Mr. Michael Beaton, P.E. ICC Evaluation Service, Inc Workman Mill Road Whittier, California March 6, 2009

Similar documents
Know the Code: Using Spray Foam Insulation In Attics and Crawl Spaces

Requirements for Fire Protection of Light Weight Floor Systems **Act 1 Revisited**

ICC-ES Evaluation Report. ESR-3493 Reissued September 2014 This report is subject to renewal September 2015.

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION REPORT HOLDER: ICYNENE, INC.

POST AND FRAME STRUCTURES (Pole Barns)

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

HOOVER TREATED WOOD PRODUCTS, INC. TECHNICAL NOTE FOR ADDITIONAL INFORMATION: TEC-WOOD ( )

THERMAL BARRIERS FOR THE SPRAY POLYURETHANE FOAM INDUSTRY

THE DOW CHEMICAL COMPANY Issued: August 1, LARKIN CENTER 1605 JOSEPH DRIVE MIDLAND MICHIGAN (989)

RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS

LIFE SAFETY UPDATE. FULL SPRINKLERING OF ALL NURSING FACILITIES ADDITIONAL CLARIFICATIONS Prepared by Eric Rosenbaum, P.E. Hughes Associates, Inc.

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

Underwriters Laboratories Testing Information

Fire-Retardant-Treated (FRT) Plywood

LP OSB Sheathing & Structural 1 Sheathing

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

LEGACY REPORT. (800) (562) A Subsidiary of the International Code Council RETAINED ON U.S.

Residential Deck Safety, Construction, and Repair

Guidelines for Earthquake Bracing Residential Water Heaters

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES

Chapter 6 ROOF-CEILING SYSTEMS

STANDARD OPEN PATIO COVER

H-Stud Area Separation Wall System

Meeting the Fire Code with Continuous Foam Plastic Insulation

Building Department John Fiedler Construction Official Ext SAMPLE GUIDE FOR 1&2 FAMILY DWELLING BASEMENTS Rev

Guidelines for Earthquake Bracing of Residential Water Heaters

March 14, Installation of Bay, Bow and Garden Windows

Heating Load Calculation

EXPANDED POLYSTYRENE (EPS) INSULATION BOARD SPECIFICATIONS

UL 580 TEST REPORT. Rendered to: ARMSTRONG WORLD INDUSTRIES. SERIES/MODEL: MW Vector PRODUCT TYPE: Ceiling System, 3' OC

How To Build A Basement House

Typical Finished Basement Details

Built to Last. Built for Beauty. Good. Solid. Logix. TM

2.18 INTERIOR & EXTERIOR FINISHES VAPOR & AIR BARRIERS

4. ANCHOR BOLTS AND STRAPS a. ½" anchor bolts shall be embedded 7" into concrete a maximum of 6' on center and 12" from corners and ends of plates.

Load Design Charts. R-CONTROL SIPs STRUCTURAL INSULATED PANELS. CONTROL, NOT COMPROMISE.

Wood use in Type I and II (noncombustible) construction

The better way to build TM. Installation Manual. EXTERIOR WALL SIPs

Mark Cramer Inspection Services, Inc.

Fire Resistance of Brick Masonry

GreenGuard Housewrap Installation Guide

Residential Foundations and Basements

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION REPORT HOLDER: CERTAINTEED CORPORATION

Fiberglas, Exterior Wall Thermal Insulation

COMMONLY USED RESIDENTIAL BUILDING CODES

Gypsum Board Systems Manual

BUILDING PERMIT SPECIFICATIONS

CONSTRUCTION DETAILS & LOAD DESIGN CHARTS

If you are a web registered user of ArlingontPermits.com you may also request an inspection at:

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

Superform Products Ltd.

SIGNIFICANT CHANGES to the 2015 Minnesota Residential Codes (MR 1303, 1309 and 1322)

Preventing Ice Dams on Roofs

Single Family Residential Basement Finish

The Closed Crawl Space: Making the Transition Climate Zones 3A & 4A

Preparation for 2015 Residential Code Changes Discussion with Local Builders and Designers

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C Date of issue , Updated July 1, 2011

WHI 90-Minute Rated Veneered Door Frame Installation Instructions

Repair of Earthquake-Damaged Masonry Fireplace Chimneys SOUTH NAPA EARTHQUAKE RECOVERY ADVISORY

AUTHORIZATION TO MARK

SUPER SHED. Indoor shelter for your outdoor tools.

AMERICAN GOTHIC PLAYHOUSE

BUILDING SAFETY UNIT

(This report is endorsed) Industrivej 20, 9900 Frederikshavn, Danmark

GigaCrete Specification PlasterMax

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

Best Barns USA Assembly Book

MAJOR 2015 MN RESIDENTIAL CODE CHANGES Effective Date: January 24 th, 2015

VA25014B0516 VA CINCINNATI PROJECT NO INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION GYPSUM BOARD

Herringbone Pattern Flooring

CHAPTER 6 CONSTRUCTION TYPES

Typical Finished Basement Details

Fire 2This Technical Bulletin has been commissioned by the UK SIP Association in

Additions and Alterations

Applications for building permits will not be reviewed until all of the required information has been submitted.

Page & Turnbull imagining change in historic environments through design, research, and technology

Residential Decks. Planning and Development Services Department

Excerpts from the Canadian National Building Code (NBC)

1/9/2013. Terminology Calculating Heat Transfer Code Requirements Design Examples and Sustainability

Pre-Drywall Inspection Report

How to secure your property after a disaster

EcoTouch Insulation with PureFiber Technology

Asphalt Shingle Application Requirements

CertainTeed. Shaftliner For A rea Separation Firewalls

CERTIFICATE OF COMPLIANCE Prescriptive Residential Re-roof Project Name:

CLOSED-CELL SPRAY FOAM Resisting Wind Uplift in Residential Buildings

Sample Drawing Package for One and Two Family Dwelling Applications

Formwork for Concrete

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: SHOP APPLIED WOOD COATINGS SECTION: SHEATHING REPORT HOLDER:

Proposed Minimum Subterranean Termite Treatment Standards

Chapter 3 Pre-Installation, Foundations and Piers

Renovating Your Basement

Guide Specifications for Maple Flooring Systems

City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures

CITY OF FAIRFAX CODE ADMINISTRATION / FAX

FIRE AND SMOKE PROTECTION FEATURES

Final inspections are completed by site visit only. Access to fenced yards shall be planned.

REQUIREMENTS FOR SUBMITTING PLANS FOR NEW CONSTRUCTION

Transcription:

Mr. Michael Beaton, P.E. ICC Evaluation Service, Inc. 5360 Workman Mill Road Whittier, California 90601 March 6, 2009 Subject: Attic and Crawlspace Test Proposal for AC 377 Dear Mr. Beaton On behalf of the SPFA, I would like to submit the following two documents to support our new attic and crawlspace fire test proposal. The first document outlines the test method, and the second provides suggested changes to AC 377 that will incorporate this new test procedure. This proposal represents voluntary contributions from a task force consisting of more than fifteen different supplier members of SPFA. It took 14 months of hard work, and its final form has been endorsed by a significant majority of the task force members. Our work has been guided by a world class fire testing consultant, and has been reviewed by other members of the foam plastics industry. I would also like to thank you for granting us a few extra days to complete this proposal. I understand the next step in the process will be for ICC ES staff to prepare our proposal for internal review. Please feel free to contact me should you have any questions during the subsequent stages of the review process. Respectfully yours, Richard S. Duncan, Ph.D., P.E. Technical Director www.sprayfoam.org

[Add as new Appendix X] Appendix X Fire Test Method for Attics and Crawl Spaces Scope: The objective of this test is to evaluate the fire performance of spray-applied, polyurethane foam plastic insulation materials (SPF) when tested in a room/corner test configuration to determine if the insulation and/or the insulation system is acceptable for use in attics and crawl spaces without prescriptive ignition barriers per IRC or IBC. Test Method: The test method to be used is the NFPA 286 Standard Methods of Fire Tests for Evaluating Contribution of Wall and Ceiling Interior Finish to Room Fire Growth with the modifications described below. All test requirements, procedures, and conditions specified in NFPA 286 shall be followed except as described below. Modifications to NFPA 286: 1. Ignition Source The standard gas burner shall be used. The burner shall be positioned such that it is in contact with both sidewalls in the test corner of the fire test room as indicated in Figure 3. 2. Specimen Mounting: The test specimens can be mounted in either of two configurations. Whichever configuration is used, the interior room dimensions as required by NFPA 286 shall be maintained. The two configurations are: a. The fire test room shall be completely lined with one layer of 5/8 inch thick, Type X gypsum wallboard. The SPF shall be applied directly to the gypsum wallboard at the maximum thickness and density intended for use. The SPF shall be applied to both the three test walls and the test ceiling. If a covering is used over the foam, it shall be applied to both the walls and the ceiling at the same minimum thickness or coverage rate intended for use. b. The three walls of the test room without the doorway will be constructed with wood studs sized to the same depth as the test specimen, 93 inches high, 24 inches on center with a single top and bottom plate, as shown in Figure 1. The exterior side of the walls will be covered with one layer of 5/8 inch thick, Type X gypsum wallboard. The SPF will be sprayed to fill each stud cavity and be continuous from the bottom plate to the top plate and from stud to stud. The ceiling of the test room will be constructed as shown in Figure 2. The ceiling will consist of wood joists sized to the same depth as the test specimen at 24 inches on center. A total of five joists will be used and they will run parallel with the 12 ft. length of the test room (front to back). The two outboard joists will rest on the top plates of the walls. The exterior side of the ceiling will be covered with one layer of 5/8 inch thick, Type X gypsum wallboard. The SPF will be

sprayed to fill each joist cavity and will be continuous from the front to the back and from joist to joist. If a covering is used over the foam, it shall be applied to both the walls and the ceiling at the same minimum thickness or coverage rate intended for use. 3. Test Corner Configuration During the installation of the SPF, care shall be taken to provide as smooth a surface as possible especially in the wall areas that will be adjacent to as well as above the burner. The maximum allowable deviations are described in Figure 3. 4. Test Data During the test, all of the following test parameters shall be determined: a. Time at which the Heat Release Rate exceeds 1 MW, b. Time at which the heat flux to the floor exceeds 20 kw/m 2, c. Time at which the average upper layer temperature exceeds 600ºC, and d. Time at which flames exit the doorway 5. Reporting The following additional items shall be reported: a. Type, description, average thickness and nominal density of the SPF wall and ceiling specimens. b. Type, description, and nominal thickness (i.e. mils) or application rate (i.e. gallons per 100 square feet) of coating. c. Time recorded for each test parameter from Item 4 above. d. Average of the four time values indicated in Item 5-c. 6. Acceptance Criteria A test shall be determined to be successful when the average time for attainment of the four measured test parameters (Item 5-d above) is 4 minutes 18 seconds or greater. This acceptance criterion is based on testing performed with a code prescribed ignition barrier over foam plastic insulation.

2" x D studs @ 24" O.C. (D ~ foam thickness to be tested) spray polyurethane foam at thickness to be tested, installed to full height of cavity exterior of wall interior of wall Figure 1 Top view of wall construction

gypsum wallboard 2" x D top plate 2" x D joists @ 24" O.C. (D ~ foam thickness to be tested) interior of room spray polyurethane foam at thickness to be tested, installed to full height of cavity Figure 2 - Side view of ceiling construction

S0 S3 S6 foam S9 S12 B0 3" 3" 3" 3" 3" B3 B6 3" 3" 12" x 12" gas burner foam B9 3" B12 At 12", 24", 36" and 48" above module floor, measure distance from outside edge of burner to foam surface. Meet the following criteria: max (S0, S3, S6, S9, S12) 2" Savg = 0.20(S0+S3+S6+S9+S12) 1" max (B0, B3, B6, B9, B12) 2" Bavg = 0.20(B0+B3+B6+B9+B12) 1" Figure 3- Measurement points for burner spacing from foam

ACCEPTANCE CRITERIA FOR SPRAY-APPLIED FOAM PLASTIC INSULATION (AC377) Revise Section 3.4.4 of AC377 to read: 3.4.4 Spray-applied Foam Plastic Used in Attic and Crawl Spaces: Within an attic or crawl space where entry is made only for the service of utilities, spray-applied foam plastics shall be protected as set for the in IBC section 2603.4.1.6, IRC Section R314.5.3 or R314.5.4 or Exception 4 of UBC Section 2602.4. Utilities include, but are not limited to, mechanical equipment, electrical wiring, fans, plumbing, gas or electric hot water heaters and gas or electric furnaces. As an alternative, the prescriptive ignition barrier shall not be required when satisfactory testing is conducted in accordance with 3.4.4.1 or 3.4.4.2. 3.4.4.1 For Use on Walls or Floors or Underside of Roofs in Attics or on Walls or Floors or Underside of Floors in Crawl Spaces: Tests shall be conducted in accordance with NFPA 286 with the conditions of acceptance specified in IBC Section 803.2; or UL 1715 or UBC Standard 26-3 with conditions of acceptance as specified in Section 3.3.3.2.3 of AC377. The tests must be conducted with the foam plastic installed at the maximum thickness and density for which recognition is sought over the gypsum wallboard or glass-reinforced cement board, as described in the standard. Coverings, if part of the insulation system, must be tested at the minimum thickness or coverage rate for which recognition is sought. 3.4.4.1.1 Limitations: When testing is in accordance with Section 3.4.4.1, the evaluation report shall include the following limitations: a. Attic ventilation is provided in accordance with IBC Section 1203.2 or IRC Section R806 as applicable. b. Under-floor (crawl space) ventilation is provided in accordance with IBC Section 1203.3 or IRC Section R408 as applicable. c. Combustion air is provided in accordance with IMC Sections 701 and 703 d. The foam plastic insulation is limited to the maximum thickness and density tested. e. Coverings, if part of the insulation system, are limited to the minimum thickness or coverage rate tested. 3.4.4.2 For Use on Walls or Floors or Underside of Roofs in Attics or on Walls or Floors or Underside of Floors in Crawl Spaces: The tests shall be conducted in accordance with the test methods described in either Appendix A (for Crawl Spaces only) or Appendix X (for Attics and Crawl Spaces) of AC-377. The Conditions of Acceptance shall be as described in Appendix A or Appendix X. The tests must be conducted with the foam plastic installed at the maximum thickness and density for which recognition is sought. Coverings, if part of the insulation system, must be tested for approval. Coverings, if part of the insulation system, must be tested at the minimum thickness or coverage rate for which recognition is sought. 1

ACCEPTANCE CRITERIA FOR SPRAY-APPLIED FOAM PLASTIC INSULATION (AC377) 3.4.4.2.1 Acceptance: Successful passage of the Crawl Space test in Appendix A allows use on walls or floors or the underside of floors in crawl spaces. Successful testing based on Appendix X allows use on walls or floors or underside of roofs in attics or on walls or floors or underside of floors in crawl spaces. 3.4.4.2.2 Floors Although floors are not specifically tested in Appendix A or Appendix X, approval can be gained such that the maximum thickness for floors is the maximum thickness successfully tested in either Appendix A or Appendix X. 3.4.4.2.3 Limitations: When testing is in accordance with Section 3.4.4.2, the evaluation report shall include the following limitations: a. Entry into the attic or crawl space is only for service to utilities and no storage is permitted. b. There are no interconnected attic areas. c. There are no interconnected crawl space areas. d. Air in either the attic or the crawl space is not circulated to other parts of the building. e. Attic ventilation is provided in accordance with IBC Section 1203.2 or IRC Section R806 as applicable. f. Under-floor (crawl space) ventilation is provided in accordance with IBC Section 1203.3 or IRC Section R408 as applicable. g. Combustion air is provided in accordance with IMC Sections 701 and 703 h. The foam plastic insulation is limited to the maximum thickness and density tested. i. Coverings, if part of the insulation system, are limited to the minimum thickness or coverage rate tested. 2

ACCEPTANCE CRITERIA FOR SPRAY-APPLIED FOAM PLASTIC INSULATION (AC377) Replace existing Appendices A, B and C with: Appendix A Comparison Testing for use in Crawl Spaces A1.0 Use in Crawl Spaces Comparison Test A1.1 For Use on Walls or Floors or the Underside of Floors in a Crawl Space: Comparative crawl space fire tests shall be conducted in accordance with Section A 1.2 where the performance of the exposed foam plastic insulation is compared under identical test conditions to that of the foam plastic insulation covered with a codeapproved ignition barrier. A1.2 TEST METHOD CRAWL SPACES A1.2.1 TEST CONFIGURATION A sub-floor assembly is mounted on top of a three-sided wall module. The simulated crawl space module consists of three 8-ft. square (outside dimensions ± 2-in.) walls, each 48 ± 2-in. high, and built of nominal 4-in. wide x 8-in. high x 16-in. long concrete blocks with a full open space on one side of the structure. Masonry walls or module walls constructed of wood or metal studs with two layers of 1 / 2 -in. gypsum board are permitted provided the interior dimensions are the same as for a concrete block module, i.e., 88 ± 2-in. wide and 92 ± 2-in. deep. If wood or metal stud construction is used, the studs shall be located inside the module, i.e., the width of the module is equal to the distance between the interior faces of the gypsum board attached to the side walls and the depth is equal to the distance between the front opening and the interior face of the gypsum board attached to the back wall. The floor/ceiling above the crawl space is built using nominal 2 x 8-in. x 8-ft. floor joists on 16-in. centers, with 2 x 8-in. joist headers, all bearing on 2 x 4-in. sill plates and surfaced with 15 / 32 -in. thick, 4-ply, APA graded A-C plywood sub-flooring. The use of joists and headers with a larger depth, e.g., 2 x 10-in., 2 x 12-in., etc. is permitted at the client's request. Note 1: The use of CDX grade plywood is considered too variable in quality for comparison purposes required for this evaluation. Note 2: All construction lumber (joists and studs, if used) shall be of the same species and grade for all tests conducted to qualify a foam plastic insulation. The joists are perpendicular to the camera's line-of-sight, so that they tend to dam the flame front and hold it inside the test area. The floor of the test chamber is covered with approximately 1-in. of sand. To provide additional protection, it is acceptable to cover the floor with 1 / 2 -in. gypsum board before installing the 1-in. layer of sand. 3

ACCEPTANCE CRITERIA FOR SPRAY-APPLIED FOAM PLASTIC INSULATION (AC377) A1.2.2 IGNITION SOURCE The fire source is a 22-lb wood crib constructed of nominal 2 x 2-in. No. 1 select grade white pine (no knots), 15-in. square in plan, spaced approximately 1 1 / 2 -in. apart and fastened at right angles with a single nail at each end. The crib shall be conditioned to an average moisture content of 7.5 ± 0.5%. The crib is placed in a rear corner of the crawl space 1-in. from each wall surface and supported approximately 4-in. above the floor on small sections of refractory brick. The crib sticks of the bottom layer shall be parallel to the side walls. Approximately 150-ml of ethyl alcohol in a circular or square metal pan with a surface area of 36 to 40-in 2 placed under the crib is used for ignition. A1.2.3 TEST MATRIX The interior face of the control assembly shall consist of nominal 1 / 4 -inch-thick A-C or B-C plywood applied to the interior face of wood wall framing (plywood is permitted by UBC Section 2602.4, Exception 4, IBC Section 2603.4.1.6 and IRC Section R314.5.3 as a protective material for foam plastic located in attics.) The second test assembly shall be identical, but without plywood on the interior face of the wall.. A1.2.4 TEST DURATION AND END POINT COMPARISON CRITERIA One or both of the following two criteria are established for test duration and relative comparison to between tests: 1. Time to flames emerging from the front of the crawl space. 2. Time to burn-through of the floor/deck system. The time to flashover and the time to burn through the wood-framed floor/ceiling must be equal or greater for the exposed foam plastic insulation versus the foam plastic insulation covered with the 1 / 4 -inch-thick plywood. A1.2.5 DOCUMENTATION The test is recorded with photographs and video documentation positioned to view the entire front of the open side of the module. A timing reference, mechanical or electronic, is included in all photographic and video records. A1.2.6 REPORT The report shall include: Name and location of facility where test is conducted. A description of the tested assembly with emphasis on the insulation type (including facings), thickness, density, and attachment details. Photographic and video documentation: pre-test, during (including timing), and post-test. A summary of visual observations including time to flames exiting the module and/or burn through of the sub-floor assembly. 4

ACCEPTANCE CRITERIA FOR SPRAY-APPLIED FOAM PLASTIC INSULATION (AC377) Conclusions in the form of a statement of findings summarizing the fire performance of the assembly; and, as appropriate, compared to a baseline test. Signature of a representative engineer or officer of the test facility. 5