B. Shop Drawings: Diagram power, signal, and control wiring.



Similar documents
A. Accessible Fixture: Emergency plumbing fixture that can be approached, entered, and used by people with disabilities.

A. Accessible Fixture: Emergency plumbing fixture that can be approached, entered, and used by people with disabilities.

A. Accessible Fixture: Emergency plumbing fixture that can be approached, entered, and used by people with disabilities.

EMERGENCY PLUMBING FIXTURES

FIRING RANGE PHASE 1 DESIGN

BRADLEY HALO EMERGENCY PLUMBING FIXTURES (Short Form Version)

BRADLEY HALO EMERGENCY PLUMBING FIXTURES

SECTION COMMERCIAL PLUMBING FIXTURES

15430 SAFETY SHOWERS AND EYEWASHES

A. Product Certificates: Submit certificates of performance testing specified in "Source Quality Control" Article.

Emergency Showers and Eyewashes Mike Adkins Wednesday, October 31, 10:00-11:1511:15 a.m.

DECONTAMINATION PRODUCTS

Design Requirements for Eyewash and Safety Shower Units APPLICATION: Detailed Installation, Operation and Design. Eyewash Stations.

Tepid Water Solutions for you and your customers

ANSI / ISEA Z Compliance Checklist

LAKE COUNTY ANIMAL SERVICES EXPANSION SECTION 15459

When Should Examination Preparation Begin?

STANDARD OPERATING PROCEDURE EMERGENCY EYEWASH AND SHOWER EQUIPMENT

Plumbing Installations. A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling

What to Expect From the Examination. How to Study the Plumbing Codes

Chapter 7 Plumbing Connections

Plumbing Identification and Damage Assessment Guide

OWNER S MANUAL FORCE 10 MARINE COMPANY HAMILTON ROAD RICHMOND, BC CANADA V6V 1C9 TEL: (604) FAX: (604)

EMERGENCY EYEWASH & SHOWER EQUIPMENT SELECTION, INSTALLATION & USE GUIDE

Section 4 EMERGENCY EYEWASH AND SAFETY SHOWER EQUIPMENT

SECTION FACILITY STORM DRAINAGE PIPING

NAVIEN AMERICA INC FITCH AVENUE

CITY of LOS ANGELES DEPARTMENT of BUILDING and SAFETY

EMERGENCY EYEWASH AND SHOWERS 29 CFR Part (c)

Installation S19-220PT S19-220BPT. Wall-Mounted Eyewash with Plastic Bowl. Wall-Mounted Eyewash with Stainless Steel Bowl.

Commercial Electric Water Heater

TABLE 1. Rugged cast aluminum alloy casing,celcon waterways with nichrome parts White (unless stainless steel housing)

2010 Residential Water Heater Replacement Check List

TANKLESS WATER HEATER INSTALLATION DIAGRAMS

Emergency Showers and Eyewash Stations

Element D Services Plumbing

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION PLUMBING SPECIALTIES

FACILITY POTABLE WATER STORAGE TANKS

Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling

American National Standard for Fixed and Portable Decontamination Shower Units

Therm-Omega-Tech, Inc. Therm-Omega-Tech, Inc. MODEL EMV. A Heavy Duty, Reliable Source For Tepid Water Delivery. Model EMV

INSTALLATION AND OPERATION INSTRUCTIONS - (LOW FLOW MODELS) (Before installation, compare electrical needed for the model of heater selected)

Installation Instructions

Amendments to the 2012 International Plumbing Code

Georgia State Amendments to the International Plumbing Code

Plumbing Apprenticeship Program Curriculum

WINTERIZING YOUR HOME PLUMBING AT BLUE RIDGE SHORES

BRADLEY COMMERCIAL SHOWERS AND SHOWER VALVES

Dominic i Barbato Dpt. Of Building and Safety (818) domenico.barbato@lacity.org

Indirect-Fired Storage Water Heater Models WH-30 through WH-80 INSTALLATION AND OPERATING INSTRUCTIONS

SPECIFICATION DIVISION 22 SECTION DESCRIPTION DIVISION 22 PLUMBING SECTION THERMOMETERS, PRESSURE GAUGES, AND ACCESSORIES

TECHNICAL ASSISTANCE TOLL FREE TELEPHONE NUMBER TECHNICAL ASSISTANCE FAX:

Sun Bandit Hybrid Water Heater Installation, Operation and Solar Hybrid Energy Systems Patent(s) Pending

Plumbing Code Sections For Commercial Food Facilities

STAINLESS STEEL TANK TABLE OF CONTENTS TROUBLESHOOTING... 1 TESTING WATER TEMPERATURE... 3 TANK & JACKET ASSEMBLY... 4.

D Youville College July 31, 2008 New Academic Building Cannon Design Project No

OPERATING AND MAINTENANCE MANUAL FOR COMMERCIAL ELECTRIC WATER HEATER ELECTRIC HEATER COMPANY BASE MODEL SE

Ceiling Mount Air Handler Manual

YOUR HOME S PLUMBING SYSTEM By Tim Oglesby, Home Check America

SECTION MORTUARY REFRIGERATORS

How To Fix A Leaky Water Heater

INSTALLATION AND SERVICE MANUAL EPJ SERIES INDIRECT WATER HEATERS

One of the fundamental design elements that every

GENERAL PLUMBING REQUIREMENTS

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

1. Taboe Sani 2. Taboe 3. Taboe Freestanding

B. ASTM C 533 Calcium Silicate Block and Pipe Thermal Insulation. C. ASTM C 547 Mineral Fiber Preformed Insulation

stainless steel pre-assembled manifolds

Arapahoe County Residential Water Heater Installation and Inspection Guide

PERMITS REQUIRED & PERMIT EXEMPTIONS

RMF Engineering

Installation Manual. Solar Pool Heating System. Read the complete manual before beginning the installation

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS

Oil and Coolant Circulating Heating System. Model - OCSM

Essentials Welding QA/QC Plan Sample

2006 Codes. Please verify the following before calling for inspection

One Year Warranty. Stock U.S. # of Volts Weight CONN. Height Dia. Watts # GAL. Elements INS. Inches NATURAL GAS* Six Year Warranty

SECTION MEDICAL COMPRESSED-AIR PIPING FOR HEALTHCARE FACILITIES PART 1 - GENERAL

CHAPTER 5 WATER HEATERS

OREGON FIRE CODE Interpretations and Technical Advisories

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

RHODE ISLAND. Downloaded

CALIFORNIA PROPOSITION 65 WARNING:

Plumbing. Helpful Hints Residential Construction. Lincoln County. Bert Polk Plumbing Inspector

GENERAL PLUMBING REQUIREMENTS

Operators manual Basic water heater

WELCOME INTERNATIONAL RESIDENTIAL CODE 2009 EDITION PLUMBING SECTION

Electric Water Heater

ELECTRIC/DIESEL FIRE PUMP CHECK LIST

Solar Skies Stainless Tank Series Water Heater

SHC 2.5, SHC 4 MINI-TANK ELECTRIC WATER HEATERS INSTALLATION INSTRUCTIONS FOR THE LICENSED PLUMBER SHC 2.5 SHC 4. English. English

Installation and Operating Instructions Installation Instructions for SS EPE-316L Series

Transcription:

SECTION 224500 - PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Emergency showers. 2. Eyewash equipment. 3. Eye/face wash equipment. 4. Combination units. 5. Water-tempering equipment. 1.2 SUBMITTALS A. Product Data: For each type of product indicated. B. Shop Drawings: Diagram power, signal, and control wiring. C. Field quality-control test reports. D. Operation and maintenance data. 1.3 QUALITY ASSURANCE A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application. B. ANSI Standard: Comply with ANSI Z358.1, "Emergency Eyewash and Shower Equipment." C. NSF Standard: Comply with NSF 61, "Drinking Water System Components - Health Effects," for fixture materials that will be in contact with potable water. D. Regulatory Requirements: Comply with requirements in ICC/ANSI A117.1, "Accessible and Usable Buildings and Facilities"; Public Law 90-480, "Architectural Barriers Act"; and Public Law 101-336, "Americans with Disabilities Act"; for plumbing fixtures for people with disabilities. 224500-1

PART 2 - PRODUCTS 2.1 EMERGENCY SHOWERS insulation A. Freestanding, Plumbed Emergency Showers: 2. Capacity: Not less than 20 gpm for at least 15 minutes. 3. Supply Piping: NPS 1galvanized steel or PVC with flow regulator and stay-open control valve. 4. Control-Valve Actuator: [Pull rod] [Foot treadle]. 5. Shower Head: 8-inch- minimum diameter, chrome-plated brass or stainless steel 6. Mounting: Pedestal. 2.2 EYEWASH EQUIPMENT A. Standard, Freestanding, Plumbed Eyewash Units: 2. Capacity: Not less than 0.4 gpm for at least 15 minutes. 4. Control-Valve Actuator: [Paddle] [Treadle]. 5. Spray-Head Assembly: Two receptor-mounted spray heads. 7. Drain Piping: NPS 1-1/4 minimum, chrome-plated brass, receptor drain, P-trap, 8. Mounting: Pedestal. B. Accessible, Freestanding, Plumbed Eyewash Units: 224500-2

2. Capacity: Not less than 0.4 gpm for at least 15 minutes. 4. Control-Valve Actuator: Paddle. 5. Spray-Head Assembly: Two receptor-mounted spray heads. 7. Drain Piping: NPS 1-1/4 minimum, chrome-plated brass, receptor drain, P-trap, 8. Mounting: Offset pedestal. 9. Special Construction: Comply with ICC/ANSI A117.1. 2.3 EYE/FACE WASH EQUIPMENT A. Standard, Freestanding, Plumbed, Eye/Face Wash Units: 2. Capacity: Not less than 3.0 gpm for at least 15 minutes. 4. Control-Valve Actuator: [Paddle] [Treadle]. 5. Spray-Head Assembly: Two or four receptor-mounted spray heads. 7. Drain Piping: NPS 1-1/4 minimum, chrome-plated brass, receptor drain, P-trap, 8. Mounting: Pedestal. B. Accessible, Freestanding, Plumbed, Eye/Face Wash Units: e. WaterSaver Faucet Co. 2. Capacity: Not less than 3 gpm for at least 15 minutes. 4. Control-Valve Actuator: Paddle. 5. Spray-Head Assembly: Two or four receptor-mounted spray heads. 224500-3

7. Drain Piping: NPS 1-1/4 minimum, chrome-plated brass, receptor drain, P-trap, 8. Mounting: Offset pedestal. 9. Special Construction: Comply with ICC/ANSI A117.1. 2.4 COMBINATION UNITS A. Standard, Plumbed Emergency Shower with Eyewash Combination Unit: e. Haws Corporation. f. Sellstrom Manufacturing Company. g. Speakman Company. h. WaterSaver Faucet Co. 2. Piping: a. Material: [Galvanized steel] [Chrome-plated brass] [PVC]. b. Unit Supply: NPS 1-1/4 minimum. c. Unit Drain: Outlet at back or side near bottom. 3. Shower: a. Capacity: Not less than 20 gpm for at least 15 minutes. b. Supply Piping: NPS 1 with flow c. Control-Valve Actuator: [Pull rod] [Treadle]. d. Shower Head: 8-inch- minimum diameter, [chrome-plated brass or stainless steel]. e. Mounting: Pedestal. 4. Eyewash Unit: a. Capacity: Not less than 0.4 gpm for at least 15 minutes. b. Supply Piping: NPS 1/2 with flow c. Control-Valve Actuator: Paddle. d. Spray-Head Assembly: Two receptor-mounted spray heads. e. Receptor: [Chrome-plated brass or stainless-steel] bowl. f. Mounting: Attached shower pedestal. g. Drench-Hose Option: May be provided instead of eyewash unit. 1) Capacity: Not less than 0.4 gpm for at least 15 minutes. 2) Drench Hose: Hand-held spray head with squeeze-handle actuator and hose. 224500-4

3) Mounting: Bracket on shower pedestal. B. Standard, Plumbed Emergency Shower with Eye/Face Wash Combination Units: e. Haws Corporation. f. Sellstrom Manufacturing Company. g. Speakman Company. h. WaterSaver Faucet Co. 2. Piping: a. Material: [Galvanized steel] [Chrome-plated brass or stainless steel] [PVC]. b. Unit Supply: NPS 1-1/4 minimum c. Unit Drain: Outlet at back or side near bottom. 3. Shower: a. Capacity: Not less than 20 gpm for at least 15 minutes. b. Supply Piping: NPS 1 with flow c. Control-Valve Actuator: [Pull rod] [Treadle]. d. Shower Head: 8-inch- minimum diameter, [chrome-plated brass or stainless steel]. e. Mounting: Pedestal. 4. Eye/Face Wash Unit: a. Capacity: Not less than 3 gpm for at least 15 minutes. b. Supply Piping: NPS 1/2 with flow c. Control-Valve Actuator: Paddle. d. Spray-Head Assembly: Two or four receptor-mounted spray heads. e. Receptor: [Chrome-plated brass or stainless-steel] bowl. f. Mounting: Attached shower pedestal. g. Drench-Hose Option: May be provided instead of eye/face wash unit. 1) Capacity: Not less than 3 gpm for at least 15 minutes. 2) Drench Hose: Hand-held spray head with squeeze-handle actuator and hose. 3) Mounting: Bracket on shower pedestal. 2.5 WATER-TEMPERING EQUIPMENT A. Hot- and Cold-Water, Water-Tempering Equipment: 224500-5

e. Haws Corporation. f. Sellstrom Manufacturing Company. g. Speakman Company. h. WaterSaver Faucet Co. 2. Description: Factory-fabricated equipment with thermostatic mixing valve. a. Thermostatic Mixing Valve: Designed to provide 85 deg F tepid, potable water at emergency plumbing fixtures, to maintain temperature at plus or minus 5 deg F throughout required 15-minute test period, and in case of unit failure to continue cold-water flow, with union connections, controls, metal piping, and corrosion-resistant enclosure. b. Supply Connections: For hot and cold water. 2.6 SOURCE QUALITY CONTROL A. Certify performance of emergency plumbing fixtures by independent testing organization acceptable to authorities having jurisdiction. PART 3 - EXECUTION 3.1 EMERGENCY PLUMBING FIXTURE INSTALLATION A. Insulate all outdoor fixtures and plumbing to prevent water from solar heating to an uncomfortable or dangerous level. Install outdoor fixtures under shade when possible. B. Install fixtures level and plumb and fasten to substrate. C. Install shutoff valves in water-supply piping to fixtures. Install valves chained in open position. Install valves in locations where they can easily be reached for operation. Comply with requirements for valves specified in Section 220523 "General-Duty Valves for Plumbing Piping." D. Install dielectric fitting in supply piping to emergency equipment if piping and equipment connections are made of different metals. Comply with requirements for dielectric fittings specified in Section 221116 "Domestic Water Piping." E. Install thermometers in supply and outlet piping connections to water-tempering equipment. Comply with requirements for thermometers specified in Section 220519 "Meters and Gages for Plumbing Piping." 224500-6

F. Install trap and waste piping on drain outlet of emergency equipment receptors that are indicated to be directly connected to drainage system. G. Fill self-contained fixtures with flushing fluid. 3.2 CONNECTIONS A. Connect hot- and cold-water-supply piping to hot- and cold-water, water-tempering equipment. Connect output from water-tempering equipment to emergency plumbing fixtures. Comply with requirements for hot- and cold-water piping specified in Section 221116 "Domestic Water Piping." B. Directly connect emergency plumbing fixture receptors with trapped drain outlet to sanitary waste and vent piping. Comply with requirements for waste piping specified in Section 221316 "Sanitary Waste and Vent Piping." 3.3 IDENTIFICATION A. Install equipment nameplates or equipment markers on emergency plumbing fixtures and equipment and equipment signs on water-tempering equipment. Comply with requirements for identification materials specified in Section 220553 "Identification for Plumbing Piping and Equipment." 3.4 FIELD QUALITY CONTROL A. Mechanical-Component Testing: After plumbing connections have been made, test for compliance with requirements. Verify ability to achieve indicated capacities. B. Tests and Inspections: 1. Perform visual and mechanical inspection. 2. Perform Leak Test after installation and charging. 3. Perform Operational Test after electrical circuitry has been energized to test all safety features. 4. Prepare test and inspection reports. 3.5 ADJUSTING A. Adjust or replace fixture flow regulators for proper flow. B. Adjust equipment temperature settings. END OF SECTION 224500-7