OKR04: What s Changed/What s New

Similar documents
CHAPTER MUNICIPAL SEPARATE STORM SEWER SYSTEMS

MICHIGAN DEPARTMENT OF TRANSPORTATION PHASE I STORM WATER MANAGEMENT PLAN

Official OPP Overall Penn State Stormwater Program Latest Revision/Review: 5/28/2015

III. Relying on another Governmental Entity

AUTHORIZATION TO DISCHARGE UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM

State of West Virginia Department of Environmental Protection Division of Water and Waste Management th Street, SE Charleston, WV

MASSACHUSETTS COASTAL NONPOINT PROGRAM NOAA/EPA DECISIONS ON CONDITIONS OF APPROVAL

How To Amend A Stormwater Ordinance

County Watersheds. Total Project Cost - $11.1 M. Project Description. Funding Sources. Project Milestones. Service Impact

1.7.0 Floodplain Modification Criteria

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

MS4 MUNICIPAL SEPARATE STORM SEWER SYSTEMS. Purpose The magnitude of the MS4 program Where do the stormwater dollars go Benefits Authority

Buffer and Soil Loss Legislation

Low Impact Development Checklist

TABLE OF CONTENTS. Page 2 of 37 Ohio EPA Permit No.: OHC000004

THE CITY OF EDGEWOOD STORMWATER MANAGEMENT PROGRAM

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

Permit No. VA Page 1 of 39 PART I-AUTHORIZATION, EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS

Carlton Fields Memorandum

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations

City of Valdosta Land Development Regulations

Warren County MS4 Stormwater Management Program Plan

GENERAL PERMIT WMGM043

COASTAL APPLICATION FOR A MAJOR SITING PERMIT

Ameren Callaway Energy Center-Water Treatment Plant Sedimentation Basins #5 &#6, MO , Construction Permit No. CP , Callaway County

RIR Valid ONLY in accordance with Part I.C. Expiration Date: December 19, 2008

GENERAL NPDES PERMIT FOR PESTICIDE APPLICATION POINT SOURCE DISCHARGES. Leslie Lowry Illinois Environmental Protection Agency

APPENDIX A: STORMWATER MANAGEMENT CHECKLIST

3.4 DRAINAGE PLAN Characteristics of Existing Drainages Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

Use of Green Roofs to Meet New Development Runoff Requirements. Greg Davis Nov. 8, 2007

STORM WATER MANAGEMENT PLAN (SWMP)

State of Florida. Department of Environmental Protection. Generic Permit. For. Stormwater Discharge from Large and Small Construction Activities

Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington

CHAPTER WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

Texas Natural Resource Conservation Commission Page 1 Chapter Water Quality Performance Standards For Urban Development

Order No. R MS4 Storm Water Permit Santa Rosa, Sonoma County, and the Sonoma County Water Agency

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION III 1650 Arch Street. Philadelphia, Pennsylvania

GENESEE COUNTY DRAIN COMMISSIONER S OFFICE

IV. Certification. Name Cathy Rosen Title Public Works Director Date 29-Mar-11. Name Title Date

Tier 1 General Permit for the Discharge of Storm Water Associated with Industrial Activity. Table of Contents

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities

Standard Operating Procedures Storm Drain System Maintenance

City of Beaumont, Texas Grading Permit Information

12/3/2015 MUNICIPAL STORMWATER RESPONSIBILITIES YOU NEED TO KNOW WHAT IS STORMWATER? WHY?

Phase II/MS4 NOI Page 1 Town of Shelburne, Vermont Version: 2/22/08

rescue and relief efforts in the aftermath of flooding, (iii) repair of flood damaged public facilities and utilities, and

AZPDES ARIZONA PESTICIDE GENERAL PERMIT. SWVMA Annual Conference October 29, 2014

CHAPTER 17. Sewers and Sewage

MS4 Municipal Stormwater Compliance: Pollutant Removal through Floodplain Restoration / Reconnection Villanova Urban Stormwater Partnership

City of Atlanta. Department of Watershed Management. Post-Development Stormwater Management Ordinance Summary of Revisions

HOUSE BILL 987. Read and Examined by Proofreaders: Sealed with the Great Seal and presented to the Governor, for his approval this

Storm Water Management Requirements for Construction Projects Less than One Acre

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

Best Management Practices (BMPs) Ideas for School Districts. Presented by: Donald Lussier

CODE OF REGULATIONS OF THE NORTHEAST OHIO REGIONAL SEWER DISTRICT TITLE III SEPARATE SANITARY SEWER CODE

A Developer s Guide: Watershed-Wise Development

The answers to some of the following questions are separated into two major categories:

Storm Drain System Operation and Maintenance

Final Report of the Town Owned Lands Improvement Project for the Town of Brentwood, NH

COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION

DRAFT Public Outreach Document for What s an SSMP?

SECTION 1.0 STATUTORY AUTHORIZATION AND PURPOSE

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans

DEQ Response to Comments regarding the Public Notice for a Coal Mining Project in the Panther Creek watershed In Craig and Nowata Counties.

Goal 1 To protect the public health, safety and property from the harmful effects of natural disasters.

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

ON-SITE WASTEWATER TREATMENT SYSTEMS ACT

City of Powder Springs

Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report

Overview of the Division of Water Restoration Assistance

ALBUQUERQUE BERNALILLO COUNTY WATER UTILITY AUTHORITY WATER WASTE ORDINANCE

ORDINANCE. BE IT ORDAINED by the Board of Commissioners of Bibb County, Georgia, and it is hereby ordained by authority of the same as follows:

Shooks Run Drainage Study Basic Terminology

Proposed General Plan Update Goals, Policies, and Implementation Actions

A. General Information

PUBLIC NOTICE Application for Permit

Overview of Water Quality Trading Programs

CONSTRUCTION PERMIT SUBMITTAL CHECKLIST

STORMWATER MANAGEMENT ORDINANCE

COMMUNITY CERTIFICATIONS

Stormwater, Grading and Drainage Control Code

CASS COUNTY COMMISSION POLICY MANUAL ADOPTED DATE: FEBRUARY 2, 1998 PAGE 1 OF 9

State Water Resources Control Board

Photo Credit: Geoff Brosseau

Clean Water Activites Services - Suggestions from Stakeholders. Federal Statute or Regulation Change? State Regulation Change? Policy Change?

ARLINGTON HEIGHTS MUNICIPAL CODE CHAPTER 22 SEWERS

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS

Phosphorus. Phosphorus Lake Whatcom Cooperative Management.

Conservation Tax Credit Regulations Chapter A-1 RULES OF GEORGIA DEPARTMENT OF NATURAL RESOURCES CHAPTER

Underground Commercial Electric Service

DRAINAGE SERVICE CHARGES

Remaining Wetland Acreage 1,500, , ,040-39%

Baltimore City Phase II Watershed Implementation Plan (WIP) July 2, 2012

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST

Please consider substituting the following short narrative on wetland regulatory issues:

Essential Resources for the Stormwater Program Revised September 2008 EPA 833-F

Transcription:

OKR04: What s Changed/What s New Presented By: Carrie J. Evenson, Ph.D., P.E. Industrial Wastewater Enforcement Section Water Quality Division Department of Environmental Quality

Outline What s changed? What s new? What does this mean for you?

Proposed Changes 1. I.B.2 Authorized Non-Stormwater Discharges 2. I.C.5 Limitations on Coverage 3. I.C.6 Discharges not Consistent with a TMDL 4. I.F.4 Application and Annual Permit Fee 5. II Notice of Intent Requirements 6. III Special Conditions 7. IV Stormwater Management Program

Proposed Changes 8. V.C Annual Reports 9. VI Standard Permit Conditions 10. VII Definitions 11. VIII Optional Permit Requirements for Municipal Construction Activities 12. Exhibit 1 Endangered Species and Their Critical Habitat 13. Exhibit 2 Notice of Intent 14. Exhibit 4 Buffer Guidance

Authorized Non-Stormwater Discharges I.B.2.w Non-stormwater Discharges Authorized discharges now include gray water from municipal splash pads (aka, spray parks or spray grounds) Discharges from recirculating systems shall be de-chlorinated prior to discharge Include location, receiving waters and determination that discharge is not a substantial contributor of pollutants to MS4

Limitations on Coverage Discharges Exceeding Water Quality Standards: Your SWMP must include a description of all necessary BMPs and other measures that you will be using to ensure that discharges, or future discharges, will not cause, or have the reasonable potential to cause, or contribute to an exceedance of water quality standards. Language added to be consistent with 40CFR 122.44(d)(1(j)

Limitations on Coverage Discharges not consistent with a Total Maximum Daily Load (TMDL): Discharge of a pollutant into any water for which a TMDL, or watershed plan in lieu of a TMDL, for that pollutant has been either established or approved by DEQ or EPA is prohibited unless your discharge is consistent with that TMDL, or watershed plan. Language added to include instances when a watershed plan is developed instead of a TMDL

Annual Permit Fee Application fee = $100 Annual permit fee = $748.11 Fees will coincide with state fiscal year New MS4s - first year s permit fee will be prorated Fee schedule can be found in Section 252:606-3-4(D)(1): http://www.deq.state.ok.us/rules/606.pdf Invoice will be sent after NOI received

Part II NOI Requirements II.A.I - Application deadlines: Renewal permittee: 90 days Newly regulated small MS4s: 180 days Small MS4s newly designated after the date of permit issuance: 180 days Clarified application deadlines for 3 types of permittees

Part II NOI Requirements II.B.2.b. Description or map that defines the boundaries or extent of your jurisdiction. Extended jurisdiction for those MS4s not located entirely within a UA to corporate boundaries of municipality MS4 program will need to cover entire MS4 not just the area located within UA

Part II NOI Requirements II.B.2.c Name(s) of major receiving water(s) Modified the list of major receiving waters to include ORW or water with TMDL Include indication of receiving waters that are designate as an ORW or have a TMDL in addition to waters on latest CWA 303(d) list on NOI 2012 303(d) list is official list until the 2014 303(d) list is approved http://www.deq.state.ok.us/wqdnew/305b_303d/2012irreport/2012%2 0Appendix%20C%20-%20303d%20List.pdf

Part II NOI Requirements II.B.2.d Supporting documentation addressing special conditions of permit required by Part III.B and C. Added a new provision to include documentation addressing special conditions in Part III.B (TMDL) and Part III.C (ORW) SWMP must address TMDL or watershed plan requirements Must adopt any WLAs or similar targets as measureable goals in SWMP

Part II NOI Requirements II.B.2.e Optional MCM #7 If selected, include description of optional permit requirements or an outline of SWP3 Include this additional information with NOI

Part III Special Conditions III.A.1 Discharges to water listed on latest 303(d) list Added new provisions for the discharge of any pollutants in a 303(d) impaired water. If you discharge into a 303(d) impaired water you must: a) Develop a plan of BMPs you have/will implement and describe how each BMP will reduce the pollutant load b) Use your outreach programs to target entities likely to have significant impacts c) Identify significant pollutant contributors d) Locate and inspect areas likely to have illicit discharges

Part III Special Conditions e) Include operation and maintenance procedures for structural and non-structural controls to reduce pollutants Ensure that new flood management projects assess the impacts on water quality Examine existing projects to determine if additional controls are necessary f) Choose BMPs that can be used for managing the identified pollutants in your discharge. EPA s menu of BMPs can be found here: http://water.epa.gov/polwaste/npdes/swbmp/index.cfm

Part III Special Conditions g) If the pollutant of concern is bacteria, you must submit your proposed BMPs to the DEQ for review. Your proposed BMPs must address: 1. Sanitary sewer systems 2. On-site sewage facilities 3. Illicit discharges and dumping 4. Animal sources 5. Residential education

Part III Special Conditions III.B TMDL or Watershed Plan Added a new provision to adopt any WLA in TMDL or similar targets in watershed plan as measurable goals in your SWMP Include WLA as measureable goals in SWMP Modify SWMP to implement TMDL or watershed plan within the established timeframe

Part IV Stormwater Management Program IV.A.1 Renewal Permittees Added new requirements for existing MS4 permittees to revise and update existing, and/or develop new BMPs and measurable goals Modifications should be implemented within one year of effective date of permit Program should have been developed and implemented during previous permit cycle Modifications should be to strengthen program

Part IV Stormwater Management Program IV.A.2 Newly regulated MS4s Added new requirements for new MS4 permittees to develop a written SWMP IV.A.3 Newly designated MS4s after permit issued Added new requirements for new MS4 permittees designated after the date of permit issuance First 5-year permit cycle should focus on program development and implementation

Part IV Stormwater Management Program IV.A.5.c - Sharing Responsibility: If the other government entity fails to implement the control measure on your behalf, then you remain responsible for compliance with permit obligations. You must modify your SWMP within one (1) year and comply with permit requirements. Added language to require SWMP modification if copermittee or other entity responsible for implementing BMP or MCM fails to meet permit obligations

Part IV Stormwater Management Program Reorganized the 7 MCMs into 2 sections: Permit requirements Recommendations Reminder: existing permittees are required to revise their SWMP within the first year Both sections were changed to be consistent with 40 CFR and MS4 Permit Improvement Guide

Part IV Stormwater Management Program IV.C.4.a.1 Construction Site Stormwater Runoff Control Added a new provision to provide a procedure to notify DEQ if the permittee lacks legal authority of direct enforcement action for their construction site runoff controls DEQ can assist with enforcement if continued noncompliance is encountered

Part IV Stormwater Management Program IV.C.5.a.3 Post-Construction Stormwater Management Added a new provision to review local ordinances and regulations to: Identify any legal/regulatory barriers to LID Develop a schedule to remove these barriers, or Provide a justification for each barrier not removed

Part IV Stormwater Management Program IV.C.6.a Pollution Prevention/Good Housekeeping Added a new provision to implement a municipal employee training and education program for your Pollution Prevention/Good Housekeeping for MS4 Operations Added a new requirement to maintain a list of industrial facilities owned or operated by MS4 that are subject to the MSGP or individual OPDES/NPDES permits

Part V Monitoring, Recordkeeping, & Reporting V.C.1 Annual Reports Submit via mail or email to DEQ by March 1 st Will cover calendar year during this permit cycle Include a description and schedule for implementation of any additional BMPs or monitoring that may be necessary to: 1. Reduce/eliminate the discharges of the pollutant of concern into impaired waters on the 303(d) list 2. Ensure compliance with any applicable TMDL or watershed plan in lieu of a TMDL

Part VI Standard Permit Conditions VI.A Duty to Comply Updated permit language of Duty to Comply to be consistent with OPDES Act VI.S Compliance Schedules Added a new provision to submit reports in any compliance schedules no later than 14 days following each schedule date and VI.T Twenty-Four (24) Hour Reporting Added a new provision to orally report any noncompliance which may endanger health or the environment within 24 hours from the time you become aware of the circumstances

Part VII Definitions Updated definition of Construction Site Operator to be consistent with construction general permit OKR10: Owner/Operator replaced with Operator Clarified use of term Owner = individual who owns structure or land Doesn t necessarily imply operational control of construction activities Established primary operator and secondary operator Primarily for use with larger common plans of development with multiple parties meeting definition of operator

Part VII Definitions Added new definitions of: Impaired Water LID Newly regulated small MS4 Small MS4 newly designated after the date of permit issuance Stabilization Total Maximum Daily Load Waters of the State

Part VII Definitions Impaired Water (or Water Quality Impaired Water) Identified by State or EPA pursuant to Section 303(d) or the Clean Water Act as not meeting applicable State water quality standards Includes Waters with approved or established TMDLs, and Waters for which a TMDL has not yet been established or approved

Part VII Definitions LID (or Low Impact Development) An approach to land (re)development that works with nature to manage stormwater as a resource rather than a waste product. LID employs principles such as: Preserve and recreate natural landscape features Minimize effective imperviousness Create functional and appealing site drainage Treats stormwater as a resource

Part VII Definitions Newly Regulated Small MS4 MS4 newly designated as a result of 2010 US census data or other new information and required to be covered under an OPDES permit Small MS4 Newly Designated after the Date of Permit Issuance MS4 newly designated by EPA or DEQ after the date of this permit issuance

Part VII Definitions Stabilization Process of covering exposed ground surfaces with vegetative or nonvegetative practices to reduce erosion and prevent sediment discharge 1. Temporary stabilization Stabilization of exposed portions of the site in order to provide temporary cover: During the establishment and growth of vegetation, and/or In areas where earth-disturbing activities will occur again in the future 2. Final stabilization Stabilization of exposed portions of the site using practices that provide permanent cover and qualify the permittee for permit termination

Part VII Definitions Total Maximum Daily Load or TMDL Refers to the sum of the individual waste load allocations (WLAs) for point sources, safety, reserves, and loads from nonpoint sources and natural background

Part VII Definitions Waters of the State (27A O.S. 1-1-201) Refers to all streams, lakes, ponds, marshes, watercourses, waterways, wells, springs, irrigation systems, drainage systems, storm sewers and all other bodies or accumulations of water, surface and underground, natural or artificial, public or private, which are contained within, flow through, or border upon this state or any portion thereof, and shall include under all circumstances the waters of the United States which are contained within the boundaries of, flow through, or border upon this state or any portion thereof. Provided waste treatment systems, including treatment ponds or lagoons designed to meet federal and state requirement other than cooling ponds as defined in the Clean Water Act or rules promulgated thereto, and prior converted cropland are not waters of the State.

Part VII Optional Permit Requirements for Municipal Construction Activities Updated the requirements to be consistent with OKR10 Includes: Erosion and sediment controls Stabilization requirements Pollution prevention requirements Corrective actions More stringent requirements for stabilization, inspections, buffers, etc. if discharging to ORW or ARC

Exhibits 1, 2, and 4 12. Exhibit 1 Endangered and Threatened Species and Their Critical Habitat : Updated the list and map according to the comments received from USFWS 13. Exhibit 2 Notice of Intent : Updated the NOI according to the new requirements of this permit 14. Exhibit 4 Buffer Guidance : Added this new exhibit to be consistent with OKR10

Buffer Requirements Two (2) buffer requirements 1. Discharging into receiving water located on or immediately adjacent to your site Provide 50 feet of natural buffer as measured from the top of the bank to disturbed portions of the site 2. Discharging to the watershed of ARC and/or ORW Provide 100 feet of vegetated buffer between area disturbed and all perennial or intermittent streams; or 50 feet of vegetated buffer between area disturbed and all ephemeral streams or drainages.

Buffer Requirements Types of Streams 1. Perennial Flow year-round 2. Intermittent Flow periodically/seasonally when there is enough water from various sources 3. Ephemeral Exist for short periods of time, usually during a rainy period May have defined channels even when they are dry

Buffer Requirements Three compliance alternatives Alternative 1: Provide and maintain a 50/100-foot natural buffer Alternative 2: Provide and maintain >50/100-foot buffer and install additional erosion and sediment controls Alternative 3: Implement equivalent erosion and sediment controls to achieve the same sediment load reduction as provided by a 50/100 foot natural buffer if natural buffer of any size is infeasible

Buffer Requirements Natural buffers and equivalent sediment controls don t apply when: Water crossings, limited water access, and stream restoration authorized under a Clean Water Act (CWA) Section 404 permit exist No natural buffer exists due to preexisting development disturbances (e.g., structures, impervious surfaces)

The DEQ Office Contacts Stormwater Permitting: Michael Moe (405) 702-8184 Karen Milford (405) 702-8191 Ismat Esrar (405) 702-8193 Compliance/Enforcement: Wayne Craney (405) 702-8139 Carrie Evenson (405) 702-8136 Michelle Loudenback (405) 702-8116 Lori Mollenkamp (405) 702-8156 Michelle Chao (405) 702-8112

Questions?