JASON IKEN CITY OF HOUSTON TXWARN 1



Similar documents
Innovative Naples Generator Design Replaces Large Units in Temporary Power Restoration Following Hurricane Wilma. Introduction

FWEA Utility Council Sanitary Sewer Overflow (SSO) Enforcement Policy Recommendations

CenterPoint Energy Executes Emergency Operating Plan. Hurricane Ike Restoration

Texas Universities Recover from Hurricane Ike University of Texas Medical Branch Galveston and Texas A&M University Galveston

CenterPoint Energy responds to frequently asked questions

Jefferson Parish Department of Water Emergency Plan

Infrastructure for Adapting to Climate Change Environmental Law Forum April 10, O Brien & Gere

Emergency Restoration Plan (ERP) Components

Addressing SSOs in Austin, Texas: Initial Call to Final Fix

Table of Contents ESF

U.S. Army Corps of Engineers

Policy Clarifications on the Eligibility of Water and Wastewater Utility Projects for FEMA s Public Assistance and Hazard Mitigation Assistance Grants

REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE

City of Bakersfield Public Works Department Sewer System Management Plan December 2014

Simple Tabletop Exercise, Interdependency Natural Disaster Scenario Scenario #8 Facilitator s Guide

Emergency Response Plan

Emergency Operations Plan ANNEX K - UTILITIES RESTORATION ESF #3, #12 I. MNWALK REQUIREMENTS. Item #: 1, 4, 46, 53, 54

Storm Ready. 3 Gulf Power Ready for the storm. 4 Be prepared, be safe. 5 Getting the lights back on. 6 Damage to your home s service connection

Additional Living Expenses - With Direct Damage

Impact of Hurricane Ike

Governor s Two-Storm Panel: Distribution Infrastructure Hardening Options and Recommendations

City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007

SANITARY SEWER OVERFLOW RESPONSE PLAN (SSO RP)

Veterinary Practice Emergency Plan Instructions

Aligning Natural and Built Infrastructure for

New Orleans Hurricane Storm Damage Risk Reduction System Tour March 23 24, 2012

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011

Standard Operating Procedures for Flood Preparation and Response

History of the SPCC Rule

CRS Report for Congress

Routine Maintenance and Inspection

Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES

OPERATIONS & MAINTENANCE FY Adopted Budget

Hurricane Hotwash. Presented by: David W. Mock, P.E. Director S.E. Region, Ports and Maritime Group CH2M HILL. AAPA Cruise Committee

Work Practice: Wastewater Collection System Maintenance Plan Potential Safety Hazards

Lessons Learned from a Basic Vulnerability Assessment and Emergency Response Plan Update Project in Greensboro

Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority

Flood Preparedness Checklist

Maryland Emergency Operations Plan

Agenda Report. April 8, Honorable Mayor and City Council TO: THROUGH: Finance Committee (April 8, 2013) FROM: Water and Power Department

Hurricane Irene Response Before, During and After the Storm. John D. Rea Director of Operations Support, Penelec. October 12, 2011

Property Policyholder Risk Improvement Report and Hurricane Survey

Microgrids: Key to Energy Security, Resiliency and Clean Energy. Marita Mirzatuny Project Manager, Smart Power U.S. Climate & Energy EDF

Disaster Ready. By: Katie Tucker, Sales Representative, Rolyn Companies, Inc

SECTION 810 SEWER LINE CLEANING

INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE ACE GLOBAL RISK ENGINEERING. Flood risk assessment. Introduction

Hurricane Season Disaster Planning Checklist

City of Chico Sanitary Sewer Overflow Response Plan (Appendix D of the City of Chico Sewer System Management Plan)

A trusted partner to insurance adjusters. Fast, accurate, claims solutions 24 hours a day, 365 days a year.

Sewer Overflow Response Plan (SORP)

Sewer and Stormwater Back-ups Policy Adopted by Council October 4, 2010

Sanitary Sewer Overflow Response Plan Working Committee SANITARY SEWER OVERFLOW RESPONSE PLAN

Texas Commission on Environmental Quality Page 1 Chapter Design Criteria for Domestic Wastewater Systems

Monterey Regional Water Pollution Control Agency. Sewer System Management Plan

DRAFT Public Outreach Document for What s an SSMP?

Emergency Management Planning Criteria for Assisted Living Facilities (State Criteria Form)

Testimony of. President David L. Callender, MD, MBA, FACS The University of Texas Medical Branch. before the

HURRICANE SANDY One Year Later A LOOK BACK AT ATLANTIC CITY ELECTRIC S STORM RESTORATION EFFORTS

MODEL WEB CONTENT FOR CITY SANITARY SEWER DEPARTMENTS

Element 3: OVERFLOW EMERGENCY RESPONSE PLAN

Construction Specification for Sewer Bypass Flow Pumping

Backup Plan Examples. What s Your Backup Plan?

Info What? Using InfoMaster to Develop a Rehabilitation and Replacement Plan

HURRICANE PREPAREDNESS PLAN

Terry Biederman, PE- Director of Public Works Greg Gucwa, PE- Principal Johnson and Anderson Engineering

The Story of Mercy and Joplin - Regional EMS Response and Hospital Recovery- Sustainability

In the Caribbean, August and September are peak months during the hurricane season that lasts from June 1 through November 30.

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water

Contracting Opportunities Vendor Day May 17, 2011

Historic Flood Impact on the Nashville Drinking Water System. Scott Potter, Director Metro Water Services, Nashville, TN

Storm Restoration. Bill Smeaton Distribution Superintendent Provincial Lines

APPENDIX XII: EMERGENCY SUPPORT FUNCTION 12 - ENERGY

Home Repair After a Hurricane Disaster

REPORT TO WILDERNESS MOUNTAIN WATER SERVICE COMMISSION MEETING OF TUESDAY, MARCH 31, 2015

Activity Yes No N/A Notes

ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems

LOSS OF HEATING/VENTILATION/AIR CONDITIONING (HVAC)

Number September 2014 SEWER LIABILITY

CRS Report for Congress

Preparing for A Flood

Storm tide is the water level rise during a storm due to the combination of storm surge and the astronomical tide.

SEWER SYSTEM MANAGEMENT PLAN

the amount of data will grow. It is projected by the industry that utilities will go from moving and managing 7 terabytes of data to 800 terabytes.

THE UNIVERSITY OF TEXAS MEDICAL BRANCH (UTMB) AT GALVESTON

CITY OF ALHAMBRA. Sewer System Management Plan

Transcription:

LESSONS LEARNED FROM RESPONSE TO HURRICANE IKE IN HOUSTON THE TEXAS WATER/WASTEWATER AGENCY RESPONSE NETWORK Pflugerville, Texas June 28, 2013 Jason Iken, P.E., Senior Assistant Director Wastewater Operations Branch Hurricane Ike Ike Information City of Houston Impacts Emergency Preparedness Wastewater System Impacts Response Lessons Learned Category 2 hurricane 500 miles wide Eye passed over Houston s east side Effects began on 9/12/08 (Friday) Effects felt thru 9/13/08 (Saturday) Maximum sustained winds = 60 mph Wind gusts = 110 mph Storm surge = 8 to 21 ft Hurricane Ike Due to size, amount of destruction approximates Category 4 storm TXWARN 1

Impacts on City of Houston Extensive power outage Damage to homes & buildings Lack of water/wastewater Food shortage Debris Pre & post-hurricane stress on citizens/employees Fuel Evacuation Uncertainty Hurricane Ike Preparedness SOPs during emergencies Public Works represented at COH EO Center Strategically located critical Employees and equipment GIS & SCADA system in place Chemical storage Hurricane Ike Preparedness Prioritized facilities for generator deployment based on: Collection system storage capacity Potential for SSOs TPDES permit limits Each facility assigned a number Power requirements Voltage / kw / no. phases Strategic placement of portable generators before Ike TXWARN 2

Impacts on Wastewater System POWER OUTAGE AT ALL LIFT STATIONS & WASTEWATER TREATMENT PLANTS!!! NEVER BEFORE RECORDED IN OPERATIONS HISTORY!!! Dramatic increase in SSOs Sims Bayou WWTP flood wall Debris everywhere Numerous other impacts Power Supply Major transmission/distribution/individual lines damaged Multiple levels of system components affected Transformers MCCs/Panels Outage lasted an average of 1 week (Range: 3 to 24 days) Facilities returned to commercial power supply by 10/7/08 TXWARN 3

Debris Collection system Debris in process units at plants Numerous trees down Facilities inaccessible Other Impacts System communications limited (SCADA, phone, & e-mail) Equipment damaged due to flooding and/or power surges Security fences damaged Increased odor issues Damaged buildings Safety Resource availability (adjoining cities) Wastewater Operations Response Communications Damage assessment Temporary power supply SSOs containment & cleanup Facility restoration TXWARN 4

Communications Managing chaos during initial days Internal meetings each day Main Communication CenterPoint Energy FEMA Director s Office Response Team Prepared facilities status report 4 times/day Damage Assessment Ten damage assessment teams Inspected facilities to note extent of damage Assessment drives scope and extent of response Generator Deployment Prioritized facilities database utilized Modified based on: Commercial power restoration SSOs Wastewater system needs D/S to U/S Deployment, connection, operations and fueling by: COH FEMA Contractors FEMA/COH TXWARN 5

SSO Containment & Cleanup Isolated areas around SSOs (e.g., intersections) Dead fish removed from waterways Pumped water bodies & refilled with potable water Coordinated increased fresh water release from upstream dams w/ USACE to flush waterways Other Response Actions Numerous RFI responses Director s Office/Mayor/Council Regulatory Agencies Media/Customers Emergency purchase orders Re-started facilities including treatment Meals, employee vehicle fueling EMPLOYEE RESPONSE WAS GREAT!!! Lessons Learned Damage Assessment Damage assessment is key first step of response Need uniform, high quality assessments in a timely manner Assessment to include: Power supply status Site accessibility Structural damage Equipment damage Water levels Site security, safety, etc. Service life compromised TXWARN 6

Lessons Learned - Power System-wide backup power plan Power from two separate substations Power restoration schedule Overcoming site access challenges Generator with manual transfer switches needed GPS tracking of each generator & secure installations Trouble-shooting complicated Fueling program coordination Lessons Learned - Power Trailer-mounted generators preferred Preparation time for new generators Stock of connection supplies and repair parts Improve generator preventive maintenance Annual emergency contracts Electricians/Mechanics/Technicians Generator hauling & fueling COH employees at FEMA/USACE emergency power logistic center Lessons Learned - SSOs Collection system storage capacity reduced the number of SSOs Spill clean up procedures Restore facilities from downstream to upstream Plan for surface water cleanup Methods to properly communicate with public TXWARN 7

Lessons Learned - Other Updated facilities information packages Lat./long. Photos/map/access code Re-examine employee deployment schedule On-call consultant Damage assessment Emergency design tasks Update response plan documents annually and rehearse Lessons Learned Other FEMA paperwork Flexible response organization structure Balance security needs with facility access needs Delayed hurricane impacts (e.g., debris in collection system, employee morale, O&M and capital budgets, etc.) On-Going Efforts Purchase of generators 56 total (36 during Ike) 32 Portable (19); 24 Stationary (17) Optimized PM of generators Established protocol with USACOE Reprioritized critical facilities Negotiating contract to: Deploy, fuel, and monitor generators during emergencies TXWARN 8