René Voss Attorney at Law 15 Alderney Road San Anselmo, CA 94960 Tel: 415-446-9027 renepvoss@gmail.com



Similar documents
USDA Forest Service Proposed Soil and Water Restoration Categorical Exclusions Frequently Asked Questions Table of Contents

King Fire Restoration Project, Eldorado National Forest, Placer and El Dorado Counties, Notice of intent to prepare an environmental impact statement.

Determination of NEPA Adequacy (DNA)

Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices

May 9, Draft Environmental Impact Statement for Power Fire Restoration Project (CEQ# )

RESTRICTIVE COVENANTS. THIS DECLARATION OF RESTRICTIVE COVENANTS is made this day of, 20, by RECITALS

18 voting members 44 stakeholders 114 list. Senators: Wyden & Merkley Representative DeFazio

Untreated (left) and treated (right) Sierra Nevada forests in Amador County, CA. Photos: Sierra Nevada Conservancy

Angora Fire Restoration Activities June 24, Presented by: Judy Clot Forest Health Enhancement Program

The State of the Sierra Nevada s Forests

RECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION

Addendum D. Nomination of Moody Wash ACEC

Nevada Pinyon-Juniper Partnership Proposed Demonstration Area A Brief Introduction. Presented by Jeremy Drew Project Manager Resource Concepts, Inc.

September 25, Dear Concerned Citizen:

Decision Memo. Restore Act Land Acquisition

Environmental Compliance Questionnaire for National Oceanic and Atmospheric Administration Federal Financial Assistance Applicants

Restoration and chaparral landscapes: Forest Service strategic goals and funding opportunities

Section 401 Water Quality Certification

CHAPTER 4 ALTERNATIVES COMPARISON

SANTA BARBARA COUNTY COMPREHENSIVE PLAN LOMPOC AREA

SR 89/Fanny Bridge Community Revitalization Project. Draft Environmental Impact Report/ Environmental Impact Statement/ Environmental Assessment

PART I. NOMINATOR PART II. SHORT ANSWERS

PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions

AN INITIATIVE TO IMPROVE

Do we know the cost of fires? An example from California, USA

HFQLG Project Evaluation Form

RE: Docket # COE ; ZRIN 0710 ZA05 Submitted via to NWP2012@usace.army.mil and Rulemaking Portal at

Avison Management Services Ltd. COMPANY PROFILE

DECLARATION OF ROBIN SILVER

Environmental Protection Information Center

WAIVER OF LEGAL RIGHTS TO SUE OR MAKE CLAIM FOR INJURY WITH ARBITRATION CLAUSE AND ASSUMPTION OF THE RISK AND RELEASE

Benefits. Mary S. Kohnke Wagner, Esq. Marshall, Dennehey, Warner, Coleman & Goggin. The following sections explain each element.

Increasing the Pace of Restoration and Job Creation on Our National Forests

How To Get A Parkland Permit

IN THE SUPERIOR COURT OF THE STATE OF WASHINGTON FOR CLARK COUNTY ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) )

1.7.0 Floodplain Modification Criteria

Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002

ANGORA FIRE RESTORATION PROJECT

STATEMENT OF SHARON BUCCINO SENIOR ATTORNEY NATURAL RESOURCES DEFENSE COUNCIL WASHINGTON, DC

ANSWER A TO QUESTION 8

NPS Burned Area Emergency Response (BAER) and Burned Area Rehabilitation (BAR) in the Southern California Landscape

US 281 AT PREMONT PUBLIC HEARING. US 281 at Premont Public Hearing

Using an All lands Framework for Conservation of Ecosystem Services

DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment

Wildlife Habitat Conservation and Management Program

OPPOSE H.R (THE SHARE ACT )

WORKSHOP SUMMARY REPORT 1

APPENDIX 4. Risk Tables

Management Plan Template For Conservation Easements Held by CPW

GENERAL NPDES PERMIT FOR PESTICIDE APPLICATION POINT SOURCE DISCHARGES. Leslie Lowry Illinois Environmental Protection Agency

REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 LEECH WATER SUPPLY AREA RESTORATION UPDATE

The California Environmental Protection Agency works to restore, protect,

Indicate on the envelope containing your bid the following information: Bid on Forest Products, Harbison

Citizens Guide to Stopping LNG Pipelines on Private Land in Oregon

Maine Forest Service Interpretations of the Maine Forest Practices Act Statute and Rules (12 MRSA 8867-A to 8888 & MFS Rules Chapter 20)

Section 4 General Strategies and Tools

Community Workshop 5. Overarching Goals for Machado Lake Ecosystem and Wilmington Drain Multi-Use Projects

A. Flood Management in Nevada

SITE VEGETATION EW POINTS GOAL CREDIT REQUIREMENTS DOCUMENTATION RELATED CREDITS SUSTAINABILITY COMPONENTS BENEFITS

Smoke Management Plan

Gold Ray Dam Interagency Technical Team Meeting

Federal Environmental Requirements for Construction Projects

2008 Compensatory Mitigation Rule: Overview and Highlights. Jenny Thomas U.S. Environmental Protection Agency Wetlands Division July 2014

Wildlife Habitat Conservation and Management Plan

General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title]

PUBLIC NOTICE Application for Permit


HOW A TRIER OF FACT REACHES DECISIONS. Donna Siers

Michigan Wetlands. Department of Environmental Quality

The Muddy River: A Century of Change

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1

How To Decide If A Dam Removal Is Safe For Water Quality

The Need for Traffic Incident Management

FOREST SERVICE HANDBOOK NATIONAL HEADQUARTERS (WO) WASHINGTON, DC

Incident Management Response Plan Hampton Roads Highway Incident Management Committee

GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold

Pipeline Regulatory and Environmental Permits

FREQUENTLY ASKED QUESTIONS Biomass Harvest Guidelines

1620 L Street, NW 1620 L Street, NW

Michigan Department of Natural Resources Oil and Gas Leases Frequently Asked Questions

REGULATORY GUIDANCE LETTER

Arapaho & Roosevelt National Forests 2013 Flood: Long-term Recovery in a Changed Landscape

Karuk Tribe Integrating Traditional Ecological Knowledge within Natural Resource Management

First Annual Centennial Strategy for. Yucca House National Monument

October 11, Sharon Stohrer State Water Resources Control board P.O. Box 2000 Sacramento, CA

(THIS SPACE FOR RECORDER S USE ONLY)

INVERSE CONDEMNATION INTRODUCTION. Article I, Section 19 of The California Constitution provides the basis for recovery

Final Report. Dixie Creek Restoration Project. Funded by Plumas Watershed Forum

OSU Extension FACT SHEET

CAPACITY AND LEVEL-OF-SERVICE CONCEPTS

U.S. DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MEDFORD DISTRICT GRANTS PASS FIELD OFFICE 2164 NE Spalding Ave Grants Pass, OR 97526

Permit No. Permit Fee: $ Permit Expires (D+90 days): Business Name: Applicants Name: Telephone Number: Address:

Crown Land Management

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Broadmoor Public Golf Course TREE MANAGEMENT GUIDE

CONCEPTUAL REHABILITATION ALTERNATIVE

A Developer s Guide: Watershed-Wise Development

NAPCS Product List for NAICS 54162: Environmental Consulting Services

FLOOD PROTECTION AND ECOSYSTEM SERVICES IN THE CHEHALIS RIVER BASIN. May Prepared by. for the by Earth Economics

Transcription:

René Voss Attorney at Law 15 Alderney Road San Anselmo, CA 94960 Tel: 415-446-9027 renepvoss@gmail.com August 10, 2012 Submitted through www.regulations.gov Restoration CE Comments P.O. Box 4208 Logan, UT 84323 Subject: Categorical Exclusions (CEs): Sequoia ForestKeeper Comments re: Soil & Water Restoration CEs; Support for and Opposition to Certain Aspects of proposed CEs To Whom It May Concern: Thank you for the opportunity to provide comments. Sequoia ForestKeeper (SFK) conditionally supports some and opposes other aspects of the newly-proposed Soil & Water Restoration CEs. Summary of Comments More specifically, we believe the intent of all three restoration CEs hit a high mark. See proposed 36 C.F.R. 220.6(e)(18) (20). But the CEs need further numerical limitations, and one specific example is inconsistent with the ultimate goal of these CEs to restore ecological functions, as expressed in the rule s preamble: The Forest Service s proposed categorically excluded actions promote hydrologic, aquatic, and landscape restoration activities. All three categorical exclusions involve activities that are intended to maintain or restore ecological functions and better align the Agency s regulations, specifically its categorical exclusions, with the Agency s current activities and experiences related to restoration. 77 Fed. Reg. 35323, 35324 (June 13, 2012). To achieve this purpose, it appears that CEs 18 & 20 are largely consistent with the rule s preamble, although both CEs need to specify limitations in project size and potential effects on water bodies to meet the intent of excluding the analysis from NEPA. CE 19, however, includes an example of an activity that is both (1) internally inconsistent and inconsistent with the preamble and (2) is subject to abuse, based on past practices of the U.S. Forest Service: (iii) Removal of downed or damaged trees that limit or reduce public access, result in potential risks to public safety, or where removal is needed to restore wildlife, or protect infrastructure; 77 Fed. Reg. at 35326. First, the example is inconsistent with the rule s purposes because protect[ing] infrastructure is not an activit[y] intended to maintain or restore ecological functions and it is internally 1

inconsistent because these activities do not promote restoration of uplands, wetlands, or riparian systems to pre-disturbance conditions, to the extent practicable, such that site conditions will not impede or negatively alter natural processes. See CE 19. Moreover, the removal of damaged or downed trees is not needed to restore wildlife. Second, the example given is subject to abuse because past practices in many national forests have allowed the Forest Service to remove large numbers of downed or damaged trees when their removal is not needed to restore wildlife habitat (and may actually harm wildlife) or their removal is not needed to avert risks to public safety. Most of the examples where the Forest Service has abused the public s trust are roadside or recreation site hazard tree cutting and removal projects. In our comments below, we provide several examples of this abuse. Therefore, we urge that all removal of downed or damaged trees be eliminated as an example in proposed CE 19. All non-emergency tree removal projects should be fully analyzed under NEPA with either an Environmental Assessment (EA) or Environmental Impact Statement (EIS) with a full range of alternatives. Detailed Comments I. Conditional Support for Proposed Categorical Exclusions in 220.6(e)(18) & (20) In general, the use of CEs for restoring water bodies and removing roads and trails are good ideas, so long as the allowed activities are limited in scope and size and are, in fact, completely beneficial without any adverse direct, indirect, or cumulative environmental impacts. Therefore, SFK urges the Forest Service to place numerical limits on the size of the project, based on several factors. A. CE 18: Restoring wetlands, streams, and riparian areas The examples provided are likely to have a long-term beneficial impact to assist with the restoration of wetlands, streams, and riparian area, but if the amount of fill or soil disturbance from implementation of the action would exceed a threshold amount that could adversely affect the watershed or a stream it could result in direct or indirect short-term adverse effects (based either on a sensitive resource or the total amount of the discharge or fill) by itself or in combination with other watershed or stream effects. So, when the proposed activity exceeds a certain size, the Forest Service should not allow the use of this CE. The CE should provide a specific quantifiable limitation on the amount of soil movement (in cubic yards or meters) above which the restoration project should be analyzed fully under NEPA. To derive this figure, it would be necessary to go back to the projects that were reviewed to create this CE and determine at which point the soil movement or size of the project would potentially cause an effect that would necessarily require analysis in an EA or EIS. This method was use in the past by the Forest Service to derive limitations on project size appropriate for using CEs for small timber sales, as an example. See 68 Fed. Reg. 44598 (July 29, 2003). Moreover, when the proposed activity would require placing fill or cause a discharge into a water of the United States, the Forest Service should exclude the activity from this CE. If the dredging, excavation, or placement of fill results in discharges into waters of the United States, the Forest 2

Service must first apply for and receive a Clean Water Act (CWA) National Pollution Discharge Elimination System (NPDES) permit or CWA Section 401 permit, usually from the applicable State. See Sequoia ForestKeeper v. U.S. Forest Service, No. 1:09-cv-00392, Slip. Op. at 7-8 (E.D. Cal. Mar. 15, 2011) (requiring USFS to consider a CWA Section 401 permit for diversion, dam, and discharge into U.S. waters). This should preclude the project from using this CE, because CWA permits should always be accompanied with an EA or full EIS. B. CE 20: Removing or restoring roads and trails Again, the examples provided will likely have a long-term beneficial impact to assist with the restoration of watersheds, streams, and water quality. But again, the CE must include limitations on the locations of the restoration activities and should include numerical limits on the size of the activity above which it could potentially have adverse effects due to potential soil movement into nearby streams. Further, the CE should be very overly cautious and should exclude proposed activities in floodplanes, riparian areas, and areas near streams so that road or trail removal activities in these areas are considered either in an EA or in a full EIS. Outside floodplanes, riparian areas, and areas near streams, the CE should also place a limit on the size based on a numeric standard, such as the total amount of soil to be moved, the amount of soil that could potentially move into a waterway from the restoration activity, or the number of miles of road or trail proposed for rehabilitation, restoration, or re-contouring. As stated above, to derive this figure, it would be necessary to go back to the projects that were reviewed to come up with this CE and determine at which point the soil movement or size of the project caused an effect that would necessarily require analysis in an EA or EIS. Again, when the proposed activity would require placing fill or cause a discharge into a water of the United States, the Forest Service should exclude the activity from this CE. If the dredging, excavation, or placement of fill results in discharges into waters of the United States, the Forest Service must first apply for and receive a Clean Water Act (CWA) National Pollution Discharge Elimination System (NPDES) permit or CWA Section 401 permit, usually from the applicable State. This should preclude the project from using this CE, because CWA permits should always be accompanied with an EA or full EIS. II. Opposition to Tree Removal as an Example in Proposed 220.6(e)(19) SFK opposes the example provided with CE 19, which would allow the (iii) [r]emoval of downed or damaged trees that limit or reduce public access, result in potential risks to public safety, or where removal is needed to restore wildlife, or protect infrastructure. 77 Fed. Reg. at 35326. 3

A. Tree Removal is Not a Legitimate Restoration Activity This example is not a legitimate restoration activity and should be eliminated from the CE as an example. First, the Forest Service can provide public access without removing a downed or damage tree by simply moving it out of the way. Second, a potential risk to public safety can also be averted by moving the tree out of the roadway or trail or by felling a damaged tree without removing it. Third, tree removal is rarely, if ever, needed to restore wildlife [sic] or even wildlife habitat. Instead, standing dead trees (snags) and downed logs are essential ecological components of a healthy forest ecosystem, which many of the most imperiled species in our national forests need for their survival or recovery. Finally, the protection of infrastructure is not a proper restoration activity, and this example does not belong in a CE whose purpose is ecosystem restoration. Further, the removal of trees necessarily requires the use of heavy equipment that disturbs soils and also implicates safety issues. For example, logging trucks are generally incapable of staying in their own lane on narrow forest roads and are a public safety risk. 1 Moreover, logging activity is risky and can cause fires and logging trucks cause air pollution from burning and using petroleum products in trucks, which also implicates issues with green house gas emissions and climate change. Finally, the example is fundmentally inconsistent with the CE s purpose to restore uplands, wetlands, or riparian systems to pre-disturbance conditions, to the extent practicable, such that site conditions will not impede or negatively alter natural processes. See 77 Fed. Reg. at 35326. 1 Off-tracking long Vehicles Increase Public Safety Danger: According to the December 1989 California Department of Transportation (CALTRANS) Report to The Legislature, as required by Chapter 1378, Statute of 1986 (SB 2232 - McCorquodale), about 19 percent of the California State highway system, mostly mountain roads (not counting Forest Service roads or county roads) are inadequate, at any truck speed, to handle tractor-semitrailers of 30 feet truck kingpin to rear axle length (KP-RA). According to the sworn testimony of CALTRANS Attorney, William R. Morrisroe, Esq., CALTRANS engineers found that tractor-semitrailers more than 30 feet king pin to rear axle length (KP-RA), would have to be offtracking (leave their lane of traffic and illegally cross over the centerline of the road and or use the shoulder of the road), possibly causing accidents with on coming traffic, due to the extremely dangerous conditions of the tight radius of curves and narrow roadway that currently exist on these narrow roads. CALTRANS posted warning signs on these State Highways alerting drivers to the inadequacies of the State Highway system roads to handle tractorsemitrailers over 30 feet KP-RA, without off-tracking. According to the testimony of Officer Martin, California Highway Patrol, Commercial Section, most logging trucks are 33 feet 6 inches KP-RA plus any overhang of logs. So the average logging truck is 3 feet and 6 inches longer than the maximum length truck that can safely be geometrically handled by these narrow roads in the State Highways System. The Forest Service is responsible for public safety which is directly threatened by this and other Forest Service actions. The Forest Service must assume the responsibility for public safety threatened by the future logging that could be specified as a result of implementing this project. The Forest Service must consider, study, and analyze the public safety impacts caused by this project, in addition to the other cumulative impacts on the environment. The probability of an accident occurring with one of these future logging trucks, which will most likely be offtracking on narrow, curving mountain roads is significant. The Forest Service cannot ignore the public safety concerns of off-tracking trucks, which have actually caused injury and death. If litigation results from an accident, ignoring the issue of future off-tracking logging trucks, which may cause accidents and deaths, could implicate the Forest Service with contributory negligence. 4

B. Examples of Abuses of Tree Removal SFK and other groups have opposed and challenged a number of projects on the Sequoia and Los Padres National Forest, including in Federal Court, in which the Forest Service has proposed to cut and remove trees in popular recreation sites or along roads without adequate public oversight and without the necessary NEPA analysis. These projects can be described more accurately as timber sales, disguised as threats to public safety. Again, as stated above, the risk to public safety can be averted by simply felling or moving a tree from a roadway or trail. 1. Tree Removal from the Trail of 100 Giants Sequoia National Forest On April 15, 2000, President Clinton signed the Presidential Proclamation creating the Giant Sequoia National Monument ( GSNM ) out of the Sequoia National Forest. The signing ceremony was held in this easily accessible and frequently-visited area within the GSNM, the Trail of 100 Giants, which is within a giant sequoia grove. The Proclamation stated that the purpose of the newly designated monument is to protect the Sequoia forests and end logging for timber. See Declaration of Ara Marderosian, 9 (attached as Exhibit A). In April of 2004, the Forest Service stated their intention to fell hazard trees along the Trail of 100 Giants using a CE and SFK was told there would be no Environmental Assessment. SFK was told, verbally, that the project would fell all of the designated hazard trees, predominantly dead trees (88 were designated and 11 were previously cut to open the southern end of the trail). Hand crews were to limb and buck up the large pieces and chip and scatter the chips around the base of the large sequoias. Some of the larger trees were to be transported by helicopter out of the grove to a landing to be distributed elsewhere in the GSNM, but they were not to be sold in a timber sale. See id. 10. There was nothing distributed to the public in writing regarding this hazard tree project: no formal written public notice; no written announcement; and no invitation to submit written comments. Also, there was no Environmental Assessment or Environmental Impact Statement, no decision memo, and no administrative appeal period. SFK did not know that the trees were being cut until he visited the Trail of 100 Giants in 2005 and saw the trees on the ground. See id. 11. After the trees were felled in the Trail of 100 Giants, SFK discovered that the Forest Service had removed 67 live, green trees that they declared to be hazards, and piled the live and dead trees in a log deck at a landing area. This felling also occurred within an occupied California spotted owl nest site, and included removal of many large live trees and snags, which are important habitat components for the owl. See id. 12. After the project was completed SFK requested and received a document titled Project File for Monument Proclamation Hazard Tree Felling, stating that hazard trees would be felled on the Trail of 100 Giants, and that it would be categorically excluded from environmental analysis and documentation under the rubric of routine road/trail maintenance. See id. 13. 5

Later, SFK also received a letter, dated November 8, 2004, signed by Acting District Ranger Nancy C. Ruthenbeck, which was titled 100 Giants Hazard Tree Falling Project Log Deck Treatment. The letter stated: The file stated that the felled trees which were removed from the trail area by helicopter would be taken to a landing and piled. The resulting log deck constitutes an attractive nuisance, thereby creating a safety hazard for the public. The log deck needs to be removed. The treatments in the project area are consistent with the Giant Sequoia National Monument management plan. No memo in the Forest Service file indicated that the cut trees were to be sold as a means of removal. Yet, on November 17, 2004, the log deck was offered as a commercial timber sale. On July 26, 2005, these trees were sold to the timber industry: Jess Witten and Sierra Forest Products. See id. 14. This incident not only created a safety hazard for the public but it caused a major breach in the public s trust of the Forest Service to protect valuable resources, and the agency should not let this occur again, especially under the guise of restoration or to avert risk from standing dead trees in a recreation site. SFK urges the Forest Service to drop the example provided in proposed CE 19 for this reason alone. 2. Tree Removal Along Roads Federal Court Litigation in the Los Padres, Sequoia, Malheur, and Plumas National Forests In response to a tree felling and removal project along a road in an area of the Los Padres National Forest after the Day Fire, plaintiff Los Padres Forestwatch filed suit, seeking to overturn the Forest Service s decision allowing the roadside hazard project using CEs for road, trail, and recreation site maintenance. The court held that the project violated NEPA because it should have prepared at least an EA, since it exceeded the 250 acre limitations of another CE for salvaging dead or dying trees. See Los Padres Forestwatch v. U.S. Forest Service, No. 2:08-cv- 00845, Slip. Op. at 18 (C.D. Cal. July 3, 2003) (attached as Exhibit B). In another example, plaintiff League of Wilderness Defenders challenged the Forest Service s decision to remove 15,000 roadside hazard trees after the Flagtail Fire on the Malheur National Forest using a CE for road maintenance. The court permanently enjoined the project, holding that additional NEPA analysis was required. See League of Wilderness Defenders-Blue Mtns. Biodiversity Project v. U.S. Forest Service, No. 3:03-cv-00171, Slip. Op. at 5 (D.Or. Feb. 17, 2005) (attached as Exhibit C). In a final example, plaintiff Earth Island Institute challenged the Forest Service s decision to proceed with a roadside hazard project after the Moonlight Fire on the Plumas National Forest, again using the road maintenance CE. During the case, the Forest Service withdrew its decision and the Forest Service agreed in a stipulated order that it would not proceed with the project using a CE and would prepare a full NEPA analysis. See Earth Island Institute v. Carlton, No. 2:08-cv-01957, Stipulated Order at 2 (E.D. Cal. Oct. 31, 2008). On the Sequoia National Forest, plaintiff Sequoia ForestKeeper challenged the Forest Service s decision to proceed with a roadside hazard tree removal project, which also included a claim that the Forest Service exceeded the acreage limitation of the salvage CE. See Sequoia ForestKeeper v. Exline, No. 1:09-cv-01519 (E.D. Cal. 2009). 6

These legal examples show an overriding failure of trust of the Forest Service in its use of CEs for roadside hazard tree removal and an abuse of discretion with regard to the need to prepare adequate NEPA analysis for projects that should never be excluded from environmental analysis. SFK believes that if the new CE 19 for restoration allowed tree removal as proposed for wildlife purpose, public safety or to protect infrastructure (which are not appropriate in a restoration CE), the ambiguity of the tree removal example would prompt further distrust and litigation. Therefore, the tree removal example should be removed from the final version of the CE. As a final note, we suggest that the Forest Service consider adding a statement suggesting that ecological restoration necessarily requires a prohibition on any further grazing, logging, fire suppression, road construction or any other activities that caused the stream or watershed problem to begin with, and that these activities will continue to cause the adverse postdisturbance condition if they are not discontinued. For Sequoia ForestKeeper, René Voss Attorney at Law Ara Marderosian Sequoia ForestKeeper P.O. Box 2134 Kernville, CA 93238-2134 ara@sequoiaforestkeeper.org cc: Peter Gaulke, U.S. Forest Service: pgaulke@fs.fed.us 7