Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans



Similar documents
STORMWATER MANAGEMENT CHECKLIST

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

APPENDIX A: STORMWATER MANAGEMENT CHECKLIST

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Annual Standards and Specifications. Erosion and Sediment Control

12-O-1761 A SUBSTITUTE ORDINANCE BY CITY UTILITIES COMMITTEE

URBAN DRAINAGE CRITERIA

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

Low Impact Development Checklist

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.

Post Construction Stormwater Management Checklist Program

City of West Linn Public Works Design Standards Table of Contents

CHAPTER 3 STORM DRAINAGE SYSTEMS

Exhibit A-7.III. Water Quality Management Plan (WQMP) Checklist

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS

DESIGN & TECHNICAL CRITERIA STORM DRAINAGE JEFFERSON COUNTY, COLORADO PLANNING & ZONING DIVISION

3.4 DRAINAGE PLAN Characteristics of Existing Drainages Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

10/4/ slide sample of Presentation. Key Principles to Current Stormwater Management

STORM DRAINAGE GENERAL INFORMATION Drainage Systems VDOT Requirements Metric Plan Preparation...

Chapter 5.0. Stormwater Credits for Innovative Site Planning

Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities

SITE PLAN REVIEW APPLICATION

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

Engineering Department

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report

CITY OF CHARLOTTE STORM WATER SERVICES CREDIT APPLICATION INSTRUCTION MANUAL

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

CITY OF AURORA STORM DRAINAGE DESIGN AND TECHNICAL CRITERIA

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

Computing Stormwater Runoff Rates and Volumes

UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

Post Construction Stormwater Management Inspection & Maintenance PROGRAM MANUAL

SECTION 5 DRAFTING STANDARDS

Using Hydraflow Storm Sewers Extension with AutoCAD Civil 3D 2008: A Recommended Workflow

Carlton Fields Memorandum

Stormwater Management Functional Servicing Report

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

Storm Drainage Design and Technical Criteria Manual. City of Brookings, SD

CHAPTER 9 STORM DRAINAGE DESIGN AND STORMWATER QUALITY REGULATIONS

GRAND COUNTY STORM DRAINAGE DESIGN AND TECHNICAL CRITERIA MANUAL. OFFICIALLY ADOPTED: August 1 st, 2006

Engineering Specifications February, 2004 Schedule H to Bylaw 7452, Subdivision Bylaw Page 18

CHAPTER 7 STORM WATER DESIGN

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION

CHAPTER II - STORM DRAINAGE

Fort Dodge Stormwater Master Planning. Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M.

Harris County Flood Control District. Policy, Criteria, and Procedure Manual

1800 Washington Boulevard, Baltimore, MD TTY Users Larry Hogan, Governor Boyd

STORMWATER MANAGEMENT ORDINANCE

STORM DRAINS CHAPTER 7

CITY UTILITIES DESIGN STANDARDS MANUAL

Presented by Dani Wise Johnson Vanasse Hangen Brustlin, Inc.

OAKLAND COUNTY WATER RESOURCES COMMISSIONER ENGINEERING DESIGN STANDARDS FOR STORM WATER FACILITIES

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness

4. Environmental Impacts Assessment and Remediation Targets

SECTION 5: SANITARY SEWER SYSTEM DESIGN

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS

Outlet stabilization structure

MARSHALL COUNTY STORM DRAINAGE AND SEDIMENT CONTROL ORDINANCE. ralphb [Pick the date]

Construction Site Inspection Checklist for OHC By making use of some simple Best Management Practices (BMPs) a construction site operator can

Floodplain Development Land Use Review

CONSTRUCTION PERMIT SUBMITTAL CHECKLIST

ALAN BRUBAKER, P.E., P.S. SUMMIT COUNTY ENGINEER

Preliminary Plan Application and Checklist

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

ENGINEERING & CONSTRUCTION MANAGEMENT

City of La Quinta Public Works Department - Storm Drain Plan Review Checklist

Georgia Coastal Stormwater Supplement April 2009

Preventing Basement Flooding

TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African

Stormwater Design Guidelines Frequently Asked Questions:

Drainage Analysis for the McKownville Area

APPLICATION PROCESS FOR LAND DISTURBING PERMIT

Official OPP Overall Penn State Stormwater Program Latest Revision/Review: 5/28/2015

Appendix G: Model Stormwater Ordinance and Performance Standards

6-1 Introduction. 1. Storm drain that does not require pressure testing. 2. Lateral that does not require pressure testing.

Shooks Run Drainage Study Basic Terminology

Conveyance means a mechanism for transporting water from one point to another, including pipes, ditches, and channels.

Storm Water Permanent Best Management Practices Manual

SUSTAINABLE URBAN DRAINAGE SYSTEMS

February 1996 Revised and Adopted April 1998 Revised and Adopted December 2002

MODULE 2 RULES RELATING RULES RELA

Riprap-lined Swale (RS)

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

SEWER LINE EXTENSION DESIGN CHECKLIST

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.

Stormwater Drainage Design for Parking Lots

Electronic Signature and Fee Payment Confirmation

A Developer s Guide: Watershed-Wise Development

City of Shelbyville Site Inspection Checklist

Functional Servicing and Preliminary Stormwater Management Report Paris Grand Submission

Project Manager. Geoff Masotti, P.Eng. T Ext. 254 T

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date

Emergency Spillways (Sediment basins)

Homeowner s Guide to Drainage

Transcription:

APPENDIX IV Version: February 2, 2015 Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans Please fill in all blanks and please reference the plan sheets/pages where the information may be found, where appropriate, or write N/A by items that are not applicable. GENERAL Plan Submission Date Project Name VSMP Permit Number Site Plan Number Site Address Applicant _ Phone Number Applicant Legal Address _ Owner Owner E-mail Address _ Principal Designer Phone Number Phone Number Principal Designer E-mail Address_ Total Disturbed Area Figure Professional's seal - The designer's original seal, signature, and date are required on the cover sheet of each Narrative and each set of Plan Sheets. A facsimile is acceptable for subsequent Plan Sheets. Number of plan sets Attach two sets of SWM Plans. Exceptions - Exceptions requested are governed by Section 9VAC25-870-57 of the Virginia Stormwater Management Regulations. Local Consideration Provide contact information for the locality s plan review coordinator. Name Phone Number Address Grandfathering - Attach supporting documentation consistent with the requirements of Section 9VAC25-870-48 of the Virginia Stormwater Management Regulations. Offsite Compliance Attach letter of availability from the off-site provider as governed by Section 9VAC25-870-55 of the Virginia Stormwater Management Regulations. PROJECT NAME: SUBMITTAL#: PLANS DATED: _ Plan Reviewer for Stormwater Management IV - Page 1

CHECKLIST PREPARER I certify that I am a professional in adherence to all minimum standards and requirements pertaining to the practice of that profession in accordance with Chapter 4 ( 54.1-400 et seq.) of Title 54.1 of the Code of Virginia and attendant regulations. By signing this checklist I am certifying that this document and all attachments are, to the best of my knowledge and belief, true, accurate, and complete. SIGNATURE PRINTED NAME QUALIFICATIONS DATE PROJECT NAME: SUBMITTAL#: PLANS DATED: _ Plan Reviewer for Stormwater Management IV - Page 2

SITE PLANS Please reference the plan sheet numbers where specific information may be found in the blanks below. Common address and legal description of the site, including the tax reference number(s) and parcel number(s) of the property or properties affected. A narrative that includes a description of current site conditions and proposed development and final site conditions, including proposed use of environmental site design techniques and practices, stormwater control measures, relevant information pertaining to long-term maintenance of these measures, and a construction schedule. Existing and proposed mapping and plans (recommended scale of 1 = 50, or greater detail), which illustrates the following at a minimum: North arrow Legend Vicinity map Existing and proposed topography (minimum of 2-foot contours recommended) Property lines Perennial and intermittent streams Mapping of predominant soils from USDA soils surveys as well as the location of any sitespecific test bore hole investigations that may have been conducted and information identifying the hydrologic characteristics and structural properties of soils used in the installation of stormwater management facilities Boundaries of existing predominant vegetation and proposed limits of clearing and grading Location and boundaries of natural feature protection and conservation areas (e.g.,wetlands, lakes, ponds, aquifers, public drinking water supplies, etc.) and applicable setbacks (e.g., stream buffers, drinking water well setbacks, septic drainfield setbacks, building setbacks, etc.) Identification of any on-site or adjacent water bodies included on the Virginia 303(d) list of impaired waters Current land use and location of existing and proposed roads, buildings, parking lots and other impervious areas Location and description of any planned demolition of existing structures, roads, etc. Proposed land use(s) with a tabulation of the percentage of surface area to be adapted to various uses, including but not limited to planned locations of utilities, roads, parking lots, stormwater management facilities, and easements Location of existing and proposed utilities [e.g., water (including wells), sewer (including septic systems), gas, electric, telecommunications, cable TV, etc.] and easements Earthwork specifications Show the BMP name, geographic coordinates and design of both structural and nonstructural stormwater control measures, including maintenance access and limits of disturbance Storm drainage plans for site areas not draining to any BMP(s) Location of existing and proposed conveyance systems, such as storm drains, inlets, catch basins, channels, lateral groundwater movement interceptors (French drains, agric. tile drains, etc.), swales, and areas of overland flow, including grades, dimensions, and direction of flow Final drainage patterns and flow paths PROJECT NAME: SUBMITTAL#: PLANS DATED: _ Plan Reviewer for Stormwater Management IV - Page 3

Location of floodplain/floodway limits and relationship of site to upstream and downstream properties and drainage systems Location of all contributing drainage areas and points of stormwater discharge, receiving surface waters or karst features into which stormwater discharges, the pre-development and postdevelopment conditions for drainage areas, and the potential impacts of site stormwater on adjoining parcels Location and dimensions of proposed channel modifications, such as bridge or culvert crossings Final stabilization and landscaping plans Hydrologic and hydraulic analysis, including the following: Site map with locations of design points and drainage areas (size in acres) for runoff calculations Identification and calculation of stormwater site design credits, if any apply Summary description of the water quantity and water quality compliance strategy. Time of concentration (and associated flow paths) Imperviousness of the entire site and each drainage area NRCS runoff curve numbers or volumetric runoff coefficients A hydrologic analysis for the existing (pre-development) conditions, including runoff rates, volumes, and velocities, showing the methodologies used and supporting calculations A hydrologic analysis for the proposed (post-development) conditions, including runoff rates, volumes, and velocities, showing the methodologies used and supporting calculations Hydrologic and hydraulic analysis of the stormwater management system for all applicable design storms Pollution load and load reduction requirements and calculations Final good engineering and sizing calculations for stormwater control measures, including contributing drainage areas, storage, and outlet configurations, verifying compliance with the water quality and water quantity requirements of the regulations Stage-discharge or outlet rating curves and inflow and outflow hydrographs for storage facilities Final analysis of the potential downstream impacts/effects of the project, where necessary Downstream analysis, where detention is proposed Dam safety and breach analysis, where necessary Representative cross-section and profile drawings and details of stormwater control measures and conveyances which include the following: Existing and proposed structural elevations (e.g., inverts of pipes, manholes, etc.) Design water surface elevations Structural details of BMP designs, outlet structures, embankments, spillways, grade control structures, conveyance channels, etc. Applicable construction and material specifications, including references to applicable material and construction standards (ASTM, etc.) PROJECT NAME: SUBMITTAL#: PLANS DATED: _ Plan Reviewer for Stormwater Management IV - Page 4

Landscaping plans for stormwater control measures and any site reforestation or revegetation Long term operations and maintenance plan/agreement as governed by 9VAC25-870-112 of the Virginia Stormwater Management Program Regulations. Evidence of acquisition of all applicable local and non-local permits Waiver/exception requests Evidence of acquisition of all necessary legal agreements (e.g., easements, covenants, land trusts, etc.) Applicable supporting documents and studies (e.g., infiltration tests, geotechnical investigations, TMDLs, flood studies, etc.) Other required permits: PROJECT NAME: SUBMITTAL#: PLANS DATED: _ Plan Reviewer for Stormwater Management IV - Page 5