Unit Rules / Work Instructions for MRI facility. MRI-08 Emergency Procedures. Name: Last reviewed: 4th July 2011



Similar documents
Subject: Magnet Safety. Overview: Environmental Health & Safety Policy/Procedure Effective Date: July 29, 2011

ACR WHITE PAPER ON MAGNETIC RESONANCE (MR) SAFETY Combined Papers of 2002 and 2004

2012 Operating Room Design Manual

Prior to commencing a research study, the necessary approval must be obtained from:

POLICIES AND PROCEDURES. CODE BLUE Adult / Pediatric. I.D. Number: Authorization: [x] Advanced Life Support Committee [x] SHR Nursing Practice

AUTOMATED EXTERNAL DEFIBRILLATOR

Turnkey solutions. Design & Consultancy Services

FLA S FIRE SAFETY INITIATIVE

UCL FIRE RISK ASSESSMENT POLICY& ARRANGEMENTS

ACR Guidance Document on MR Safe Practices: 2013

UC Davis Imaging Research Center. MRI Online Safety

Magnetic Resonance Imaging Environment Safety in Ontario

IN CASE OF EMERGENCY. Emergency Telephone Number 112

EMERGENCY PREPAREDNESS & RESPONSE PROCEDURE

REACT. Rapid Emergency Action Checklist. The University of Toledo Health Science Campus. Emergency Contact Information for Department or Lab

Emergency Procedures. Emergency Phone Numbers. Unisafe (Security) (07) or extension 4444 Police, Fire Service or Ambulance 1-111

1.1. EMERGENCY PROCEDURE On discovering a fire or being informed of an emergency;

FIRE EVACUATION PLAN. School of Mathematics & Statistics

Fire Evacuation Procedures Network Building, 97 Tottenham Court Road, London, W1

Table of Contents Introduction Page 3. Definitions Page 3. District Description Page 4. Legal existence of the fire district Page 4

Prepublication Requirements

Emergency Preparedness Guidelines

Automatic External Defibrillator Program

WORKING IN CONFINED SPACES GUIDELINES

University of Minnesota Center for Magnetic Resonance Research Standard Operating Procedure Human System Magnet Operator Training

An inventory of hazardous materials used in your workplace will prove useful.

Workplace Fire Safety

Custom Engineered Design Custom Engineered Design

Fire Safety Report Fire Statistics

Preventing Overheated Boiler Incidents

Process Safety Management of Highly Hazardous & Explosive Chemicals. Safe Work Practices

MANAGED TRAINING SERVICES

FLAMMABLE LIQUIDS COMPLIANCE NOTE

EMERGENCY PLANS FACT SHEET

North York General Hospital Policy Manual

The Johns Hopkins Hospital and The Johns Hopkins University Health, Safety and Environment Manual Fire Safety:

Emory University RT to Bachelor of Medical Science Degree Medical Imaging

Firefighter Review. Instructor Guide

WORKPLACE WRITTEN PROCEDURES OH&S Regulation, Section 3

JOB DESCRIPTION. *-- Drives and operates ambulance or other apparatus as assigned and/or operates as a member of medic engine or medic truck company.

MATERIAL SAFETY DATA SHEET NATURAL GAS (PIPELINE QUALITY - MSDS #526)

SCS1. UNIT TITLE: MAINTAIN HOTEL SECURITY

c. As mandated by law, facilities must obtain and maintain valid zoning permits as well as permits for intended use.

BELMONT PUBLIC SCHOOLS

A. Policy Statement. B. Principles. (1) Phases of Emergency Medical Services (EMS)

DCSS (ACB) Data Center Fire Suppression Procedures

FIRE-FIGHTING DESIGN BRIEF REPORT

South Carolina Child Care Services. Child Care Emergency Plan Template

Material Safety Data Sheet 1. Product and Company Identification. 2. Hazards Identification

Standard Operating Procedures

FIRE RISK ASSESSMENT WORKED EXAMPLE

BS D American Board of Magnetic Resonance Safety MRMD,MRSO, MRSE Examination Content Syllabus Version 1.5 Friday, February 06, 2015

The terms hazard and risk are often used, which we define as the following:

Lee Baron FIRE RISK ASSESSMENT

Exit Routes, Emergency Action Plans, Fire Prevention Plans, and Fire Protection. OSHA Office of Training and Education 1

EMERGENCY EVACUATION PLAN FOR LIFE AND FIRE SAFETY

Safety Data Sheet SDS ID NO: 001 Revision date: April 2014 Section 1. CHEMICAL PRODUCT AND COMPANY IDENTIFICATION

EMERGENCY PREPAREDNESS

In Case of Emergency. At Met, Western, and Malden Park, any staff member can notify switchboard of an emergency code by dialing: 3333

Liberty Mutual Insurance RISK ENGINEERING PROCEDURE. REP 07 Incident Planning For external use

Natural Gas Emergencies

Annual Fire Safety Training Module

Chemistry Department

EMPLOYEE FIRE AND LIFE SAFETY: Developing a Preparedness Plan and Conducting Emergency Evacuation Drills

HOT WORK PERMIT PROCEDURES

EMERGENCY MANAGEMENT PROCEDURE

Fire Alarms- Use of buildings when they are out of service

Child Care Emergency Preparedness Training. Participant Manual

Decree of the Ministry of the Environment. on fire safety of garages

Appendix J3 - Outline Fuel Spill Contingency Response Plan. Control room receives call on fuel spill from staff or public

Warehouse Checklist. Warehouse Construction

OSHA Training Guidelines (An Unofficial Summary)

Presented by: Rich Perry Marsh Risk Consulting

Emergency Procedures

The Home Owner's Guide to Handling A Home Insurance Claim

Section 9 Major Urban Fire

AIR CUT OFF KIT INSTALLATION INSTRUCTIONS

Fire Safety PROCEDURES January 2011

UPDATE ON MAINE'S UNDERGROUND TANK LAWS

While at work your safety also depends upon your colleagues. If you observe an unsafe situation, point it out to your colleague.

Vehicle Fire Protection. An Ownerʼs Manual for ANSUL Fire Suppression/Detection Systems

MR Safety: Requirements and Practical Aspects

MRI SAFETY JEOPARDY (NON Technologist Edition) Questions

Material Safety Data Sheet

Fire Alarm and Protection Impairment Policy and Procedures

Automotive and Diesel Lab Safety Guidelines

TEPP Planning Products Model Procedure

SECTION 3: COMPOSITION/INFORMATION ON INGREDIENTS 3.1. Substances Not applicable 3.2. Mixture

PART 3: RIGHTS AND RESPONSIBILITIES

FIRE SAFETY MANUAL. Table of contents can be found on the left side of this document.

Continuing Education Catalog

Fire Investigation I FST 205. COURSE SYLLABUS Fire Investigation I FST 205 [Semester] CRN 3 Credits

PATIENT CARE SERVICES POLICY AND PROCEDURE

CONSTRUCTION FIRE SAFETY PLANNING GUIDELINES

Transcription:

Unit Rules / Work Instructions for MRI facility Name: Last reviewed: 4th July 2011 MRI-08 Emergency Procedures. SECTION 1 - INTRODUCTION 2 PURPOSE 2 SCOPE 2 DEFINITIONS 2 CONTEXT 2 SECTION 2 - UNIT RULES 3 1. EMERGENCY QUENCH & LIQUID HELIUM LEAKS 3 2. FIRE 3 3. FLOOD OR WATER DAMAGE 4 4. MEDICAL EMERGENCY 4 SECTION 3 - RELATED MATERIAL 5 Related Material 5 SECTION 4 - GOVERNANCE 5 RESPONSIBILITY 5 VERSION CONTROL AND CHANGE HISTORY 5 MRI-08 version R1 Page 1 of 5

SECTION 1 - INTRODUCTION PURPOSE The purpose of this guideline is to provide procedures to be followed in the event of a fire or MRI related emergency within the MRI facility. SCOPE These guidelines for safe work instructions apply to all staff within the MRI facility. DEFINITIONS Word/Term MRI Facility Zone III Zone IV Definition Zones I-IV in the MRI Rooms in the basement of Advanced Technologies Centre (ATC) This area is the region in which free access by unscreened non-mr personnel or ferromagnetic objects or equipment can result in serious injury or death as a result of interactions between the individuals or equipment and the MR scanner s particular environment. These interactions include, but are not limited to, those involving the MR scanner s static and time-varying magnetic fields. All access to Zone III is to be strictly restricted, with access to regions within it (including Zone IV, see below) controlled by, and entirely under the supervision of, MR personnel. In the SUT MRI facility, Zone III will be the MRI control room This area is synonymous with the MR examination room, i.e. the shielded room within which the MR scanner is located. Zone IV, by definition, will always be located within Zone III, as it is the MR magnet and its associated magnetic field that generates the existence of Zone III. CONTEXT Name Emergency Management Location http://policies.swinburne.edu.au/ppdonline/showdoc.aspx?recnum=pol/2008/135 MRI-08 version R1 Page 2 of 5

SECTION 2 - UNIT RULES 1. EMERGENCY QUENCH & LIQUID HELIUM LEAKS 1.1 Emergency quench In the event of a system quench, all personnel and participants shall be evacuated from the MR examination room as quickly as possible. Access to zones III and IV shall be immediately restricted to all individuals until the arrival of MR equipment service personnel. Restrictions on ferromagnetic object in the MR examination room shall be maintained until it can be confirmed that the magnetic field has been successfully dissipated, because there may still be a considerable static magnetic field present despite a quench or partial quench of the magnet. 1.2 Liquid helium leaks If cryogenic gases are observed to have vented partially or completely into the MR examination room, as evidenced in part by the sudden appearance of white clouds or fog around or above the MR scanner (ACR 2007), then access to zones III and IV shall be immediately restricted to all individuals until the arrival of MR equipment service personnel.. 2. FIRE 2.1 Emergency response procedures 1. The participant will be immediately released from the MR scanner and escorted to an evacuation area. 2. The attending MR personnel will promptly ring security 3333 or fire brigade 000 depending on size of fire, emphasizing that it is the MRI facility and requires specialised non ferromagnetic equipment. 3. Participants and personnel will be evacuated from the building as per general SUT fire evacuation procedures. 4. If safe to do so, MRI safe fire extinguishers will be used to quench the fire and assist in the control of flames spreading further. 5. When the fire brigade arrives, MR personnel will reiterate that any fire fighting equipment used in Zones III & IV needs to be MRI safe due to the powerful 3T magnetic field of the MR scanner. 6. If the fire is in such a location where Zone III or Zone IV needs to be entered for whatever reason by fire-fighting or emergency response personnel and their fire-fighting and emergency equipment, such as air tanks, crowbars, axes, and defibrillators, a decision to quench a superconducting magnet shall be very seriously considered to protect the health and lives of the emergency responders. Should a quench be performed, appropriately designated MR personnel still need to ensure that all non-mr personnel (including and especially emergent response personnel) continue to be restricted from Zones III and IV until the designated MR personnel has personally verified that the static field is either no longer detectable or at least sufficiently attenuated as to no longer present a potential hazard to one moving by it with, for example, large ferromagnetic objects such as air tanks or axes (ARC 2007). 2.2 Floor wardens All floor wardens in the ATC basement will be trained in the safe procedures for entering Zones III and IV. MRI-08 version R1 Page 3 of 5

3. FLOOD OR WATER DAMAGE 3. Emergency response procedures 1. Deactivate the MR scanner using the emergency electrical shutdown buttons in the event of a major water leak or flood. 2. In the event of extensive flooding the MR facility is to be evacuated and Security and Facilities to be notified immediately. 3. Small water leaks shall be mopped up immediately and Facilities to be notified. 4. Only MR trained personnel will be allowed to enter Zones III and IV during flood water clean-up. 5. Wet floor signage shall be placed on the floor during flood water clean-up. 4. MEDICAL EMERGENCY 4.1 Patient monitoring Participants with a known heart condition or other medical ailment requiring immediate treatment shall be monitored during scanning by appropriately qualified medical personnel.. 4.2 Resuscitation equipment and personnel Resuscitation equipment will be available for use by appropriately trained and certified resuscitation staff in the MR control room (Zone III). A person qualified for L2 resuscitation procedures shall always be on hand during MR imaging of a participant. From June 2011 the currently staff currently trained to provide resuscitation are Prof Susan Rossell (MRI Principal) and A/Prof David Liley (Senior MRI staff). It is a prerequisite of the radiographer that they also have appropriate training. This will be amended as other senior MRI staff undertake first aid and resuscitation training. Resuscitation equipment must not be taken into Zone IV as it may be ferromagnetic 4.3 Emergency resuscitation procedures In the case of cardiac or respiratory arrest or other medical emergency within Zone IV for which emergency medical intervention or resuscitation is required, appropriately trained and certified MR personnel should immediately initiate basic life support or CPR as required by the situation while the patient is being removed from Zone IV to the resuscitation equipment in the MR control room. Quenching the magnet is not advised for cardiac or respiratory arrest or other medical emergency, since quenching the magnet and having the magnetic field dissipate could easily take more than a minute, and may also cause further hazards. MRI-08 version R1 Page 4 of 5

SECTION 3 - RELATED MATERIAL Related Material Name Location Document Type None SECTION 4 - GOVERNANCE RESPONSIBILITY Owner BPsyC radiographer Next review date 10 th Feb 2012 VERSION CONTROL AND CHANGE HISTORY Version Number R1 27/6/2011 Approval Date Approved by Amendment Susan Rossell (MRI Principal) First released version prepared by Vitas Anderson, Angela McKellar & Susan Rossell MRI-08 version R1 Page 5 of 5