CEQA PRACTICUM: SUPPLEMENTAL ENVIRONMENTAL REVIEW



Similar documents
March Prepared by: Irvine Ranch Water District Sand Canyon Avenue. Irvine, CA Contact: Natalie Likens (949)

CHAPTER 4 ALTERNATIVES COMPARISON

CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS AND APPROVAL OF THE DESIGN OF THE GENOME LAUNCH FACILITY PROJECT, DAVIS CAMPUS

Office of. City Attorney. City of San Diego MEMORANDUM MS 59 (619) QUESTION PRESENTED

SUBJECT: NOTICE OF PREPARATION OF A DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT REPORT FOR THE BERTHS [CHINA SHIPPING] CONTAINER TERMINAL PROJECT

Chapter Impacts of the Proposed Project

MEMORANDUM. DEPARTMENT OF PUBLIC WORKS County of Placer TO: BOARD OF SUPERVISORS DATE: AUGUST4, 2015

PUBLIC NOTICE Application for Permit

SAN DIEGO UNIFIED PORT DISTRICT GUIDELINES FOR COMPLIANCE WITH THE CALIFORNIA ENVIRONMENTAL QUALITY ACT

Multiple Species Conservation Program County of San Diego. A Case Study in Environmental Planning & The Economic Value of Open Space

3.1.8 Utilities and Service Systems

San Francisco Water Powe Sewer Services of the San Francisco Public Utilities Commission

ADDENDUM TO THE DRAFT ECONOMIC IMPACT ANALYSIS OF CRITICAL HABITAT DESIGNATION FOR THE OTAY TARPLANT

Otay Ranch Phase 2 Resource Management Plan

APPENDICES SAN FRANCISCO BAY TRAIL: PINOLE SHORES TO BAYFRONT PARK PROJECT ENVIRONMENTAL IMPACT REPORT

TRINITY COUNTY. Board Item Request Form Phone ext 3425

AN INITIATIVE TO IMPROVE

CHAPTER 8. FEDERALLY-LISTED ENDANGERED OR THREATENED SPECIES

AIR TRAFFIC INITIAL ENVIRONMENTAL REVIEW

City of Inglewood Well No. 2 Rehabilitation. City of Inglewood Thomas Lee

SANTA BARBARA COUNTY COMPREHENSIVE PLAN LOMPOC AREA

UNITED STATES OF AMERICA 131 FERC 62,175 FEDERAL ENERGY REGULATORY COMMISSION. United Water Conservation District Project No.

NAPA COUNTY WATERSHED SYMPOSIUM

Resolving complex issues with large scale river restoration; a case study: the San Joaquin River in California

NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014

COMMUNITY CERTIFICATIONS

NOTICE OF PREPARATION

City of Los Angeles CALIFORNIA ERIC GARCETTI MAYOR. November 6, 2014

Los Angeles Union Station, CA Sustainable Neighborhood Assessment. April 22-23, 2014

PUBLIC NOTICE PROJECT: Trans Bay Cable Maintenance Project

San Diego Integrated Regional Water Management Implementation Grant Proposal Economic Analysis Flood Damage Reduction Costs and Benefits

1.7.0 Floodplain Modification Criteria

NOTICE OF INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION. Vallecitos Water District Rock Springs Sewer Replacement Project

Proposed General Plan Update Goals, Policies, and Implementation Actions

HCP Team Meeting. November 18, icfi.com

Land Protection Planning for the National Wildlife Refuge System

Governor Gray Davis. The Planner s Guide to. Specific Plans. Steven A. Nissen, Director. Terry Roberts, Manager, State Clearinghouse

Ecological Mitigation Strategies

King County, Washington Policies and Practice for the Use of Eminent Domain For Flood Risk Reduction

NEPA and CEQA: Integrating State and Federal Environmental Reviews. Draft for Public Review and Comment

Sec. 22a-1a page 1 (4-97)

Chapter 7 ZONING PLAN

ANNUAL ELEMENT PROGRESS REPORT Housing Element Implementation (CCR Title )

City of Beverly Hills Construction Stormwater Requirement Checklist

March 17, Dear Mr. Sullins:

Incidental Take Statement

Greater Los Angeles County Region

3. The submittal shall include a proposed scope of work to confirm the provided project description;

Agua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District,

Table of Contents. Introduction Guidance Permit fact sheet Completeness checklist. Introduction

Cellular Antenna Proposal Form

Using the Carbon Market to Provide Financial Support for Coastal Restoration and Protection. fact SHEET

TITLE 14. Fish and Game Commission Notice of Proposed Changes in Regulations

Threshold Determination: California Case Law

Management Plan Template For Conservation Easements Held by CPW

Chapter Four Resource Management Plan

INFORMATION SHEET ORDER NO. R XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY

Gold Ray Dam Interagency Technical Team Meeting


Chapter 3 Planning Issues, Opportunities, and Constraints

PLANNING COMMISSION COUNTY OF MONTEREY, STATE OF CALIFORNIA

DRAFT SOUTH FORK SKYKOMISH RIVER

National Environmental Policy Act/ Clean Water Act Section 404 (NEPA/404) Merger Process and Agreement for Transportation Projects in Colorado

Department of the Interior. Departmental Manual

5. Environmental Analysis

Tom Larkin, EDAW, Inc. Bill Anderson, ERA Amitabh Barthakur, ERA Judy Taylor, ERA. Preliminary Fiscal Analysis for the Navy Broadway Complex

Arkansas River Corridor Vision & Master Plan

COASTAL DEVELOPMENT PERMIT

J. Template Environmental Checklist for FEMA/HUD Using the Template Environmental Checklist for FEMA and HUD Responsible Entities EHP Reviews

The Muddy River: A Century of Change

DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment

State Planning Agency, Tribal Utilities & Renewable Energy Regime in California

March 2011 DRAFT. I. Working Forest Easements:

Floodplain Development Land Use Review

Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County

Transcription:

NAEP/AEP Conference Los Angeles CEQA PRACTICUM: SUPPLEMENTAL ENVIRONMENTAL REVIEW P RESENTED B Y : C URTIS E. ALLING, AICP G ARY D. JAKOBS, AICP A SCENT E NVIRONMENTAL, INC. A PRIL 2013

AEP CONFERENCE CEQA PRACTICUM SERIES 2011 Monterey Baseline; Effective MNDs; Cumulative Effects 2012 Sacramento Art of Response to Comments; Mitigation Deferral 2013 Los Angeles Alternatives; Significance Determinations; Supplemental Review

DISCUSSION TOPICS When supplemental review is needed Fundamentals of supplemental review Checklist to determine CEQA approach Choices for supplemental document Key court cases

WHEN IS SUPPLEMENTAL REVIEW NEEDED?

ARE WE DEALING WITH THE SAME PROJECT? Previously certified EIR or adopted ND or MND Project is the same as previously considered Time has passed Another CEQA review is needed, because: A follow-up discretionary action is necessary, and Circumstances have changed and/or project description has changed

SUPPLEMENTAL REVIEW ISSUE MAY ARISE FOR RESPONSIBLE AGENCY If after the project is approved, any of the conditions occurs, a subsequent EIR or negative declaration shall only be prepared by the public agency with the next discretionary approval, if any. No other responsible agency shall grant an approval until the subsequent EIR has been certified or subsequent negative declaration adopted. (CCR 15162[c])

THIS IS A DIFFERENT SITUATION THAN: Recirculation of a Draft EIR (CCR 15088.5) Prior to initial project approval Criteria for recirculation are similar in concept, but not identical in the details New information emerges after all discretionary approvals have occurred No CEQA purview exists without a discretionary action.

STATUTORY AND GUIDELINES PROVISIONS STATUTORY FOUNDATION FUNDAMENTALS IN THE GUIDELINES

STATUTORY FOUNDATION PRC 21166 Subsequent or Supplemental Impact Report; Conditions When an EIR has been prepared for a project pursuant to this division, no subsequent or supplemental EIR shall be required by the lead agency or by any responsible agency, unless one or more of the following events occurs: (a) Substantial changes are proposed in the project which will require major revisions of the EIR. (b) Substantial changes occur with respect to the circumstances under which the project is being undertaken which will require major revisions in the EIR. (c) New information, which was not known and could not have been known at the time the EIR was certified as complete, becomes available.

GUIDELINES FUNDAMENTALS If an EIR certified or ND approved for a project, no new EIR or ND may be prepared unless the project requires a discretionary action and a change in project or circumstances occurs that could: Add new significant impacts or Substantially increase the severity of previously identified significant impacts, or Add new information of substantial importance If no new discretionary approvals required by lead or responsible agencies and conditions above occur, no need to conduct additional CEQA. (CCR 15162 [a] and [c])

WHAT ARE PROJECT CHANGES AFTER EIR CERTIFIED OR ND APPROVED? 1. Substantial changes are proposed in the project and the changes will result in new significant impacts or change the severity of previously identified significant impacts (CCR 15162[a][1])

EXAMPLE #1 School approved with MND on 5-acre site adjacent to a wetland. Proposal addition of community gym to the school, project size increase to 8 acres, and wetland needs to be filled (biological resource impacts increased). New discretionary action? Project changed? New or substantially more severe significant impact?

WHAT ARE CHANGED CIRCUMSTANCES AFTER EIR CERTIFIED OR ND APPROVED? 2. Substantial changes occur with respect to the circumstances under which the project is undertaken which will require major revisions of the previous EIR or ND due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects (CCR 15162[a][2])

EXAMPLE #2 Specific Plan with mixed-use community approved with EIR. Nearby airport master plan approved later with a new flight pattern over a the specific plan area. Because of recession, developer seeks to change Specific Plan land use map to fit current economics, but no increase in units or square feet. New discretionary action? Circumstances changed or project changed? New or substantially more severe significant impacts?

WHAT IS NEW INFORMATION OF SUBSTANTIAL IMPORTANCE? 3. New information of substantial importance which was not known or could not have been known with the exercise of reasonable diligence when prior EIR or ND prepared shows one of three outcomes: New or substantially more severe significant effect Mitigation or alternative found not to be feasible is, in fact, feasible New mitigation or alternative considerably different from those analyzed previously EIR (CCR 15162[a][3])

NEW OR SUBSTANTIALLY MORE SEVERE SIGNIFICANT IMPACTS Project will result in new significant impacts or substantially increase the severity of previously identified significant impacts New impacts may seem easy to discern, but were they known or could have been known with reasonable due diligence? (e.g., GHG) Substantially more severe leaves room for interpretation

MITIGATION OR ALTERNATIVE PREVIOUSLY DETERMINED INFEASIBLE IS FEASIBLE Mitigation or alternatives found not to be feasible (previously), but in fact are feasible and would substantially reduce one or more significant impacts, are found to be feasible, and project proponents decline to adopt them. Only involves mitigation or alternatives previously considered in first EIR or ND/MND Previously found infeasible, but not any longer Effective in substantially reducing the impact If proponent accepts the now-feasible mitigation or alternative, no need for supplemental review

NEW AND CONSIDERABLY DIFFERENT MITIGATION OR ALTERNATIVE Mitigation or alternatives that are considerably different from those analyzed previously would substantially reduce one or more significant effects, but the project proponent declines to adopt them. Must be considerably different from those previously analyzed Effective in substantially reducing the impact Again, if proponent accepts the different mitigation or alternative, no need for supplemental review

EXAMPLE #3 After approval of an elementary school site next to a wetland with MND, citizen biologist finds red-legged frog (ESA - threatened) in wetland. New information is brought to school district s attention before award of construction contract. Discretionary action needed? Is this significant new information? Can EIR be avoided?

DETERMINING THE PROPER SUPPLEMENTAL REVIEW APPROACH ASSESSING CHANGES USE OF TAILORED CHECKLIST

UPDATED PROJECT DESCRIPTION First, define and describe the changes to the project, if any Revised site plan, if relevant Updated description, highlighting differences, with references to original environmental document Quantified comparisons can be useful (e.g., comparing acres, d.u., or s.f.) to assess magnitude of change

COMPARISON TABLE Table 2-2: Changes from the Previous Master Plan to the Proposed Grady Ranch Precise Development Plan Project Element Previous Master Plan Proposed Precise Development Plan Bridges Four bridges proposed. Vehicles would continue to drive through creeks and tributaries Eight clear span bridges and one bridge with a center abutment proposed. Vehicles would not travel through creeks or tributaries. Bridges No bridges across Grady Creek Bridge 3 spans Grady Creek so emergency vehicles do not travel through creek Creeks Loma Alta Creek conveyed under Lucas Valley Road by culvert Loma Alta Creek to be bridged and creek would retain a natural bottom Creeks and tributaries Tributary to Grady Creek near Main Building to be enclosed within culvert along north side of building Tributary to Grady Creek to be realigned along west side of building and natural bottom to be retained and enhanced Creeks Creek channel beds remain at existing elevations Creek channel beds raised to historic levels with approximately 52,700 cubic yards of material.

SUMMARY OF CHANGED CIRCUMSTANCES Identify and describe environmental circumstances that have changed Consider each environmental topic area in the Appendix G Checklist Include both physical conditions and relevant regulatory circumstances

ASSESSMENT OF NEW INFORMATION Does new information exist (i.e., not previously known by the lead agency)? Could it have been known with reasonable due diligence? Does it possess substantial importance?

USING A TAILORED CHECKLIST Appendix G Environmental Checklist includes all environmental topics But the questions/responses do not relate to changed projects, changed circumstances, and new information So modify the questions/responses to assess changed conditions!

Environmental Issue Area Where Impact Was Analyzed in 1996 Master Plan FEIR. Do Proposed Changes Involve New or Substantially More Severe Significant Impacts? Do Any New Circumstances Involve New or Substantially More Severe Significant Impacts? Any Substantially Important New Information Requiring New Analysis or Verification? Do 1996 Master Plan FEIR Mitigation Measures Address/Resolve Impacts? 1. Aesthetics. Would the Project: a. Have a substantial adverse effect on a scenic vista? a. Substantially damage scenic resources, including but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway? a. Substantially degrade the existing visual character or quality of the site and its surroundings? a. Create a new source of substantial light or glare which would adversely affect day or nighttime views in the area? Not analyzed No No No N/A Not analyzed No No No N/A 1996 FEIR; Impacts 5.5-1, 5.5-2, 5.5-4, 5,5-5, and 5.5-8; pages 5.5-26 through 5.5-35 1996 FEIR; Impact 5.5-3, page 5.5-28 No No Yes, but no significant impact would occur Yes No No No Yes

Environmental Issue Area 4. Biological Resources. Would the project: a. Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service? Where Impact Was Analyzed in 1996 Master Plan FEIR. 1996 FEIR; Section 5.3; pages 5.3-35 5.3-39 Do Proposed Changes Involve New Significant Impacts or Substantially More Severe Impacts? Any New Circumstances Involving New Significant Impacts or Substantially More Severe Impacts? Any New Information Requiring New Analysis or Verification? Do 1996 Master Plan FEIR Mitigation Measures Address/Resolve Impacts? No Yes Yes No a. Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, and regulations or by the California Department of Fish and Game or US Fish and Wildlife Service? 1996 FEIR; Section 5.3; pages 5.3-22 5.3-31, 5.3-39 5.3-41 No No Yes, but new or more severe significant effects would not occur Yes, with modifications /updates

Environmental Issue Area Where Impact Was Analyzed in 1996 Master Plan FEIR. Do Proposed Changes Involve New Significant Impacts or Substantially More Severe Impacts? Any New Circumstances Involving New Significant Impacts or Substantially More Severe Impacts? Any New Information Requiring New Analysis or Verification? Do 1996 Master Plan FEIR Mitigation Measures Address/Resolve Impacts? 8. Greenhouse Gas Emissions. Would the project: a. Generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment? N/A No Yes Yes No a. Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of greenhouse gases? N/A No Yes Yes No

ADVANTAGES OF THE CHECKLIST Thoroughly covers environmental issues Forces consideration of the questions about changed conditions Provides substantial evidence to support the selection of a CEQA document

CHOICES FOR SUPPLEMENTAL DOCUMENT SUBSEQUENT EIR SUPPLEMENT TO AN EIR NEGATIVE DECLARATION ADDENDUM

POTENTIAL APPROACHES WHEN ANOTHER EIR IS NEEDED If Section 15162 provisions require a new EIR, prepare either a subsequent EIR or a supplement to an EIR Pay attention to both content differences and process questions

SUBSEQUENT V. SUPPLEMENT TO EIR General practice rule of thumb: if changes are sufficient for a broad range of revisions in the EIR, prepare a subsequent EIR. If only minor additions or changes in documentation needed, such as one or two impact issue areas, a supplement to an EIR would be enough. Judgment needed. No bright line test.

PROCESS DIFFERENCES Subsequent (CCR 15162) Include all sections of EIR (including cumulative, alternatives, etc.) Relevant information can be incorporated by reference to prior EIR (including cumulative, alternatives, etc.) Supplement (CCR 15163) Include only information needed to make previous EIR adequate Need not circulate prior EIR, but prior EIR is part of record, including when making findings Applies to both Same notice (NOA) and review period as the original Draft EIR Guidelines silent on need for NOP. Recommendation: reissue an NOP, especially for subsequent EIR (CCR 15082: after decision to prepare an EIR, lead agency shall send an NOP) Some believe prior NOP can be reused for supplement to an EIR Make previous EIR available

SUBSEQUENT NEGATIVE DECLARATION Probably a rare document, because criteria involves new or substantially more severe significant effects Process: same notice (NOI) and public review period as a regular ND or MND Can we mitigate our way from a Subsequent EIR to a Subsequent MND?

ADDENDUM Addendum is for minor changes or additions after certification of EIR or approval of ND, and new discretionary action needed. No new or substantially more severe significant impacts Include brief explanation why an EIR or subsequent ND is not needed, supported by substantial evidence (CCR 15164[e]) No public review required Make addendum available to public according to lead agency regulations or ordinances (e.g., with normal staff report procedures, if lead agency is holding a public meeting) Agency considers addendum together with previous EIR or ND before acting

MITIGATION TO AVOID SUBSEQUENT EIR? RULES ARE UNCLEAR Guideline discussions of substantial changes in the project or circumstances, leading to new or more severe significant effects, do not discuss mitigation. (CCR 15162[a][1, 2]) Guideline discussions of new information, leading to new or more severe significant effects reference mitigation and alternatives (if they could reduce the impact but are not adopted, then prepare a subsequent EIR or supplement to an EIR). (CCR 15162[a][3])

WHAT DO COURTS SAY? Issue has not been directly challenged In some cases, lead agencies have mitigated new impacts and not prepared supplemental EIR documents (River Valley v. Metropolitan Transit, 1995; STOP v. San Francisco, 1999) In other cases, Courts have suggested new mitigation measures require recirculation to public (Mira Monte Homeowners v. County of Ventura, 1985) By analogy, cannot add mitigation to qualify for a cat ex (SPAWN v. County of Marin, 2005)

UNSETTLED LEGAL ISSUE Because the issue has not been settled, no firm guidance. In practice, many addenda have included new mitigation. But proceed at your own risk until the issue is challenged directly on point and resolved in court.

SUMMARY OF RELEVANT COURT DECISIONS

KEY RELEVANT COURT DECISIONS Citizens of Goleta Valley v. BOS; 1990 Moss v. Co. of Humboldt; 2008 SD Navy Broadway Complex Coalition v. City of SD; 2010 Further review prohibited unless Addendum decision, substantial evidence SEIR not required, if discretionary action not related to impact Benton v. Board of Supervisors; 1991 Only the increment of changed impact needs to be analyzed

KEY RELEVANT COURT DECISIONS STOP v. City and County of SF; 1999 River Valley Preservation Project v. MTDB Mani Brothers Real Estate Group v. City of Los Angeles; 2007 No SEIR, even with major project change No substantial severity increase, if well studied SEIR not required with large s.f. increase; no significant impacts Eller Media Co. v. Community Redevelopment Agency; 2003 Proposal for billboards was substantial new information; historic/ aesthetic impacts

CASE STUDIES

CHANGED CIRCUMSTANCES: CASE STUDY #1 EIR certified and project approved by lead agency. No biological impacts were identified. Project is initiated and burrowing owls (species of special concern, but not listed by CESA or ESA) are found on a site during construction. No permits needed from CDFG or USFWS. Is supplemental environmental review and documentation needed?

CHANGED CIRCUMSTANCES: CASE STUDY #2 EIR certified and project approved by lead agency. No biological impacts were identified. Active Swainson s hawk nests (CESA threatened) are found on the site prior to award of construction contract. A take permit is needed from CDFG. Is supplemental review and documentation needed?

THANK YOU! A SCENT E NVIRONMENTAL, INC. S ACRAMENTO, CALIFORNIA WWW. ASCENTENVIRONMENTAL. COM WWW. FACEBOOK. COM/ ASCENTENVIRONMENTAL