Major and Minor Schemes

Similar documents
Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015

Goals & Objectives. Chapter 9. Transportation

Bedford s Network Management Strategy ( ) November 2010

WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE.

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.

Midlands Connect. Economic Impacts Study

A23 CHEQUERS ROUNDABOUT, HORLEY: PREDESTRIAN AND CYCLING CROSSING IMPROVEMENTS

Construction Traffic Management Plan

LEGISLATIVE COUNCIL PANEL ON PLANNING, LANDS AND WORKS

Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site.

Why build the Silvertown Tunnel?

DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY

A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013

TRANSPORT ASSESSMENT GUIDANCE

City Plan Part 1 Sustainability Appraisal Summary February 2012

770 TH Tseung Kwan O Development, Phase II, Grade Separated Interchange T1/P1/P2

Lawson Outline Plan External Traffic Analysis Working Paper

Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk

Transport Mobility Management: Small Changes - Big Impacts

Energy and. Resources

Demand for Long Distance Travel

Cathkin Relief Road Planning Statement

DEPARTMENT OF TRANSPORT CYCLING STRATEGY 29 February 2008

Construction of a pedestrian footbridge between Chiswick Business Park and Bollo Lane/Colonial Drive.

M8 M73 M74 Motorway Improvements Project

Infrastructure Requirements and Costs Update for Strategic Locations

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT

COPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November Prepared by Capita Lovejoy on behalf of William Davis Limited

2 Integrated planning. Chapter 2. Integrated Planning. 2.4 State highway categorisation and integrated planning

Around 33 million journeys are currently made on Metrolink every year. This is forecast to increase to 44 million journeys by 2019.

VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY

Claughton Medical Centre Travel Plan

How To Develop A Balanced Transport System In Devon

Framework Pinhoe Area Access Strategy

St Albans Local Development Framework. Core Strategy: Spatial Strategy Options

GO Skegness. Economic Appraisal Report. April Lincolnshire County Council

Guildford Station Regeneration

Richmond upon Thames College. Draft Planning Brief. May 2008

The Northumberland Estates Proposed Residential Development, Prudhoe Town Centre D/I/D/63558/603. Framework Residential Travel Plan

PLANNING APPLICATION: 12/00056/APP

London Borough of Merton Local Flood Risk Management Strategy

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure

Major Improvement Schemes in Basingstoke

11. Managing our Transport Assets


3.0 Planning Policies

Segregation of Shared Use Routes

TRANSPORT FOR LONDON BOARD CROXLEY RAIL LINK PROPOSED TRANSPORT AND WORKS ACT ORDER

Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons

Development Management Report

London Paramount Entertainment Resort Workshops : Masterplanning & Infrastructure February / March 2015

Section 6 Traffic Analysis

SOCIAL INFRASTRUCTURE

Seamless journeys from door to door.

3 Tappan Zee Bridge Rehabilitation Options

IPSWICH BOROUGH COUNCIL SCHEDULE OF REGISTERS/INFORMATION FOR LOCAL SEARCH ENQUIRIES

Vision for Salisbury Quality Bus Partnership. 25 July 2012

Proposal for a Demonstration Exemplar at British Sugar, York

Coventry Development Plan 2016 Appendix 89. Glossary of Key Terms

A Vision for the future of Ascot, Sunninghill and Sunningdale

Network Rail Consultation on Draft West Coast Main Line Route Utilisation Strategy Consultation Response by Birmingham International Airport Limited

Network Management Supplementary Strategy Document

POLICY DP6 Mitigating the impacts of development

Development Layout Design

Cycle Strategy

Improving Access in Florida International University Biscayne Bay Campus Executive Summary

SKY BET CHAMPSIONSHIP PLAY-OFF SATURDAY 28 TH MAY 2016

On the instruction of Ros Goode & Roland Morgan, Joint Fixed Charge Receivers

CORPORATE TRAVEL PLAN. Key Messages

Chapter 13 Route Window C11 Isle of Dogs station. Transport for London

Report To: The Planning Board Date: 2 April Report By: Head of Regeneration and Planning Report No: 14/0023/IC

IPENZ TRANSPORTATION GROUP CONFERENCE 2013 KEEP CHRISTCHURCH MOVING FORWARD CHRISTCHURCH TRANSPORT STRATEGIC PLAN

London 2012 Travel Demand Management Chris HANLEY

4 Alternatives and Design Evolution

Shannon Corner Service Centre, Burlington Road, New Malden, KT3 4NP

University of Glasgow Strategic Travel Plan

OVERVIEW PROJECT SUMMARY

05 AREA/SITE SPECIFIC GUIDELINES

Development Brief for New Lodge, Bank Mill Lane Berkhamsted. Adopted November 2007

Network Rail Sussex Rail Utilisation Study (RUS)

Cycle Network Modelling A new evidence-based approach to the creation of cycling strategy

APPENDIX B - PL1 Homes that meet people s needs and aspirations

The role of stakeholders in the evolution of cycling infrastructure in London. Brian Deegan Design Engineer

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011

Elephant & Castle Regeneration TRADERS CHARTER

Highway Asset Management Strategy

26 Connecting SEQ 2031

Transcription:

1 Major and Minor Schemes Peterborough City Council has identified a number of proposals for major transport schemes over the next five year period that will support the planned housing and employment growth (set out in the Core Strategy), while supporting Peterborough s Environmental Capital agenda (in accordance with Home of Environment Capital Major Policy 0). These schemes have been identified to secure transport benefits for the whole of Peterborough and to help achieve the following overarching objectives of the Long Term Transport Strategy (LTTS) and Local Transport Plan (LTP): Tackle climate change, by reducing emissions of CO and other greenhouse gases Improve quality of life for all transport users and non-transport users and promote a healthy natural environment Support economic growth, by delivering reliable and efficient transport networks Promote greater equality of opportunity, with the desired outcome of achieving a fairer society Contribute to better safety, security, health and long life-expectancy Funding Although the future for the funding of major schemes is uncertain, the city council will concentrate on finding funding streams for the projects outlined in this section. Bringing forward these schemes is dependent on the pace and pattern of growth within Peterborough and the funding available. Funding for the major schemes will be sought from various sources including but not exclusively from: Growth Area Development Funding (GAD) Community Infrastructure Funding (CIF) Developer Funded (Dev) Developer Site Specific (Section and Planning Conditions) Planning Obligations Implementation Schemes (Strategic) Planning Obligations Implementation Schemes (Neighbourhood) Community Infrastructure Levy Major Scheme Business Case to the Department for Transport (DfT) Rail Sources Local Investment Plan (LIP) Homes and Communities Agency 1 Peterborough Long Term Transport Plan and Peterborough Local Transport Plan

Figure : South Bank regeneration 1 Major and Minor Schemes 1

1 South Bank regeneration area The South Bank regeneration area will be redeveloped for a mix of residence, leisure, community and employment use. Planning permission has already been granted for 00 code level homes and the football stadium will be incrementally upgraded. The site measures. hectares and straddles the Peterborough to Ely railway line. The South Bank area lies between the busy A London Road to the west and A1 Frank Perkins Parkway to the east. The A London Road corridor is the only major route into the city centre from the south, experiencing approximately,000 vehicles travelling over the link each day. The corridor is subject to peak period congestion and it is important to ensure that development of the South Bank site does not exacerbate this situation. The River Nene and the railway line present barriers to movement for pedestrians and cyclists both within the South Bank area and between the South Bank area and the city centre. The redevelopment of the South Bank means there is an opportunity to provide a pedestrian and cycle bridge across the River Nene and the railway line in order to give access for new and existing communities to facilities and services on the riverside and in the city centre. Accessibility is a key issue that will need to be tackled in order to ensure the South Bank becomes a success and realises its full potential. It will be necessary to improve pedestrian and cycle access as well as throughmovements. By promoting ease of movement through the South Bank, existing and future residents in the area will benefit from creation of high quality routes through to the city centre. The scheme would provide a pedestrian and cycle bridge within the South Bank area enabling pedestrians and cyclists to cross both the railway line and the River Nene and access the city centre. These schemes will unlock the potential of the South Bank development area and thereby enable the expansion of the city centre. South Bank railway and river crossings The South Bank development is severed by the Peterborough to Ely railway line and separated from the city centre by the River Nene to the north, and contained by the A London Road to the west, making travel by sustainable modes on a north-south axis potentially unattractive due to the additional travel distances required to cross the railway and river via the A London Road. A footway/cycle crossing across the railway and then the River Nene northwards towards the city centre would provide a short cut between both sides of the South Bank development as well as provide a short cut to the city centre providing an attractive route for those seeking an alternative to travelling by car. This will necessitate the construction of a visually sensitive structure to carry the footway/cycleway across the River Nene. South Bank river bridge phase Work has already been undertaken making structural repairs to the Town Rail Bridge over the railway which facilitated direct access into the South Bank regeneration area off London Road. This included a new footway/cycleway across the western side of the Town Rail Bridge. The phase proposal is to extend the western footway/cycleway from the Town Rail Bridge northwards to the Rivergate retail area. This will include the construction of a visually sensitive structure to carry the footway/cycleway across the River Nene adjacent to the historic river crossing. City centre 1 Peterborough Long Term Transport Plan and Peterborough Local Transport Plan Proposed changes in the city centre will require a significant transport master plan for the area in order to facilitate the growth as outlined in the Core Strategy. This transport master plan will build on LTP and be produced alongside the City Centre Area Action Plan (CCAAP). The plan will also require a comprehensive look at the wider strategic transport network within Peterborough (including the parkway system). This is because any significant changes to the city centre transport network will require the rest of the system to operate in a different manner to compensate for changes in cross city centre traffic movements. This section of the document looks at the schemes that are being considered as possible improvements for the city centre. The city centre major scheme bids would be focussed on Bourges Boulevard and comprise a number of improvements. Bourges Boulevard was constructed as a dual carriageway during the New Town expansion of the city and designed to contain the city centre. Peterborough city centre has grown and expanded and therefore the city centre is now bisected rather than contained by Bourges Boulevard. This has led to access problems for residents and visitors, constraint on further growth and a lack of cohesion of the wider city centre.

Figure : City core and city centre boundaries (small scale) 1 Major and Minor Schemes 1

Crescent Bridge/Bourges Boulevard improvements Bourges Boulevard and Crescent Bridge roundabout present a major barrier to movement between the retail core, railway station and the river, therefore presenting a barrier to the future development of the city. Bourges Boulevard and Crescent Bridge roundabout create severance between the shopping areas, bus station, car parks, the railway station and residential areas to the west. On the southern part, it creates severance between the city centre and the River Nene. The Crescent Bridge roundabout is a key junction within the city centre, it provides access from the west via A1 Thorpe Road and from the north and south via A Bourges Boulevard. In addition the railway station, the shopping centre car parks and bus station are all accessed via this junction. Bourges Boulevard pedestrian crossings Crescent Bridge currently provides a poor quality gateway to the city centre for vehicles, pedestrians and cyclists. There are limited pedestrian and cycling crossing points, visitors arriving at the railway station are forced into subways beneath the roundabout to access Cowgate, whilst the signalised crossing point to the south at Bridge Street is a significant distance away. Crescent Bridge pedestrian and cycle bridge In addition a new pedestrian/cycle bridge adjoining Crescent Bridge over the East Coast Main Line (ECML) could be implemented to provide a high quality sustainable transport corridor improving links between the west of the city and the city centre. Bridge from railway station to Midland Road The city council is in discussions with Network Rail regarding the possibility of providing a cycle and pedestrian bridge to connect the city centre at the railway station to Midland Road on the other side of the rail tracks. This is a possible alternative to the Crescent Bridge alterations discussed previously. Bus and railway station The existing bus station is located off Bourges Boulevard and contained by the Queensgate Shopping Centre, separated from the railway station by a footbridge which does not comply with current equality legislation across Bourges Boulevard. A key issue to be resolved is the access to the bus station outside normal shopping hours when the Queensgate Shopping Centre is closed. At present a major detour is required to access the bus station by the alternative entrance. Relocation to a new site adjacent to the railway station or improved routes between the two transport hubs would improve opportunities for pedestrian and cycle access. Both options will require improved pedestrian links across Bourges Boulevard between the bus and railway stations as part of the new transport interchange arrangement. Bus priority and improved cycle links on Bourges Boulevard As part of the city centre improvement an option is being considered to provide bus priority and improved cycle links on Bourges Boulevard. City centre improvements Other city centre improvements may be required as part of the forthcoming CCAAP. changes in the city centre will require a significant transport master plan 1 Peterborough Long Term Transport Plan and Peterborough Local Transport Plan

Figure : City centre improvements 1 Major and Minor Schemes 1

1 Lincoln Road bus priority corridor This scheme is designed to provide a step-change in public transport provision into the city centre from the north, and would consist of: Dualling of the A Paston Parkway between Junction and Glinton roundabout A Glinton roundabout improvements with bus priority Bus priority measures along Lincoln Road between Glinton and its junction with the A Dualling of Paston Parkway would divert throughtraffic from Lincoln Road and onto the dualled Paston Parkway, thereby assisting the future delivery of bus priority measures on Lincoln Road and providing the potential for a future Park and Ride site. The dualling of Paston Parkway was identified in the Strategic Environmental Assessment (SEA) as having the potential for negative impacts and is also close to the Car Dyke scheduled ancient monument. The scheme will be designed in reference to the SEA, Habitats Regulation Assessment (HRA) and other relevant legislation and guidance and may require an appropriate project level environmental assessment and particular attention to impacts on Car Dyke. to provide a step-change in public transport provision into the city centre Park and Ride At present Peterborough has a Christmas Park and Ride scheme which it has operated over a number of years. A year round Park and Ride system around the city would help to promote Peterborough as a regional shopping centre and would: Improve accessibility to the city centre by bus and other sustainable modes Reduce congestion on the network Reduce traffic coming into the city centre Improve Peterborough s parking stock (in particular the availability of car park space for shoppers and commuters) Early feasibility work suggests that Peterborough could be served by up to three Park and Ride sites located on its periphery and linked to the city centre along quality transport corridors. The scheme would involve provision of Park and Ride sites and necessary transport corridor improvements to assist with the efficiency and attractiveness of the service. The selection of sites is to be determined, as is the order in which they would be developed. Site selection will be made with reference to the SEA, HRA and other relevant legislation and guidance. Where schemes require an appropriate project level environmental assessment, particular attention will be paid to sites of European and international interest; notably the Orton Pit Special Areas of Conservation (SAC) identified as potentially impacted in the HRA. Site location should seek to avoid impacts in the first instance and minimise them, as far as possible, thereafter. Mitigation measures that eliminate impacts including, but not limited to, Sustainable Drainage Systems (SuDS), tree and plant screening, low impact and cowled lighting and low noise/vibration surfacing, will be employed as necessary. 1 Peterborough Long Term Transport Plan and Peterborough Local Transport Plan

Figure : Lincoln Road bus priority corridor 1 Major and Minor Schemes 1

1 Figure : Park and Ride (possible sites and corridors) 1 Peterborough Long Term Transport Plan and Peterborough Local Transport Plan

River Nene transport corridor The River Nene is an asset to Peterborough and has potential to become a transport service. Infrastructure could be developed to enable the provision of a Water Bus and to encourage the use of water borne freight. By providing improved access to riverside venues, including new planned developments, it is hoped that the river will become a popular destination for residents, visitors and a catalyst for future developments. Public transport and infrastructure development plan A scheme could be developed to improve public transport infrastructure along the core bus routes within the city to make Peterborough a more public transport friendly city (including Innovative Public Transport Systems). A1 Wittering junction improvement (Highways Agency scheme) The Highways Agency, who are responsible for the A1 Trunk Road are proposing a scheme to replace the current junction on the A1 to serve Wittering with a grade separated junction. At present, traffic coming from the north and turning right into Wittering has to give way and turn across the face of fast moving traffic, whilst traffic emerging and heading south has to initially turn left then eventually regain the south-bound carriageway at the recently constructed grade separated junction at Carpenter s Lodge, Stamford. The city council supports this proposal, which will improve access to Wittering, both in terms of traffic delay and road safety, as well as reduce the overall carbon footprint by eliminating the need for southbound traffic from Wittering to initially head north. Embankment access The Embankment area is a major opportunity site for Peterborough. Access to the area and the adjacent Eastern Industries is currently poor and at present integration of use (when added to other planned development for the area) would cause unacceptable congestion on local roads and through the city centre at peak times. The nearby A1/Boongate junction (Junction ) currently provides the main access to the east of the city centre and to the industrial areas to the east of the A1. The Boongate junction was constructed during the New Town expansion of the city and is a single carriageway with adjacent land provision to the north for potential widening. This link is becoming congested during peak hours leading to excessive queuing through the A1/Boongate junction and stationary traffic on the A1 Frank Perkins Parkway. A package of options could include: Dualling the Boongate carriageway South facing junction onto the A1 Frank Perkins Parkway The need and scope of the options will depend on the emerging land use patterns for the Embankment area which will form part of the CCAAP. 1 Major and Minor Schemes

1 Figure : River Nene transport corridor (possible sites) 0 Peterborough Long Term Transport Plan and Peterborough Local Transport Plan

Figure 1: A1 Wittering junction improvement (Highways Agency scheme) 1 Major and Minor Schemes 1

1 Figure 0: Embankment access Peterborough Long Term Transport Plan and Peterborough Local Transport Plan

Junction 0 Junction 0 is a roundabout located to the north-east of Peterborough at the intersection between the A and the A Paston Parkway. The junction was constructed as part of the New Town phase of development and comprises part of the Peterborough parkway network. The junction represents a key traffic interchange on the strategic road network providing links to the A1, A, A, A0, A and A. The A improvement scheme (once completed) will deliver traffic from the north-east of Peterborough onto the A just east of Junction 0. This is expected to lead to a significant increase in traffic using Junction 0 to access Peterborough and other parts of the strategic network. Peterborough is going to experience significant growth over the next ten years, with numerous developments planned including Paston Reserve which will consist of approximately 00 dwellings. It is expected that at least 0 of these dwellings will use Junction 0 as a primary point of access to the strategic road network. The city council, in partnership with the Highways Agency and the Paston Reserve developers, hope to implement full signalisation of Junction 0 and increase the number of approach and circulatory lanes. Implementation of the scheme will result in improved journey time reliability for road users, will directly assist in reducing congestion and also provide additional capacity for the extra growth identified. Junction 1 to improvements The A1 runs from the A1(M) to the west of Peterborough to the A to east of Peterborough. Between the A1(M) and Junction (Stanground) the A1 is known as Fletton Parkway, from Junction to the A it becomes Frank Perkins Parkway. The A1 is a primary route that forms part of the parkway network of dual carriageway roads in and around Peterborough. The parkways benefit the city by keeping long distance through traffic out of the central and residential areas. Fletton Parkway also provides a link between the A (via the A0) and the A1 to the A and A. The A1 Fletton Parkway carries approximately 0,000 vehicles per day between Junction 1 and Junction. Observations have shown there is queuing traffic on the westbound carriageway in the morning and along the eastbound carriageway during the evening. The preferred solution to overcome these problems would be to widen the carriageway to three lanes in both directions. Widening of the A1 has the potential to impact the Orton Pit SAC as identified in the HRA. The scheme will address capacity issues associated with development identified in the Core Strategy and will consider how the carriageway is allocated to different modes. The scheme will be designed in reference to the SEA, HRA and other relevant legislation and guidance and may require an appropriate project level environmental assessment. Major and Minor Schemes

1 Figure 1: Junction 0 Peterborough Long Term Transport Plan and Peterborough Local Transport Plan

Figure : Junction 1 to improvements 1 Major and Minor Schemes

1 Figure : Location of major scheme proposals Peterborough Long Term Transport Plan and Peterborough Local Transport Plan

Funding Bids Local Sustainable Transport Fund Following the successes of Peterborough s sustainable travel demonstration town project, locally branded as Travelchoice, the city council will be submitting a comprehensive funding package to the Local Sustainable Transport Fund. At this stage it is envisaged that the submission will build on the successes of Travelchoice but will also include such initiatives as pocket Park and Ride, infrastructure schemes to close gaps in the Green Wheel cycle network and initiatives working in schools, businesses and communities to encourage and support cycling and walking for an improved healthy and active life style. East of England European Regional Development Fund Low Carbon Transport The city council is submitting a funding bid to the European Regional Development Fund (ERDF) Competitive Programme to undertake a project linking live sustainable travel information via smart phone applications with the rental of ibikes. The project will work with partner organisations and small and medium enterprises (SMEs) to produce live, accurate and reliable sustainable travel information direct to smart phones. The user will be able to receive information on walking, cycling, public transport, taxis and car sharing. The smart phone application will also enable users to hire an ibike as well as provide the route information direct to their phone. This project aims to work with SMEs to encourage and support the wider use of sustainable travel therefore reducing the need to travel by car for their employees and visitors and assisting SMEs to reduce their carbon footprints and costs. EU TOGETHER Project, energy efficient transport training for immigrants Peterborough is working with JMP consultants on the EU funded TOGETHER project to develop and implement energy efficient transport training for immigrants. The training will focus on providing new immigrants with advice on energy efficiency in transport as well as providing them with essential skills in how to travel using sustainable modes of transport. This project aims to work with specific target groups and stakeholders to deliver tailor made training that seeks to enhance the quality of life of immigrants, to facilitate social inclusion as well as conserving essential energy resources for future generations. The bid for the Local Sustainable Transport Fund will build on the success of Travelchoice Major and Minor Schemes