Consultation on integrating flood defence consents into the Environmental Permitting regime in England and Wales



Similar documents
EPR Exempt Flood Risk Activities: descriptions and conditions

2016 No. 000 ENVIRONMENTAL PROTECTION, ENGLAND AND WALES FLOOD RISK MANAGEMENT, ENGLAND AND WALES

Consultation on integrating flood defence consents into the Environmental Permitting regime in England and Wales

A guide to your rights and responsibilities of riverside ownership in Wales

Floodplain Mapping. Vision. Events: 1 in 2 year 1 in 10 year 1 in 20 year 1 in 50 year 1 in 100 year Probable Maximum Flood Climate Change Impacts

Catchment Scale Processes and River Restoration. Dr Jenny Mant The River Restoration Centre therrc.co.uk

Bolton s Flood Risk Management Strategy

Improving the physical condition of Scotland s water environment. A supplementary plan for the river basin management plans

1 Introduction. 1.1 Key objective. 1.2 Why the South Esk

ENVIRONMENT AGENCY POLICY REGARDING CULVERTS

Places Directorate Environment Infrastructure PO Box 100 Wigan Council WN1 3DS. Culvert Advice Note

Adopted 9/23/98 CHATTAHOOCHEE CORRIDOR PLAN. The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are:

Outlet stabilization structure

1. Purpose and scope. 2. SEPA's role in hydropower and planning

2012 Program Report. Agricultural Group Drainage Program

CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES

Chapter III Preparation of Bill of Quantities

Watershed Works Manual

London Borough of Merton Local Flood Risk Management Strategy

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.

CHAPTER 9 CHANNELS APPENDIX A. Hydraulic Design Equations for Open Channel Flow

Carlton Fields Memorandum

How To Fix A Flood Control System In South Lakewood

Land claims are now being settled in Canterbury.

IUCN Guidelines to Avoid Impacts of Water Resources Projects on Dams and Other Water Infrastructure

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project

Regulatory Features of All Coastal and Inland Ecological Restoration Limited Projects

Agricultural & Farm Development - The Planning Issues

Engineering in the water environment: good practice guide. River crossings

FLOOD-RESISTANT CONSTRUCTION (Not adopted by the State of Oregon, but may be adopted by local municipalities.)

How To Write A Watercourse Crossing

AN INITIATIVE TO IMPROVE

Prattsville Berm Removal Project. 1.0 Project Location

1 cm 3. 1 cm. 1 cubic centimetre. height or Volume = area of cross-section length length

COMMUNITY CERTIFICATIONS

City of Shelbyville Site Inspection Checklist

Planning Policy and Guidance on Flooding and Coastal Erosion

The correct answers are given below. Some talking points have been added for the teachers use.

Fluvial non-tidal Fluvial tidal Coastal

Flood Risk Management

Flood Risk Management

Lincoln County Floodplain Development Permit Application

Muddy River Restoration Project Project Description

REFERENCE. All National Grid personnel who plan and perform work involving protected water resources are responsible for:

General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title]

Self assessable codes temporary amendments extension Post flooding and cyclone impacts and fish habitat recovery 1 February October 2015

Howsham fish passage Consultation document

Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration

River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a

SUSTAINABLE URBAN DRAINAGE SYSTEMS

Types of flood risk. What is flash flooding? 3/16/2010. GG22A: GEOSPHERE & HYDROSPHERE Hydrology. Main types of climatically influenced flooding:

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

Homeowner s Guide to Drainage

FLOOD INFORMATION SERVICE EXPLANATORY NOTES

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document

Waterway Technote Drains

Code of Practice for Pipelines and Telecommunication Lines Crossing a Water Body

Small Dam Hazard Assessment Inventory

201[X] No. INFRASTRUCTURE PLANNING. The Network Rail (Ipswich Chord) Order

INTEROFFICE MEMORANDUM DATE: October 15, Special Provisions for Construction in Special Flood Hazard Areas

Construction Site Inspection Checklist for OHC By making use of some simple Best Management Practices (BMPs) a construction site operator can

Safe & Sound Bridge Terminology

City of Valdosta Land Development Regulations. Table of Contents

Chehalis River Basin Flood Damage Reduction Capital Budget Approved by Legislature in June 2013

Preliminary Damage Assessment (PDA) Field Guide

Sediment and Dredged Material Management - Relevance and Objectives 18 September 2003

MassDEP Natural Disaster Guidance for Coastal and Inland Wetland Resource Area Impacts: Hurricane or Tropical Storm Sandy

PROPOSAL FOR CONTRACTORS ALL RISKS

Pow Beck, St Bees to Seascale promenade

NID statement Agreement Disagreement Auburn Ravine: During irrigation and nonirrigation

Appendix H Dredging and Stream Channel Restoration

INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE ACE GLOBAL RISK ENGINEERING. Flood risk assessment. Introduction

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES

APPENDIX I (See Paragraph -6) FORM I

BRIDGES ARE relatively expensive but often are

Table 4.9 Storm Drain Inlet Protetion Applicable for

Advice note. Linking River and Floodplain Management

Environmental Compliance Questionnaire for National Oceanic and Atmospheric Administration Federal Financial Assistance Applicants

Puhinui Stream Restoration- Concept Plan

CAPS Landscape Metrics November 2011

Welded Mesh Gabions and Mattresses River Protection Design Guide HY-TEN GABION SOLUTIONS Dunstall Hill Trading Estate, Gorsebrook Road,

Flooding Fast Facts. flooding), seismic events (tsunami) or large landslides (sometime also called tsunami).

PreventING falls from height Introduction How will worksites be targeted? Approach Who will be targeted?


SECTION 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION

Integrated Water and Sediment Management of Yellow River

Rural Flooding: The Potential Role of Forestry

Guideline: Works that interfere with water in a watercourse watercourse diversions. September 2014

The Everglades & Northern Estuaries; St. Lucie River Estuary, Indian River Lagoon & Caloosahatchee Estuary. Water Flows & Current Issues

Contents. Figure Index. 1. Introduction Engineered solutions Conclusions 11

1. Water Line Maintenance 2. Sanitary Sewer Maintenance 3. Spill/Leak/Overflow Control, Response, and Containment

Presentation on Flood Risk Management To Engineers Ireland 12 th February David Keane Cork County Council

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Rivers Group. Effect of Canterbury Earthquakes on Waimakariri, Kaiapoi, & Halswell Rivers. Flooding & Drainage Perspectives

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

PENNINGTON COUNTY FLOOD DAMAGE PREVENTION ORDINANCE

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

Henry Van Offelen Natural Resource Scientist MN Center for Environmental Advocacy

Service First request normally supplied free of charge, but minimum charge for additional requests:

Transcription:

www.gov.uk/defra www.wales.gov.uk Consultation on integrating flood defence consents into the Environmental Permitting regime in England and Wales Annex 2; Proposed exclusions Emergencies and licensable marine activities... 2 Maintenance work... 2 Bridges and service crossings... 3 Floodplain works... 3 In channel activities... 4 1

Emergencies and licensable marine activities XC1 - Any activity carried on in an emergency situation. (a) the activity is not a pre-planned emergency activity; and (b) the person carrying on the activity provides the regulator with notice in writing as soon as practicable of the carrying on of the activity and circumstances in which it was carried on. A pre-planned emergency activity is an activity which has been planned in response to an emergency before it occurs. The EA/NRW will review such works once they have received notification. If they consider that the structure or modifications present a flood or environmental risk, then they will have the power to serve a remediation notice, requiring that it is removed or modified. If necessary the notice can specify that any detrimental harm to the environment, or detrimental impact on drainage is remedied. There will be a power of appeal against such a remediation notice. XC2 - A marine activity covered by a marine licence. (a) An application for a marine licence has been made in respect of that activity; (b) the regulator has received notice of that application having been made; (c), in view of the terms and conditions that will be included in the marine licence the regulator considers that an environmental permit is not necessary; and (d) A notice to that effect has been issued by the regulator to the applicant. Licensable marine activity and marine licence have the same meaning as in Part 4 of the Marine and Coastal Access Act 2009. Maintenance work XC3 - The erection and use of ladders and scaffold towers ( equipment ). (a) the suitability of river conditions are reviewed by the operator each working day; (b) the equipment is erected on each working day that it is required; and (c) the equipment is removed at the end of each working day and is stored outside the river or its banks. XC4 - The removal of rubbish and debris from structures. (a) The removal of rubbish and debris does not involve dredging of the main river. 2

Bridges and service crossings XC5 - The construction and use of service crossings within an existing structure. (a) the crossing is entirely within the original profile of the existing structure; (b) a notification has not been sent by the regulator to the landowner that the structure has been identified for removal or modification in the relevant River Basin Management Plan; (c) equipment associated with the works is not stored on the bed or banks of the main river; and (d) no works are carried out from the main river or from the banks of the main river. XC6 - The carrying out of minor works on or affecting bridges and culverts for highways and public rights of way ( minor works ). (a) the minor works do not affect the bed, banks, water level or flow in the main river; (b) equipment associated with the minor works is not stored on the bed or banks of the main river; and (c) no works are carried out from the main river or from the banks of the main river. Floodplain works XC7 - The attachment of a flood protection device direct to an existing, residential building in order to protect the interior of that building. Proposed condition; (a) the flood protection provided by the device does not include any part of a garden. XC8 - Erection of notice boards. (a) the board is attached to existing fencing or freestanding, permanent posts; (b) the board is no more than 2 metres wide; (c) the board is more than 2 metres from any culvert, remote defence, flood defence structure or sea defence on the main river; and (d) the board is more than 2 metres from the landward side of the bank. XC9 - The erection of agricultural fencing. (a) the fencing is not located on the bed or banks of the main river and does not exceed 1.3 metres in height; and (b) the fencing is constructed of 3

(i) post and rail, (ii) post and wire mesh with greater than 100 millimetres spacing, or (iii) post and wire strands. XC10 - Site investigation boreholes and trial pits within a flood plain. (a) the works are more than 5 metres from any culvert, remote defence, flood defence structure or sea defence on the main river; (b) the works are more than 8 metres from the bank of a non-tidal main river; (c) the works are more than 16 metres from the bank of a tidal main river; and (d) the works are completed, including refilling of the borehole or pit, within a total of 48 hours. In channel activities XC11 - The installation of rafts for wildlife surveys. (a) the raft has dimensions no greater than 1.5 metres x 1 metre x 0.75 metres; (b) the raft is permanently and securely attached to the bank; (c) the raft is installed no less than 100 metres from any other raft; (d) when the raft is installed, there are no more than four other rafts within a distance of one kilometre; (e) the raft is installed for no more than 12 months and removed immediately if, within that period, it is no longer required; and (f) the raft is not installed within 100 metres of any non-agricultural building in the floodplain or another man-made structure on or in the main river. XC12 - The temporary use of fish traps. (a) the trap has dimensions no greater than 2 metres x 1 metre x 0.75 metres; (b) any trap, or combination of traps, placed in the main river is less than one third of the width of the channel; (c) the trap is not used when the main river is in a condition of high flow; and (d) the trap is located more than 50 metres up and downstream from any dam or other obstruction. XC13 - Clearance of purpose-built sediment traps. (a) only sand and silt is cleared from the trap; and 4

(b) where the sand and silt from the clearance is spread on the floodplain, it is spread to a depth of no more than 100mm and no closer than 8 metres from the landward side of the bank. 5