Chandgana 600MW Power Plant Project

Similar documents
Mongolian power sector:

Overview of Integrated Coal Gasification Combined-cycle Technology Using Low-rank Coal

Economic Outlook & PPP Projects in Mongolia

Small Scale Coal Power Plant in Indonesia

Baganuur coal mine expansion Opportunities for investors. Ulaanbaatar

Efficiency Metrics for CHP Systems: Total System and Effective Electric Efficiencies

Well Positioned for the Future

Small Scale Coal Power Plant in Indonesia

5. State the function of pulveriser. The pulverisers are the equipments which are used to powdered coal.

Performance of the Boiler and To Improving the Boiler Efficiency Using Cfd Modeling

PRE-QUALIFICATION ANNOUNCEMENT

1.3 Properties of Coal

Steam Turbine Concepts for the Future Volatile Power Market

Demand Response Market Overview. Glossary of Demand Response Services

Environment Impact Assessment of Thermal Power Plant for Sustainable Development


Developing Power Projects in Southern Africa. Cape Town Presentation 8 th February 2016

A Green Sector Overview

Rauhalahti Biomass CHP Plant

KUHMO: the perfect example of local bioenergy production

BIOMASS LOOKING FOR EFFICIENT UTILIZATION THE REHEAT CONCEPT. Jaroslav Lahoda Olaf Arndt Walter Hanstein. Siemens Power Generation (PG)

of electricity The discovery Victoria s brown coal

CENTRAL ELECTRICITY REGULATORY COMMISSION

University of Iowa Power Plant

Developing Power Projects in Southern Africa. Annual General Meeting Presentation 20 th November 2015

FIXED CHARGE: This is a cost that goes towards making the service available, including

THE PRODUCTION OF ELECTRICITY FROM WOOD AND OTHER SOLID BIOMASS

Performance Analysis of Thermal Power Station: Case Study of Egbin Power Station, Nigeria

Development in Egypt. Egyptian Electricity Holding Company - EEHC

Fact Sheet on China s energy sector and Danish solutions

Smart solutions for fleets of all types & sizes of power generation. Marcus König, E F IE SGS / September 2013

16 Cheung Kong Infrastructure Holdings Limited

Benefits of Geothermal Energy By Dr. Silas Simiyu

China Energy efficiency report

Electricity market drivers

Stora Enso Fors Ltd Sweden

Investment Opportunities Solar Energy Applications in Egypt

A Review on Power Generation in Thermal Power Plant for Maximum Efficiency

Policy measures for the prevention and minimization of hazardous wastes

University of Missouri Power Plant Combined Heat and Power Upgrades Columbia, Missouri

SSE s criteria used for GHG emissions reporting

Greater Mekong Sub-region Power Trade and Interconnection, Mongolia Grid Interconnection Perspectives

HOW TO SELECT A LOW VOLUME (L.V ) BOILER

TARIFF DETERMINATION METHODOLOGY FOR THERMAL POWER PLANT

ENERGY EFFICIENCY IN POWER PLANTS

Development of Coal Gasification System for Producing Chemical Synthesis Source Gas

Introduction to Ontario's Physical Markets

Geneva, March 2009 COUNTRY REPORT: MALAWI

Technology comparison of CFB versus pulverized-fuel firing for utility power generation

How KASIKORNBANK Plans to Support Green Projects

Prospects and Incentives for Use of Alternative Energy Technologies in the Arab Electric Power Generation Sector

Torino Nord. Cogeneration Plant. The gas turbine. The steam generator. The Torino Nord cogeneration plant produces electricity and heat for district

Thermodynamical aspects of the passage to hybrid nuclear power plants

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

Good Practice Form

EVN SMART GRID PLAN. Technical and Operational Dept., Vietnam Electricity Nguyễn Hải Hà

State of the art of solid biomass technologies in Germany

BOILER OPERATORS HANDBOOK

MHI s Energy Efficient Flue Gas CO 2 Capture Technology and Large Scale CCS Demonstration Test at Coal-fired Power Plants in USA

GUIDELINE FOR THE INSTALLATION AND OPERATION OF CONTINUOUS EMISSION MONITORING SYSTEMS (CEMS) AND THEIR USE FOR REPORTING UNDER THE PROVISIONS OF

Generating Current Electricity: Complete the following summary table for each way that electrical energy is generated. Pros:

Renewable Energy Strategy for 2020 and Regulatory Framework. Eng. Hatem Amer Egyptian Electric Regulatory and Consumer Protection Agency

SOLARRESERVE. BASELOAD SOLAR Power. Improving Mining Economics with Predictable Energy Costs

Tutkimuksen merkitys menestyvässä liiketoiminnassa- Innovaatiosta tuotteeksi

STATE JOINT-STOCK COMPANY UZBEKENERGO. Electric power industry of the Republic of Uzbekistan: a current situation and development prospects

Renewable Energy in the manufacturing and tourism industry in Egypt. Regulatory Framework and market potential

Electric Power Systems An Overview. Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas

Ubiquitous Computing in Business Processes Part V

Glossary of Energy Terms. Know Your Power. Towards a Participatory Approach for Sustainable Power Development in the Mekong Region

ATTACHED TECHNICAL ASSISTANCE: DARKHAN URBAN UTILITY INSTITUTIONAL IMPROVEMENT ACTION PLAN

A. Brief Introduction to Mongolian National University (MNU)

University of Melbourne Symposium on ICT Sustainability Dan Pointon 25 November 2008

Inventory of LCPs in Turkey LCP Database introductory presentation

White Rose Carbon Capture and Storage (CCS) Project

Law of Mongolia on Concessions

Energy transfers. Coal is mined and transported to the power station. It is ground into a powder to make it burn quicker. Step 2:

Outlook on Integrated Gasification Combined Cycle (IGCC) Technology

COGENERATION OF ELECTRICITY AT RADFORD ARMY AMMUNITION PLANT (AAP) - A CASE STUDY

Use of Substitute Fuels in Large Combustion Plants (LCPs)

4 th EU Sout Africa Clean Coal Working Group Meeting

Estimated emissions and CO2 savings deriving from adoption of in-place recycling techniques for road pavements

Sewage sludge treatment with oxygen enrichement and oxyfuel combustion in CFBC - new pilot plant results

Power Island. Industrial Power Plants. / energy

Mission 4: Fossil Fuel Power Stations

CSP- Biomass Hybrid cogeneration system offers synergistic solution for continuous process industries. 9 th May 2013 Chennai

Review of Potential Efficiency Improvements at Coal-Fired Power Plants

Combined Heat & Power. Discussion with Connecticut Energy Advisory Board. February 23, 2010

Committed to make a better world

Design and Test Operation Performance of 1,500 C Class Gas Turbine Combined-Cycle Power Plant:

Waste a source of energy. Regional Solid Waste Management Plan Review: Engaging solutions for tomorrow. Incineration. Incineration

GVK acquires Hancock Coal and Infrastructure Projects in Australia

Case Study 5 Use of Wind Turbine Technology

Ecological Aspects of Oil Shale Processing

TARIFF AND GOVERNANCE ASSESSMENT

AE BIO SOLAR AE BIO SOLAR HYBRID PLANT SOLAR/BIOMASS ADESSO ENERGIA SRL HYBRID PLANT SOLAR/BIOMASS THE BEGINNING OF A NEW ENERGY PRESENTATION

Transcription:

Chandgana 600MW Power Plant Project Executive Summary Prophecy Coal Corp. March, 2013

Executive Summary 1 Project Summary The Chandgana Coal-Fired Power Plant Project includes the building of a 600 MW (4X150 MW) coal fired mine-mouth power plant in combination with the construction of power transmission lines (Chandgana Transmission Project) and development of the Chandgana Coal Mine. The power plant will be located close to the coal resources found in the Chandgana Tal coal deposit in Tsaidam Nuur Valley, Murun Soum, Khentii Province. The power plant and coal mine will be 100% owned by Prophecy Coal through its subsidiaries in Mongolia, while the transmission line will be transferred to Mongolia government. 1.1 Project Location The plant will be located close to the coal resources found in the Chandgana Tal coal deposit in Tsaidam Nuur Valley, Murun Soum, Khentii Province. The location is at an average elevation of 1,250m and about 55km west of Undurkhaan city and 300km east of Ulaanbaatar. A paved road suitable for the access to the power plant and mining area is about 2km north of the mining area. This is the road no. A0501, connecting Ulaanbaatar and Undurkhaan. The nearest railway station is Baganuur, located at a distance of 180km west. The power plant will be located about 1 km north of the mining area. Access roads to all new plants shall be included. The living area for the power plant and supply mine employees will be in the Muron soum centre which is 20 km to the east aligning the existing paved road.

A railway link is not required as coal supply is direct from the coal mine. Coal will be transported with belt conveyors. Location stated above is only for illustration purpose. 1.2 Project Status Prophecy Coal initiated the licensing process required for the construction of a planned 600 MW mine mouth power plant in 2010. In November 2010, the company received the approval of its Detailed Environmental Impact Assessment (DEIA) pertaining to the Changdana power plant project. Prophecy submitted feasibility study in early 2011 and In November 2011, Prophecy Coal received the first 600 MW power plant construction license in Mongolian history. The mine-mouth power plant will be supplied with coal from our Chandgana Tal coal deposit, for which the company secured a mining license in February 2011. In June 2012, Prophecy Coal shortlisted Three Chinese Engineering, Procurement and Construction (EPC) management firms for the power plant construction. The company issued technical specification requirement in July 2012 and received 3 final bids in September 2012. Preliminary evaluation of the submitted bids indicates that the power plant project construction costs are within the estimated capital budget of the project. Prophecy Coal has prepared EPC contract and anticipates selecting the final bidder of the construction contract in early 2013. In May 2012, A Cooperation Covenant with the Mongolian Energy Authority (EA) was signed and in August 2012, a power purchase agreement (PPA) was submitted to National Electricity Transmission Grid Company, the only authorised power purchasing company in Mongolia and under the auspices of the Ministry of Energy of Mongolia. Prophecy Coal submitted a separate Power Generation Tariff Application

in September 2012 to the Energy Regulatory Commission. The company is currently working with National Transmission Grid Company and the Energy Regulatory Commission on finalizing PPA and Power Generation Tariff Application. Prophecy is in active discussion to date on tariff and PPA. In February 2013, Prophecy secured 532.4 hectares of land to be used for Prophecy s proposed Chandgana Power Plant from local Murum soum. The proposed PPA details the terms under which Chandgana power plant would be prepared to supply power to National Electricity Transmission Grid Company. The Power Purchase Agreement stipulates a 25 year long term power off-take contract with the power plant construction commencement date in April 2013 and 1st phase operational date of April 2016. The tariff in the PPA is lower than price of imported electricity from Russia and Mongolia s wind farm tariff. The PPA incorporates capacity and energy charges to cover fixed and variable costs with foreign exchange protection and indexation based on the US CPI, Mongolia Wage Index and Diesel Price Index. Fuel supply agreement is also being finalized. The development of the coal mine is progressing in parallel to supply coal to the power plant from commissioning of Unit 1. The preliminary plan of plant construction and installation proposes the construction of the first unit to achieve Commercial Operation Date in 36 months. Construction work is expected to commence in April 2013. Each unit is expected to come into operation as follows: a. Unit 1 (150 MW): April 2016 b. Unit 2 (150 MW): August 2016 c. Unit 3 (150 MW): December 2016 d. Unit 4 (150 MW): April 2017 Prophecy Coal aims to start preliminary mobilization work to ensure start of construction in April 2013. 1.3 Project Capacity The Coal Fired Power Plant has a total capacity of 600 MW split into 4 block units to ensure stability of existing networks and to have the capability of staggered integration. Steam will be generated with Circulated Fluidized Bed fired steam generator (CFB type). The generator unit will be a drum boiler equipped with all necessary heating surfaces and connecting lines, single reheating, CFB combustion, as well as a heavy fuel oil (Mazoud) or diesel firing system for start-up and backup.

The plant will make use of one single flow high pressure turbine, one single flow intermediate pressure turbine and one double-flow low pressure turbine and one generator. The plant will employ a closed-cooling system with air cooled condensers due to its low water consumption. The system uses the direct dry cooling mechanism and doesn t need any cooling water supply. 1.3 Coal Supply and Quality Approximately 3.5 million tonnes per year will be required to meet the power plant demand. Prophecy s Chandgana resource consists of two properties-chandgana Tal and Chandgana Khavtgai. The company s existing Chandgana licenses host a measured resource of 650 million tonnes and an indicated resource of 540 million tonnes of thermal coal. The main fuel of the power plant will be the coal supplied from the adjacent Chandgana Tal deposit, which contains 143 million tonnes of measured coal resource and is sufficient for approximately 40-50 years of power plant operation. This coal is classified as sub- bituminous/lignite. Expected daily consumption will be about 10,200 tonnes. The power plant is designed for the following coal: Power Plant Coal Quality Requirements (As received basis): Coal Parameter (arb) Unit Design Gross calorific value kcal/kg 3,190 Net calorific value kcal/kg 3,070 Total moisture wt-% 41.6 Volatile Matter wt-% 25.9 Ash wt-% 10.6 Total sulphur wt-% 0.6 Chandgana Tal Mine Coal Quality (Air-dried basis) Moisture Base Total Moistur e (wt %) Inherent Moisture (wt %) Ash (wt %) Volatile Matter (wt %) Fixed Carbo n (wt %) Total Sulfu r (wt %) Gross Calorific Value (kcal/kg) Relative Density (g/cc) Air Dried 41.94 25.00 13.3 30.90 30.80 0.74 4,175 1.45

The plant will have a Coal Handling Facility, the crushing and screening plan. A conveyor belt with three belt scales will deliver the crushed product to the automatic coal sampling plant. There will be two coal stock yards sufficient for 14 days of coal consumption at full load operations. 1.4 Limestone Limestone supply will be from a supplier with whom a supply agreement has been concluded. The quality of this supply has been analysed and it is suitable for the power plant. In addition three limestone deposits were found within 50km from the power plant and are considered potential sources. Exploration and mining rights are currently being pursued by the company for the Khavtgai deposit as it is the most attractive option. 1.5 Electrical Energy Electrical energy will be provided from the 6kV line that will be established next to the coal mine supplying the Chandgana TPP. The maximum capacity required by the construction site will be approximate 3 4 MW in peak times. 1.6 Water Supply The raw water supply will be from various sources. Current indications are that sufficient water is available from ground water of the site and a study will be conducted to prove this as it will be the first choice supply. The water quality for the Morun and Kherlen rivers was analysed and the Kherlen river is used as the potential source of water. A water treatment plant needs to be constructed at the beginning of the construction period to supply potable water for the power plant construction site and for the coal mine. This will also be the long term potable water supply for the power plant and the mine. The power plant will be equipped with an air cooled closed circuit cooling system rather than cooling towers. This will limit the raw water demand of the plant to a minimum. 1.7 Transmission Lines The plant is located between the Central Electricity System (CES) connection at Baganuur and the East Electricity System (EES) connection at Undurkhaan. Two transmission lines to be built by Prophecy and then transferred to government.

CES is the biggest power generation and transmission system in Mongolia. It has a basic transmission grid of 220kV and 110 kv Over Head Transmission Lines (OHTL). A 220kV ring system connects the principal generation and load centers of Ulaanbaatar, Darkhan and Erdenet and additional 220kV connections with load centers of Baganuur and Choir. During peak load periods, electricity is imported from Russian Fedration in order to meet and regulate electricity demand of the system. The Chandgana power plant will be connected by 200kV, 2 circuits, OHTL to the CES system 150km away at Baganuur. EES is dependent on the Choibalsan thermal power plant that provides electricity to province centers and 12 soums of Dornod and Sukhbaatar provinces. The Choibalsan plant has an installed capacity of 36MW. The Chandgana power plant will be connected by 200kV, 1 circuit, OHTL to the EES system 60km away at Undurkhaan. 1.8 Environmental The Environmental Impact Assessment for the project has been approved by the Mongolian Ministry of Nature and Environment and supported by the Mongolian Scientific and Technical Council. The power plant will be designed following the Mongolia standards and World Bank Standards applicable for new power plant projects.