Guidelines for Solar Grid Power Projects



Similar documents
PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO , SECTOR 34-A, CHANDIGARH. Petition No.26 of 2010 (Suo Motu) Date of Order: 7.7.

Solar Power Policy Uttar Pradesh 2012 Suggestions to be sent to : dirupneda@rediffmail.com ho_nmk@rediffmail.com

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM IN THE MATTER OF

DRAFT STANDARD POWER PURCHASE AGREEMENT FOR PROCUREMENT OF.. MW SOLAR POWER ON LONG TERM BASIS (UNDER NEW PROJECTS SCHEME) (SECOND BATCH) Between

Success in Scaling-up Solar Energy in Rajasthan, India

Guidelines for Grid Connected Solar PV Projects (Phase-II, Batch-I)

all that you want to know About Rajasthan Solar Energy

PROCEDURE FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT FOR RENEWABLE ENERGY CERTIFICATE BY STATE AGENCY

TAMIL NADU ELECTRICITY REGULATORY COMMISSION. Notification No. TNERC/RPO/ 19/1 dated

Telecom Energy Management

Solar Power Plants FAQs

Grid Connected Solar Power in India. Tarun Kapoor Joint Secretary Ministry of New and Renewable Energy Government of India

G.O.MS.No. 8 Dated Read the following:-

TELANGANA SOLAR POWER POLICY 2015

RAJASTHAN ELECTRICITY REGULATORY COMMISSION JAIPUR

Uttar Pradesh Rooftop Solar Photovoltaic Power Plant Policy, 2014

To whom application is to be filed

PROCEDURE FOR ISSUANCE OF RENEWABLE ENERGY CERTIFICATE TO THE ELIGIBLE ENTITY BY CENTRAL AGENCY

PROCEDURE FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT FOR RENEWABLE ENERGY CERTIFICATE BY STATE AGENCY

Draft Jharkhand State Solar Power Policy 2015

POLICY FOR IMPLEMENTATION OF SOLAR POWER BASED PROJECTS IN MADHYA PRADESH, 2012

No. 22/9/2009-NSM (ST) भ रत सरक र/ Government of India नव न और नव करण य ऊर म त र ऱय / Ministry of New & Renewable Energy ***** Office Memorandum

Methodology for Solar Power Projects

DELHI ELECTRICITY REGULATORY COMMISSION

Mercom Capital Group India Solar Market Update

a) Whether there is a need to revisit the existing approach for debt: equity ratio or to continue with the existing composition?

Indian Electricity Sector

DRAFT SOLAR (PV / THERMAL) POWER PURCHASE AGREEMENT

DRAFT REGULATIONS FOR ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION UNDER SECTION 86(1)(e) OF THE ACT NOTIFICATION

DRAFT KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE. No. 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015

Tamil Nadu WiNd ENErgy ProfilE

DRAFT OF THE GOA STATE GOVERNMENT POLICY TOWARDS RENEWABLE, SOLAR ENERGY AND ENERGY CONSERVATION- GOA 2014

New Delhi, the 20 th November, 2002

THE INDIAN MARKET FOR RENEWABLE ENERGY THE 100 GW SOLAR INITIATIVE

Generation Cost Calculation for 660 MW Thermal Power Plants

DRAFT MODEL REGULATIONS for STATE ELECTRICITY REGULATORY COMMISSION UNDER SETION 86 (1) (e) OF THE ACT. No. Dated: October, 2009 NOTIFICATION (DRAFT)

AN OVERVIEW OF INDIA S ENERGY SECTOR

IREDA-NCEF REFINANCE SCHEME REFINANCE SCHEME FOR PROMOTION OF RENEWABLE ENERGY SUPPORTED BY THE NATIONAL CLEAN ENERGY FUND

( Extract from Haryana Government Gazette, dated the 6 th December,2005) HARYANA GOVERNMENT

ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION

POWER PURCHASE AGREEMENT BETWEEN SOUTHERN POWER DISTRIBUTION COMPANY OF TELANGANA LIMITED

Pilot Scheme of MNRE for Large Scale Grid Connected Roof Top Solar Power Generation

COMBINED SUMMARY OF STATE POLICIES FOR SOLAR POWER

IREDA-NCEF REFINANCE SCHEME

KARNATAKA ELECTRICITY REGULATORY COMMISSION No.9/2, 6 th & 7 th Floor, Mahalaxmi Chambers, M.G. Road, Bangalore

(REVISED)

Karnataka Electricity Regulatory Commission. Discussion note on

Software Technology Parks of India

Renewable Energy Certificate Mechanism for India. ABPS Infrastructure Advisory. Background

Paving the Way for a Transformational Future Lessons from Jawaharlal Nehru National Solar Mission Phase I

The progressive growth of the Indian Power Market

F.No 4/8/2015-DoD-II A Government of India Ministry of Finance Department of Disinvestment Block No. 11, CGO Complex Lodhi Road, New Delhi

TARIFF DETERMINATION METHODOLOGY FOR THERMAL POWER PLANT

MINISTRY OF ENERGY FEED-IN-TARIFFS POLICY ON WIND, BIOMASS, SMALL-HYDRO, GEOTHERMAL, BIOGAS AND SOLAR RESOURCE GENERATED ELECTRICITY

PROCEDURE FOR AVAILING DUTY BENEFITS FOR MINI-GRID OR MICRO GRID SOLR POWER PLANTS

INDUSTRIAL TRAINING DEPARTMENT, HARYANA

Integrated Development of Leather Sector (IDLS) Scheme. Tracking Software. User Manual

Draft Solar Energy Purchase Agreement (EPA) subject to approval by TNERC

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION. No. L-1/(3)/2009-CERC Dated the 7 th August 2009


EESL Business Model to Scale up Energy Efficiency Implementation in India

Support Information for Solar Power Generation Regulation of JERC & Suggestive Power Purchase Agreement.

PROJECT PROFILE MANUFACTURING AND SALES OF DOMESTIC LIGHTS WITH LED TECHNOLOGY. Prepared by. United Electrical Industries Ltd, Pallimukku, Kollam

Renewable Energy Certificate Mechanism

Sub: Scheduling and Dispatch Procedure under RERC (Intra-State ABT) Regulations, 2006.

Wind Power Programme in India

WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED. (A Govt of West Bengal Enterprise)

Financing Energy Efficiency and Renewable Energy through the India Renewable Energy Development Agency

BEFORE THE HARYANA ELECTRICITY REGULATORY COMMISSION BAYS NO , SECTOR 4, PANCHKULA HARYANA

PICO HYDROPOWER PROMOTION PROJECT

FEED-IN TARIFF (FiT) IN MALAYSIA

ISSUED BY Karnataka Solar Power Development Corporation Limited

-FINAL REPORT- Comparing Independent Power Wholesale Electricity Prices In South Asia

AFRICA ENERGY S.A. SENEGAL

KEY CONSIDERATIONS IN POWER PURCHASE AGREEMENT (PPA) RISK ALLOCATION AND COMMON CLAUSES WHICH FORM PART OF A PPA

Existing Wind Power Policies and Incentives

Transcription:

Guidelines for Solar Grid Power Projects NTPC Ltd. NTPC Vidyut Vyapar Nigam Ltd.

AGENDA 1 2 3 NTPC / NVVN at a glance Broad Guidelines for Selection of Solar Power Developers Elements of PPA

NTPC Limited At a glance One of the three largest Indian companies with market cap of nearly Rs.1,75,000 Crore. Net worth of over Rs. 57,000 Crore Total assets of over Rs. 1,05,000 Crore Ranked # 1 independent power producer in Asia in 2009 (by Platts, a division of McGraw-Hill companies) No.1 globally in capacity utilisation 317 th Largest company in the world (FORBES ranking 2009) The largest generator in India with a share of nearly 30%

NTPC VIDYUT VYAPAR NIGAM LTD. Incorporated on 26 th Nov 2002 Strong Promoter NTPC Limited Background Wholly owned subsidiary of NTPC Ltd Core Strengths Formidable Network Government Support Highest rated Trading Licensee Category I Professional Manpower Cross Border Trading Current Business Power Trading market share ~ 20% Presence in ash business Future potential Green Power Trading & Emission Trading Captive Power Trading Long Term Power Trading

Operational Performance of NVVN MUs Traded Year 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 Units traded 962 2616 1643 2664 3324 4832 (MU) Turnover (Rs. Million) 2240 5870 4346 8613 7598 18996

National Solar Mission (NSM) Targets set for development of Solar Power under NSM: Installed Capacity (MW) Phase -I Phase -II Phase -III (up to 2013) (up to 2017) (up to 2022) 1100 MW 4000 MW 20000 MW

National Solar Mission - Features NVVN appointed the Nodal Agency for sale and purchase of 33 kv and above Grid connected Solar Power under Phase -I of the NSM by Ministry of Power Cumulative capacity to be limited to 1000 MW under phase-i Tariff shall be as fixed by the CERC MOP to allocate the equivalent megawatt capacity from the central unallocated power of NTPC coal based stations to NVVN, for bundling together with the solar power NVVN will undertake the sale of the bundled power to Power Utilities at regulated tariff plus facilitation charges.

Selection of Solar Power Developers Migration from existing scheme The guidelines for migration of existing under development grid connected solar power projects from existing arrangements to JNNSM has been finalized. New Projects The ratio of Solar PV to Solar Thermal is proposed to be in the ratio of 50 : 50

BROAD PROPOSED GUIDELINES FOR SELECTION OF NEW SOLAR POWER DEVELOPERS

Proposed Guidelines for Registration Expression of Interest (EOI) Invitation of EOI for Registration of the new Solar Power Developers (SPDs) with NVVN. SPDs meeting the eligibility requirements will be registered. The final selection shall be made out of registered SPDs. Eligibility Requirement Net worth @ Rs. 3-5 Crore/MW for the past three years. Land in possession of at least 1 hectare/mw. Water allocation for Solar Thermal. Confirmation from STU regarding evacuation of power at 33kV & above. Technical requirement as approved by MNRE Undertaking for domestic content to be submitted as under- For Solar PV Use of both Cells & Modules. For Solar Thermal 30% local content

NEW PROJECTS PROPOSED TIME FRAME AND PROCESS Invitation of Expression of Interest (EOI) By 31 st March 2010 Last date of submission of Applications with documents for Registration By 30 th June 2010 Selection of Developers by the Central Empowered Committee By 15 th September 2010 Signing of MOU with SPD By 30 th September 2010 Readiness for signing of PPA & PSA By 31 st October 2010

Conditions Precedents for signing of MOU Statutory and other clearances as applicable Complete Detailed Project Report (DPR) Letter of comfort for Equity/Debt from Promoter(s) /Financial Institution(s) Submission of Performance Bank Guarantee- Rs.50 Lakh/MW Rs.25 Lakh/MW before signing of MOU Rs.25 Lakh/MW before signing of PPA. No change in controlling share holding in the Company permitted from MOU signing till PPA execution. Solar Power Developers who are meeting the set conditions will be called for signing of MOU with NVVN

Signing of PPA / PSA NVVN shall approach Distribution Utilities for signing of MOUs for purchase of solar power along with equivalent NTPC power. Based on the above MOUs, NVVN would be approaching MOP, Govt. of India for allocation of NTPC power from its unallocated quota of coal based station to NVVN for bundling it with solar power. Based on above allocation, NVVN shall sign PSA with Distribution Utilities. After signing of PSAs with Distribution Utilities, NVVN will sign PPAs with Solar Power Developers.

ELEMENTS OF PPA

Elements of PPA 1/2 PPA to remain valid for 25 years (in line with CERC regulations) duration from the date of commencement of supply from the Solar Power Project. The Solar power tariff shall be applicable for the year of commissioning as determined by the CERC. Transmission charges, losses, RLDC/SLDC charges, scheduling charges or any other charges for supply of solar power beyond delivery point to be borne by the respective Distribution Utility. Billing & Payment cycle shall be as per Energy Accounts issued by RPC / SLDC.

Elements of PPA 2/2 Scheduling of power shall be as per Indian Electricity Grid Code (IEGC). NVVN shall establish irrevocable revolving Letter of Credit (LCs) in favour of the Solar Power Developers prior to commencement of electricity supply from the proposed Solar Power Plant. Distribution Utilities shall ensure Payment Security Mechanism as per Escrow / Tri Partite Agreement and open irrevocable revolving Letter of Credit. After execution of PPA, controlling share holding in the Company shall be maintained up to 3 years after commencement of supply of power.

Thank you! Please send suggestions to akgoyal@ntpc.co.in