FINAL December 2012 SECTION 233100 DUCTWORK



Similar documents
Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

DESIGN AND INSTALLATION OF RESIDENTIAL FLEXIBLE DUCTWORK SYSTEMS

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

SECTION HVAC INSULATION. A. All work specified in this Section is subject to the provisions of Section

FSD35, FSD36 AND FSD37 COMBINATION FIRE and SMOKE DAMPERS

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

4 Installation Requirements

SECTION HVAC AIR DISTRIBUTION

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

HVAC Air Duct Leakage. Eli P. Howard, III Group Director Technical Resources SMACNA

Fire Barrier Duct Wrap 15A

The Butler MR-24 Standing Seam Roof Difference. A comparison between metal roof systems

SECTION COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

Excerpts from the Canadian National Building Code (NBC)

Roof Curbs, Extensions and Equipment Supports

SECTION STORM DRAINAGE SYSTEM

B. Types of mechanical insulation specified in this section include the following:

SECTION ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

Preformed Metal Roofing and Siding

PART 1 GENERAL 1.1 SECTION INCLUDES

Mark Cramer Inspection Services, Inc.

FRP AQUATIC DUCTWORK COMPONENTS LEADERS IN FIBERGLASS REINFORCED PLASTIC DUCT PRODUCTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

B. ASTM C 533 Calcium Silicate Block and Pipe Thermal Insulation. C. ASTM C 547 Mineral Fiber Preformed Insulation

SECTION STANDING SEAM METAL ROOF

Cooktop Low-Profile Ventilation Hoods

Drexel Metals Inc. DMC 100SS 16oz min. Copper Mechanical Seam Metal Roof System over Plywood

HVAC Duct Construction. Bob Wasilewski Project Manager, Technical Resources SMACNA

Sheet Metal Products for the HVAC Industry

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

CITY OF LONG BEACH Department of Development Services BUILDING AND SAFETY BUREAU MECHANICAL PLAN REVIEW CHECKLIST

RFQ # PR Replace Kitchen Equipment in the CGR

City of San Diego, CWP Guidelines

Acoustical Design Guidelines for HVAC Systems in Schools

Duct Construction Standards. Code Reference: 2013 Title 24, Part 6 Standards 150.0(m)1. UL Ratings

SECTION MORTUARY REFRIGERATORS

Table of Contents. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide. Notes to Designer /Installers..

Life Safety Dampers Selection and Application Manual. Ceiling Radiation Dampers Fire Dampers Combination Fire Smoke Dampers Smoke Dampers

Final inspections are completed by site visit only. Access to fenced yards shall be planned.

Design Information. Designing Your Dust Collection System. Typical dust or fume collection system

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

Schluter -KERDI-BOARD Substrate, building panel, bonded waterproofing

How To Install A Perfect 16 Id Series Filter System

PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT

Residential Deck Safety, Construction, and Repair

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM

SECTION GROUND WATER STORAGE TANKS

All work shall comply with applicable codes and ordinances. Work shall comply with the BOCA National Plumbing Code, latest edition.

Specifications. Preformed Metal Wall and Roof Panels. Alcoa Cladding Systems Manufacturing Plant 100 Industrial Boulevard Eastman, Georgia 31023

HVAC INSTALLATION SUCCESS WITH 2012 IECC DELAWARE. for Builders & Trades. Recommended Practices for Optimized Energy Savings

Mechanical Heating Ventilation and Air Conditioning Ductwork and Duct Accessories

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Architectural. Roofing. Basis of Design

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS

San Antonio Water System Standard Specifications for Construction ITEM NO SLIP-LINING SANITARY SEWERS

SECTION STANDING SEAM METAL ROOFING

Chapter 3 Pre-Installation, Foundations and Piers

DUCT SYSTEMS CHAPTER 6

LIFE SAFETY UPDATE. FULL SPRINKLERING OF ALL NURSING FACILITIES ADDITIONAL CLARIFICATIONS Prepared by Eric Rosenbaum, P.E. Hughes Associates, Inc.

STANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS

SUGGESTED SPECIFICATION EXHAUST SYSTEM SILENCER, FLEX CONNECTOR, INSULATION BLANKETS, WALL / ROOF THIMBLES

ROOF TOP MOUNTED Air Handler Specification

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS

presents Cooking With Fire Fixed Fire Suppression & Exhaust Systems for Cooking Environments Monday, 17 June, 13

security products metric sizes Redefine your comfort zone.

VA25014B0516 VA CINCINNATI PROJECT NO INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION GYPSUM BOARD

Acumen Enterprises, Inc.

WHI 90-Minute Rated Veneered Door Frame Installation Instructions

SECTION PIPE HANGERS AND SUPPORTS

FIRE DAMPER APPLICATION GUIDE

Crawford Inspection Services C.C.B. #

Basics of HVAC Cleaning

POST AND FRAME STRUCTURES (Pole Barns)

GUIDELINES FOR INSTALLATION OF AIR CONDITIONING UNITS PHILLIP STREET, SYDNEY

DENVER MODEL 30 X 30 SPECIFICATIONS

INDEX. Sec. No. Items Page Nos.

Duct Leakage Testing. Ken Helfers, TSI Inc. 2011, TSI Incorporated

Spray Booth Guideline

The Basics of Commercial Kitchen Exhaust Cleaning

CITYPLEX TOWERS BOILER INSTALLATION ORU RFP-1138

Element D Services Heating, Ventilating, and Air Conditioning

HVAC INSTALLATION. Success with 2015 IECC Northeast & Mid-Atlantic. Checklist for Builders & Trades

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS

SECTION STORM DRAIN SYSTEM

KITCHEN HOODS GUIDELINES

) SIGNIFICANT CHANGES INCLUDING CODE COMMENTARY

SAM HOUSTON STATE UNIVERSITY

INDEX. Chapter8. air master. Perforated Ceiling Diffusers

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

Section SEWER PIPE INSTALLATION AND TESTING

Holiday Inn Express & Suites Covington (Newton County) 1. Standing-seam metal roofing, custom fabricated.

CROWN BOILER COMPANY BWF SERIES BOILER CATEGORY I VENT KIT INSTALLATION AND OPERATING INSTRUCTIONS

Asphalt Shingle Application Requirements

necessary for years of satisfactory service. SmartBlock insulating form concrete walls share the

SECTION PREFORMED METAL STANDING SEAM ROOFING

Product Guide Specification

Services Enclosures and Protected Shafts - Maintaining Compartmentation

DIVISION 23 HEATING, COOLING, AIR CONDITIONING AND VENTILATION

Transcription:

SECTION 233100 DUCTWORK 1.0 Acoustical duct lining in any part of the duct system is prohibited. All ductwork requiring insula tion shall be externally insulated (Refer to the Sheet Metal Ductwork Insulation Schedule in Sec tion 230700 for insulation types and thickness). Double walled ducts consisting of an outer wall of galvanized sheet metal, an inner wall of perforated galvanized sheet metal with insulation sandwiched between the layers is permitted. 2.0 All ductwork shall be designed, constructed, supported and sealed in accordance with SMACNA HVAC Duct Construction Standards and pressure classifications. When the ductwork pressure classification of these standards is exceeded, construct ductwork in accordance with SMACNA Round and Rectangular Industrial Duct Construction Standards. The following preferences or modifications to the Standards shall be specified: A. Radius elbows with a construction radius of 1.5 the duct width are preferred to square el bows. B. All square elbows must be constructed with single thickness turning vanes, Runner Type 2 as shown in Figures 43 and 44 of SMACNA Duct Construction Standards Metal and Flexible. Where a rectangular duct changes in size at a squarethroat elbow fitting, use single thickness turning vanes with trailing edge extensions aligned with the sides of the duct. C. Air extractors and splitter dampers are not permitted. D. Transitions and offsets shall follow Figure 47 of SMACNA HVAC Duct Construction Standards Metal and Flexible, except that sides of transitions shall slope a maximum of 15 degrees. E. Minimum duct gauge shall be 22 for ducts up through 43", 20 gauge up through 60" and 18 gauge above 60". F. Transverse/Longitudinal Joints: 1. Transverse joints for all supply, return, makeup air and outside air ducts serving an application that requires ductwork to be inspected and cleaned periodically shall be gasketed flanged Vanstone joints with minimum 1.5 inch flanges fas tened 6 inches on center or Ductmate transverse sheet metal duct connection system with manufacturerfurnished gasketing system. Gasket shall be "440 Gasket Tape" by Ductmate Industries, Inc. or approved equal. 2. Duct transverse and longitudinal joints (except for the above requirements) shall be selected and used consistent with the static pressure class, applicable sealing requirements, materials involved, duct support intervals and other provisions for proper assembly of ductwork outlined in the SMACNA HVAC Duct Construction Standards Metal and Flexible. Transverse joints T15 through T24, shown in Figure 21 are acceptable construction. Type L2 (button punch snap lock) or Type L3 (grooved seam) longitudinal seams, shown in Figure 22, are not ac ceptable G. Seal all ductwork seams, joints, fastener penetrations and fitting connections with seal ants in accordance with SMACNA Seal Classification as required by SMACNA Duct Pressure Classification. Specify that all ductwork, regardless of pressure classification, shall have a minimum Seal Class B. Where ducts are not continuously welded, provide liquid, mastic, and embedded fabric tape type sealants or combination, and gaskets as required to meet the specified duct leakage allowance. Sealant composite fire and smoke rating, when tested in accordance with ASTM E 84, NFPA 255 or UL 723, shall not exceed Flame Spread of 25 and Smoke Developed of 50. H. The aspect ratio (ratio of width to height) of rectangular ducts should be minimized to re duce pressure losses and initial costs. Duct aspect ratios should not exceed 4:1. DUCTWORK 233100 1

I. To minimize fan energy, consideration must be given to the lowest practical velocity and pressure criteria which will provide adequate service. In general, size ductwork to main tain a maximum pressure drop of 0.08 per 100 lineal feet of ductwork. 3.0 Industrial Duct Construction: A. Prior approval must be attained from the University Engineering Department for the use of systems requiring industrial duct construction. B. Follow SMACNA Round and Rectangular Industrial Duct Construction Standards. C. Specify sealing requirements in terms of percent leakage appropriate for the application. D. To minimize fan energy, consideration must be given to the lowest practical velocity and pressure criteria which will provide adequate service. 4.0 All duct systems must be designed to meet the sound level requirements listed in Section 230000. The specification shall state that the Contractor is responsible for all duct generated noises which will result in noise levels greater than those stated in Section 230000, and for all discrete frequency noises generated by the ductwork, such as oil canning, banging, clicking, hiss ing or rattling. All such deficiencies shall be corrected by the Contractor as directed by the Archi tect or Engineer. 5.0 Contract drawings must have adequate notation which correlates each duct and diffuser with the central air handling unit from which it is served. The notation must be completed in such a man ner as to clearly identify each system and its components without tracing systems between draw ings. 6.0 The contract drawings (plans or diagrams) shall indicate the changes in pressure classification of duct systems by the use of pressure flags per the convention indicated in Figure 11 of the SMACNA Duct Construction Standards Metal and Flexible. 7.0 Shop drawings of all sheetmetal ductwork and related equipment must be furnished in a minimum scale of 3/8 inch to the foot or shall be submitted electronically. Architect/Engineer shall carefully review all contractorgenerated sheetmetal submittals and mark appropriately. 8.0 All materials for all duct systems shall be specified as follows: A. General Ductwork Galvanized sheet steel meeting ASTM A 653 and ASTM A 924 with G60 coating designation. G90 shall be required in specific applications such as general laboratory exhaust. B. Stainless Steel Specify type as dictated by the application. Specify finish for exposed ductwork. C. Aluminum Duct ASTM B209, Alloy Number 3003, H14. Specify finish for exposed ductwork. 9.0 All rectangular panels above 10 inches in width must be cross broken on all four sides. 10.0 All ductwork and accessories must be supported from the structure only using trapeze, strap or angle iron hangers conforming to SMACNA HVAC Duct Construction Standards Metal and Flex ible. A. Provide supplemental structural steel to span joists where required. Deflection of sup plemental structural steel shall be limited to length/180 of the span. B. Do not support ductwork from furring, hung ceilings, metal floor deck, metal roof deck or from another duct or pipe. C. Do not hang lighting fixtures or piping from ductwork. D. Do not use perforated band iron for duct support. DUCTWORK 233100 2

E. Support ductwork at each change in direction. F. Where vertical ducts penetrate floor openings, and require support, provide two horizon tal galvanized steel angle supports attached to the long side of the duct and anchored to the floor with expansion bolts. Extend angles 3 inches beyond edge of opening. Provide the following angle sizes: Duct Size (inches) Angle Size (inches) Thru 36 1 1/4 by 1 1 /4 by 1/8 37 thru 59 2 by 2 by 3/16 60 and larger 3 by 3 by 3/8 G. Where ducts penetrate mechanical room floors, provide 4 inch high concrete curbs simi lar to piping penetrations. (Refer to Section 231000). H. Where duct connects to or terminates at masonry openings or at floors where concrete curbs are not used, provide a continuous 1 1/2 inch by 1 1/2 inch by 3/16 inch galvanized steel angle support around the ductwork. Bolt and seal the supports to the building con struction using expansion bolts and caulking compound. Seal shall be watertight at floor or wall and duct such that a spill will not pass down through the opening. I. All exterior duct work shall be double walled insulated construction. Exterior ductwork shall be round or sloped (rectangular) to avoid standing water on top. Any exterior duct work with standing water will be replaced at the contractor s expense. Service stairs up and over the ductwork may be required to maintain access to the roof. J. For insulated ductwork, install hangers on the outside of the insulation. To maintain the insulation value, inset a piece of 1inch thick, 6 pcf fiberglass board with a foil/scrim/kraft (FSK) jacket at these supports. 11.0 Plenum chambers shall be constructed of minimum 18 gauge metal with 1/2" x 1/2" x 3/16" gal vanized angles up to 10' in height Above 10' angles of 2" x 2" x 1/4" must be used. Angles must be installed on all vertical and longitudinal seams and on a maximum center of 4'. 12.0 Low pressure (class 2 or lower) round ductwork shall be specified as follows: A. Locktype spiral seam or locktype longitudinal seam duct construction. B. Round galvanized gauge selection shall be in accordance with Table 35 of the SMACNA Duct Construction Standards Metal and Flexible, except that the following minimum gauges are required: 1. Longitudinal lock 22 gauge 2. Spiral lock 24 gauge C. Fittings shall have a construction radius of 11/2" times the diameter. D. All branch connections from duct headers shall be made using tee (90 degrees), lateral (45 degrees), tee cross, lateral cross or "Y" branch fittings of the conical type. All fittings fabricated as separate fittings shall have continuous welds along all seams and joints. E. All seams shall be sealed. 13.0 Flexible Ductwork: A. Flexible ducting constructed of wire frames and fiberglass or plastic film is prohibited. B. Ducts shall be aluminum with spiral fabricated triple lock construction. Pressure drop shall not exceed 0.23 inches of water for 100 feet of duct for 300 CFM in an 8" duct. C. Duct shall conform to NFPA 90A and shall be UL listed, Specification 181, Class 1, in DUCTWORK 233100 3

cluding insulation. D. Insulation where required, shall be on the exterior of the duct. E. In general, maximum length shall be 6 feet or less. The remainder of the branch duct work shall be sheet metal. Provide flexible duct runs as short and straight as possible. 14.0 Ducts penetrating through masonry walls, floors and roofs shall be clearly detailed on the draw ings. The details shall, as a minimum, indicate curbs, flashing, counterflashing, fire dampers, sealing and weatherproofing. 15.0 Horizontal exterior rectangular ducts shall be fabricated with all seams at the bottom and installed with a top surface slope of 1/4" per foot, side to side. Supports shall be detailed on the drawings. 16.0 Specify special duct sealing and weatherproofing requirements for all exterior duct applications. 17.0 Dishwasher, sterilizer, autoclave, cagewasher, etc. exhaust hoods and ductwork shall be con structed of welded stainless steel. Ductwork shall be sloped and provided with drain connections at low points. Ducts to be installed with all longitudinal seams at the top of the duct. Kitchen ex haust ductwork shall be provided with adequate access doors to facilitate cleaning. 18.0 Kitchen exhaust hoods and exposed range hood exhaust duct shall be constructed of No. 18 gauge welded stainless steel. Concealed range hood exhaust ductwork shall be constructed and supported by of minimum No. 12 gauge black iron, or No. 18 gauge stainless steel with no turning vanes. All joints shall be welded liquid tight. As an alternative, premanufactured grease duct may be used when installed strictly in accordance with the manufacturer's instructions. Slope ductwork to hood or to the base of vertical risers and provide an accessible collection point for grease and residue at base of vertical risers. Provide approved access panels for cleaning at minimum 20foot centers on horizontal duct and on each floor on vertical risers where personnel entry is not possible from the top of the riser. Hard connections to fans shall be utilized in lieu of flexible fabric connections. The construction and installation of all kitchen range hoods and grease duct shall comply with applicable codes. 19.0 Shower exhaust systems shall be constructed of aluminum and sloped to drain provisions. After the shower exhaust is mixed with a volume of general exhaust air equal to 200% of the shower exhaust rate, standard galvanized construction may be used. 20.0 Laboratory exhaust duct material must be reviewed and approved by the Office of the University Engineer and the Office of Environmental Health and Radiation Safety (OEHRS). All laboratory exhaust ductwork that is undiluted (fume hood branch ductwork, dedicated fume hood exhaust, etc.) shall be stainless steel. Acceptable duct materials for other lab exhaust applications are as follows: A. Galvanized (minimum G90) B. Stainless Steel C. PVCcoated (prebaked) steel, or epoxyphenoliccoated (air dried) steel. Coatings for exhaust duct shall be evaluated on a case by case basis. D. Plastic ducts such as Dynel reinforced polyester. When using plastic ductwork, all fire code and sprinkler code requirements must be addressed. 21.0 To reduce operating system pressure drop, manifold laboratory fume hoods to a common ex haust where possible. 22.0 All duct systems shall be field leak tested at 100% of the duct construction rating. Leak testing shall follow general procedures (Chapter 3) and use apparatus (Chapter 5) as outlined in the SMACNA HVAC Air Duct Leakage Test Manual, Latest Edition. The A/E shall specify the allowa ble leakage in terms of percent of total rated airflow capacity for each duct system based on leak DUCTWORK 233100 4

age allowances accounted for in airflow rate and fan selection calculations. The A/E shall specify that the allowable leakage rates for each duct section tested shall be determined by the use of Appendix C in the SMACNA HVAC Air Duct Leakage Test Manual. Ductwork to be leak tested after all branch connections are installed. All leak testing shall be witnessed by a representative from the Office of the University Engineer. 23.0 All Phoenix valves shall be provided with manufacturer s transition collar such that sheetmetal screws into the Phoenix valve are not required. 24.0 For all ductwork types, the screw type shall match the duct construction type. DUCTWORK 233100 5