GUIDE TO ICT SERVER ROOM ENERGY EFFICIENCY. Public Sector ICT Special Working Group

Similar documents
Managing Data Centre Heat Issues

Benefits of. Air Flow Management. Data Center

Dealing with Thermal Issues in Data Center Universal Aisle Containment

Specialty Environment Design Mission Critical Facilities

Element D Services Heating, Ventilating, and Air Conditioning

Data center upgrade proposal. (phase one)

Airflow Simulation Solves Data Centre Cooling Problem

Data Center Components Overview

Energy Efficiency Best Practice Guide Data Centre and IT Facilities

Education Evolution: Scalable Server Rooms George Lantouris Client Relationship Manager (Education) May 2009

Direct Fresh Air Free Cooling of Data Centres

Green Data Centre Design

Air, Fluid Flow, and Thermal Simulation of Data Centers with Autodesk Revit 2013 and Autodesk BIM 360

GUIDE TO ICT DESKTOP ENERGY MANAGEMENT. Public Sector ICT Special Working Group

Office of the Government Chief Information Officer. Green Data Centre Practices

VISIT 2010 Fujitsu Forum Europe 0

Supporting Cisco Switches In Hot Aisle/Cold Aisle Data Centers

Data Center Power Consumption

Center Thermal Management Can Live Together

AisleLok Modular Containment vs. Legacy Containment: A Comparative CFD Study of IT Inlet Temperatures and Fan Energy Savings

Introducing Computational Fluid Dynamics Virtual Facility 6SigmaDC

Energy Efficiency Opportunities in Federal High Performance Computing Data Centers

Great Lakes Data Room Case Study

CURBING THE COST OF DATA CENTER COOLING. Charles B. Kensky, PE, LEED AP BD+C, CEA Executive Vice President Bala Consulting Engineers

Data Center Design Guide featuring Water-Side Economizer Solutions. with Dynamic Economizer Cooling

AEGIS DATA CENTER SERVICES POWER AND COOLING ANALYSIS SERVICE SUMMARY

Unified Physical Infrastructure (UPI) Strategies for Thermal Management

Verizon SMARTS Data Center Design Phase 1 Conceptual Study Report Ms. Leah Zabarenko Verizon Business 2606A Carsins Run Road Aberdeen, MD 21001

Unified Physical Infrastructure SM (UPI) Strategies for Smart Data Centers

APC APPLICATION NOTE #112

APC APPLICATION NOTE #92

DataCenter 2020: first results for energy-optimization at existing data centers

- White Paper - Data Centre Cooling. Best Practice

How To Run A Data Center Efficiently

ICT and the Green Data Centre

Thermal Optimisation in the Data Centre

CarbonDecisions. The green data centre. Why becoming a green data centre makes good business sense

Green Data Centre: Is There Such A Thing? Dr. T. C. Tan Distinguished Member, CommScope Labs

Power and Cooling for Ultra-High Density Racks and Blade Servers

AIR-SITE GROUP. White Paper. Green Equipment Room Practices

Data Centre Energy Efficiency Operating for Optimisation Robert M Pe / Sept. 20, 2012 National Energy Efficiency Conference Singapore

Environmental Data Center Management and Monitoring

Server Room Thermal Assessment

Optimizing Network Performance through PASSIVE AIR FLOW MANAGEMENT IN THE DATA CENTER

Best Practices. for the EU Code of Conduct on Data Centres. Version First Release Release Public

Optimum Climate Control For Datacenter - Case Study. T. Prabu March 17 th 2009

International Telecommunication Union SERIES L: CONSTRUCTION, INSTALLATION AND PROTECTION OF TELECOMMUNICATION CABLES IN PUBLIC NETWORKS

Data Centres. Special Working Group Spin I Data Centre Energy Efficient Design Guide

University of St Andrews. Energy Efficient Data Centre Cooling

Data Centre Cooling Air Performance Metrics

Driving Data Center Efficiency Through the Adoption of Best Practices

Data Centre Capacity and Electricity Use How the EU Code of Conduct can help your data centre electricity bill

Choosing Close-Coupled IT Cooling Solutions

Case Study: Opportunities to Improve Energy Efficiency in Three Federal Data Centers

How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions

Hot Air Isolation Cools High-Density Data Centers By: Ian Seaton, Technology Marketing Manager, Chatsworth Products, Inc.

Energy Performance Optimization of Server Room HVAC System

How To Improve Energy Efficiency In A Data Center

How To Improve Energy Efficiency Through Raising Inlet Temperatures

Using thermal mapping at the data centre

International Telecommunication Union SERIES L: CONSTRUCTION, INSTALLATION AND PROTECTION OF TELECOMMUNICATION CABLES IN PUBLIC NETWORKS

Containment Solutions

Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings

Challenges In Intelligent Management Of Power And Cooling Towards Sustainable Data Centre

Data Center Facility Basics

Enclosure and Airflow Management Solution

Free Cooling in Data Centers. John Speck, RCDD, DCDC JFC Solutions

QUALITATIVE ANALYSIS OF COOLING ARCHITECTURES FOR DATA CENTERS

Agenda. Who we are What we do How we serve the BPO Industry

High Density Data Centers Fraught with Peril. Richard A. Greco, Principal EYP Mission Critical Facilities, Inc.

Reducing Data Center Loads for a Large-Scale, Net Zero Office Building

Cooling Audit for Identifying Potential Cooling Problems in Data Centers

Metering and Managing University of Sheffield Data Centres. Chris Cartledge Independent Consultant

IMPROVING DATA CENTER EFFICIENCY AND CAPACITY WITH AISLE CONTAINMENT

Cabinets 101: Configuring A Network Or Server Cabinet

BRUNS-PAK Presents MARK S. EVANKO, Principal

Data Center Energy Profiler Questions Checklist

Best Practices for Wire-free Environmental Monitoring in the Data Center

Managing Cooling Capacity & Redundancy In Data Centers Today

Data Centre Testing and Commissioning

Sealing Gaps Under IT Racks: CFD Analysis Reveals Significant Savings Potential

Data Centers: How Does It Affect My Building s Energy Use and What Can I Do?

Computational Fluid Dynamic Investigation of Liquid Rack Cooling in Data Centres

Selecting Rack-Mount Power Distribution Units For High-Efficiency Data Centers

Data Center Cooling & Air Flow Management. Arnold Murphy, CDCEP, CDCAP March 3, 2015

COMPARISON OF EFFICIENCY AND COSTS BETWEEN THREE CONCEPTS FOR DATA-CENTRE HEAT DISSIPATION

Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia

Speaker: John Peterson Time: April 4, 2014, 9:45-10:45 a.m. Venue: Crystal 1-2. Data Center Design and Commissioning

2014 Best Practices. The EU Code of Conduct on Data Centres

2010 Best Practices. for the EU Code of Conduct on Data Centres. Version Release Public Review Public

Strategies for Deploying Blade Servers in Existing Data Centers

Ten Steps to Solving Cooling Problems Caused by High- Density Server Deployment

Green Data Centers development Best Practices

Liquid Cooling Solutions for DATA CENTERS - R.M.IYENGAR BLUESTAR LIMITED.

EUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Institute for Energy and Transport Renewable Energy Unit Best Practices

abstract about the GREEn GRiD

Making Existing Server Rooms More Efficient Steve Bowes-Phipps, Data Centre Manager University of Hertfordshire.

Combining Cold Aisle Containment with Intelligent Control to Optimize Data Center Cooling Efficiency

Prediction Is Better Than Cure CFD Simulation For Data Center Operation.

Cooling a hot issue? MINKELS COLD CORRIDOR TM SOLUTION

Transcription:

GUIDE TO ICT SERVER ROOM ENERGY EFFICIENCY Public Sector ICT Special Working Group

SERVER ROOM ENERGY EFFICIENCY This guide is one of a suite of documents that aims to provide guidance on ICT energy efficiency. The guide provides information and techniques to improve the energy efficiency of communication/ server rooms. Use this guidance to: reduce the electrical power consumption of the server room by 30% to 50% increase the life span of the IT equipment reduce the fault rates which result from over temperature. CONTENTS OVERVIEW 2 APPLICATIONS 3 EQUIPMENT 4 CONTROL AND MEASUREMENT 6 OPERATION AND MAINTENANCE 7 HOUSEKEEPING 7 IN PRACTICE 7 PROCUREMENT 8 SERVER ROOM ENERGY MANGEMENT CHECKLIST 9 Abbreviations ASHRAE C/H CFD CRAC ICT PDU PUE SEAI UPS VSD American Society of Heating, Refrigeration and Air-Conditioning Engineers Cold/Hot side of rack Computational Fluid Dynamics Computer Room Air-Conditioning Information and communication technology Power Distribution Unit Power Usage Effectiveness Sustainable Energy Authority of Ireland Uninterruptible Power Supply/ies Variable Speed Control Line drawings courtesy of Vincent Byrne (www.vincent-byrne.com)

OVERVIEW ICT equipment rooms vary in size based on the number of racks they contain. Guidance in this document is developed for three room sizes: Small: ICT Closet which can house 1 2 racks Medium: ICT Room which can house 3 10 racks Large: ICT Room which can house 11+ racks While each room will have its own design characteristics, there are some generic principles that can be applied to improve energy efficiency, in a systematic way. This is illustrated in the Venn diagram on the right. By starting with the provision of the core energy service required, all the ancillary and supporting services to deliver this can be reviewed for energy saving opportunities. HOUSEKEEPING OPERATION AND MAINTENANCE CONTROL AND MEASUREMENT EQUIPMENT PROCESS ENERGY SERVICE operation design ENERGY SERVICE PROCESS EQUIPMENT CONTROL AND MEASUREMENT OPERATION AND MAINTENANCE HOUSEKEEPING The core energy service required from ICT rooms is data storage and processing ICT software and hardware Cooling and electrical systems and their application Controlling temperature and humidity in server rooms and measuring overall room efficiency Utility equipment should be operated and maintained in accordance with manufacturers guidelines, by competent service engineers Carrying out equipment and room condition checks 2

APPLICATIONS PROCESS ICT Software and Hardware The selection of ICT software and hardware has the greatest potential to reduce the energy consumption of a server room. Virtualisation software can reduce the number of machines required Server management software can reduce the ICT power load Select equipment with internal temperature controlled variable-speed fans (VSDs). ICT equipment should be selected with common airflow direction requirements to allow implementation of hot aisle/cold aisle containment. The hot aisle/cold aisle approach involves lining up server racks in alternating rows with cold air intakes facing one way and hot air exhausts facing the other. The rows composed of rack fronts are called cold aisles. Typically, cold aisles face air-conditioner output ducts. The rows the heated exhausts pour into are called hot aisles. Typically, hot aisles face airconditioner return ducts. Current industry guidance on server air intake temperatures, states a minimum of 18 C to 27 C (with an allowable temperature at the air inlet of up to 32 C) and 5.5 C up to 15 C dew-point and 60% RH. (ASHRAE, 2008). ICT equipment can offer internal/external power management to optimise energy consumption Consider reporting systems that can send temperature and power/energy consumption data to a Building Energy Management System 3

EQUIPMENT COOLING AND AIR DISTRIBUTION DESIGN If the ICT equipment selection is effective, the cooling system can be optimised. Depending on the size, scale and the physical characteristics of the space available for ICT operations, there are a number of recommended design and layout choices, that when applied in practice will reduce energy consumption. Small ICT equipment rooms ICT Closets up to 6kW ICT Closets over 6kW It is recommended to use the existing office air-conditioning system to supply and extract air to and from the server environment. This can be achieved by installing dedicated ductwork or by using wall grilles to the office spaces. For loads above 6kW it is recommended that a dedicated cooling system is installed. Wall mounted cooling units are suitable as they provide a natural supply and return path for the cold and hot air streams. Ceiling mounted split units are not recommended. Hot exhaust air is extracted from above the rear of the racks and reused to provide heat or dumped to atmosphere (Fire dampers installed as necessary) C Hot exhaust air is extracted from above the rear of the racks and reused to provide heat or dumped to atmosphere (Fire dampers installed as necessary) C H H Ceiling mounted split units are not recommended, as the hot and cold air streams mix together C H Medium size ICT rooms For medium size ICT Rooms, underfloor air supply is recommended (Floor depth 300mm+). Air is discharged into the room through perforated panel floor registers. The air is returned directly to the air-conditioning system or by means of a ceiling return system. Cooling units which deliver the air above the floor are not recommended. In underfloor air distribution, the space between the regular building floor and the raised floor is used as a means to supply air for equipment cooling C H C H Cooling units which deliver the air above the floor are not recommended as it creates mixing of hot and cold air streams C H C H 4

Large ICT rooms Fundamental to the efficient operation of an ICT Room is the segregation of the hot and cold air flows to and from the IT equipment. This segregation can be provided purely by correct rack layout for rooms with higher rack power loads, or by augmenting the layout by installing a physical containment system to either the hot or cold aisles. Cold aisle containment with open hot air return to CRAC unit. Outside aisles must be hot aisles (Floor depth 400-600mm). The goal of a hot aisle/cold aisle configuration is to conserve energy and lower cooling costs by managing air flow. Blanking plates are used in cabinets where future server space is allocated; otherwise short-circuiting would occur. There are a number of recommended configurations. Cold aisle containment with hot air return through the ceiling. This helps to keep the room temperature down while maintaining the high return air temperature to the CRAC units thereby ensuring higher CRAC unit efficiency (Floor depth 400-600mm). Hot aisle/cold aisle layout. This is the minimum level of design which should be installed for all server rooms and data centres (Floor depth 400-600mm). Hot aisle containment with hot air return to CRAC unit through the ceiling (Floor depth 400-600mm). Note: low cost to install. Cold aisle containment with hot air return through the ceiling to the Computer Room Air- Conditioning unit (CRAC). Outside aisles must be hot aisles (Floor depth 400-600mm). Note: Very low cost to install. Hot air chimney containment with hot air returning to the CRAC units through the ceiling. This requires new 1200mm deep racks and extra space in the data centre (Floor depth 400-600mm). 5

CONTROL AND MEASUREMENT Control of temperature The aim of the cooling system within the ICT Room is to ensure that the server equipment is kept within the manufacturers operating parameters and the recommended industry guidelines as set out in ASHRAE Environmental Guidelines for Data Centre Equipment (2008). This guideline has expanded the recommended operational bands from the earlier 2004 guidelines in recognition of the now proven ability of IT equipment to operate in higher temperature environments and the benefits of reducing cooling demands. Temperature 20 C to 25 C 18 C to 27 C 40% RH to 5.5 C DP to 60% Humidity 55% RH RH & 15 C DP It is not sufficient to just know what temperature you want the room to operate at, it is also necessary to know where you want that room temperature to be measured. Room temperature should be measured at the front of the racks in the cold aisle. Measurement The electrical power load in a data centre can be broken down into three principal categories: IT process power (servers, switches, routers, storage) Ancillary power (lighting, protective services, uninterruptible power supply/ies) Cooling power (air-conditioning units, chillers, fans, motors) The current industry standard for measurement of data centre efficiency of an ICT Room is Power Usage Effectiveness (PUE). PUE is a measure of how efficiently a data center uses its power; specifically, how much of the power is actually used by the computing equipment. Power Usage Effectiveness (PUE) = Total Data Centre Power/Server Power A PUE of 1.5 or lower is recognised as efficient Total data centre power requirements Measure temperatures at server intakes Losses Rack Rack Rack Rack Rack Cooling Servers Ancillaries Total Data Centre Power includes: Server power Cooling power Ancillary power PUE Scoring Poor = > 2.0 Fair = 1.5 2.0 Good = 1.0 1.5 Losses 6

OPERATION AND MAINTENANCE Facility designers should be involved in the compilation of maintenance and servicing manuals for the installed equipment to ensure there is a full set of guidelines available to the end user. Utility equipment should be maintained, as per the recommendations of the manufacturers, by competent service engineers. Timely maintenance and servicing will keep equipment operating at optimum efficiencies and prolong its lifespan. IN PRACTICE Forfás is Ireland s policy advisory board for enterprise, trade, science, technology and innovation. It was represented on the Public Sector ICT Working Group and achieved significant energy savings in its server room operation at Wilton House by: removing idle, unused software applications reducing the number of servers increasing the server room temperature by 1 C HOUSEKEEPING Good housekeeping consists of carrying out regular walk-round checks of systems and equipment, and generally keeping systems and equipment clean and air paths free of obstructions. Estimated annual energy savings: Mean IT load reduction of 4 kw Mean cooling load reduction of 1 kw Annual consumption reduced by 43,800 kwh Emissions reduced by 23,302kgCO2 Forfas Server Room IT Load kw 24.0 14/Apr/2010 Wed 06/Oct/2010 Wed 22.0 20.0 Kilowatts - kw 18.0 16.0 14.0 12.0 10.0 Sample reports from Forfás showing the reduction in base load as changes were implemented 7

Sample reports from Forfás showing the reduction in base load as changes were implemented PROCUREMENT Procurement policies for ICT hardware and ancillary equipment should include energy efficiency criteria. For example: Purchase certified energy efficient hardware, e.g. equipment on the SEAI Triple E list. Triple E and public procurement The new public procurement procedures and guidelines require green criteria to be at the centre of all State procurement. More information on Triple E products is available from: http://www.seai.ie/your_business/triple_e_product_ Register/ Innovative licensing, pricing and service models are now becoming available from established vendors; consult with your suppliers as to what new services are available to reduce the energy usage of existing ICT infrastructure. The European Communities (Energy Efficient Public Procurement) Regulations S.I. 151 2011 oblige public bodies when purchasing or leasing products to only procure products that: are specifically listed on the Triple E Register, or satisfy the energy efficiency criteria published by SEAI for the relevant product categories. Therefore all* public sector tenders must include reference to Triple E compliance and suppliers must be able to demonstrate that their product offering is either on the register or complies with the relevant criteria. *Some exemptions exist relating to competition issues and Register criteria. 8

SERVER ROOM ENERGY MANAGEMENT CHECKLIST The table below summarises the actions which have been found to generate savings in ICT Server Room electricity usage and cooling demand. Action Checklist Tips and findings from SEAI s Public Sector ICT Working Group Energy Management Structure Have senior management made a commitment to ICT energy efficiency? Is there an ICT Energy co-ordinator appointed? Are sufficient resources allocated to energy management within the ICT team? Has an ICT Energy Management Team been established? to ensure resources are made available and an appropriate policy is adopted with necessary time and resources allocation of time to ICT projects a small team of enthusiastic volunteers Is there a standard operating procedure to control power settings centrally? Is a system of energy use reporting in place (ICT energy consumption estimates/ metered/reported)? estimate based on rules of thumb e.g. 300W per server Are energy/power management review dates set up? Operations & Maintenance Simplify ICT processes to reduce the demands on server resources Raise server intake temperature to 23 C in 1 C steps ASHRAE Guidance allows up to 27 C Vent the server exhaust heated air to other areas Carry out a CFD thermal modelling analysis of possible cooling options to guide energy efficient design solutions To office or other areas CFD = Computational fluid dynamics Use free- cooling air when outdoor conditions are suitable Turn off duplicate cooling units where possible Ireland is a temperate country, cooling is often superfluous Install blanking panels between servers in racks Remove cable arms, to clear air flows Replace with velcro fasteners or similar Remodel server room to reduce cooling load Establish hot aisle/cold aisle arrangements Install hot/cold aisle containment Choose appropriate screens, default fonts, etc., to reduce printing demand Install temperature monitoring in cold aisles Use the ceiling void as a return plenum Retrofit variable speed electronically commutated fans to air-handling units Virtualise the server environment 80% increase in computing capacity for a 20% increase in energy use Housekeeping Deploy script power management automation and reporting tools Survey for and remove idle applications and their servers Ensure air paths are clear of obstructions and set temperatures are being maintained Reduces computing and cooling demand Estimate based on rules of thumb e.g. 300W per server Keep the server environment dust free Ensure lights are turned off when leaving the room, or install occupancy controls 9

Sustainable Energy Authority of Ireland Wilton Park House, Wilton Place, Dublin 2, Ireland. t +353 1 808 2100 f +353 1 808 2002 e w info@seai.ie www.seai.ie The Sustainable Energy Authority of Ireland is partly financed by Ireland s EU Structural Funds Programme co-funded by the Irish Government and the European Union.