McNICHOLS ECO-ROCK Specifications

Similar documents
1. Preassembled steel stairs with concrete-filled treads. 2. Handrails attached to walls adjacent to metal stairs.

SECTION ALUMINUM HANDRAIL AND RAILING SYSTEMS WITH DECORATIVE METAL PANEL INFILLS

SECTION COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

Sapa: SECTION ARCHITECTURAL ALUMINUM HANDRAILS AND RAILINGS

STANDARD SPECIFICATIONS SECTION METAL FABRICATIONS

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

PART 1 GENERAL 1.1 SECTION INCLUDES

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION PREFORMED METAL STANDING SEAM ROOFING PART 1 - GENERAL 1.1 DESCRIPTION OF WORK

DIVISION 8, METAL SOUND CONTROL DOOR ASSEMBLIES PART 1 GENERAL 1.1 RELATED DOCUMENTS

DENVER MODEL 30 X 30 SPECIFICATIONS

SECTION PREFORMED METAL STANDING SEAM ROOFING

ATLANTA MODEL SPECIFICATIONS

SECTION PIPE HANGERS AND SUPPORTS

COLORADO MODEL. 35 x 65 SPECIFICATIONS

Guidelines for Earthquake Bracing of Residential Water Heaters

Sports and High Mast Lighting Poles Phone: (866) Fax: (817)

James M. Pleasants Company

SECTION WINDOW WASHING SYSTEMS

A. The shade structure contractor shall be responsible for the design, engineering, fabrication, and supply of the work specified herein.

SECTION GUARDRAILS

It's large enough to handle most welding job shop projects, yet small enough to make it a worth while home-workshop tool

2. Division 05 Structural Steel Framing for steel framework requirements

SECTION FREIGHT & PARKING GARAGE ELEVATORS PART I - GENERAL

REDI-EXIT COMMERCIAL FIRE DOOR AND EXTERIOR DOOR KITS INSTALLATION GUIDELINES

SECTION SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

Specifications. Preformed Metal Wall and Roof Panels. Alcoa Cladding Systems Manufacturing Plant 100 Industrial Boulevard Eastman, Georgia 31023

SECTION FIRE HYDRANTS

SECTION STANDING SEAM METAL ROOFING

SECTION 6. Glass Storefront Doors:

Packaged Terminal Air Conditioner Wall Sleeve Installation

MAST ARMS & POLES. Ornamental Pole Top & Bases

DESIGN CLARIFICATION (DC)

SECTION STANDING SEAM METAL ROOF

FRAME PROFILE MASONRY METAL DOOR FRAME FLUSH MASONRY KD MITER CORNER JOINT. #8 Screw (MS002485) Required on all fire rated KD frames. Bend Tabs.

WHI 90-Minute Rated Veneered Door Frame Installation Instructions

Preformed Metal Roofing and Siding

Model # 940P-V6. Page 1 of 11

City of San Diego, CWP Guidelines

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

The Butler MR-24 Standing Seam Roof Difference. A comparison between metal roof systems

09/07/07 GLASSFIBER REINFORCED CEMENT (GRC) C. S. I. Spec Master Spec Page 1

INSTALLATION OF A BAY WINDOW

SECTION STORM DRAINAGE SYSTEM

GUIDELINE SPECIFICATIONS

Guidelines for Earthquake Bracing Residential Water Heaters

INSTRUCTIONS FOR COORDINATION SECTION SOLID SURFACE FABRICATIONS

Manufacturing, Supply & Quality Plan for Tower Bolts. SL Tower Bolt Market Penetration

March 14, Installation of Bay, Bow and Garden Windows

SECTION COLD-FORMED METAL DECK FRAMING Elevations Steel Deck Framing by Trex

Mechanical Installation

PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta

K2 STONE NATURAL VENEER

Residential Deck Safety, Construction, and Repair

Steel Panel Frame. Exterior Steel Sheeting. Optional Rigid Insulation. Optional Steel Insulation Liner

SPIRAL STAIR KIT INSTALLATION MANUAL

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11

Chapter 3 Pre-Installation, Foundations and Piers

TARIFF CODE and updates standard

CLEAR-DIVISIONS CENTERFOLD

SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)

Depend-O-Lok FxE Expansion Coupling. System No. Submitted By Spec Sect Para Location Date Approved Date. DEPEND-O-LOK FxE EXPANSION COUPLING

1. Lay out 2 pieces of 7/8" tubing and mark for bending as shown. Remember that the bend is in the shaded area as shown below in Figure 1.

SERIES 238 WINDOWS. NOTE: Read instructions completely before attempting any installation.

Dock Hardware & Accessory Products Catalog

Basement Window Installation Guide Hopper and Sliding

Diameter. Swift Lift Round Recess Plug. Note: The diameter of the narrow recess plug is the same as the diameter of the round recess plug.

Policy on Water Heater Installations Policy No. UPC Effective: September 1, 1995 Revised: February 10, 1996

SECTION 1 GENERAL REQUIREMENTS

SECTION CABLE TRAYS. A. Continuous, rigid, welded steel or stainless steel wire mesh cable management system.

Simplified Steel Stair Design for Commercial and Institutional Buildings

Acceptance Codes APPENDIX - A. Acceptance Criteria

SPECIFICATION Section Structural Precast / Prestressed Concrete

DE Frame with C Series Sidelight

Includes specifications for: Surface Cleaning & Mounting Hardware.

MGB Chrome Bumper Conversion

SECTION GUARDA SECURITY WINDOW SCREENS

SECTION ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES

SECTION SANITARY SEWER AND STORM DRAIN SYSTEMS

Black Wolf POCKET BILLIARD TABLE INSTALLATION MANUAL. SERVICE DEPARTMENT P.O. BOX 68 BRISTOL, WI 53104

EZ-48-3AB Weather Station Mounting Tripod and Mast

Springlok Flashing System

IKG Bar Grating: Anchoring

CLEAR-DIVISIONS APERTO

SECTION WATER STORAGE TANK PAINTING

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

Uncovered Decks & Porches

VALOR STEEL BUILDINGS STANDARD SPECIFICATIONS

TIGER Drylac U.S.A., Inc Swenson Avenue St Charles, IL T F office.us@tiger-coatings.us

1.02 SYSTEM DESCRIPTION

Section SEWER PIPE INSTALLATION AND TESTING

HIGH TENSION CABLE BARRIER

TYPICAL WIRING OF METER SOCKET FOR SINGLE PHASE, THREE WIRE OVERHEAD SERVICE

necessary for years of satisfactory service. SmartBlock insulating form concrete walls share the

SECTION GROUND WATER STORAGE TANKS

Display hidden notes to specifier. (Don't know how? Click Here) A. Advanced Upcoiling Security Grilles, power operated.

Arecont Vision H.264 Color or Day/Night SurroundVideo Series Installation Manual

Transcription:

SECTION 0000 ECO-ROCK System PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, apply to this Section. 1.2 SUMMARY A. This Section includes but is not limited to the following: 1. Standard ECO-ROCK System 2. Radius ECO-ROCK System 3. Custom ECO-ROCK System 4. ECO-ROCK System wire and crimps 5. Miscellaneous Trim, Clips and Fasteners. B. Products furnished, but not installed, under this Section include the following: 1. Tube steel supports, weld plates, anchor bolts, steel pipe sleeves, and wedge-type inserts indicated to be cast into concrete or built into unit masonry. 1.3 PERFORMANCE REQUIREMENTS A. Thermal Movements: Provide plant screen structure and related metal fabrications that allow for thermal movements that result from the following maximum change (range) in ambient and surface temperatures. Installer shall prevent buckling, opening of joints, overstressing of components, failure of connections, reduced connections and any other effects during installation that are detrimental to the integrity of the planting screen system. Expansion and contraction calculation shall be based on surface temperatures of materials due to both solar heat gain and night time-sky heat loss and calculated by a licensed structural engineer. 1. Temperature Change (Range): 120 deg F, ambient; 180 deg F, material surfaces. [specifier to verify] 1.4 SUBMITTALS A. Shop Drawings: McNICHOLS to show fabrication and installation details for ECO-ROCK System. 1. Include plans, elevations, sections, and details of ECO-ROCK System and relevant connections. Indicate foundation connections. McNICHOLS ECO-ROCK SYSTEM SPECIFICATIONS 0-1

2. Provide base weld plates or templates for anchors and bolts specified for installation under other Sections. 1.5 QUALITY ASSURANCE A. Welding: Qualify procedures and personnel according to the following: 1. AWS D1.1, Structural Welding Code--Steel. 1.6 PROJECT CONDITIONS A. Field Measurements: Prime Contractor to field verify existing before fabrication of ECO-ROCK System. Indicate measurements on Approval Drawings. 1. Established Dimensions: Where field measurements cannot be use established dimensions and proceed with fabricating ECO-ROCK System based on reviewed Approval Drawings. Coordinate wall and other contiguous construction as required to ensure that actual dimensions correspond to established dimensions and the context of the existing conditions. 1.7 COORDINATION A. McNichols to coordinate installation of weld base plates and system anchorage. Furnish templates, layout drawings and directions for installing anchorage system, including sleeves, concrete inserts, anchor bolts, weld plates and items with integral anchors, that are to be embedded in concrete or masonry. Installation by Prime Contractor PART 2 - PRODUCTS 2.1 MANUFACTURER A. McNICHOLS CO., PO Box 30300, Tampa, FL 33630-3300. Phone# 866-754-5144 2.2 METALS, GENERAL A. Metal Surfaces, General: Provide materials with smooth, flat surfaces, unless otherwise indicated and consistent with the design intent of the system. 2.3 FERROUS METALS A. Steel Plates, Shapes, and Bars: ASTM A 36/A 36M. B. Steel Tubing: ASTM A 500, cold-formed steel tubing. C. Steel Pipe: ASTM A 53/A 53M, standard weight (Schedule 40), unless another weight is indicated or required by structural loads. McNICHOLS ECO-ROCK SYSTEM SPECIFICATIONS 0-2

2.4 ECO-ROCK PANELS A. Standard Panel: 1. Size: 6 depth 3 high to 8 high max. 3 wide to 5 wide. 2. Wire diameter:.148 (9 gauge),.192 (6 gauge); 3. Bridge / Bulge Wire Diameter:.105 through.148 4. Bridge / Bulge Wire Spacing: 12 to 24 5. Stabilizing plate: 3/8 X 4 6. Wire Centers: 2 x 2, 3 x 3. 7. Weave: Intercrimp 8. Material: Plain steel or Galvannealed 9. Finish: Mill, Bare (Sandblasted to be weathered), Powder Coated B. Radius Panel: 1. Size: in one foot increments from 6 wide to a max of 10 wide and 1 high to a maximum of 40 high. 2. Wire Diameter:.148 (9 gauge),.192 (6 gauge) 1. Bridge / Bulge Wire Diameter,.105 through.148 2. Bridge / Bulge Wire Spacing: 12 to 24 3. Stabilizing plate: 3/8 X shape to be specified 4. Wire Centers: 2 x 2, 3 x 3 max. 5. Weave: Intercrimp 6. Material: Carbon Steel, Galvanized, Stainless Steel and Aluminum 7. Finish: Mill, Bare (Sandblasted to be weathered), Powder Coated 8. Diameter minimum: 1-0 C. Custom Panel: 1. Size: 6 wide to a max of 10 wide and 1 high to a max of 40 high. 2. Wire Diameter:.192 (6 gauge),.225 (4 gauge),.244 (3 gauge) 3. Bridge Bar Diameter: ½, 1, 1-½ 4. Bridge Bar Spacing: From wire centers to 24 5. Stabilizing plate: 3/8 X shape to be specified 6. Wire Centers: 1 x 1 min, 1.5 x 1.5, 2 x 2 ; 3 x 3, 6 x 6 max. 7. Weave: Intercrimp 8. Material: Plain Steel, Galvannealed, Stainless Steel and Aluminum 9. Finish: Mill, Bare (Sandblasted to be weathered), Powder Coated 10. Custom shape: [specifier to verify] 2.5 CLIPS A. All mounting clips shall be fabricated from minimum ¼ to 1, metal to match screen wire. All bending, forming and drilling shall be done prior to powder coat finish. All (2) piece mounting clips are to be joined with specified bolt and lock hex nut and washers. 2.6 POSTS A. Posts shall be minimum 3 diameter ASTM A-500 or 3 square x 3/16 thick tube steel, as indicated, with commercial grade finish to match panels, natural finish or powder coated. Overall post length should be verified, based on panel size, post spacing, wind load requirements and soil conditions. McNICHOLS ECO-ROCK SYSTEM SPECIFICATIONS 0-3

2.7 FASTENERS A. Stainless Steel Fasteners: Provide Type 304 stainless-steel fasteners for exterior use and zincplated fasteners with coating complying with ASTM B 633, Class Fe/Zn 5, at exterior walls. Provide stainless-steel fasteners for fastening aluminum. Provide fasteners for type, grade, and class required. B. Steel Bolts and Nuts: Round head hexagon bolts, ASTM A 307, Grade A; with nylon lock hex nuts, ASTM A 563; and flat washers. C. Anchor Bolts: ASTM F 1554, Grade 36. 1. Provide hot-dip or mechanically deposited, zinc-coated anchor bolts where item being fastened is indicated to be galvanized. Size and length of bolts to be varied based on structural requirements. D. Eyebolts: ASTM A 489. E. Machine Screws: ASME B18.6.3. F. Plain Washers: Round, ASME B18.22.1. G. Lock Washers: Helical, spring type, ASME B18.21.1. H. Cast-in-Place Anchors in Concrete: Anchors capable of sustaining, without failure, a load equal to four times the load imposed, as determined by testing according to ASTM E 488, conducted by a qualified independent testing agency. 1. Threaded or wedge type; galvanized ferrous castings, either ASTM A 47/A 47M malleable iron or ASTM A 27/A 27M cast steel. Provide bolts, washers, and shims as needed, hot-dip galvanized per ASTM A 153/A 153M. I. Expansion Anchors: Anchor bolt and sleeve assembly with capability to sustain, without failure, a load equal to six times the load imposed when installed in unit masonry and four times the load imposed when installed in concrete, as determined by testing according to ASTM E 488, conducted by a qualified independent testing agency. 1. Material for Anchors in Interior Locations: Carbon-steel components zinc-plated to comply with ASTM B 633, Class Fe/Zn 5. 2. Material for Anchors in Exterior Locations: Alloy Group 1 (A1) stainless-steel bolts complying with ASTM F 593 and nuts complying with ASTM F 594. 2.8 MISCELLANEOUS MATERIALS A. Welding Rods and Bare Electrodes: Select according to AWS specifications for metal alloy welded. B. Universal Shop Primer: Fast-curing, lead- and chromate-free, universal modified-alkyd primer complying with MPI#79. 1. Use primer containing pigments that make it easily distinguishable from zinc-rich primer. C. Galvanizing Repair Paint: High-zinc-dust-content paint for re-galvanizing welds in steel, complying with SSPC-Paint 20. McNICHOLS ECO-ROCK SYSTEM SPECIFICATIONS 0-4

2.9 FABRICATION, GENERAL A. Shop Assembly: Preassemble items in the shop to greatest extent possible. Disassemble units only as necessary for shipping and handling limitations. Use connections that maintain structural value of joined pieces. Clearly mark units for reassembly and coordinated installation. B. Cut, drill, and punch metals cleanly and accurately. Remove burrs and ease edges to a radius of approximately 1/32 inch. Remove sharp or rough areas on exposed surfaces. C. Form bent-metal corners to smallest radius possible without causing grain separation or otherwise impairing the material. D. Form exposed work true to line and level with accurate angles and surfaces and straight edges. E. Weld corners and seams continuously to comply with the following: 1. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals. 2. Obtain fusion without undercut or overlap. 3. Remove welding flux immediately. 4. At exposed connections, finish exposed welds and surfaces smooth and blended so no roughness shows after finishing and contour of welded surface matches that of adjacent surface. F. Form exposed connections with hairline joints, flush and smooth, using concealed fasteners where possible. Where exposed fasteners are required, use Phillips flat-head (countersunk) screws or bolts, unless otherwise indicated. Locate joints where least conspicuous. G. Fabricate seams and other connections that will be exposed to weather in a manner to exclude water. Provide weep holes at 12 oc. where water may accumulate. H. Cut, reinforce, drill, and tap metal fabrications as indicated to receive finish hardware, screws, and similar items. I. Provide for anchorage of type indicated; coordinate with supporting structure. Space anchoring devices to secure metal fabrications rigidly in place and to support indicated loads. 1. Where units are indicated to be cast into concrete or built into masonry, equip with integrally welded steel strap anchors, 1/8 by 1-1/2 inches, with a minimum 6-inch embedment and 2-inch hook, not less than 8 inches from ends and corners of units and 24 inches oc., unless otherwise indicated. 2.10 MISCELLANEOUS FRAMING AND SUPPORTS A. General: Provide steel framing and supports not specified in other Sections as needed to complete the Work. B. Fabricate units from steel shapes, plates, and bars of welded construction, unless otherwise indicated. Fabricate to sizes, shapes, and profiles indicated and as necessary to receive adjacent construction retained by framing and supports. Cut, drill, and tap units to receive hardware, hangers, and similar items. McNICHOLS ECO-ROCK SYSTEM SPECIFICATIONS 0-5

2.11 FINISHES, GENERAL A. Comply with NAAMM s Metal Finishes Manual for Architectural and Metal Products for recommendations for applying and designating finishes. B. Commercial Grade Finish - all panels, trim, posts, caps plus miscellaneous clips shall be fabricated, cut, bent and drilled prior to receiving a multi-grade phosphate wash, a thermally-set epoxy primer and a thermally-set powder paint finish, 13 standard colors available. C. Weather Sandblasted D. Mill Finish PART 3 - EXECUTION 3.1 INSTALLATION, GENERAL A. General: Install framing and supports to comply with requirements of items being supported and requirements indicated on Approval Drawings. B. Cutting, Fitting, and Placement: Perform cutting, drilling, and fitting required for installing plant screen structures and panels. Set plant screen structures accurately in location, alignment, and elevation; with edges and surfaces level, plumb, true, and free of rack; and measured from established lines and levels. Field verify all condition prior to installation. C. Fit exposed connections accurately together to form hairline joints. Weld connections that are not to be left as exposed joints but cannot be shop welded because of shipping size limitations. Do not weld, cut, or abrade surfaces of exterior units that have been hot-dip galvanized after fabrication and are for bolted or screwed field connections. At areas of removed finished, provide touch-up finish to match existing. D. Field Welding: Comply with the following requirements: 1. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals. 2. Obtain fusion without undercut or overlap. 3. Remove welding flux immediately. 4. At exposed connections, finish exposed welds and surfaces smooth and blended so no roughness shows after finishing and contour of welded surface matches that of adjacent surface. E. Fastening to In-Place Construction: Provide anchorage devices and fasteners where metal fabrications are required to be fastened to in-place construction. Provide threaded fasteners for use with concrete and masonry inserts, toggle bolts, through bolts, lag bolts, wood screws, and other connectors. 3.2 ADJUSTING AND CLEANING A. Touchup Painting: Immediately after erection, clean field welds, bolted connections, and abraded areas. Paint uncoated and abraded areas with the same material as used for shop painting to comply with SSPC-PA 1 for touching up shop-painted surfaces. McNICHOLS ECO-ROCK SYSTEM SPECIFICATIONS 0-6

1. Apply by brush or spray to provide a minimum 2.0-mil dry film thickness. B. Touchup Painting: Cleaning and touchup painting of field welds, bolted connections, and abraded areas of shop paint are specified in Division 9 painting Sections. END OF SECTION 0000 McNICHOLS ECO-ROCK SYSTEM SPECIFICATIONS 0-7