Project Reviews Lessons Learned Presented by: Kellie Cloud, PMP, PMI SP, PMI RMP, EVP



Similar documents
Government Contracting and Earned Value Management (EVM)

THE UNDER SECRETARY OF DEFENSE 3010 DEFENSE PENTAGON WASHINGTON, DC

How To Write Ansi/Eia Evm System Acceptanceance Guide

July 6, (1) CHAPTER 11

Defense Logistics Agency INSTRUCTION

Project Cost Management

PHASE 3: PLANNING PHASE

Earned Value Management Systems Application Guide

PHASE 3: PLANNING PHASE

The Program Managers Guide to the Integrated Baseline Review Process

Training Seminars. Description. Core Courses: The core courses consist of the following:

Practice Symposia Implementation Considerations Track

Using Earned Value Management Concepts to Improve Commercial Project Performance

THE APPLICATION OF A VALUE ASSURANCE SYSTEM TO OIL & GAS DEVELOPMENT PROJECTS (Guido Mattu, Franca Marini)

IS EARNED VALUE + AGILE A MATCH MADE IN HEAVEN?

IT Baseline Management Policy. Table of Contents

ATTACHMENT 3 SPS PROJECT SENIOR PROGRAM MANAGER (SPM) DUTIES & RESPONSIBILITIES

DCMA EVMS COMPLIANCE REPORT I LOCKHEED MARTIN AERONAUTICS CO.

Appendix E Program Management Plan Template

CPM -100: Principles of Project Management

AACE International Recommended Practice No. 86R 14

FOREWORD. Page 2 of 88

Report No. DoDIG April 27, Navy Organic Airborne and Surface Influence Sweep Program Needs Defense Contract Management Agency Support

Earned Value Management Systems Application Guide

Information Technology Processes FinCEN is an agency whose mission is dependent on the effective collection,

Project Management Certificate (IT Professionals)

Cost Management. How Much Will This Project Cost?

Project Management Professional (PMP) Examination Content Outline

ACESS A Comprehensive Enterprise Social Services System

Earned Value Management System (EVMS) Manual. System Description and Implementing Procedures

Earned Value Management and the Government Program Office. Blair Alan Knapp Jr. MSPM PMP

Chapter 7. (PMBOK Guide)

DEPARTMENT OF DEFENSE Defense Contract Management Agency INSTRUCTION. Defense Acquisition Executive Summary (DAES)

PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >

Internal Surveillance

Information Technology Project Oversight Framework

DATA ITEM DESCRIPTION Title: Integrated Program Management Report (IPMR) Number: DI-MGMT Approval Date:

Scheduling Process Maturity Level Self Assessment Questionnaire

Playing The Project Management Game

How To Write A Project Management Plan

Project Management Institute. Construction. Extension to. A Guide to the Project Management Body of Knowledge. PMBOK Guide 2000 Edition.

AUSTRALIAN INNOVATIONS

SUCCESSFULLY INTEGRATING AGILE WITH EARNED VALUE MANAGEMENT

Project Execution, Monitoring and Control (IS PM 8. Lecture; 2012 Spring)

Introduction to the ITS Project Management Methodology

Interpreting the Management Process in IEEE/EIA with the Help of PMBOK

DCMA 14-Point Assessment Metrics

msd medical stores department Operations and Sales Planning (O&SP) Process Document

Program Management Professional (PgMP) Examination Content Outline

PROJECT MANAGEMENT PLAN <PROJECT NAME>

What Does the Government Want from Project Management? DC PMI Chapter Executive Breakfast Series January 16, 2008

Department of Administration Portfolio Management System 1.3 June 30, 2010

Summary of GAO Cost Estimate Development Best Practices and GAO Cost Estimate Audit Criteria

Expert Reference Series of White Papers. Importance of Schedule and Cost Control

LGS Project Management Methodology

NASA/SP Earned Value Management (EVM) Implementation Handbook

Appeals Case Management System Project. Scope Management Plan. November 20, 2014

Project Management Methodology

1.0 Purpose. 2.0 Roles and Responsibilities. Management System Description: Project Management. Management System Owner: Lorie Howard

Scope Management Guideline August, 2015

Project Management Plan for

Earned Value Management Tutorial Module 1: Introduction to Earned Value Management. Prepared by:

Rolling Wave Planning: Manage Projects Without Going Under

Time Management. Herb Pollard III

ITRM Guideline CPM Date: January 23, 2006 SECTION 4 - PROJECT EXECUTION AND CONTROL PHASE

Earned Value Formulae

Establish Collaborative Strategies to Better Manage a Global Vendor Network Devise a Proper Float Plan

INFORMATION MANAGEMENT

Internal Audit Report. Toll Operations Contract Management TxDOT Office of Internal Audit

Auditing Capital Projects and Project Controls. March 2013

Fundamentals of Measurements

The Key to a Successful KM Project

Program Management Office Provided Adequate Oversight of Two Contracts Supporting the Defense Enterprise Accounting and Management System

Project Management Professional (PMP) Examination Content Outline

- ATTACHMENT - PROGRAM MANAGER DUTIES & RESPONSIBILITIES MARYLAND STATE POLICE W00B

Earned Value Management Knowledge Sharing

DEPARTMENT OF DEFENSE Defense Contract Management Agency INSTRUCTION. Small Business Process

Network Rail Infrastructure Projects Joint Relationship Management Plan

Project Management: Back to Basics

Design Consultant Project Management Requirements

Project Management Standards: A Review of Certifications/Certificates

Case Study. An example of a new government contract award to a private sector company required to demonstrate ANSI-748 Compliance

CPM -100: Principles of Project Management

Baseline Change Control Procedure

GAO MAJOR AUTOMATED INFORMATION SYSTEMS. Selected Defense Programs Need to Implement Key Acquisition Practices

Estimating Cost at Completion - Judgment & EV Information

FERMI RESEARCH ALLIANCE PROCEDURES PROJECT MANAGEMENT. Head, Office of Project Management Oversight

PROJECT MANAGEMENT FRAMEWORK

SQM-H. This Handbook is a summary of the processes and documents of the supplier quality management 1/13

An Oracle White Paper September Mastering Project Management Fundamentals Critical for Successful Earned Value Management

Military Handbook 881 Work Breakdown Structure Update

Project Management Guidelines

IAG EFFECTIVE SCOPE MANAGEMENT THROUGH MULTI-LEVEL CLIENT ENGAGEMENT

Project Management Body of Knowledge (PMBOK) (An Overview of the Knowledge Areas)

CDC UNIFIED PROCESS JOB AID

Best Practices Statement Project Management. Best Practices for Managing State Information Technology Projects

ITRM Guideline CPM Date: January 23, 2006 SECTION 5 PROJECT CLOSEOUT PHASE

DICK BRODKORB FAX ( ) 3 THEN CHECK THE LOCATION YOU LL BE ATTENDING.

WHY DO I NEED A PROGRAM MANAGEMENT OFFICE (AND HOW DO I GET ONE)?

Department of Veterans Affairs VA DIRECTIVE 6071

Transcription:

Project Reviews Lessons Learned Presented by: Kellie Cloud, PMP, PMI SP, PMI RMP, EVP Project Management Institute WDC Chapter Chantilly Luncheon 10 March 2011

Topics of Discussioni Best Practices and Lessons Learned Integrated Baseline Reviews Joint Surveillance Reviews Program Management Reviews Establishing validity and realism in the Performance Measurement Baseline (PMB) is essential to controlling Scope, Cost and Schedule Evaluation and maintenance of the PMB through formal reviews is critical 2

Integrated Baseline Review Benefit of Reviews Agreed upon baseline of scope, cost and schedule. hdl Assignment of expectations and authority to perform tasks within the baseline. Avoidance of deviation from the baseline. Confidence in the ability to execute the project. Joint Surveillance Review Assurance that a system is in place that can accurately report project status. Adherence to contractor System Description. Validation that the contractor is compliant with System Description and industry standards. Confidence in the reporting and accuracy of the system Project Management Review Clear understanding of issues and ability to take action to correct them in a timely manner. Overall benefits: Sustainment of baseline, ability to make critical decisions to ensure the success of the project. Reviews keep stakeholders informed, and communication between client and contractor transparent. Perfect execution of reviews does NOT guarantee the project will be perfect. 3

Business Rhythm of Reviews Review Typical Frequency Level of Effort Preparation Time Needed Participants i t Integrated Baseline High 2 4 Months Review (IBR) Client and Contractor: PM, D/PM IPT Leads and CAMs Business Operations Contracts Management EVM Analyst/SME DCMA Representative * Joint Surveillance Review (JSR) High 1 2 Months Client and Contractor: PM, D/PM IPT Leads and CAMs Business Operations EVM Analyst/SME DCMA Representative * Project Management Review (PMR) Medium 1 2 Weeks Client and Contractor: PM, D/PM IPT Leads and CAMs Business Operations Contracts Management EVM Analyst/SME 4

Choosing an appropriate review Integrated Baseline Review Out of Cycle Triggers: Baseline execution has unsteady variances from month to month. Continual downward trend after correct actions have been implemented. Authority to Proceed (ATP), large project milestone shifts or any large impact to the Performance Measurement Baseline. Joint Surveillance Review Out of Cycle Triggers: Management is having difficulty identifying root cause of issues or variances. Negative actuals on a regular basis. Continual errors in the system report or lack of a proper EV analysis, lack of accurate or functional process, lack of adhering to System Description. i Continual best practice adherence and updates. Project Management Review Triggers: Fire fighting is a frequent management technique, downward trend of variances, missed milestones, and lack of clear definition of issues driving variances. Open communication on project opportunities. Responsibility of Earned Value Analyst: Evaluate current project needs, make recommendation on review needed and schedule as soon as feasible. Ensure minimum disruption to existing project events and activities during reviews. 5

Integrated t dbaseline Reviews Definition: A joint review by Client Program Managers and their technical staffs, and Contractor Program Managers and their technical staffs to provide a mutual understanding of the Performance Measurement Baseline (PMB). Desired Outcome: Clear understanding of Issues/Findings and Improvement Opportunities. Realistic and executable performance baseline. Identification of potential risks to the project performance. Application: Valuable following contract award (within 160 180 calendar days) or after a major program event: Rolling Wave, Re baselining, Single Point Adjustment, or Over Target Baseline Preliminary Design Review, Critical Design Review, First Article to Test Significant changes in the funding or direction of the program Integrated Baseline Reviews should be regarded as a continuing process rather than a program event. 6

IBR Objectives Evaluate the Performance Measurement Baseline 1. Technical Scope PMB captures the entire scope of work 2. Planning/Scheduling Realistic and accurately scheduled 3. Budget/Resources Proper amount/mix of resources 4. Risk and Opportunities Appropriate mitigation and identification Evaluate Capabilities/Process Implementation 5. Organization Clear lines of responsibility and ownership 6. Work Authorization All planned work is authorized at appropriate levels 7. Risk Management Process Classification and assignment approach 8. Progress Assessment/Reporting & Change Control Effective implementation 7

June 1 July 7 Aug 29 Sept 4 Dec 4 Plan Review Interview Analyze Initial Intermediate In Plant Reviews Final Realistic and Executable Performance Baseline Client Planning and Training (IBR and EVM) Formal notification to Contractor System Description Review Review of Contractor Data (Data Traces) Review of Contractor Risk Logs/Registry Mock Control Account Management (CAM) Interviews Shoulder to Shoulder Discussions with Client and Contractor Control Account Manager Discussions Actions Items/Findings Preparation Agreement on Risk Watch Items Agreement on Action and Risk Closure Process Initial Memorandum for Record (MOR) issued to the Contractor (Findings and action items formalized) Tracking and Close out of Action Items and/or Findings Updating of Risk Database Final (Closeout) Memorandum for Record to Contractor 8

IBR Lessons Learned Kick off meetings are critical Sets expectations and opens lines of communication. Be realistic in time lines Optimistic IBR schedules lead to cutting corners and missing vital discoveries. Training of Client and Contractor Dt Data Traces Interviews Communication is Key Open and Clear discussions allow early resolution of problems. Discussion need to be encouraged between counterparts Logistics and Details Administrative i i support is vital Timing of the IBR The initial and subsequent IBRs are time consuming and usually run simultaneously with project objectives. Risk is not properly addressed Initial i IBR is most difficult should have as many as possible. This is NOT solely a financial review Common misconception is that the baseline is only validated for acceptable levels of Management Reserve (MR) 9

Joint tsurveillance Reviews Definition: Confirmation that the contractors internal process and procedures are being followed in accordance with the contractors EVM system description. Evaluation of the contractor to execute accurate collection and reporting of earned value. Desired Outcome: Clear understanding of contractor s ability to follow the processes defined in its system description, timely and accurate reporting of earned value data, and the resolution of all Corrective Action Requests (CARs). Application: Generally, the JSR is held annually to ensure the contractor continues to apply their earned value processes per the EVM system description and deliver accurate earned value reporting. Also can be performed on systems that show signs of inaccurate reporting. Joint Surveillance Reviews should be regarded as a vehicle for continual improvement of Earned Value Systems and Procedures. 10

JSR Objectives Assess the contractor s commitment and ability to implement the EVMS as an integral part of its management processes as evidenced d by: 1. Organization Clear understanding of roles and responsibility. 2. Work Authorization Understanding of and ability to demonstrate the approved process to include control account level scope, cost and schedule. 3. Planning/Scheduling Understanding of how tasks are horizontally and vertically integrated, material and sub contract planning and statusing. 4. Progress Assessment/Reporting & Change Control Understanding of report utilization and how reporting helps manage task execution. Engagement in weekly/monthly business rhythms. Understanding processes for change control and action item closure. 5. Risk Management Process Classification and assignment approach process and applicability to estimates. 6. Rework Understanding of process for rework and approach. 7. Estimates Understanding of requirements and processes for updating estimates. Understanding how risk processes are applied to estimates. 11

June 1 July 7 Aug 27 Sept 4 Nov 4 Plan Review Interview Analyze Initial Intermediate In Plant Reviews Final Demonstrated ability to follow System Description processes Selection of Project for Review JSR Kick off Presentation Creation of JSR Schedule and Objectives Notification of Review Control Account Manager Training System Description Review Review of Contractor Data Tracing of processes through System Processes to ANSI 32 Criteria Control Account Manager Interview Selection Review of Contractor Risk Processes Shoulder to Shoulder Discussions Action item discussions with Client and Contractor prior to in plant review In Brief, review of expectations Control Account Manager Discussions Close out of Action Items could reduce unnecessary CARs Corrective Action Requests issued Out Brief with assignment of actions Tracking and closing out of Corrective Action Requests Joint Surveillance Report issued and closure evidence documented 12

JSR Lessons Learned Kick off meetings are critical Sets expectations and opens lines of communication. Encourage participation of contractor in data traces Communication is Key Open and clear discussions allow early resolution of problems. Allows meaningful CAM discussions Set Roles and Responsibilities Each participant needs to understand their expectations and role in the review. Appropriate Questions Interviews are critical Make Mk PM interviews i mandatory. No more than 1.5 hours per interview, have short breaks for interviewers Don t leave out Business Operations, fidelity in this area is just as critical as technical areas. Review information prior to visit. One lead in a discussion. Set the Stage Brief the "rules of engagement" gg during the start of the in plant CAM interviews. Ensure that all questions have been Be Prepared verified with interview team. Have a cross reference for the Ambiguous questions can lead to systems description to the 32 ANSI misunderstandings. criteria. 13

Project tmanagement treviews Definition: A quarterly/monthly review of progress on key deliverables and project performance to date between the client and contractor. t Desired Outcome: Review of project progress and addresses issues with the baseline. Clear understanding of current risks and opportunities. Review of upcoming deliveries i and expectations. Application: Valuable to provide formal accountability of project execution. Open dialog between client and contractor. Should be held at least quarterly, generally held monthly, depending on the size and complexity of the project. Project Management Reviews keep lines of communication continuously open in regards to progress of Project Objectives. 14

PMR Objectives Review of Performance and Technical Accomplishments Evaluation of the Project s ability to maintain scope, cost and schedule. Status of the Contract changes in scope Technical Issues, Concerns and Risks changes in scope Business Operations and Financial Management changes in cost Schedule Review and Potential Risks changes in schedule Open Action Items and Special Topics 15

16

Proposed dpmr Agenda Attending: Client PM, D/PM, Business Operations/FM, IPT Leads, Subject Matter Experts (SMEs), Contracts, Contractor PM, D/PM, Business Operations/FM, IPT Leads, Support Staff Contract Status Funding and Contract Actions Engineering Change Proposals and Opportunities Status of Contractual deliverables Technical Issues and Concerns Define current technical issues by Product Team. Business Operations and Financial Management Review EV data at Program level and then by Product Team. Review progress towards project milestones. 30 60 90 day look ahead. Open Action Items and current issues assign responsibility and completion dates. 17

PMR Lessons Learned Have those that are in the authority to make decision present. Stay true to the schedule. hdl Take in depth hdiscussions off line so SMEs are present for focused discussions. Record decisions and minutes and review at the end of the meeting, memories tend to be bias. Dead weight attendees All in attendance need to contribute or facilitate. If a person is attending for informational purposes, they can read the presentation slides afterwards. Reviews can be rapidly turned into Technical Exchange Meetings stay out of the weeds, information presented needs to pertain to all attendees not just a small subset. Discuss inter product team impacts, sometimes the solution is being worked in the wrong area. Look for root causes. Review presentations 2 3 days prior to meeting to ensure topics of interest are covered. 18

Improper Application i of Reviews Integrated Baseline Review Used as a kick off k meeting for the project, meet and greet. One day quick ik review for completion of a project objective. Lower level reviews not preformed prior to system review. Joint Surveillance Review Attempt to pass responsibility of accurate reporting to the client. In plant reviews have ended badly due to lack of preparation and no clear understanding of objectives. Seen as a review of the bare minimum to get past the processes. Project Management Review Excessive or cumbersome reviews, only presenting positive topics, no set agenda or review of information. No decision making or informational only. Outcome of Improper Application of Reviews: The misuse of limited resources can drain the life from a project. Excessive travel places a burden on the project budget. Loss of Baseline integrity Cancellation or failure of project and objectives. 19

Project Management Institute PMBOK 4 th Edition i Rf References Practice Standard for Project Scheduling Practice Standard for Project Risk Management Department of Defense Defense Contract Management Agency (DCMA) EVM Community of Practice Defense Federal Acquisition Regulation Supplement (DFARS) 252.234 7002 Defense Acquisition University (DAU) Program Managers Guide to the Integrated Baseline Review Process Integrated Master Plan and Integrated Master Schedule Preparation and Use Guide Earned Value Management Integration Guide (EVMIG) ANSI/EIA Standard 748 Latest Revision Earned Value Management Systems 20

Acronyms AACE Association for the Advancement of Cost Engineering g ANSI/EIA American National Standards Institute/Electronic Industries Alliance ATP Authority to Proceed CAM Control Account Manager CAR Corrective Action Request CoP Community of Practice DAU Defense Acquisition University (EVM CoP https://acc.dau.mil/evm) DCMA Defense Contract Management Agency D/PM Deputy Project Manager EVM Earned Value Management EVMS Earned Value Management System EVP Earned Value Professional (AACE) FM Finance/Financial Manager IBR Integrated Baseline Review IPT Integrated Product Team JSR Joint Surveillance Review 21 MR Management Reserve OSD Office of the Secretary of Defense PM Project Manager PMB Performance Management Baseline PMBOK Project Management Body of Knowledge (A Guide to the PMBOK) PMI Project Management Institute PMI SP PMI Scheduling Professional RMP Risk Management Professional (PMI) SME Subject Matter Expert

Questions and Answers 22

Project treview Cheat Sheet Definition Potential Triggers Desired Outcome Application d Baseline Review (IBR) Integrate The Integrated t Baseline Baseline execution has unsteady Clear understanding di of Valuable Vl following contract t award Review (IBR) is a joint review variances from month to month Issues/Findings and (within 160 180 calendar days) or by Client Program Managers Continual downward trend after correct Improvement Opportunities. after a major program event: and their technical staffs, and actions have been implemented Realistic and executable Rolling Wave, Re planning/reprogramming, Contractor Program Managers After Contract Award or Authority to performance baseline. Single Point and their technical staffs to Proceed (ATP) Identification of potential risks Adjustment, or Over Target Baseline provide a mutual Large project milestone shifts or any to the project performance. Preliminary Design Review, Critical understanding of the Performance Measurement Baseline (PMB). large impact to the PMB Design Review, First Article to Test Significant changes in the funding or direction of the program Jo oint Surveillance Review (JSR) Confirmation that the contractors internal process and procedures are being followed in accordance with the contractors EVM system description. Evaluation of the contractor to execute accurate collection and reporting of earned value. Difficulty in identifying root cause of issues or variances Negative actuals on a regular basis Continual errors in the system report or lack of a proper EV analysis Lack of accurate or functional process or in adhering to MCSD Clear understanding of contractor s ability to follow the processes defined in its system description, timely and accurate reporting of earned value data Resolution of all Corrective Action Requests (CARs) Generally, the JSR is held annually to assure the contractor continues to apply their earned value processes per the EVM system description and deliver accurate earned value reporting Can also be performed on systems that show signs of inaccurate reporting Project Management Revie w (PMR) A quarterly/monthly review of progress on key deliverables and project performance to date between the client and contractor. Fire fighting is a frequent management technique Downward trend of variances and lack of clarity in issues driving variances Missed milestones Open communication on project opportunities Review of project progress and addresses issues with the baseline Clear understanding of current risks and opportunities Review of upcoming deliveries and expectations. Valuable to provide formal accountability of project execution Open dialog between client and contractor Should be held at least quarterly, generally held monthly, depending on the size and complexity of the project. 23