Military Handbook 881 Work Breakdown Structure Update
|
|
|
- Nickolas Parker
- 10 years ago
- Views:
Transcription
1 Military Handbook 881 Work Breakdown Structure Update Presented By: Neil Albert 25 August 2004 MCR, LLC 2000 Corporate Ridge, Suite 400 McLean, VA 22102
2 Update to incorporate DoD changes in Acquisition Policy and Guidance Task 1: Update for DoD 5000 changes Task 2: Identify how the WBS can support each acquisition phases and the actions necessary to enter and exit successfully Task 3: Reflect changes to new and improved approaches to product development (i.e., IPTs) Task 4: Show how WBS is developed and maintained throughout the life cycle to meet program management goals as well as cost, schedule and technical objectives Task 5: Show how the WBS is the common link which will unify the planning, scheduling, estimating, budgeting, configuration management and performance reporting disciplines
3 Schedule Task July Aug Sept Oct Nov Dec 1. Update to Include DoD Policy and Guidance 2. Add/Improve on WBS Definitions 3. Used with newer terms and policies 8-Jul 8-Jul Draft WBS Def Final Review 4. Characterized as an Acquisition tool 5. Support Budget, Cost, Schedule, Technical, Contractual, and Program Management 6. Integration with Program Management, Systems Engineering, Contractual and Cost Estiamting Documents 7. Ensure Industry Participation 8. Format for Web Access 8-Jul Monthly Progress Reports Government Review Mid Term Review Final Review
4 Expectations Integrating with current AT&L and DCARC activities New procedures and requirements being considered that affect the use of the WBS in both CPR and CSDR Become involved with working groups already making changes to CPR and CSDR processes that affect the WBS Ensure Handbook becomes a comprehensive guide for Industry and Government Outreach support Work with major DoD organizations to get the inputs needed to make the Handbook a government and industry wide document Use participation in all major professional associations Leverage relationships to gain insight, lessons learned and new innovations and ideas for better execution
5 Task 1: Add/Improve upon WBS definitions Update definitions to reflect advancement of technology in design, development and manufacturing Heavier reliance on software Commercial-off-the-shelf items (Status: Working groups formed to address issues working with other contractor representatives) Establish a Working Group consisting of Government and Industry to review at least the following appendices and provide comments and potential revisions Aircraft specifically UAVs Space Multiple definitions NASA, NRO, DoD, etc. Ships Waived for CSDR no longer (Status: Working groups formed, initial response due 10 Sept. Meetings to be held week of 20 Sept)
6 Task 2: Clarify how WBS is used with newer terms and processes System of Systems/Family of Systems Clarify terminology and highlight examples of how the WBS is created given the requirement for system interaction and interoperability Show example of System of Systems WBS Spiral/Evolutionary Development (Hardware/Software) Each spiral provides new functionality which could be considered product oriented, but better definition is required Will define terminology and provide examples of how the WBS is created given an evolutionary requirement. (Process is already defined in the software WBS description --- most software engineers used spiral development to create software in the early 1990 s) Risk Analysis Description of risk analysis use with WBS System Engineering use to trade cost, schedule and technical risk of the system to meet end-item requirements (Status: Collecting information for inclusion in document)
7 Task 3: Ensure the WBS is characterized as an Acquisition tool To decrease the use of multiple WBSs used by different functional areas, define the WBS for all practical uses: Cost Estimating EVM Database Scheduling Requirements planning, etc. Establish group of system engineers, cost analysts, logisticians, earned value management technicians, program managers and contracts personnel to agree and commit to one approach defining and using the WBS for program support Maintain a product oriented WBS reporting at level 3 (except for high cost, high risk or technology driving elements) Communicate result by follow on training (Status: Starting to contact appropriate associations)
8 Task 4: Support Budget, Cost, Schedule, Technical, Contractual and Performance Management Identify DoD 5000 has mandated certain reporting functions that rely on the WBS Contract Funds Status Report Contractor Cost Data Reporting Earned Value Management Use example (e.g., Joint Strike Fighter) Demonstrate how acquisition reports will track to each other if a single WBS is used Show relationship to CLIN SOW Requirements IMP/IMS (Status: Not started)
9 Task 5: Integrates with PM and SE Documents, Contracts and Cost Estimating Re-enforce the use of the WBS via example Show that without the WBS, the IMP/IMS relationship to other acquisition artifacts would not be possible (Status: Not started)
10 Ensure Industry Participation Involve those who are affected by the changes by having them participate in making those changes Embrace as many joint industry/government associations as possible to get buy-in and feedback Task 1&2: Working groups comprised of functional experts to re-examine WBS definitions proposed for review Task 3: Use Govt and industry representatives to ensure all aspects of WBS application and usage are considered and reflect real life situations Program Management: Project Management Institute (PMI) System Engineering: International Council on Systems Engineering (INCOSE) and National Defense Industrial Assoc (NDIA) Cost Estimating: Society of Cost Estimating and Analysis; Cost and Software Data Reporting (CSDR) Focus Group and Space Systems Cost Analysis Group (SSCAG) Earned Value Management: PMI s College of Performance Management and NDIA s Program Management Subsystems Committee Logistics: Society of Logistics Engineers (SOLE) Contract Management: National Contract Management Association (NCMA) Tasks 4&5: Use DAU to ensure changes reflect understanding and communication of the revisions to DoD 5000 processes and terminology affecting the WBS
WORK BREAKDOWN STRUCTURES FOR DEFENCE MATERIEL PROJECTS
COMMONWEALTH OF AUSTRALIA AUSTRALIAN DEFENCE STANDARD DEF(AUST)5664 Issue A Dated Jun 2004 REPLACING/SUPERSEDING DEF(AUST)5664 Dated Aug 1995 WORK BREAKDOWN STRUCTURES FOR DEFENCE MATERIEL PROJECTS DRAFT
THE WORK BREAKDOWN STRUCTURE IN AN ACQUISITION REFORM ENVIRONMENT. Prepared For: COST SCHEDULE PERFORMANCE MANAGEMENT CONFERENCE
THE WORK BREAKDOWN STRUCTURE IN AN ACQUISITION REFORM ENVIRONMENT Prepared For: COST SCHEDULE PERFORMANCE MANAGEMENT CONFERENCE Prepared By: Neil F. Albert 700 Technology Park Drive Billerica, MA 01821
Developing Work Breakdown Structures
Developing Work Breakdown Structures International Cost Estimating & Analysis Association June 2014 Neil F. Albert MCR, LLC [email protected] 703-506-4600 2014 MCR, LLC Distribution prohibited without express
Cost and Software Data Reporting Training
Cost and Software Data Reporting Training Contracting for CSDRs October 16, 2012 Contracting Begins 60 days prior to RFP release CSDR IPT Contractor Data Reporting Structure Resource Distribution Table
DEPARTMENT OF DEFENSE HANDBOOK
NOT MEASUREMENT SENSITIVE MIL-HDBK-881A 30 JULY 2005 SUPERSEDING MIL-HDBK-881 2 JANUARY 1998 DEPARTMENT OF DEFENSE HANDBOOK WORK BREAKDOWN STRUCTURES FOR DEFENSE MATERIEL ITEMS This handbook is for guidance
Update: OSD Systems Engineering Revitalization Efforts
Update: OSD Systems Engineering Revitalization Efforts 23 October 2007 Col Rich Hoeferkamp Ms. Sharon Vannucci Systems and Software Engineering (Enterprise Development) Office of the Deputy Under Secretary
ROYAL REHAB COLLEGE AND THE ENTOURAGE EDUCATION GROUP. UPDATED SCHEDULE OF VET UNITS OF STUDY AND VET TUITION FEES Course Aug 1/2015
UPDATED SCHEDULE OF UNITS OF STUDY AND TUITION FEES Course Aug 1/2015 Course Name: Delivery Mode: BSB50215 Diploma of Business Online DBTEU01 01/08/2015 19/08/2015 31/10/2015 0.25 $4245 $3265 DBTEU02 01/11/2015
Using Parametric Software Estimates During Program Support Reviews
Using Parametric Software Estimates During Program Support Reviews Version 1.0 Chris Miller Office of the Deputy Director, Software Engineering and System Assurance SYSTEMS & SOFTWARE ENGINEERING Office
Cost and Software Data Reporting (CSDR) Manual
DoD 5000.04 M 1 Cost and Software Data Reporting (CSDR) Manual April 18, 2007 Cost Analysis Improvement Group FOREWORD This Manual reissues DoD 5000.4-M-1 (Reference (a)) pursuant to the authority of DoD
Earned Value Management Systems Application Guide
National Defense Industrial Association Integrated Program Management Division Earned Value Management Systems Application Guide May 4, 2011 Revision 1* National Defense Industrial Association (NDIA) 2111
Government Contracting and Earned Value Management (EVM)
Government Contracting and Earned Value Management (EVM) Ida Davis, EVP, PMP, MBA Earned Value Manager DynPort Vaccine Company LLC, A CSC Company Note: This presentation is the property of DynPort Vaccine
System Security Engineering
A Critical Discipline of SE Ms. Kristen Baldwin Director, Systems Analysis DDR&E/Systems Engineering 12th Annual NDIA Systems Engineering Conference 28 October 2009 10/28/09 Page-1 Defense Research & Engineering
WORK BREAKDOWN STRUCTURE HANDBOOK
WORK BREAKDOWN STRUCTURE HANDBOOK U.S. Department of Energy Washington, D.C. 20585 August 16, 2012 AVAILABLE ONLINE AT: URL TBD INITIATED BY: Office of Management FOREWORD This handbook was developed by
DEPARTMENT OF DEFENSE STANDARD PRACTICE
NOT MEASUREMENT SENSITIVE MIL-STD-881C 3 October 2011 SUPERSEDING MIL-HDBK-881A 30 July 2005 MIL-STD-881B 25 March 1993 DEPARTMENT OF DEFENSE STANDARD PRACTICE WORK BREAKDOWN STRUCTURES FOR DEFENSE MATERIEL
How To Write Ansi/Eia Evm System Acceptanceance Guide
National Defense Industrial Association (NDIA) Program Management Systems Committee (PMSC) ANSI/EIA 748 Earned Value Management System Acceptance Guide Working Release For User Comment January 23, 2006
Earned Value Management Systems Application Guide
National Defense Industrial Association Integrated Program Management Division Earned Value Management Systems Application Guide January 27, 2015 Revision 2 National Defense Industrial Association (NDIA)
Space and Naval Warfare Systems Center Atlantic
Space and Naval Warfare Systems Center Atlantic Charleston Defense Contractors Association 40 th Small Business Industry Outreach Initiative 23 June 2016 Mr. Chris Miller SSC Atlantic Executive Director
AT&T Global Network Client for Windows Product Support Matrix January 29, 2015
AT&T Global Network Client for Windows Product Support Matrix January 29, 2015 Product Support Matrix Following is the Product Support Matrix for the AT&T Global Network Client. See the AT&T Global Network
BY ORDER OF THE COMMANDER USTRANSCOM INSTRUCTION 33-48 UNITED STATES TRANSPORTATION COMMAND 22 JUNE 2015
BY ORDER OF THE COMMANDER USTRANSCOM INSTRUCTION 33-48 UNITED STATES TRANSPORTATION COMMAND 22 JUNE 2015 Communications and Information DATA MANAGEMENT POLICY AND RESPONSIBILITIES COMPLIANCE WITH THIS
CYBERSECURITY CHALLENGES FOR DOD ACQUISITION PROGRAMS. Steve Mills Professor of Information Technology [email protected] 256.922.
CYBERSECURITY CHALLENGES FOR DOD ACQUISITION PROGRAMS 1 Steve Mills Professor of Information Technology [email protected] 256.922.8761 Overview Cybersecurity Policy Overview Questions Challenge #1 -
Systems Thinking in DoD Program Management
Systems Thinking in DoD Program Management Bipin Chadha and John Welsh Lockheed Martin Advanced Technology Laboratories Amelia Ruzzo Placer Dome, Inc. Problem Major programs often encounter major cost
WBS Development: Rules, Aberrations, and MIL-STD-881C Implementation Challenges
Development: Rules, Aberrations, and MIL-STD-881C Implementation Challenges M. Michael Metcalf, Technomics Inc. SCEA/ISPA 2012 Sponsor: Mr. Mike Augustus, DCARC Some material was taken from DCARC training
How To Manage The Navy Marine Corps Intranet
ATTACHMENT NO. 1 SEAPORT ENHANCED PERFORMANCE WORK STATEMENT DRPM, NMCI ENTERPRISE IT SERVICE MANAGEMENT SYYSTEM (EITSMS)/ NMCI ENTERPRISE TOOL (NET) Rev. 2, dated 30 Jan 2007 1.0 INTRODUCTION The Direct
Program Management vs Systems Engineering
Program Management vs Systems Engineering How different are they? Lori F Zipes NSWC-PC Panama City, FL Overview PMBoK review DAU Guidebook review INCOSE handbook review (15288) What are the PM s goals,
Appendix B: Work Breakdown Structure (WBS)
: Work Breakdown Structure (WBS) B.1. Introduction The WBS and WBS dictionary are effective management processes for planning, organizing, and administering NASA programs and projects. In accordance with
CPM -100: Principles of Project Management
CPM -100: Principles of Project Management Lesson B: Time and Cost Management Presented by Bruce R. Shaw, P.E., PMP [email protected] Ph: 703-922-2772 Presented at the PMI-CPM 2002 Fall Conference
Department of Defense MANUAL
Department of Defense MANUAL NUMBER 5000.04-M-1 November 4, 2011 CAPE SUBJECT: Cost and Software Data Reporting (CSDR) Manual References: See Enclosure 1 1. PURPOSE. This Manual: a. Reissues DoD 5000.04-M-1
How To Become A Senior Contracting Official
Program Management Specific Functional Requirements for Key Leadership Positions (Attributes and Demonstrated Experience Beyond Level III Certification) Education: o Advanced Degree Preferably in a technical,
NICE and Framework Overview
NICE and Framework Overview Bill Newhouse NIST NICE Leadership Team Computer Security Division Information Technology Lab National Institute of Standards and Technology TABLE OF CONTENTS Introduction to
Best Practices for the Acquisition of COTS-Based Software Systems (CBSS): Experiences from the Space Systems Domain
GSAW 2004 Best Practices for the Acquisition of COTS-Based Software Systems (CBSS): Experiences from the Space Systems Domain Richard J. Adams and Suellen Eslinger Software Acquisition and Process Office
Space Systems Engineering Professional Development & Certification
Space Systems Engineering Professional Development & Certification Gerard H. Fisher The Aerospace Corporation 15049 Conference Center Drive, CH2-220 Chantilly, VA 20151 [email protected] 703-808-4175
WORKFORCE COMPOSITION CPR. Verification and Validation Summit 2010
WORKFORCE COMPOSITION CPR PEO IEW&S Organizational Assessment VCSA Brief Date 2010 October 13, 2010 This briefing is UNCLASSIFIED/FOUO PREDECISIONAL LIMITED DISTRIBUTION AS OF: 11 Sep 2010 Verification
U.S. Dept. of Defense Systems Engineering & Implications for SE Implementation in Other Domains
U.S. Dept. of Defense Systems Engineering & Implications for SE Implementation in Other Domains Mary J. Simpson System Concepts 6400 32 nd Northwest, #9 Seattle, WA 98107 USA Joseph J. Simpson System Concepts
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
RISK MANAGEMENT GUIDE FOR DOD ACQUISITION
RISK MANAGEMENT GUIDE FOR DOD ACQUISITION Sixth Edition (Version 1.0) August, 2006 Department of Defense Preface The Department of Defense (DoD) recognizes that risk management is critical to acquisition
SYSTEMS SECURITY ENGINEERING
SYSTEMS SECURITY ENGINEERING Mission Statement Integrating Security into Every Solution We Deliver Reducing Risk and Providing Fully Reliable and Trusted Solutions Utilizing Best Practices and Rigorous
PROGRAM MANAGEMENT IN DEFENSE SYSTEMS
Seminar s Title : PROGRAM MANAGEMENT IN DEFENSE SYSTEMS Purpose and Background : Program Management is one of the most important aspects of the entire defense acquisition process. It is the application
Certified Associate in Project Management (CAPM) Examination Content Outline
Certified Associate in Project Management (CAPM) Examination Content Outline Project Management Institute PMI Certified Associate in Project Management (CAPM) Exam Content Outline Published by: Project
Computing & Telecommunications Services Monthly Report March 2015
March 215 Monthly Report Computing & Telecommunications Services Monthly Report March 215 CaTS Help Desk (937) 775-4827 1-888-775-4827 25 Library Annex [email protected] www.wright.edu/cats/ Last Modified
REQUEST FOR PROPOSALS (RFP) FOR RETAIL NATURAL GAS SUPPLY SERVICE
REQUEST FOR PROPOSALS (RFP) FOR RETAIL NATURAL GAS SUPPLY SERVICE ISSUED BY: SMG WORLD on behalf of THE PENNSYLVANIA CONVENTION CENTER AUTHORITY Issue Date: Wednesday, September 17, 2014 Initial Pricing
Modelling the Management of Systems Engineering Projects
AEROSPACE CONCEPTS Modelling the Management of Systems Engineering Projects Daniel Spencer Shaun Wilson Aerospace Concepts Pty Ltd www.concepts.aero 28 November 2012 Model-Based Systems Engineering Symposium
Cost Management. How Much Will This Project Cost?
Cost Management How Much Will This Project Cost? Moderator Janelle Abaoag Project Insight Marketing, Public Relations [email protected] www.projectinsight.net All participants will be on
Using Earned Value Management Concepts to Improve Commercial Project Performance
Using Earned Value Management Concepts to Improve Commercial Project Performance R. Scott Brunton, PMP, PMI-RMP/SP, EVP Principal Solutions Consultant Lewis Fowler, LLC www.lewisfowler.com Welcome to the
Headquarters U.S. Air Force. Building CERs & SERs for Enterprise Resource Planning (ERP)
Headquarters U.S. Air Force I n t e g r i t y - S e r v i c e - E x c e l l e n c e Building CERs & SERs for Enterprise Resource Planning (ERP) Programs Dr. Wilson Rosa, Travis Packard, Abishek Krupanand,
DoD Software Assurance Initiative. Mitchell Komaroff, OASD (NII)/DCIO
DoD Software Assurance Initiative Mitchell Komaroff, OASD (NII)/DCIO Agenda Background Software Assurance Definition and Strategy Guiding Principles for SwA DoD SwA Strategy Elements Industry Outreach
GOVERNING BODY MEETING held in public 29 July 2015 Agenda Item 4.4
GOVERNING BODY MEETING held in public 29 July 2015 Agenda Item 4.4 APPENDIX A Strategic Planning Process 2016/17 Strategic Planning Process 2016/17 Interlocking processes 5 Year strategic process: reviewed
DOCUMENTING THE SOFTWARE DEVELOPMENT PROCESS. June S. Hopkins and Jean M. Jeroow. Litton Data Systems 8000 Woodley Ave. Van Nuys, CA 91406
DOCUMENTNG THE SOFTWARE DEVELOPMENT PROCESS June S. Hopkins and Jean M. Jeroow Litton Data Systems 8000 Woodley Ave. Van Nuys, CA 91406 ABSTRACT The Software Engineering Process Group (SEPG) at the Data
DEPARTMENT OF DEFENSE HANDBOOK PARTS MANAGEMENT. This handbook is for guidance only. Do not cite this document as a requirement.
NOT MEASUREMENT SENSITIVE MIL-HDBK-512 04 October 2000 DEPARTMENT OF DEFENSE HANDBOOK PARTS MANAGEMENT This handbook is for guidance only. Do not cite this document as a requirement. AMSC N/A DISTRIBUTION
FOREWORD. Page 2 of 88
FOREWORD Earned Value Management (EVM) is one of the DoD s and industry's most powerful program management tools. Government and industry program managers use EVM to assess cost, schedule and technical
Earned Value Management and the Government Program Office. Blair Alan Knapp Jr. MSPM PMP
Earned Value Management and the Government Program Office Blair Alan Knapp Jr. MSPM PMP Agenda EVM Information Alignment OMB Exhibit 300 and Funding Government Program Office Challenges Government Program
LABOR CATEGORIES: Minimum Requirements
Page 1 of 7 Labor Category Minimum Requirements Education Experience Program Manager The Program Manager is a senior level manager within the 15 Years company who has a minimum of fifteen (15) years experience,
The Department of Defense (DoD) has reached
SPECIAL BBP2.0 I S S U E DoD Open Systems Architecture Contract Guidebook for Program Managers A Tool for Effective Competition Nickolas Guertin Thomas Hurt The Department of Defense (DoD) has reached
3.1 Overview of Software Development and Integration Activities
3 PART 2 SOFTWARE DEVELOPMENT PLAN 3.1 Overview of Software Development and Integration Activities The Development Team will utilize the SDLCM Methodology standards and procedures for all development with
Program Lifecycle Methodology Version 1.7
Version 1.7 March 30, 2011 REVISION HISTORY VERSION NO. DATE DESCRIPTION AUTHOR 1.0 Initial Draft Hkelley 1.2 10/22/08 Updated with feedback Hkelley 1.3 1/7/2009 Copy edited Kevans 1.4 4/22/2010 Updated
An Application of an Iterative Approach to DoD Software Migration Planning
An Application of an Iterative Approach to DoD Software Migration Planning John Bergey Liam O Brien Dennis Smith September 2002 Product Line Practice Initiative Unlimited distribution subject to the copyright.
How To Implement Itil V3
2009 NMCI Conference: Implementing ITIL Session 1: ITSM Process ITSM COE Agenda Background ITSM Overview ITIL and Service Delivery Adopting ITIL to NGEN SE&I Activities 2 Background Develop Government
FACT SHEET. General Information About the Defense Contract Management Agency
FACT SHEET General Information About the Defense Contract Management Agency Mission: We provide Contract Administration Services to the Department of Defense Acquisition Enterprise and its partners to
DEFENSE BUSINESS PRACTICE IMPLEMENTATION BOARD
Defense Business Practice Implementation Board DEFENSE BUSINESS PRACTICE IMPLEMENTATION BOARD Report to the Senior Executive Council, Department of Defense MANAGEMENT INFORMATION TASK GROUP Report FY02-3
ACA Online Training September 2014 Intake
ACA Online Training September 2014 Intake BPP offers two ACA online training programmes Courses The Online Live Programme Both of our ACA online training programmes offer the following benefits: Flexibility
Evolving DoD Policy Life Cycle Management and Product Support
Evolving DoD Policy Life Cycle Management and Product Support Fiscal Year 2010 National Defense Authorization Act In October 2009, President Obama signed the Fiscal Year 2010 National Defense Authorization
RISK MANAGEMENT GUIDE FOR DOD ACQUISITION
RISK MANAGEMENT GUIDE FOR DOD ACQUISITION Sixth Edition (Version 1.0) August, 2006 Department of Defense Preface The Department of Defense (DoD) recognizes that risk management is critical to acquisition
SEBoK: a guide to the systems engineering body of knowledge
SEBoK: a guide to the systems engineering body of knowledge Presented by a panel of contributors to SEBoK Panelists! Rick Adcock, Cranfield University! Dick Fairley, IEEE Computer Society! Dave Olwell,
Risk Management in DoD Programs
in DoD Programs James Thompson Director, Major Program Support Office of the Deputy Assistant Secretary of Defense for Systems Engineering National Defense Industrial Association (NDIA) Industrial Committee
Assessment of NCTD Program Management Framework for Positive Train Control Program
Assessment of NCTD Program Management Framework for Positive Train Control Program Subtask 2: Analysis Gap Analysis Prepared for: Brad Hansen, M.S., PMP Director, PMO Capital Projects May 2013 0 icfi.com/transportation
ISO 9001:2000 Its Impact on Software
ISO 9001:2000 Its Impact on Software Norman P. Moreau, PE, CSQE, CQA Theseus Professional Services, LLC Westminster, Maryland 410-857-0023 / [email protected] / http://theseuspro.com Presented to American
Department of Defense DIRECTIVE
Department of Defense DIRECTIVE NUMBER 5000.01 May 12, 2003 Certified Current as of November 20, 2007 SUBJECT: The Defense Acquisition System USD(AT&L) References: (a) DoD Directive 5000.1, The Defense
GAO COST ASSESSMENT GUIDE. Best Practices for Estimating and Managing Program Costs. Exposure Draft. Applied Research and Methods
GAO United States Government Accountability Office Applied Research and Methods July 2007 COST ASSESSMENT GUIDE Best Practices for Estimating and Managing Program Costs Exposure Draft From August 13, 2007
Using EVMS with COTS-Based Systems
Using EVMS with COTS-Based Systems Mary Jo Staley Patricia Oberndorf Carol A. Sledge June 2002 TECHNICAL REPORT CMU/SEI-2002-TR-022 ESC-TR-2002-022 Pittsburgh, PA 15213-3890 Using EVMS with COTS-Based
Project Management Professional Training
Training Course Course Language Course Duration Project Management Professional Training PMP Project Management Professional Exam Preparation based on PMBOK 5 th Edition ( 35 PDUs) English Total Number
AC 2010-741: ASSOCIATE SYSTEMS ENGINEERING PROFESSIONAL (ASEP) CERTIFICATION: A CREDENTIAL TAILORED FOR STUDENTS AND JUNIOR ENGINEERS
AC 2010-741: ASSOCIATE SYSTEMS ENGINEERING PROFESSIONAL (ASEP) CERTIFICATION: A CREDENTIAL TAILORED FOR STUDENTS AND JUNIOR ENGINEERS Steve Walter, Indiana University-Purdue University, Fort Wayne Dr.
Introduction to the CMMI Acquisition Module (CMMI-AM)
Pittsburgh, PA 15213-3890 Introduction to the CMMI Acquisition Module (CMMI-AM) Module 2: CMMI-AM and Project Management SM CMM Integration, IDEAL, and SCAMPI are service marks of Carnegie Mellon University.
CYBERSECURITY CHALLENGES FOR DOD ACQUISITION PROGRAMS. Steve Mills DAU-South
CYBERSECURITY CHALLENGES FOR DOD ACQUISITION PROGRAMS Steve Mills DAU-South 1 Overview Questions Cybersecurity Owners and Stakeholders Cybersecurity Why It Matters to DoD Program Managers Defense Science
PROJECT MANAGEMENT PLAN <PROJECT NAME>
PROJECT MANAGEMENT PLAN TEMPLATE This Project Management Plan Template is free for you to copy and use on your project and within your organization. We hope that you find this template useful and welcome
Introducing Competency-Based Employee Performance Management for Public Health Nurses: A Toolkit and Piloting Strategy
Introducing Competency-Based Employee Performance Management for Public Health Nurses: A Toolkit and Piloting Strategy CHNC Pre-Conference Workshop, May 16, 2011 Caroline Ball BEd, MHK City of Hamilton,
Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138. Exhibit 8
Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138 Exhibit 8 Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 2 of 138 Domain Name: CELLULARVERISON.COM Updated Date: 12-dec-2007
National Defense Industrial Association Systems Engineering Division Task Group Report Top Five Systems Engineering Issues
National Defense Industrial Association Systems Engineering Division Task Group Report Top Five Systems Engineering Issues In Defense Industry January, 2003 Vers 9, 1/23/03 Background The Director, Systems
An introduction to Earned Value Analysis
An introduction to Earned Value Analysis Prepared by: Suketu Nagrecha, MBA, PMP, CNA March 16, 2002 Earned Value Analysis - 2 Abstract Earned value analysis is a method of performance measurement. Many
DICK BRODKORB 714.235.1485 FAX ( ) 3 THEN CHECK THE LOCATION YOU LL BE ATTENDING.
Instructors VENUE INFORMATION PROJECT SCHEDULING & EVMS LAS VEGAS, NV August 23-27, 2010 The M Resort, Spa and Casino 12300 Las Vegas Blvd. South Henderson, NV 89044 (877) 673-7678 Group block expires:
LOCKHEED MARTIN CORPORATION PRIME SUPPLEMENTAL FLOWDOWN DOCUMENT (PSFD) ADDITIONAL TERMS AND CONDITIONS FOR SUBCONTRACTS/PURCHASE ORDERS UNDER
LOCKHEED MARTIN CORPORATION PRIME SUPPLEMENTAL FLOWDOWN DOCUMENT (PSFD) ADDITIONAL TERMS AND CONDITIONS FOR SUBCONTRACTS/PURCHASE ORDERS UNDER F-35 / JSF LRIP 8 Production (Combines Prime Contract #: N00019-13-C-0008,
Using CMMI Effectively for Small Business Panel
Using CMMI Effectively for Small Business Panel (With interactive discussion from panel and audience recorded in slides) NDIA CMMI Working Group NDIA Systems Engineering Division 2010 CMMI Technology Conference
Department of Administration Portfolio Management System 1.3 June 30, 2010
E 06/ 30/ 2010 EX AM PL 1. 3 06/ 28/ 2010 06/ 24/ 2010 06/ 23/ 2010 06/ 15/ 2010 06/ 18/ 2010 Portfolio System 1.3 June 30, 2010 Contents Section 1. Project Overview... 1 1.1 Project Description... 1 1.2
Project Management Standards: A Review of Certifications/Certificates
Project Standards: A Review of Certifications/Certificates Standards for Project Supporting Certification and Certificates Certificate Certification The Project Body of Knowledge PMBOK Guide Projects in
A COMPARISON OF PRINCE2 AGAINST PMBOK
Introduction This comparison takes each part of the PMBOK and gives an opinion on what match there is with elements of the PRINCE2 method. It can be used in any discussion of the respective merits of the
International Acquisition Career Path
International Acquisition Career Path By Jeffrey S. Grafton Associate Professor, DISAM An International Acquisition Career Path (IACP) has been created by the Under Secretary of Defense for Acquisition,