Delta Launch Vehicle Programs



Similar documents
Dawn - Overview, Science Objectives, Mission Progress. Hap McSween For PI Chris Russell

Interaction of Energy and Matter Gravity Measurement: Using Doppler Shifts to Measure Mass Concentration TEACHER GUIDE

Fig.1. The DAWN spacecraft

Overview of the Orbiting Carbon Observatory (OCO) Mishap Investigation Results For Public Release

Space Shuttle Mission SPACE SHUTTLE SYSTEM. Operation. Luca d Agostino, Dipartimento di Ingegneria Aerospaziale, Università di Pisa, 2010/11.

SpaceLoft XL Sub-Orbital Launch Vehicle

How To Celebrate The Pictures Of The Asteroid Vesta

SpaceX Overview Tom Markusic Director, McGregor Rocket Development Facility 27 July, SpaceX

AIDA: Asteroid Impact & Deflection Assessment A Joint ESA-NASA Mission. Joint ESA NASA AIDA Team

Space Flight Project Work Breakdown Structure

The 2013 MAVEN Mission To Mars. Bruce Jakosky MAVEN Principal Investigator University of Colorado

The Space Shuttle: Teacher s Guide

Launch Vehicle Mission Capability Enhancement through Global Positioning System Metric Tracking

Science Standard 4 Earth in Space Grade Level Expectations

JPL ANOMALY ISSUES. Henry B. Garrett Jet Propulsion Laboratory California Institute of Technology Pasadena, CA, 91109

Robotic Pre-Cursor Contribution to Human NEA Mission. H. Kuninaka JSPEC/JAXA

The Solar System. Source

Earth Is Not the Center of the Universe

Mission Spacecraft and Operations Overview MAVEN Science Community Workshop December 2, 2012

MISSION OPERATIONS DIRECTORATE FLIGHT DIRECTOR OFFICE. STS-106/ISS 2A.2b/ INCREMENT 0C-2

A: Planets. Q: Which of the following objects would NOT be described as a small body: asteroids, meteoroids, comets, planets?

Penn State University Physics 211 ORBITAL MECHANICS 1

NASA ISS Research Academy and Pre-Application Meeting. Erin Beck Mission Integrator August 4, 2010

LER Ages. Grades. Solar System. A fun game of thinking & linking!

Georgia Performance Standards Framework for Science Grade 6. Unit Organizer: UNIVERSE AND SOLAR SYSTEM (Approximate Time 3 Weeks)

Probing for Information

History of the Titan Centaur Launch Vehicle

2. Orbits. FER-Zagreb, Satellite communication systems 2011/12

Falcon 9 Launch Vehicle Payload User s Guide

Presented by Gary Davis, Director, Office of Systems Development NOAA/NESDIS/OSD. Fifty Years of Achievement

Mars Sample Return Campaign: An Overview. Dr. Firouz Naderi Associate Director NASA s JPL

Chapter 9 Asteroids, Comets, and Dwarf Planets. Their Nature, Orbits, and Impacts

SHEFEX II 2nd Flight within DLR s Re-Entry Technology and Flight Test Program

Fleet Ballistic Missile Eastern Range Operations Supporting Navy Testing and Deployment

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION HUMAN CAPITAL PLAN FOR MISSION EXECUTION, TRANSITION, AND RETIREMENT OF THE SPACE SHUTTLE PROGRAM

June VV 05. Sentinel-2A LOGOTYPE COMPLET (SYMBOLE ET TYPOGRAPHIE) 294C

THE SOLAR SYSTEM - EXERCISES 1

THE SOLAR SYSTEM Syllabus

Progress of MoonLITE Penetrators

tal OFFICE OF THE SECRETARY OF DEFENSE Col. Paul E. Worthrnan, SAF-SS, 4C1000 SUBJECT: Public Affairs Guidance for MOL

Technologies for Re-entry Vehicles. SHEFEX and REX FreeFlyer, DLR s Re-Entry Program. Hendrik Weihs. Folie 1. Vortrag > Autor > Dokumentname > Datum

UNIT V. Earth and Space. Earth and the Solar System

Study Guide: Solar System

Asteroids. Earth. Asteroids. Earth Distance from sun: 149,600,000 kilometers (92,960,000 miles) Diameter: 12,756 kilometers (7,926 miles) dotted line

NASA Explorer Schools Pre-Algebra Unit Lesson 2 Student Workbook. Solar System Math. Comparing Mass, Gravity, Composition, & Density

The Apollo Program. PTYS 395 October 9, 2008 Sarah Mattson

Related Standards and Background Information

IAC-15-D2.1 NASA S SPACE LAUNCH SYSTEM PROGRAM UPDATE. Todd May NASA Marshall Space Flight Center, USA, todd.may@nasa.gov

A long time ago, people looked

Chang e-3 s Progress and Achievement 2/2014

Revision history. Version Date Action. 1.0 Oct 1, 2015 Initial release. Moonspike - Feasibility Study - October Page 1 of 35

STUDY GUIDE: Earth Sun Moon

Does currently available technology have the capacity to facilitate a manned mission to Mars?

Congresso della SAIT Museo della Scienza e della Tecnologia di Milano 15 Maggio 2014

Grade 6 Standard 3 Unit Test A Astronomy. 1. The four inner planets are rocky and small. Which description best fits the next four outer planets?

Space 2012: AS you are reading this right now, Cover Story SHOILI PAL

Atlas Emergency Detection System (EDS)

Copyright 2006, Astronomical Society of the Pacific

Solar System Fundamentals. What is a Planet? Planetary orbits Planetary temperatures Planetary Atmospheres Origin of the Solar System

LED Anti-Collision Lighting System for Airbus A320 Family

The Main Point. Lecture #34: Solar System Origin II. Chemical Condensation ( Lewis ) Model. How did the solar system form? Reading: Chapter 8.

Launch / Tracking and Control Plan of Advanced Land Observing Satellite (ALOS) / H-IIA Launch Vehicle No. 8 (H-IIA F8)

Astrodynamics (AERO0024)

Physics 2A, Sec B00: Mechanics -- Winter 2011 Instructor: B. Grinstein Final Exam

Launch Services Program Earth s Bridge to Space

Bangkok Christian College EIP Matayom Course Description Semester One

Nanosat 4 Competition

Group Leader: Group Members:

Modular Approach to Launch Vehicle Design Based on a Common Core Element

Name Class Date. true

A Fractionated Space Weather Base at L 5 using CubeSats & Solar Sails

Using Tactical Unmanned Aerial Systems to Monitor and Map Wildfires

Appropriate space vocabulary for Primary School

MISSION DESIGN AND OPERATIONS CONSIDERATIONS FOR NASA S LUNAR RECONNAISSANCE ORBITER

Efficacy of the Dawn Vesta Science Plan

Task 329. Tracking and Monitoring Suborbital Commercial Space Vehicles

WEIGHTLESS WONDER Reduced Gravity Flight

Chapter 12 Asteroids, Comets, and Dwarf Planets. Asteroid Facts. What are asteroids like? Asteroids with Moons Asteroids and Meteorites

Solar System Fact Sheet

NASA Independent Review Team Orb 3 Accident Investigation Report

California Standards Grades 9 12 Boardworks 2009 Science Contents Standards Mapping

A Taxonomy for Space Curricula

Educator Guide to S LAR SYSTEM El Prado, San Diego CA (619)

Perspective and Scale Size in Our Solar System

Saturn V Stage I (S-IC) Overview

Press Kit/JULY Dawn at Vesta

Name: João Fernando Alves da Silva Class: 7-4 Number: 10

Transcription:

Delta Launch Vehicle Programs

Dawn United Launch Alliance is proud to launch the Dawn mission. Dawn will be launched aboard a Delta II 7925H launch vehicle from Cape Canaveral Air Force Station (CCAFS), Florida. The launch vehicle will deliver the Dawn spacecraft into an Earthescape trajectory, where it will commence its journey to the solar system s main asteroid belt to gather comparative data from dwarf planet Ceres and asteroid Vesta. United Launch Alliance provides the Delta II launch service under the NASA Launch Services (NLS) contract with the NASA Kennedy Space Center Expendable Launch Services Program. We are delighted that NASA has chosen the Delta II for this Discovery Mission. I congratulate the entire Delta team for their significant efforts that resulted in achieving this milestone and look forward to continued launches of scientific space missions aboard the Delta launch vehicle. Kristen T. Walsh Director, NASA Programs Delta Launch Vehicles 1

Dawn Mission Overview The Dawn spacecraft will make an eight-year journey to the main asteroid belt between Mars and Jupiter in an effort to significantly increase our understanding of the conditions and processes acting at the solar system s earliest epoch by examining the geophysical properties of the asteroid Vesta and dwarf planet Ceres. Evidence shows that Vesta and Ceres have distinct characteristics and, therefore, must have followed different evolutionary paths. By observing both, with the same set of instruments, scientists hope to develop an understanding of the transition from the rocky inner regions, of which Vesta is characteristic, to the icy outer regions, of which Ceres is representative. 2

Dawn Trajectory Thrust Coast Vesta Departure May 2012 Launch Sept Oct 2007 Mars Gravity Assist Feb 2009 Ceres Arrival Feb 2015 Vesta Arrival Aug 2011 End of Mission Jul 2015 3

Dawn On-Orbit 4

Dawn Science Objectives Define the internal structure, density, and heterogeneity of Vesta and Ceres, two of the most massive asteroids in the solar system Determine the thermal history and geochemistry of Vesta and Ceres Investigate surficial processes, cratering, and tectonics of the asteroids Determine meteoric source locations and production mechanisms Investigate the role of water in controlling asteroid evolution 5

Dawn Science Instruments Two Framing Cameras comprise the scientific imaging system of the Dawn mission. The cameras will be used to study the surfaces of Vesta and Ceres to understand the geological processes that shaped them. The Gamma Ray and Neutron Detector (GRaND) will measure elemental abundances on the surface and near surface of Vesta and Ceres. The Visible and Infrared Mapping Spectrometer (VIR) will measure the mineralogical composition of the surfaces. Dawn will also carry a system to measure the gravity fields of Vesta and Ceres, which will enable scientists to infer the internal structure of each body. 6

Dawn Instruments Framing Cameras GRaND 7 VIR

Delta II 7925H Launch Vehicle Fairing Dawn Spacecraft Third-stage Motor Second Stage Spin Table Attach Fitting Third-stage Motor Separation Clamp Band First Stage Guidance Electronics Second-stage Miniskirt and Support Truss Helium Spheres Nitrogen Sphere Interstage Wiring Tunnel Fuel Tank Centerbody Section First-stage Oxidizer Tank Fairing Thrust Augmentation Solids 8

Dawn Mission Description Launch Site CCAFS SLC-17B Launch Period 26 Sept 15 Oct 2007 Spacecraft Mass 1217.67 kg (2684.5 lb) Launch Time (26 Sept 2007) 7:25 AM EDT Launch Window (26 Sept 2007) 29 min Launch Azimuth 93 deg Target Orbit (26 Sept 2007) C3 = 11.4 km2/sec DLA = 28.5 deg 9

Dawn Flight Mode Description Stages II and III Following second-stage engine cutoff (SECO-1), a thermal roll will be initiated, ending approximately 34 min later Second-stage restart follows Spin-up and Stage II-III separation occur following SECO-2 Third-stage burn injects payload into desired orbit Nutation control system (NCS) is disabled and yo-yo despin initiated Spacecraft is separated A second-stage depletion burn sequence follows the primary mission to safe the stage 11

Sequence of Events Event Liftoff Mach 1 Maximum Dynamic Pressure Six Ground-Lit Solid Motors Burnout Three Air-Lit Solid Motors Ignition Jettison Three Ground-Lit Solid Motors Jettison Three Ground-Lit Solid Motors Three Air-Lit Solid Motors Burnout Jettison Three Air-Lit Solid Motors Main Engine Cutoff (MECO) Stage I-II Separation Stage II Ignition Jettison Fairing First Cutoff Stage II (SECO-1) Time (hr:min:sec) 00:00:00.0 00:00:30.3 00:00:39.2 00:01:17.1 00:01:19.0 00:01:20.5 00:01:21.5 00:02:35.8 00:02:39.5 00:04:22.5 00:04:31.0 00:04:36.5 00:04:41.0 00:08:58.3 12

Event Begin Coast Phase Roll Program End Coast Phase Roll Program First Restart Ignition Second Cutoff Stage II (SECO-2) Fire Spin Rockets Stage II III Separation Stage III Ignition Stage III Burnout (TECO) Separate Spacecraft Target Interface Point (TIP) Sequence of Events Continued For 26 Sep 9 Oct 2007 Launch Time (hr:min:sec) 00:15:10.5 00:48:50.5 00:51:35.0 00:54:14.5 00:55:04.5 00:55:07.7 00:55:44.7 00:57:10.7 01:02:00.8 01:05:44.7 Depletion Ignition Third Cutoff Stage II (SECO-3) 01:16:40.5 01:17:03.9 13

Dawn Flight Profile Second-Stage Ignition t = 4 min 36.5 sec Alt = 71.88 nmi VI = 21,278 fps Fairing Jettison t = 4 min 41 sec Alt = 73.06 nmi VI = 21,318 fps SECO-2 t = 54 min 14.5 sec Alt = 99.58 nmi VI = 29,559 fps Third-Stage Ignition t = 55 min 44.7 sec Alt = 114.84 nmi VI = 29,463 fps Spacecraft Separation t = 1 hr, 2 min 0.8 sec Alt = 551.46 nmi Inc = 28.71 deg MECO t = 4 min 22.5 sec Alt = 68.03 nmi VI = 21,269 fps Liftoff SRM Jettison (3) t = 2 min 39.5 sec Alt = 39.25 nmi VI = 10,787 fps SRM Jettison (6) t = 1 min 20.5 sec and 1 min 21.5 sec Alt = 13.83 and 14.09 nmi VI = 3,901 and 3,959 fps SRM Impact SECO-1 t = 8 min 58.3 sec Alt = 102.00 nmi VI = 25,568 fps SRM Impact TECO t = 57 min 10.7 sec Hp = 148.51 nmi Inc = 28.71 deg TIP t = 1 hr, 5 min 44.7 sec C3 = 11.4 km2/sec2 DLA = 28.5 deg Notes: (1) Values shown for 26 Sep 9 Oct 2007 launch (2) VI = Inertial Velocity (3) Hp = Perigee Altitude (4) Inc = Inclination (5) DLA = Declination Angle 14

Dawn Ground Trace 26 Sep 9 Oct 2007 60 30 TEL4 1 2 ANT Event hr:min:sec 1 MECO 00:04:22.5 2 SECO-1 00:08:58.3 3 Restart 00:51:35.0 4 SECO-2 00:54:14.5 5 Stage-3 Ignition 00:55:44.7 6 Stage-3 Burnout 00:57:10.7 7 S/C Separation 01:02:00.8 0 RTS 30 60 Tracking Sites TEL-4 Eastern Range Cape Station ANT Eastern Range Antigua Station DONG Dongara, Australia Station BC Big Crow Telemetry Aircraft PINT USAF Deployable, Tennant Creek RTS Regan Test Site, Kwajalein BC 4 3 DONG 5 6 7 PINT 120 90 60 30 0 30 60 90 120 150 180 15

Delta Countdown T-0 Day 1300 1500 1700 1900 2100 2300 0100 0300 0500 0700 0900 1100 Wed, 26 Sep 2007 Spacecraft Battery Charge Spacecraft Power Up/ MST Preparation for Removal (F2-T4) Configuration for Launch PLF Close-out (Install Access Doors) Briefing (F1-T1) LEGEND Engineering Walkdown (F1-T1) Pad Open MST Preparations and Move (F1-T1B) Amber Limited Final Prop System Preparations (F1-T1A) Access Camera Setup Red Pad Closed Weather Briefing Whiteroom A/C Off (After East Door Open) Spacecraft Activity Prepare for S/M Arming, Lanyard Tensioning, MST Removal/Securing (F1-T1B) Photo Opportunity Solid Motor TLX Connection (F1-T2) (Option) LPI and ISDS Pin Pull (F1-T2) Grate Removal (F1-T1B) (Option) Deck Plate Removal and Pad Securing (F1-T2) Hold Fire Checks (F1-T2) Pressurize Second-Stage He and GN 2 (F1-T2) Built-in Hold (60 min) Terminal Count (F1-T3) A/C Watch (F52-T1), VDS Monitor and Prop Watch (F41) Support: MST and Searchlight Support OD5525 OSM Freq Clear 416.5, 2241.5, 2252.5, 5690.0, 5765.0 MHz Area Conditions FCO, RCO and Seq 16

Terminal Count T-0 Day Wednesday, 26 September 2007 Local (EDT) 06:40:00 07:00:00 07:11:00 07:21:00 04:25:00 04:35:00 04:45:00 04:55:00 05:05:00 05:15:00 05:25:00 05:35:00 05:45:00 05:55:00 06:05:00 06:15:00 06:25:00 06:35:00 07:05:00 07:25:00 T-Minus 150 140 130 120 110 100 90 80 70 60 50 40 30 20 15 15 10 4 4 0 60-min Built-in Hold at T-150 min Terminal Countdown Initiation and Briefing (50 min into Hold) Personnel Not Involved in Terminal Count Clear Cx-17 (Sound Warning Horn) OSM Clear Blast Danger Area First-Stage He and GN2 Press Second-Stage He, Tank Pressurization Guidance System Turn-On First-Stage Fueling C-Band Beacon Checks Weather Briefing LO2 Loading Command Carrier On Launch Window (29 min, 00 sec) Open Close Local 07:25:00 07:54:00 UTC 11:25:00 11:54:00 20-min Built-in Hold at T-15 min 10-min Built-in Hold at T-4 min Command Receiver Checks Auto Slews Slew Evaluations Top-Off He and GN2 Pressurize Fuel Tank Status Checks Spacecraft Internal at L-6 Arm Destruct S&A Arm Third-Stage S&A Spacecraft Launch Ready (T-3) Launch 08:25:00 08:35:00 08:45:00 08:55:00 09:05:00 09:15:00 09:25:00 09:35:00 09:45:00 09:55:00 10:05:00 10:15:00 10:25:00 10:35:00 11:05:00 UTC 10:40:00 11:00:00 11:11:00 11:25:00 11:21:00 17

Delta II Operational Flow at Eastern Range Sacramento, CA Magna, Utah Cincinnati Electronics Cincinnati, Ohio L3 Communications Space & Navigation Division communications Budd Lake, NJ Headquarters Denver, CO CRD RIFCA ITIP Engine Graphite-Epoxy Motors Elkton, MD VAFB RS-27 Engine Star 48 Motor Integration and Checkout Alliant Techsystems Iuka, Mississippi Canoga Park, CA PCM Launch Processing B.F. Goodrich Aerospace Albuquerque, New Mexico El Paso, Texas Launch Vehicle Assembly Decatur, Alabama Delta Program Huntington Beach, CA Major Subcontractor Major Component Flow Ordnance Shipped Directly to Cape From Vendors Eastern Range CCAFS Florida 18

Total Vehicle Integration and Checkout at the Launch Site Delta Mission Checkout (Hangar AO) Horizontal Processing Facility First-stage from assembly plant Destruct installation Area 55 Second-stage fairing interstage from assembly plant Processing Facility Delta II integration and checkout area Receive and inspect Mission integration and checkout Dual composite tests Storage Load on pad erection trailers Destruct installation Erection preparation Leak checks Launch Complex-17 Space vehicle Area 59 Mate to upper stage Upper-stage motor Balance motor Area 57 GEM graphite-epoxy motors Motor buildup Destruct installation Erect and mate stages Install solid motors Check out subsystems Simulated flight test Preflight finalization 19

Notes: 20

Delta Launch Vehicle Programs United Launch Alliance 12257 South Wadsworth Boulevard Littleton, CO 80125-8500 (720) 922-7100 www.ulalaunch.com 10707401