A JACKET FOR ALL OCCASIONS Newly developed system offers unique solution for quick retrofit of deteriorated columns



Similar documents
The Original Carbon Fiber Reinforced Polymer System

External Wrapping of Steel Riser Pipe. Case Study HJ3 CS200902

beams columns blast walls slabs pipes protective coatings polymer concrete Solutions Looking for Problems...

Structural Failures Cost Lives and Time

How To Repair A Steel Pier With A Watertight Frame

FX-70 Structural Repair and Protection System

Construction. Pile Restoration Timber/Concrete Pile Repair

MILMAN & ASSOCIATES STRUCTURAL CONSULTING ENGINEERS/ PROJECT MANAGERS

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training

SEISMIC RETROFITTING TECHNIQUE USING CARBON FIBERS FOR REINFORCED CONCRETE BUILDINGS

6 RETROFITTING POST & PIER HOUSES

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

ASSESSMENT AND PROPOSED STRUCTURAL REPAIR STRATEGIES FOR BRIDGE PIERS IN TAIWAN DAMAGED BY THE JI-JI EARTHQUAKE ABSTRACT

Failing Coastal Wood Infrastructure on the Great Lakes

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Epoxy Crack Injection (the basics)

SECTION STORM DRAINAGE SYSTEM

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

What is Seismic Retrofitting?

Chapter 3 Pre-Installation, Foundations and Piers

Introduction to Pressure Pipe Rehabilitation with CIPP

Strengthening and Repair of Reinforced Concrete Structures. Ian Wienholt Business Development Manager

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

Meeting the Challenge of Pipeline Emergency Repair

Using StrongPIPE Hybrid FRP for PCCP Rehab in Miami-Dade System

GARDEN CITY SKYWAY SUBSTRUCTURE REHABILITATION

Chapter 5 Bridge Deck Slabs. Bridge Engineering 1

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

Rolla, Rolla, MO 65409, USA

Embedded Parts Introduction - Anchors

North American Society for Trenchless Technology (NASTT) NASTT s 2014 No-Dig Show. Orlando, Florida April 13-17, 2014

A Decade of Performance of FRP-Repaired Concrete Structures

APE T CFRP Aslan 500

Concrete Repair. Applications and Procedures

1.02 DESCRIPTION A. This Section specifies furnishing and installing Cast in Place Detectable/Tactile Warning Surface tiles where indicated.

ENTRY FORM. DVASE 2015 Excellence in Structural Engineering Awards Program

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)

PAAM COMMERCIAL PRIVATE LIMITED

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

Oil and Gas Pipeline Design, Maintenance and Repair

Bridge Structural Rehabilitation Using FRP Laminates

Mark Cramer Inspection Services, Inc.

Report on Sanctuary/Chancel Crawl Space Inspection. St. John in The Wilderness, 2896 Old Lakeshore Road Bright s Grove. Project No.

Section SEWER PIPE INSTALLATION AND TESTING

SECTION 1 GENERAL REQUIREMENTS

Fire Damage Evaluation. Concrete Garage. Vehicular fires in parking garages are not an

Rehabilitation Alternatives. MWEA Collection System Seminar October 1, 2009

CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

Mold Preventing I nterior System

CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations

BRIDGE REHABILITATION TECHNIQUES

San Antonio Water System Standard Specifications for Construction ITEM NO SLIP-LINING SANITARY SEWERS

Since HMT Inc. 24 Waterway Avenue, Suite 400 The Woodlands, Texas Ph: Fax:

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS

Acceptance Codes APPENDIX - A. Acceptance Criteria

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12

Rehabilitation of an Aging Concrete Reservoir Adit Tower

SECTION CAST-IN-PLACE CONCRETE

PIPE REHABILITATION. Industrial Wastewater Municipal Wastewater Drinking Water Pressure Pipes

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

Fire-Damage or Freeze-Thaw of Strengthening Concrete Using Ultra High Performance Concrete

Rehabilitation of corroded pipelines and pipes with FibaRoll

Module 3: Sewer Material Lecture 3: Sewer Material

Chapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling

REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS. Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC

Safe & Sound Bridge Terminology

Chapter. Restoration of Damaged Structures

Essential Performance Attributes of Preapplied waterproofing

USE OF CFRP LAMINATES FOR STRENGTHENING OF REINFORCED CONCRETE CORBELS

Protecting Your Home From Hurricane Wind Damage

Section 2100-Trenching and Tunneling

MEMORANDUM West Swann Avenue, Suite 225 Tampa, Florida Phone (813) Fax (813)

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors

Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology

INSTALLATION OF INSITUFORM LINER

PTFE Slide Bearings 04/10 149

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

Ecoflex Wall Penetration Systems: An efficient, sustainable solution for penetrating concrete or block walls

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe

ROOF CONDENSATION: A COSTLY PROBLEM

Structural Audit of Buildings

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

TEXAS A&M CENTRAL ACADEMIC BUILDIING & PATRIOT S CASA SUBMITTAL Pre-Insulated Piping

SPR PE Steel Reinforced Liner

Lighthouse Engineering, L.L.C.

WIRE, TERMINAL AND CONNECTOR REPAIR CONDUCTORS

SECTION SANITARY SEWER AND STORM DRAIN SYSTEMS

Module 3 : Sewer Material. Lecture 3 : Sewer Material

Condition assessment and repair of antenna towers concrete foundations

Flowtite Jacking Pipe

Guide Specification Precast Concrete Products

Measuring the Condition of Prestressed Concrete Cylinder Pipe

In-situ Load Testing to Evaluate New Repair Techniques

Building Owners Guide to a Duro-Last System!

1.02 SYSTEM DESCRIPTION

FRP AQUATIC DUCTWORK COMPONENTS LEADERS IN FIBERGLASS REINFORCED PLASTIC DUCT PRODUCTS

Transcription:

A JACKET FOR ALL OCCASIONS Newly developed system offers unique solution for quick retrofit of deteriorated columns Mo Ehsani, PhD, PE, SE, Majid Farahani, PE, and Eric Raatz, PE Loss of load-carrying capacity in columns and piles in bridges is a major concern worldwide. In coastal regions, the dry-wet cycles lead to corrosion of reinforcing steel in concrete piles and bridge piers. In cold climates, the use of deicing chemicals results in corrosion of steel. Figure 1 shows one of many such cases in Chicago where reinforced concrete columns are severely weakened by corrosion and steel trusses have been added to carry the load. In fact, the problem is not limited to only bridges. In industrial facilities such as mines, aggressive chemicals cause premature corrosion of steel columns. Thousands of wooden utility poles weakened by infestation break each year during hurricanes and tornados. Many old bridges are supported on timber piles. Due to recent successes in cleaning the waterways, marine borers have returned and the timber piles are deteriorating at alarming rates. These scenarios all require efficient techniques for in-situ repair and retrofit of these structures. The ideal method will not only replace the loss in strength due to decaying materials, but should create a stronger and more durable structural element. The concept of repair and tetrofit of structures with FRP was first introduced by the author in the late 1980s (Ehsani and Saadatmanesh, 1990). In the ensuing years, the same reaserchers received the first grant awarded by the NSF to study retrofit of bridge piers with Fiber Reinforced Polymer (FRP) products (Saadatmanesh et al. 1996). That study and many others that were conducted worldwide in the following years, have undeniably demonstrated the effectiveness of FRP in strengthening deteriorated columns. A large number of columns in buildings and bridges have been retrofitted withy this technique worldwide. All those studies and field applications use the wet layup technique, whereby fabrics of arbon or glass are saturated in the field and wrapped around the column. However, there are several shortcomings with that technique. The flexibility of the fabric requires that the surface of the host structure be repaired to a smooth surface before the fabric can be wrapped onto the column. This prolongs the Fig. 1. Corrosion-damaged concrete piles in Chicago being assisted with steel trusses repair time. Similarly, the flexible fabric cannot be bonded to wooden piles that have an uneven surface. The wet layup is also useless for repair of steel columns. PileMedic To overcome the above shortcomings, a new form of FRP products called, PileMedic has been developed (Ehsani, 2010). During the manufacturing process, one or more layers of carbon or glass fabric are saturated with resin and subjected to heat and pressure to construct pre-cured laminate sheets as thin as 0.01 inches. The precision required to produce such a thin laminate is not a trivial matter but one that was finally achieved after an extended R&D process. The laminates are 4 to 5 ft wide and are supplied in rolls as long as 300 feet. The tensiles trength of these laminates ranges between 60,000 and 155,000 psi depending on the number of layers of fabrics and the orientation of the fibers. Unlike the wet layup system, the laminates are stiff enough to stand on their own (Fig. 2). In the field, an appropriate length of the laminate is cut and wrapped around the deteriorated column to create a structural shell that is not bonded to the host column. A thin layer of epoxy is brushed over the overlapping portion of the laminate to create a two- or three-ply shell in the field similar to a sonotube. The annular space between the shell and the host column is filled with resin or grout to make the host column and the shell work compositely.

Advantages of the New System The laminates described offer several advantages over conventional methods and materials used for repair of columns and piles. In the field, the laminates are usually wrapped two times and epoxy is applied in the overlapping portion to create a seamless shell around the column. From a structural behavior point of view, the combination of high tensile strength of the laminates and the creation of a seamless shell results in a tube that offers very high confining pressure for the grout and the pile. The magnitude of this confining pressure depends on the strength of the laminates and the number of plies that are incorporated in forming the shell in the field. For example, if a concrete pile constructed with 4000 psi concrete is encased in a PileMedic jacket that offers a confining pressure of 600 psi, the confinement results in a rise of concrete compressive strength from 4000 psi to 6600 psi. In the wet layup FRP systems, it is customary to prepare coupons (witness panel) of the installed fabrics each day. These coupons are later shipped to a qualified laboratory for Fig. 2. Carbon and Glass PileMedic strength verification. However, by the time the results Laminates become available, the project is most likely completed, making any remedial measures difficult to implement. In contrast, the laminates can be tested in advance and any substandard roll can be rejected. From a construction point of view, the laminates can be made into endless geometrical shells in the field; this eliminates time and expense of ordering customized jackets in advance, and speeds up the repair process. Similarly shipping and storage costs are reduced. The light-weight laminates require no heavy equipment for handling and the entire repair kit and necessary tools fit on a typical pickup truck. This eliminates traffic controls, reduces labor, equipment and associated delays and expenses in most situations. The laminates also serve as a moisture barrier and protect the grout and the host column from future deterioration. Even in cases where reinforcing steel is placed within the annular space, there is no need to provide substantial concrete cover for the reinforcing bars. This, combined with the ability to build the jacket to any size in the field allows construction of snug-fitting jackets that minimize the volume of grout needed for repair. In certain application, for example when a concrete or wooden pile is embedded in soil, the repair can be completed with no open cut trenches. The shell is first created above ground and is free to slide up and down along the height of the pile. Next, high pressure water or air jet is used to remove a 1 inch ring of soil adjacent to the pile. Then the shell is lowered along the pile into its final position and the annular space is filled with resin or grout. Similarly, in repair of underwater piles, it is possible to construct the jacket on the portion of the pile above waterline and gradually lower the jacket into water as the jacket is being constructed. Moisture insensitive epoxies are used in such applications to allow curing of the epoxy in water. Such repairs can eliminate costly divers and result in significant cost savings. FRP laminates are non-metallic and will not corrode. They offer a long service life with little maintenance. The laminates are ideal for repair of deteriorated concrete or wooden piles and utility poles. In such applications, it is best to inject a low viscosity resin in the annular space. The resin can be pressurized to penetrate into the voids and crevices of the concrete or wood for enhanced structural performance and elimination of decay from the environment and insects.

Field Application There are several different structure types within Tucson Electric Power Company (TEP) substations that are typically constructed with 10x10 hollow galvanized steel tubes. Due to improper drainage, moisture from rainwater is trapped inside the tubes and cause significant corrosion near the base of the structures. Figure 3 shows a typical HSS where the corroding steel has been scraped off and removed away from the inside face of the pole. Earlier attempts to remedy the problem called for steel plates that were externally bolted to the lower 3-ft of the structures (Fig. 3). However, these repairs would hide the corroded portion of the structures from view and inspection, while the corrosion process continued inside the poles. Additionally, in utilizing the FRP system, no outage was necessary to repair the structures thus resulting in continuing system reliability. Rather than replace the structures and take a costly outage, the structures could be repaired in place with proper safety personal overseeing the repairs. The repair of the poles with PileMedic was aimed at strengthening the lower 3-ft of the structures. An access port about 3 inches in diameter was cut at an elevation of 33 inches from the base. All loose rust was removed from inside the structure and the openings were temporarily sealed with plywood and clamps. A non-shrink high-strength grout was mixed and pumped into the structure from the access port. Four No. 5 U-shaped reinforcing bars were welded to the base plate; these bars were primarily for enhanced flexural capacity of the structure. Fig. 3. Repair of steel poles at TEP substations: original repair concept; corroded pole; filling the pole with grout; reinforcing steel welded to base plate; applying epoxy to the laminate, wrapping it around the pole and holding it with straps while grout is placed; finished and painted jacket Due to its dielectric properties, a glass laminate with tensile strength of 62000 psi and thickness of 0.026 inch was used. A 3-ft wide x 8.5-ft long piece of laminate was used for each structure. A special twocomponent epoxy was mixed in the field and applied to an approximately 5 ft long section of the laminate. The mixed epoxy has a paste-like consistency and is applied with a trowel to a thickness of 30-40 mil. The laminate is then wrapped loosely around the structure to create a two-ply shell. The 8.5- ft length of the laminate allows creation of a two-ply 15-inch diameter shell with 8 inches of overlap beyond the starting point.

At this stage, before the epoxy cures, ratchet straps must be used to hold the shell in the desired shape. The bottom edge of the jacket was sealed with tape atop the base plate. Consolidation of the grout was completed with a small vibrator and the top of the grout was finished with a trowel. Before the grout sets, the hydrostatic pressure from the grout pushes the inner layer of the jacket outward against the outer layer and forces the two plies of the PileMedic laminate to be tightly pressed against each other. A 1-inch diameter PVC pipe was installed to make sure no rain water will accumulate inside the structure. After several hours, the ratchet straps were removed and the exterior of the shell was painted. All of these repairs were performed while the substation remained fully operational. A similar approach was used to repair 49 steel H piling in four bridges at the intersection of I-70 and I- 270 in St. Louis, MO (Ehsani and Croarkin, 2011). Routine inspections had lowered the substructure condition rating of this bridge to poor (National Bridge Inspection rating of 4 on a 9 point scale). This meant these bridges were considered Structurally Deficient due to the number of piling with significant section loss (Fig. 4). The repairs were completed in just two weeks, improving all 4 bridges to a Satisfactory Condition Rating (NBI rating of 6). All of this was affordable enough to be funded with the Fig. 4. The I-70/I-270 interchange in St. Louis, MO where 49 corroded bridge piling were recently repaired with PileMedic jackets. region s operations budget and happened on one of the busiest highways in Missouri without causing any delays or distractions to the traveling public. PileMedic jackets have been used on several other projects including the repair of underwater concrete piles in a condominium building in Miami, FL. They are currently being considered for repair of timber bridge piles and utility poles. The numerous applications attest to the unique features of this product. The PileMedic products and the installations described in this article are subject to several pending U.S. and international patent applications. References: Ehsani, M. and Saadatmanesh, H. (1990). "Fiber Composite Plates for Strengthening Bridge Beams," Composite Structures, 15(4), 343-355. Saadatmanesh, H., Ehsani, M., and Jin, L. (1996). "Seismic Strengthening of Circular Bridge Pier Models with Fiber Composites," ACI Structural Journal, 93(6), 639-647.

Ehsani, M. (2010). SuperLaminates: Transforming the Future of Repair and Retrofit with FRP, Concrete International, ACI, 32(3), 49-53. Ehsani, M.and Croarkin, M. (2011). Restoration of Deteriorated Piles, Government Engineering, March- April 2011, 14-15. Ehsani, M., and Tipnis, A. (2011). Miami Building First to Benefit from Innovative Pile Jacket, Concrete Repair Bulletin, ICRI, July-August 2011 Mo Ehsani, PhD, PE is Professor Emeritus of Civil Engineering at the U. of Arizona and President of QuakeWrap, Inc., Tucson, AZ. Majid Farahani, PE is Civil/Transmission Engineering and Standards Supervisor with Tucson Electric Power Company. Eric Raatz, PE is Civil/Transmission Engineer with Tucson Electric Power Company.