Click to edit Master title style. Integrity Excellence Respect

Similar documents
How To Manage Transportation Asset Management

Asset Management Highway Division Plan

Intergraph Roadway Information Management Solution. Title Title. Title Title. A White Paper

How To Manage A Highway Asset Management System

How To Manage Big Data For The Ohio Department Of Transportation

New Mexico DOT Transportation Asset Management Implementation Plan. final plan

Presented via Video Recording at IHEEP Conference June 2014

State of California Department of Transportation. Transportation System Data Business Plan

Bringing agility to Business Intelligence Metadata as key to Agile Data Warehousing. 1 P a g e.

Caltrans - Asset Management Implementation. March 2015

NCHRP Target-Setting Methods and Data

Asset Management for MAP-21. Gary Lasham, P.E. Jonathan Pollack

How To Improve Road Quality

Maintenance Management and Asset Management

I-29 Corridor ITS Architecture and Systems Engineering Analysis

American Public Works Association Asset Management Task Force, 1998

The New Brunswick Intelligent Transportation Systems (ITS) Strategic Plan

Transportation Asset Management Best Practices for Canada

Road Asset Management

TRANSPORTATION. Industry Solutions Harness the Power of GIS for Transportation

Transit Asset Management Pilot Projects MBTA Initiatives & Lessons Learned

TxDOT Project CTR: Integration of Data Sources to Optimize Freight Transportation in Texas

Infrastructure and Growth Leadership Advisory Group Ideas and Approaches Survey

11. Managing our Transport Assets

REQUEST FOR INFORMATION

Begin Your BI Journey

U.S. DOT Roadway Transportation Data Business Plan (Phase 1) Data Business Plan. Final Report January 2013 FHWA-JPO

ACCESS OHIO Ohio Department of Transportation

Stephen Gaj. Martin Kidner State Planning Engineer Wyoming DOT

M.S. in Transportation

FLH Asset Management

Y R T S TransporTaTion U D IN solutions

AN ASSET MANAGEMENT ASSESSMENT MODEL FOR STATE DEPARTMENTS OF TRANSPORTATION STEVEN ROBERT COOKSEY. Bachelor of Science in Civil Engineering

Chapter 4 ASSET INVENTORY AND CONDITION CHAPTER 4 ASSET INVENTORY AND CONDITION PAGE 33

Integrating GIS-Based Videolog and Asset Data With Commonly Used Systems Provides Major Benefits With Minimal Effort

IBM asset and service management solutions White paper. Asset and service management for Departments of Transportation.

Phone: Fax: ROMDAS Manufactured by Data Collection Ltd. New Zealand

EXECUTIVE SUMMARY. Syracuse Metropolitan Area Intelligent Transportation Systems Strategic Plan

Transit Asset Management MBTA Initiatives

Visual Enterprise Architecture

Aligning Big Data Management with Business Priorities

Kingdom Of Bahrain Ministry of Works. Enterprise Asset Management System A Geocentric Approach. Presented By Hisham Y.

Law Enforcement Consolidation Task Force

Texas Freight Advisory Committee A PRIMER ON PUBLIC SECTOR FREIGHT PERFORMANCE MEASURES

03096 PL 12. Integrated solutions for airport operations

Data Governance Overview

Automating the IT Operations to Business Connection

Kentucky Sign Management System

Draft TMH 22 ROAD ASSET MANAGEMENT MANUAL

Designing Dashboards and Scorecards for End-User Needs. Jim Hadley

Explore the Possibilities

HERS_IN. HIGHWAY ECONOMIC REQUIREMENTS SYSTEM (for) INDIANA. AASHTO Transportation Estimator Association Conference October 16, 2001

Training Management System for Aircraft Engineering: indexing and retrieval of Corporate Learning Object

DEVELOPMENT OF INTEGRATED HIGHWAY MANAGEMENT SYSTEM IN KOREA

University of Hawaii Information Technology Services Strategic Plan May 22, Looking Forward to 2020 and Beyond [V15-1]

Linking Planning and Operations Initiative A Data Driven Approach. Chris Francis Transportation Statistics

Data Management Practices for Intelligent Asset Management in a Public Water Utility

transport.gov.scot Road Asset Management Plan for Scottish Trunk Roads January 2016

Update on Information Technology Strategic Plan

Louisiana DOTD s Maintenance Management System

Review of Recent Bridge Asset Management Systems

SECTION 16 TRAFFIC/SAFETY SECTIONS 16.1, 16.2 AND 16.3 ARE UNDER DEVELOPMENT

5 TIPS FOR MAXIMIZING THE VALUE OF YOUR SECURITY ASSESSMENT

FREDericksburg Regional Transit (FRED) REAL-TIME SCHEDULING SOFTWARE, BUS STOP ANNUNCIATOR AND TRANSIT WEBSITE PROCUREMENT

Roads for All. The Trunk Road Network. Disability Equality Scheme. and. Action Plan

The Role of the BI Competency Center in Maximizing Organizational Performance

OM-13: Transportation Management and Operations

Use of GIS in Planning and Asset Management

Transcription:

Click to edit Master title style

Click to Success edit Master Factors title style TAM Committee Structure and Champion Transportation Asset Management Information System (TAMIS) Project Several coordinated data/system initiatives Continuous improvement

Click to TAM edit Structure Master title style Highways Aviation Ferries Fleet/Facilities

Transportation Asset Management Data Click to Integration edit Master Team title style Purpose Identify cross-organizational information and data needs for effective TAM Roles & Responsibilities Implement data collection and manage continuous improvement of TAMIS (Transportation Asset Management Information Systems)

Task 1 Task 2 Project Management and Work Plan Document and Assess all Federal Requirements and Associated Research Task 3 Research Other State Best Practices Task 4 Task 5 Stakeholder Coordination Evaluate Current Systems and Extent of Integration (Existing Condition) TAMIS Project Outline Task 6 Task 7 Task 8 Develop ADOT&PF TAMIS Framework (Desired Condition) TAMIS Gap Analysis Research TAMIS System Model Alternatives Task 9 Research Recommendations for TAMIS Task 10 Task 11 Task 12 Develop and Conduct a Project Communication Plan Data Business Plan for TAMIS Pilot TAMIS Application

Click to TAMIS edit Master Framework title style

Tier 3 Tier 2 Tier 1 Click to edit Master title style ADA Inventory EMS IRIS MMS MMS Inventories MRS PETS PONTIS/ BrM PMS RDS AASP Airport & Highway PMS Fleet Cond. Survey GMPAS RWIS Shore Cond. Survey Station Profiles Traffic Server Transit & Rail WIM Data Port CRASH edocs FAAM Geotechnical Assets Tier 1* 7

TAMIS Click Data to edit Systems Master Maturity title style levels 10 9 8 7 6 5 4 3 2 1 0 Initial (1) Awakening (2) Structured (3) Proficient (4) Best Practice (5)

Click TAMIS to edit Gap Master Analysis title style Potential Asset Management Models to Achieve Desired Scope Option 1 Fully integrated selfcontained system Less Systems Blend of options: some feeds, some integrated Option 2 Asset management planning and analytical tools with data feeds Blend of options: some separate, some feeds Option 3 Separate systems with interfaces More Systems Recommended Range for ADOT&PF 9

Click to edit Data Master Catalog title style Data Type(s) Road Network and Linear Referencing ADOT&PF System - (Tier level) RDS (future SIRIS) (Tier 1*) Business Data Owner TDS Program Development Div. Business Data Steward TDS Program Development Div. IT Custodian Information Services Section, Administrati ve Services Division Stakeholders /Users Current: HPMS, CRASH, 511 Future: Traffic, MMS, PMS, CRASH, SIRIS (RDS integrated into SIRIS) Documentation (to be stored in edocs) 1. RDS Overview document (RDS- Overview.pdf) 2. RDS HandBook (draft) (RDS_Handbook.pdf) 3. RDS_SIRIS.pptx (Powerpoint slides demonstrating relationship between RDS and SIRIS) 4. GEO Data Models.xlsx 5. TAMIS Interview Notes (SIRIS) Excerpt 6. TAMIS Interview Notes (Highway Data Inventory) 10

Click Desired to edit integration Master title points style Data Type(s) Systems Integrated ADOT&PF System Purpose Asset Inventory Across specialized PMS (Tier 1) Assess needs and develop work inventories for single PONTIS (BMS 2014) (Tier 1) programs reflecting multiple assets in assets or asset groupings a corridor; filter data based on MMS (Tier 1) pavement type or bridge locations; MMS Inventories (Tier 1) consolidate information for HPMS reporting; consolidate information for Retaining Walls Inventory (Tier 3) financial reporting. Material Sites Inventory (Tier 3) ADA Inventory (Tier 1) Road Weather Information System (RWIS) (Tier 2) Alaska Aviation System Plan (AASP) (Tier 2) Airport and Highway Pavement Mgmt System (Tier 2) GMPAS (Tier 2) EMS (Tier 1) Station Profiles (Tier 2) 11

Click New to edit Data Master and IT title P&P style Establishes a structure for developing, approving and managing standards, procedures and manuals to ensure consistency so that reliable, timely data and information is easily accessed, shared for analysis and integrated into the Department s decision-making processes. The information systems used to support decisionmaking serve as repositories of high-quality data that can be retrieved efficiently in a cost-effective and userfriendly manner.

Click to P&P edit Master Requires title style Approval process for the acquisition of new data & IS Standard development of standards for data collection, data dictionaries, metadata/documentation and IT infrastructure Definition of roles and responsibilities Define Common geospatial/linear reference-based system for locating assets Vet of any individual regional or office data governance plans and polices

Click to P&P edit Master Requires title style Use centralized electronic filling to minimize electric and paper files Use Central portal to facilitate exchange of information across non-integrated databases Use Business Intelligence Tools to automate current manual practices

Click to Other edit Master Initiatives title style Engineering Automation Team CAD/GIS Integration efforts GIS Enterprise Plan Information Systems Team RFI s Pavement, Maintenance

TAMIS Click Strategies/Success to edit Master title Factors style Low hanging fruit/early wins Keep it simple Pilot projects are important Policies and procedures Mainstream Business processes Ongoing stakeholder involvement