Best Practices/Task Definition



Similar documents
Chapter 9 Computer Scheduling Projects should be scheduled one byte at a time

OVERVIEW. Microsoft Project terms and definitions

Microsoft Project Exam Study Guide

WORK PROGRAM GUIDELINES

Microsoft Project 2010

Lesson 6 - Managing Resources in a Project Plan

pm4dev, 2015 management for development series Project Schedule Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS

Microsoft Project From the WBS to a Complete Schedule Emanuele Della Valle, Lecturer: Dario Cerizza

ELECTRO-MECHANICAL PROJECT MANAGEMENT

Importance of Project Schedules. matter what happens on a project. projects, especially during the second half of projects

5. Creating a Gantt Chart

Mastering Microsoft Project 2010

Microsoft Project Professional

Mastering Microsoft Project 2013

Mastering Microsoft Project 2013 Course: 55054A Course Length: 3 Days

Use project management tools

added to the task, using Project, it will automatically calculate the schedule each time a new resource is added.

NE-50413B Mastering Microsoft Project 2010

Open Workbench Warrior. Beginner's Guide to Open Workbench

MS Project 2007 Quick Guide

technical tips and tricks

technical tips and tricks

Schedule Analysis Using Earned Value Concepts ABSTRACT

Agenda. CPM Scheduling at CDOT Laura Zamora, P.E. February 24, 2016

INTRODUCTION TO MICROSOFT PROJECT 2007 CONTENTS

ABOUT THIS COURSE...3 ABOUT THIS MANUAL...4 EXCHANGING PROJECT PLAN DATA WITH OTHER APPLICATIONS...5

The management of the projects with MS Project

Project Creation and Gantt Chart Design Using Microsoft Project. R. Baker. The University of Tampa

Microsoft Project 2007 Level 1: Creating Project Tasks

Project Management Courses

Chapter 2: Project Time Management

Collaborative Scheduling using the CPM Method

Mastering Microsoft Project B; 3 days, Instructor-led

Is Your Schedule Correct? Common Scheduling Mistakes and How to Avoid Them

Scheduling Glossary Activity. A component of work performed during the course of a project.

PROJECT PROPOSAL: PROJECT BLUE ZUMA

MS PROJECT FOR CONSTRUCTION SCHEDULERS

Cambridge International AS and A Level Computer Science

ECDL / ICDL Project Planning Syllabus Version 1.0

CPM Scheduling with Primavera Unifier

USER CONVERSION P3, SURETRAK AND MICROSOFT PROJECT ASTA POWERPROJECT PAUL E HARRIS EASTWOOD HARRIS

Applied Software Project Management

Administration. Welcome to the Eastwood Harris Pty Ltd MICROSOFT PROJECT 2010 AND PMBOK GUIDE FOURTH EDITION training course presented by

technical tips and tricks

Test Fragen. October 2003 Project Management Wilhelm F. Neuhäuser IBM Corporation 2003

Project Management Courses

IJSRD - International Journal for Scientific Research & Development Vol. 3, Issue 10, 2015 ISSN (online):

DCMA 14-Point Assessment Metrics

1. INTRODUCTION PRODUCT Installation Documentation Website workbench features...2

Basic Project Management & Planning

Synergy between PMBOK and MS Project 2007 A Schedule Management Perspective

Assignment 2: Microsoft Project Toolset. Eric Palmer & Mahindra Bheodari. Kennesaw State University. IS 8100 Spring 2015

Microsoft Project 2007 Level 2: Working with Resources and Managing a Project

Mastering Microsoft Project 2013

CSC 443: IT Project Management Midterm 1 exam - Spring semester March 21 st, 2012

MICROSOFT OFFICE PROJECT - SYLLABUS

Scheduling Fundamentals, Techniques, Optimization Emanuele Della Valle, Lecturer: Dario Cerizza

MSP How to guide session 2 (Resources & Cost)

HOW TO START WORKING WITH P2WARE PROJECT MANAGER 7?

Planning and Scheduling Your Project Using Microsoft Project 2003

The Project Planning Process Group

Chapter 6: Project Time Management. King Fahd University of Petroleum & Minerals SWE 417: Software Project Management Semester: 072

Chapter 3 Managing the Information Systems (IS) Project

Microsoft Project Dissected

Systems Analysis and Design

ECDL / ICDL Project Planning Project Management Software Level 2. Syllabus Version 1.0 (UK)

Session 6. Microsoft Project. Emanuele Della Valle. Lecturer: Dario Cerizza

Project Planning, Scheduling and Control: Assignment 2 D. U. Singer Hospital Products Corp.

MS Project Tutorial for Senior Design Using Microsoft Project to manage projects

ONLINE SUPPLEMENTAL BAPPENDIX PROJECT SCHEDULES WITH PERT/CPM CHARTS

Microsoft Project 2007 Level 1

CRITICAL PATH METHOD (CPM) SCHEDULES

Project Management. Week 4- Project Planning and Network Diagrams

Topics. Project plan development. The theme. Planning documents. Sections in a typical project plan. Maciaszek, Liong - PSE Chapter 4

Object-Oriented Analysis. with the Unified Process. John W. Satzinger Southwest Missouri State University. Robert B. Jackson Brigham Young University

Revealing the Secrets of Microsoft Project

Scheduling Resources and Costs

SYSTEMS ANALYSIS AND DESIGN DO NOT COPY

8. COMPUTER TOOLS FOR PROJECT MANAGEMENT

PMP Exam Preparation Answer Key

Test Fragen + Antworten. October 2004 Project Management Wilhelm F. Neuhäuser IBM Corporation 2003

Module A2 Item Activities, Gantt Chart and Utilization Sheet. A2.1 Project item activities A2.2 Gantt chart A2.3 Utilization sheet

CDC UNIFIED PROCESS JOB AID

Network Planning and Analysis

Bradley University College of Liberal Arts and Sciences Department of Computer Sciences and Information Systems

Software Development & Education Center. Microsoft Office (Microsoft Project 2010)

Goals of the Unit. spm adolfo villafiorita - introduction to software project management

How to use Microsoft Project? Basic Training to Help You during the BYI challenge

Project and Production Management Prof. Arun Kanda Department of Mechanical Engineering Indian Institute of Technology, Delhi

1 Start a new project

MICROSOFT PROJECT TUTORIAL

Scheduling Best Practices. Proper Use of Milestones and Constraints By Paul Brough, Vice President of Warner s Scheduling Group

Schedule Test and Assessment Tool (STAT) STAT 4.0 User s Guide

Set up projects quickly Key: =Feature Included =Improved in Office Project Standard 2007 =New in Office Project Standard Project Standard 2003

Oracle Primavera. P6 Resource Leveling Demo Script

Table of Contents Author s Preface... 3 Table of Contents... 5 Introduction... 6 Step 1: Define Activities... 7 Identify deliverables and decompose

Project management. Objectives. Topics covered. Organizing, planning and scheduling software projects DISCUSSION

Hands on Microsoft Project (Part I) From a WBS to a Complete Schedule Emanuele Della Valle, Lecturer: Dario Cerizza

CONVERTING TO PHYSICAL % COMPLETE METHOD OF EARNED VALUE IN MICROSOFT PROJECT

Transcription:

Written from the perspective of best practices to build a good project schedule and then maintain a healthy, corruption-free Project Server database. 1. Set Task Constraints Setting task constraints includes defining flexible, inflexible and moderately flexible constraints on tasks such as As Soon As Possible, Must Finish On, and Start No Earlier Than respectively. By default, flexible constraints are applied to tasks. Constraints impose restrictions on the way Project Professional calculates the start and finish dates of tasks. When task constraints are used correctly, they can provide the extra needed control of the When erroneously applied, task constraints can restrict scheduling flexibility. A constraint may change the schedule without knowing the impacts to the rest of the schedule or why it occurred. It is recommended that flexible constraints, such as As Soon As Possible (the default constraint type), be used for optimal scheduling flexibility. Project will calculate the start and finish dates for the tasks based on the durations and dependencies. This will allow the MS Project scheduling engine to plan tasks effectively. There will be times when a hard constraint is needed, such as when the task s date cannot be moved, but they should be used sparingly. In addition, deadline dates should be used to indicate the Need by date, so that the schedule is not locked because of an inflexible constraint. When using the deadline date feature, a red flag will appear in the indicator column in Project Professional when the indicated deadline date is not achieved. The red flag is a visual indicator only and does not have any adverse effects on the 2. Set Task Assignments Task assignments should be set at a reasonable level of detail. Assignments for work with less than eight hours are ideal for detailing task to-do lists. Change requests usually fall within this category. Scheduling less than eight hours per task is cumbersome to maintain and goes against PMI best practices. Time reporting can be extremely confusing and time consuming when expected to work on tasks with less than eight hours of planned work. A team member task screen/ timesheet can become cluttered with an excessive amount of detailed tasks, making it difficult to find exactly which task should be reported.

It is recommended to follow the 8/80 Rule. This rule states tasks should not be scheduled with less than eight hours of work and no more than eighty hours of work. If resources want to keep track of their detailed tasks, then it is recommended to utilize to-do lists within Project Web Access (PWA). 3. Identify Task Need by Date The project schedule should provide a task s Need by date, possibly using the Notes field. For example, it is necessary to identify how far in advance of a project s Finish date that the task must be complete. This date is commonly known as the Deadline date. The date by which the task needs to be completed will be easily seen in the Notes field along with other important information. Using the Notes field instead of an inflexible task constraint will not lock the dates and impact the If the Deadline date feature is not used to capture the Need by date, but the Notes field is used, then when the date slips beyond the deadline date, no indication of the issue will appear. Entering the Deadline date in the Notes field and in the Deadline date feature presents a potential for inaccuracies and/or discrepancies. Utilizing the Notes field does not provide for a consistent format when entering the deadline or Need by date (e.g. 12/15/06, Dec 15, mid Dec). It is recommended to use Deadline dates to indicate the Need by date so that the schedule is not locked because of an inflexible constraint. When using the deadline date feature, a red flag will appear in the indicator column in Project Professional when the indicated deadline date is not achieved. The red flag is a visual indicator only and does not have any adverse effects on the The Notes field is not recommended to be used for the Need by date. Providing this information in both the Notes field and Deadline date feature poses the threat for discrepancies between the two. 4. Define Task Schedule Project Professional has a Task Type field that indicates which scheduling algorithm to use. The two values that are most frequently used are Fixed Duration and Fixed Work. Questions that have been raised include: Should a default task type be set? What should be used for the planning of work? 2

The table below is called the Magic Formula and indicates how MS Project schedules tasks when a certain task type is specified and one of the variables changes. In a... If you revise units... If you revise duration... If you revise work... Fixed Duration task Work is recalculated. Work is recalculated. Units are recalculated. Fixed Work task Duration is recalculated. Units are recalculated. Duration is recalculated. Fixed Duration task types have the following advantages: - Fixed Duration tasks are ideal for scheduling meetings (i.e. status meeting, project milestone review or code review meeting). - Fixed Duration tasks can be used to plan at a higher level. Fixed Work task types have the following advantages: - Fixed Work tasks are the industry standard for scheduling work. - Fixed Work tasks are effort-driven by default. Fixed Duration task types have the following disadvantages: - Fixed Duration tasks are not ideal to use for tasks that have an estimated amount of work to be completed. If you have an estimated amount of work, Fixed Work should be used and that estimate should be put into the Work column. - Fixed Duration tasks are not ideal to use for capacity planning. Tasks overlap and regardless of the work required to complete the task, the duration is set which makes it more difficult to accurately track resource capacity. - Fixed Duration tasks can be effort-driven or non-effort driven which presents another potential area for inconsistencies. Adding resources (units) to a Fixed Duration, non-effort driven task will decrease the amount of work required to complete the task. Effort driven regulates calculations when you add or subtract resources assigned to the task. If you change the duration of an effort driven task, Project Server changes the work to fit the new duration. Fixed Work task types have the following disadvantages: - Work estimates must be accurately reflected in the schedule to ensure a meaningful schedule can be reported on. - Duration will change based on the resource(s) availability. - Fixed Work is not ideal to use when the schedule is date constrained. If the schedule is date constrained (e.g. the Government imposes restrictions on when a certain activity must be completed), then Fixed Duration should be used. If you change the duration of an effort driven task, Project Server changes the work to fit the new duration. Fixed Work task types have the following disadvantages: - Work estimates must be accurately reflected in the schedule to ensure a meaningful schedule can be reported on. - Duration will change based on the resource(s) availability. Fixed Work is not ideal to use when the schedule is date constrained. - If the schedule is date constrained (e.g. the Government imposes restrictions on when a certain activity must be completed), then Fixed Duration should be used. 3

It is recommended that tasks are planned using Fixed Duration, non-effort driven. Before the project is published for time entry by team members, change all Fixed Duration tasks (that are not meetings, review sessions, or date constrained) to Fixed Work. To ensure the scheduling algorithm is considered, the Gantt Chart view should contain the Task Type and Effort Driven columns. The default for task type and effort can be set in the Project Professional Tools Options feature. Be sure to provide an accurate assessment of the work to complete the task; this estimate should come from the person doing the work. Estimates from team members should be reflected in the Work column of the project when Fixed Work is the task type. 5. Set Task Linkage The following general rules wil help you keep your projects linked properly so you can see the critical path of the project: Summary tasks should not be linked to other tasks. Summary tasks in Project are not productive tasks but rather a visual and data summary of the tasks under them. Start and end milestones within each summary grouping should be used to link the tasks within. Level of Effort (LOE) tasks should be tied to the last milestone in the summary grouping. Linkages are critical to ensure tasks fit into the overall Linkages create a floating phase in the project Without a predecessor, the task will begin on the project start date, thus providing inaccurate estimates. Linkages can be time-consuming to ensure relationships are accurate and meaningful. It is recommended to always have predecessors (and successors) at non-summary task levels to ensure no orphan tasks exist in the project. Without these dependencies set, tasks will begin on the project start date or next available working date. Start and finish milestone tasks are recommended for linkages. It is also recommended that LOE tasks be tied to the last milestone in the project This will keep the project schedule from appearing unorganized and being difficult to manage while still accounting for these tasks. 6. Identify Milestones A milestone marks a significant event (such as a hand-off point) or a turning point in the Milestones are generally tasks without associated time, although it is possible to have a milestone that is also a task that takes time. A milestone can also be called an achievement or significant landmark, and will appear on the Gantt Chart as a diamond shape. Milestones provide a linking mechanism for starting and finishing tasks. Milestones allow project schedule phases to float and not be constrained by dates. Milestones allow for filtering the schedule in Project Professional. 4

Milestones can add a lot of tasks to the project It is recommended that milestones be utilized in the project schedules. There should be a start milestone and finish milestone task for each of the summary tasks directly above the lowest level tasks. The lowest level tasks are then linked within those milestone tasks. Any comments or requests? Please don t hesitate to let us know! 5