The intensive work of the individual partners Results of extended evaluations will strongly depend on the availability of data from third partners Savings in meeting times and travel and subsistence costs that are a the result of the current status of the progress of work ~ Invested in the project in order to improve quality of the end product The project is an example of an extended benchmark exercise extended benchmark exercise, one of the possible tasks proposed within FP6 13