Wildfire & Flash Flood Recovery NACo Justice & Public Safety Symposium January 2014

EMERGENCY WATERSHED PROTECTION

Angora Fire Restoration Activities June 24, Presented by: Judy Clot Forest Health Enhancement Program

Waldo Canyon Fire. Mark Shea Watershed Planning Supervisor August 23, 2012

Untreated (left) and treated (right) Sierra Nevada forests in Amador County, CA. Photos: Sierra Nevada Conservancy

Prattsville Berm Removal Project. 1.0 Project Location

Arapaho & Roosevelt National Forests 2013 Flood: Long-term Recovery in a Changed Landscape

Appendix D: Federal Agencies Hazard Mitigation Roles, Responsibilities, and Authorities

Disaster Recovery Managing and Leveraging Multiple Funding Sources

A. Flood Management in Nevada

Mission Canyon Residential Design Guidelines Workshop. Table Focus: Environmental Issues and Concerns

ESCAMBIA COUNTY FLOOD RECOVERY: 1- YEAR ANNIVERSARY REPORT

Case Study: The History of the San Juan Headwaters Forest Health Partnership

Lesson 5. After a Disaster: Recovery and Hazard Mitigation Programs. Disaster Assistance

LOS ANGELES COUNTY S FLOODING HISTORY:

SFPUC Experience with Rim Fire

Federal Assistance for Wildfire Response and Recovery

Construction Site Inspection Checklist for OHC By making use of some simple Best Management Practices (BMPs) a construction site operator can

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

Animals in Disasters

Potential Economic Benefits to Santa Ana River Watershed of Forest Restoration. Barbara Wyse, Senior Economist

City of Shelbyville Site Inspection Checklist

FLOOD PROTECTION BENEFITS

Post-Flood Assessment

The answers to some of the following questions are separated into two major categories:

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

ANGORA FIRE RESTORATION PROJECT

Walter Dasheno Governor Santa Clara Pueblo

PIRU FIRE BURNED AREA EMERGENCY RESPONSE PLAN

Arizona s Large Fires Suppression vs. Restoration. WESTCAS Fall 2011 Meeting Bruce Hallin Manager, Water Rights and Contracts October 27, 2011

ANNEX 3 ESF-3 - PUBLIC WORKS AND ENGINEERING. SC Budget and Control Board, Division of Procurement Services, Materials Management Office

California Alluvial Fan Task Force

Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT

How To Assess An Area For Erosion

How To Check For Scour At A Bridge

2012 Program Report. Agricultural Group Drainage Program

Appendix B REFERENCES

Landslides. Landslides-1. March 2007

Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

House Research Department General Fund Appropriations in Flood Relief Bills

REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 LEECH WATER SUPPLY AREA RESTORATION UPDATE

Challenges. Estimated Damages from 100-Year Flood

Floodplain Connectivity in Restoration Design

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

Flood Risk Management

Flood Risk Management

The Role of Government in a Disaster

Flood Emergency Response Planning: How to Protect Your Business from a Natural Disaster RIC005

Outlet stabilization structure

Hurricane Sandy Recovery Efforts

Your Defensible Space Slideshow

PUBLIC ASSISTANCE DAMAGE ASSESSMENT

The correct answers are given below. Some talking points have been added for the teachers use.

El Nino in the OC. Orange County Sheriff s Department Emergency Management Division

ALTERNATIVE SOURCES OF FUNDING FOR

3.4 DRAINAGE PLAN Characteristics of Existing Drainages Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

DRAFT SOUTH FORK SKYKOMISH RIVER

Colorado Natural Heritage Program

ESF 14. Long-Term Community Recovery

King Fire Restoration Project, Eldorado National Forest, Placer and El Dorado Counties, Notice of intent to prepare an environmental impact statement.

Village of Spring Valley Comprehensive Plan

Chapter 6: Mitigation Strategies

Table 4.9 Storm Drain Inlet Protetion Applicable for

US Army Corps of Engineers BUILDING STRONG

Emergency Streambank Restoration/Stabilization. Kentucky Division of Water Water Quality Certification May 2010 Educational Assistance

Small Dam Hazard Assessment Inventory

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County

How To Protect Your Property From Flooding

5.14 Floodplains and Drainage/Hydrology

Swannanoa River Flood Risk Management Study

Town of Canmore Flood Recovery Action Plan January canmore stands strong canmore stands strong

Final Report. Dixie Creek Restoration Project. Funded by Plumas Watershed Forum

A Stream Restoration Case Study in the California Central Coast

STRATEGIES FOR PROTECTING YOUR PROPERTY

Frequently-Asked Questions about Floodplains and Flood Insurance FLOOD INSURANCE

Homeowner s Guide to Drainage

Why should communities invest in resiliency? What are the steps communities can take to become more resilient?

REFERENCE. All National Grid personnel who plan and perform work involving protected water resources are responsible for:

Transcription:

Wildfire & Flash Flood Recovery Emergency Watershed Protection (EWP) Flood Mitigation Efforts April 2014 Fall 2013

Recovery Specific to Incident Recovery Efforts Depend on: Population Impacted Topography of Area Size and Extent of Disaster Homes Damaged/Destroyed Businesses Damaged/Destroyed Infrastructure Damage/Destroyed Utilities Damaged/Destroyed Jurisdictions Public Health Concerns Citizen & Volunteer Reponse Funding Resources

June 11, 2013: north of Colorado Springs in unincorporated El Paso County Two people killed 14,000 acres burned, heavily forested area 488 homes destroyed Black Forest Fire

Waldo Canyon Fire June 23, 2012: near Colorado Springs in western El Paso County Two people killed 18,247 acres burned, mostly mountainous, steep terrain 347 homes destroyed More than $40 million spent on fire recovery and flood mitigation to date

Overview of Effort

Waldo Canyon - Above Cascade Work on private property: Debris removal Structure protection -Gabions -TRAP bags -Sand bags & berms Channel improvements

Above Cascade Gabions TrapBags

Cascade Projects Grade control Catchment basins Log crib walls Rock crib walls Riprap run downs Road water bars Erosion control logs Erosion control matting Revegetation

Grade Control Purpose: slow water down Achieved by use of several techniques: Sills Crib walls Energy dissipation Basins Erosion control matting

Grade Control Rock check dams in series for grade control Rock-lined low water crossing to protect road from erosion

Catchment Basins Used to catch sediment and reduce peak flows

Log & Rock Crib Walls Channel is flattened to spread out water Slows down flow and allows for infiltration

Riprap Rundown Flow across cul-de-sac is channeled into opening between RIBS bags Rock sill at bottom dissipates energy Channel is covered in reinforced erosion matting Re-graded side slopes are seeded and matted

Riprap Rundown

Road Water Bars Diverts flows off of roadway

Rainbow Falls Pond (before) Dam

Rainbow Falls Pond (after) Dam Used existing structure built in 1934 by Civilian Conservation Corps Removed 3,400 cubic yards of decomposed granite Achieved approximately 3 acre-feet of storage

Rainbow Falls Pond (after) Sediment Line Three to five feet of sediment removed from pond area Approximately 50 trees removed

Manitou Springs Structure Protection

Williams Canyon Evaluated canyon from old entrance gate to Forest Service boundary: Temporary access road Rosgen structures Debris removal Decommission road upon completion

Williams Canyon Very limited access in upper reach (from falls to USFS boundary, walk in only) Varied geology in middle stretch (in red) Inadequate space available for catchments/no access for maintenance Archeological clearances require removal of old road and wall Not cost effective

EWP Spending Summary Waldo Canyon Fire & Flooding Incurred and Budgeted Costs (as of 3/12/14) Total Project Cost Local Match (25%) Above Cascade - Complete Construction $ 410,788 $ 102,697 Cascade - Complete Technical Assistance $ 89,005 $ 0 Construction $ 424,809 $ 106,202 Rainbow Falls Pond - Complete Construction $ 128,662 $ 32,166 Manitou Springs - Complete Technical Assistance $ 36,653 $ 0 Construction $ 28,754 $ 7,188 Williams Canyon - Complete Technical Assistance $ 59,130 $ 0 Total $ 1,177,801 $ 248,253* Cascade - In Progress Construction (cleanable catchment basin) $ 232,400 $ 58,100* Ute Pass Area - Planned Technical Assistance $ 1,865 $ 0 Construction (structure protection) $ 855,719 $ 213,930* Manitou Springs - Planned Technical Assistance $ 347,147 $ 0 Construction $ 1,900,000 $ 475,000** Total $ 3,337,131 $ 747,030 * In-kind match amount provided by our partner CUSP ** Match amount to provided by Manitou Springs

Planned Projects September 2013 Flooding September 2013 Flooding Exigent 3 projects Match = 12.5% Shorter timeframe Non-Exigent (NOT FUNDED) 12 projects $2.3M (25% Match) Longer timeframe

Seven Falls Undermined wall and erosion

Seven Falls Bank failure and debris dam in creek

Seven Falls Undermined wall and bank failure

K5 Ranch Bank failure and erosion at bend in Fountain Creek Threatening 115 kv power line in background

K5 Ranch Bank failure and erosion at bend in Fountain Creek

Cascade Middle Channel Sediment removal & channel stabilization Grade control structures & catchment basins Low water crossings

EWP Spending Summary September 2013 Flooding Phase 1 Exigent (Funding Agreement in Process as of 3/12/14) Seven Falls Total Project Cost Local Match (12.5%)* Construction $ 322,000 $ 40,250 K5 Ranch Construction $ 620,000 $ 77,500 Cascade Middle Channel Construction $ 1,256,000 $ 157,000 Total $ 2,198,000 $ 274,750* * Project costs and match to be provided by property owners for Seven Falls and K5 Ranch; CUSP to provide match for Cascade Middle Channel

Recovery: Public Communication Efforts Public Meetings in impacted areas to address Post fire public safety risks: restoration of Utilities, Flash Flooding, Dead Trees, Infrastructure damage/repair Insurance Advocacy Consider Non-Profit like United Policyholders Recovery projects updates and timelines Communicate clearly funding requirements and efforts Interagency responsibilities and cooperation Non-profit resources Non-stop press releases, email blasts, social media, recovery information web page, etc use all avenues

Recovery Collaboration Identify Partners and Responsibilities now Government Agencies County Cities & Towns Utilities State Department of Local Affairs Office of Emergency Management U.S. Forest Service Natural Resources Conservation Service (NRCS) U.S. Congressional representation State Department of Transportation Army Corps of Engineering Water Quality: State and County Health Dept. U.S. Weather Service Other Jurisdictional Agencies

Recovery Collaboration Identify Partners and Responsibilities now Coordinate for participation at a Disaster Assistance Center Non Profits & Disaster Assistance Goodwill United Way Red Cross United Policyholders Insurance Agencies Food Banks Faith Based Organizations Environmental Organizations Mental Health Organizations Local Agencies that can help with funding, volunteers, food, clothing, health care, home building organizations, etc.

Recovery Collaboration What You Can Provide. Coordinate for participation at a Disaster Assistance Center County & Affiliated Agencies Budget & Finance (FEMA) Transportation/Fleet Engineering Assessor Human Services Public Health Regional Building Environmental Services Sheriff s Office Office of Emergency Management Public Information Workforce Center Small Business Development Center

Prevention is Critical The same conditions that contributed to the Waldo Canyon Fire and subsequent flooding exist in lands adjacent to the burn scar Major population centers and life safety at risk Communities and critical U.S. highway connecting the Front Range to the mountains

Prevention is Critical Healthy forest management is a fraction of the cost of fighting and recovering from forest fires and floods. A healthy forest has 100 trees per acre; a typical acre in Pike National Forest has 1,000 trees Forestry projects that prevent catastrophic forest fires are key to limiting lasting regional economic impact from fires and flash floods There is approximately 212,000 acres of Pike National Forest in El Paso and Teller Counties; 18,000 acres burned in the Waldo Canyon Fire National Forest officials say all acreage needs active management

Needs for Current & Future Projects Emergency Watershed Protection Program funds to initiate and complete projects and expand mitigation. Funds to restore healthy forests to prevent catastrophic wildfires and damage to watersheds and communities. Funds needed for hazardous fuel reduction to aid in healthy forests. Continuation of Good Neighbor Authority and Forest Stewardship Program under the Farm Bill critical in current and future forest fire mitigation projects. Funds (Hazard Mitigation Grant Program) needed to purchase private property that is repeatedly flooded to reduce long-term risk and insured losses.

Legislative & Funding Needs U.S. Forest Service Healthy Forest Initiatives Natural Resources Conservation Service (EWP) Biggert Waters Act & NFIP insurance premiums FEMA National Flood Insurance Program & HMGP Community Development Block Grant flexibility Stafford Act changes to include post-fire floods Army Corps of Engineers (Sec. 205 assistance) Department of Defense support for forest mitigation near Cheyenne Mountain EPA and watershed restoration and protection Transportation infrastructure

Questions