Baganuur coal mine expansion Opportunities for investors. Ulaanbaatar

Size: px
Start display at page:

Download "Baganuur coal mine expansion Opportunities for investors. Ulaanbaatar"

Transcription

1 Baganuur coal mine expansion Opportunities for investors Ulaanbaatar

2 Content Introduction Resources and reserves Coal production Market outlook Mine expansion plan Research and development Investment issues

3 Introduction ESTABLISHED IN1978. SE 130 KM FROM ULAANBAATAR. CONNECTED TO PAVED ROAD AND RAILWAY NETWORK. GOVERNMENT OWNS 75%, OTHERS 25% OF SHARES RESPECTIVELY. EMPLOYEES 1100 EXTRACTS 50% OF COAL CONSUMPTION FOR PRODUCING ENERGY OF MONGOLIA, 60% FOR CENTRAL REGION.

4 Coal quality standart MNS Type of coal size Ash content /%/ <A ã Moisture /%/ <W ã Sulfur content /%/ S d t Volatile matter /%/V Calorific value <Q ã t Kkal/kg KJ/kg Brown coal type -B

5 Main consumers Annual supply # Thermal power plants /thous.tn/ Shares to total consumption 1 TPP % 2 TPP % 3 TPP % 4 Darkhan TPP % 5 Erdenet TPP %

6 Resource and reserve Proved in 1978 with million tons. Updated in 1998 with million tons as a result of detailed survey. In total, 88.4 million tons of coal has been extracted since Norvest migrated the reserve model of 1978 into Minex in 3D.

7 Resource and reserve Millions ,00 4,50 4,00 Кхх, м3/тн 2-р Seam давхарга 2 2a-р Seam давхарга 2a ,50 3,00 2,50 3-р Seam давхарга 3 Хязгаарласан Limiting strip ratio m3/ton хөрс хуулалтын итгэлцүүр, м3/тн - 2,00 0,2 0,3 0,4 0,5 0,6 0,7 0,8 0,9 1 1,1 1,2 1,3 1,4 1,5 1,6 Minimum thicknesses of coal seam, m Reserve can be elevated up to 700 million tones depending on the availability of minable coal seam thicknesses. 1,7 1,8 1,9 2

8 Quality of survey results Laboratory analysis: In total samples from drilled boreholes Ash analysis 47% Caloric value analysis 24% Sulphur content analysis 47% Volatile analysis 29% Core recovery (60-70%) Insufficient quality of survey to prepare a Feasilibility study for a bank Requires detailed survey to choose proper mine technology for the mine. Potentiality of resource increase up to 1.0 billion tones by conducting additional geological survey in accordance with international standards.

9 ,00 14,00 12,00 10,00 8,00 6,00 4,00 2, COAL PRODUCTION Нүүрс Coal production, олборлолт, thous.tons м.тн Кхх, м3/тн Increase in earth moving.

10 Current situation

11 CHALLENGES Overdue overburden Water drainage issues Higher unit production cost than selling price Coal price set by government Outdated equipments and facilities - 90%, requires technical renovation. Movement in internal stock piling Unreachable reserves due to geological conditions Increase in transport distance HR risks- lower salary Financial issues Requires technical renovation and decrease in production cost

12 PROJECTED COAL CONSUMPTION IN CENTRAL REGION Million tones 20,0 18,0 16,0 14,0 12,0 10,0 8,0 6,0 4,0 2,0 18,1 15,7 13,7 12,5 8,8 6,5 6,8 7,5 10,6 11,7 13,0 5,2 5,3 5,9 7, Central energy Total consumption ТЭХС ийн system s хэрэглээ consumption Тєвийн in central бүсийн region нийт хэрэглээ 15,0 Coal consumption of central region projected to be 6.5 million tones in 2012 while it will reach 15.7 million tones in 2018, 18.1 million tones in 2025 respectively. Regarding the consumption projection, Baganuur mine needs to expand the mine capacity.

13 Capacity expansion 16,00 14,00 12,00 10,00 8,00 6,00 4,00 5,2 5,3 5,9 3,30 3,57 3,52 7,1 4,30 11,7 12,2 12,5 10,6 5,51 5,51 5,51 5,64 14,0 13,5 13,0 6,05 6,00 6,13 Багануурын Supply from нийлүүлэлт Baganuur ТЭХС-ийн Demand from эрэлт CES 2, % of coal consumption to TPP-5 which will be built with 820 MW capacity in % of coal consumption to Baganuur power plant which will be built with 270MW in projected coal production of the mine is 6 million tons by 2020.

14 Technological developments To entry Surface mining technology for Coal production and overburden To build conveyor systems for both coal and waste transport To start using underground mine technologies in some coal seams. To reduce overburden volume and optimize mine earth movements

15 COAL PRICE AND MINEABLE RESERVEs Millions Technology: Surface mining + Conveyor systems 2,72 2,74 2,75 2,80 2,43 3,00 2,80 2, ,98 2,16 2,40 2,20 2,00 1,80 1,60 Хөрс, Waste, м3 m3 Нүүрс, Coal, ton тн Кхх, Strip м3/тн ratio, m3/t ,40 1,20 1,00 Minimum coal thickness seam 0.4 m 0,7 0,8 0,9 1 1,1 1,2 1,3 Mineable reserve can be elevated to 749 million tones if selling price increased by 30% after technological renovation. Main option Coal price tugriks/ton

16 COAL PRICE AND MINEABLE RESERVE Millions Technology: Surface mining+ conveyor system Main option Coal price tugriks/ton ,7 0,8 0,9 1 1,1 1,2 1,3 Factor impacting selling price 2 р Seam давхарга 2 2a р Seam давхарга 2a 3 р Seam давхарга 3 Minimum thickness of coal seam 0.4 m

17 MINE PLAN Million ,10 3,51 3,19 2,69 2,05 2,34 2,14 2,22 2,30 2,24 2,07 4,50 4,00 3,50 3,00 2,50 2,00 1,50 1,00 Strip ratio m3/t Хөрс waste, хуулалт, m3 м3 Нийт Coal, нүүрс, ton тн Хөрс Strip хуулалтын итгэлцүүр, ratio, m3/t м3/тн 0, он 2013 он 2014 он 2015 он 2016 он 2017 он 2018 он 2019 он 2020 он 2021 он 2022 он Substantial decline in the volume of vesting

18 PROJECTED COST AFTER TECHNOLOGICAL RENOVATION Thous. tugriks 25,0 20,0 15,0 10,0 5,0 23,1 4,2 21,7 20,3 17,7 15,5 14,6 15,3 15,4 15,1 14,8 13,9 5,2 5,2 5,3 5,3 5,1 5,4 5,3 5,0 5,0 5,0 5,0 4,5 4,0 3,5 3,0 2,5 2,0 1,5 1,0 Strip ratio, m3/t 0,5 0, Unit тн нүүрсний cost/ton бүрэн coal өөрийн өртөг 1 Unit м3 Уулын cost/ m3 цулд rock ноогдох mass зардал Кхх Strip ratio

19 Preparation to stock exchange (2012) - Geophysical survey - Detailed survey drilling - Geotechnical survey - Drainage survey - Resource report in accordance with JORC - Have the resource report in accordance with Mongolian standard approved by Mineral Resource Authority. - Have the feasibility study in accordance with Mongolian standard approved by Mineral Resource Authority. - Feasibility study for a bank - Prepare documents for stock exchange - Баяжуулах үйлдвэрийн туршилт судалгаа ТЭЗҮ боловсруулах Additional shares to be sold at domestic stock exchange to raise the necessary fund while keeping state owned shares at 51% in 2012.

20 Investment plan ,6 (/in accordance with Feasibility study done by Glogex LLC) (10) 14 11,1 9,4 7,1 4,1 3,9 2,9 2,9 1,5 1,5 1, Preparation Хөрөнгийн биржд cost to stock гарах бэлтгэл ажлын exchange зардал Mine Уурхайн тоног equipments төхөөрөмж and facilities Total investment of million USD required between 2012 and 2022

21 ECONOMIC PARAMETERS Investment Facilities CAPEX 2012: USD85.5 million OPEX ( ): USD16.7 million OPEX ( ): USD29.2 million Total: USD117.5 million Preparation cost to stock exchange USD 13.9 million Total USD131.4 million Coal price/ton: tugriks in 2012, tugriks in Unit cost/ ton of coal in 2012: tugriks in 2014: tugriks in 2018: tugriks in 2022: tugriks Net present value (when 10%): 35.6 billion tugriks Internal rate of return (IRR) %, Payback period 7.91years or in 2018.

22 Thank you for your attention We welcome any kind of cooperation

Guidelines for the Estimation and Reporting of Australian Black Coal Resources and Reserves

Guidelines for the Estimation and Reporting of Australian Black Coal Resources and Reserves Guidelines for the Estimation and Reporting of Australian Black Coal Resources and Reserves 2001 Edition (as referred to in the Joint Ore Reserves Committee Code ( The JORC Code ) 1999 edition) Prepared

More information

Investing in an Underground Coal Mine in Indonesia

Investing in an Underground Coal Mine in Indonesia Coal Supplying Key Resources into expanding Asian markets Investing in an Underground Coal Mine in Indonesia Disclaimer Forward Looking Statements This presentation includes certain forward looking Statements.

More information

TD Securities Mining Conference JANUARY 26-27, 2016. Developing the third-largest copper mine

TD Securities Mining Conference JANUARY 26-27, 2016. Developing the third-largest copper mine TD Securities Mining Conference JANUARY 26-27, 2016 Developing the third-largest copper mine Forward-looking statements This presentation includes certain forward-looking information within the meaning

More information

Exploration. Exploration methods

Exploration. Exploration methods Exploration Activities related to establishing a mineral deposit through geological, geophysical and geochemical methods. It is preceded by Prospecting and followed by Planning & Development. Geological

More information

Savannah North Scoping Study Looking into the future 3 February 2016

Savannah North Scoping Study Looking into the future 3 February 2016 Savannah North Scoping Study Looking into the future 3 February 2016 ASX: PAN Disclaimer Cautionary Statements This presentation includes information extracted from Panoramic Resources Limited ASX announcement

More information

By Gene Kitts, Senior Vice President-Mining Services, International Coal Group, Inc.

By Gene Kitts, Senior Vice President-Mining Services, International Coal Group, Inc. Why Surface Mine? By Gene Kitts, Senior Vice President-Mining Services, International Coal Group, Inc. Why do we surface mine in Central Appalachia? It s certainly not because we like the public attention

More information

NEW HORIZONS, HOPE & INVESTMENTS WINNERS FOR THE RECOVERY THE DONKIN MINE NOVA SCOTIA

NEW HORIZONS, HOPE & INVESTMENTS WINNERS FOR THE RECOVERY THE DONKIN MINE NOVA SCOTIA NEW HORIZONS, HOPE & INVESTMENTS WINNERS FOR THE RECOVERY THE DONKIN MINE NOVA SCOTIA Mr. Paul Vining, CEO - Cutlass Collieries, LLC Canadian Coal Association 2015 Conference Forward Looking Statements

More information

BUSINESS PLAN FOR THE MINERAL PROJECT FOR [NAME(S) OF PERIMETER(S)] SUBMITTED TO THE MINISTRY OF NATURAL RESOURCES/RWANDA

BUSINESS PLAN FOR THE MINERAL PROJECT FOR [NAME(S) OF PERIMETER(S)] SUBMITTED TO THE MINISTRY OF NATURAL RESOURCES/RWANDA (COVER PAGE) COMPANY NAME PHONE / Fax Physical Address P.O. Box Email Website BUSINESS PLAN FOR THE MINERAL PROJECT FOR [NAME(S) OF PERIMETER(S)] SUBMITTED TO THE MINISTRY OF NATURAL RESOURCES/RWANDA NAME

More information

LIGNITE MINING DEVELOPMENT STRATEGY

LIGNITE MINING DEVELOPMENT STRATEGY LIGNITE MINING DEVELOPMENT STRATEGY STATEM ENT OF PRINCIPL E Recognizing that lignite will remain the principal fuel for electricity generation in the long term, the use of indigenous coal is encouraged

More information

Coalbed Methane CO2 Sequestration Project Mecsek Mts Hungary

Coalbed Methane CO2 Sequestration Project Mecsek Mts Hungary Coalbed Methane CO2 Sequestration Project Mecsek Mts Hungary ROTAQUA KFT UNIVERSITY OF MISKOLC Janos Foldessy University of Miskolc, Department of Geology and Mineral Resources Resources and Environment

More information

Appraisal of Mineral Properties. August 2013 www.resourcetec.com

Appraisal of Mineral Properties. August 2013 www.resourcetec.com Appraisal of Mineral Properties August 2013 www.resourcetec.com Appraisal of Mineral Properties INSTRUCTOR: JEFFREY R. KERN Certified General Appraiser: Pennsylvania Delaware Texas Florida Georgia Virginia

More information

Policy measures for the prevention and minimization of hazardous wastes

Policy measures for the prevention and minimization of hazardous wastes WASTE AND WASTE MANAGEMENT PROGRESS AND ACHEIVEMENTS Policy measures for the prevention and minimization of hazardous wastes 1. At the international level, Mongolia joined The Basel Convention on the Control

More information

Developing Power Projects in Southern Africa. Annual General Meeting Presentation 20 th November 2015

Developing Power Projects in Southern Africa. Annual General Meeting Presentation 20 th November 2015 Developing Power Projects in Southern Africa Annual General Meeting Presentation 20 th November 2015 2015 Company Highlights AFR now participating in the development of three large-scale power projects

More information

Small Scale Coal Power Plant in Indonesia

Small Scale Coal Power Plant in Indonesia Small Scale Coal Power Plant in Indonesia Taufik Sastrawinata Director Technology and Business Development of PT. Advance Technology Indonesia and Secretary General of Indonesian Coal Society Indonesia

More information

COARSE DRY COAL CLEANING

COARSE DRY COAL CLEANING COARSE DRY COAL CLEANING R. Q. Honaker University of Kentucky Department of Mining Engineering Lexington, Kentucky, USA 40506-0107 0107 Workshop on Coal Beneficiation and Utilization of Rejects : Initiatives,

More information

WILLAMAX PROJECT. TSX-V: DVN Reach us at 604 818 1706. Developing B.C. mining assets to create profitable gold production.

WILLAMAX PROJECT. TSX-V: DVN Reach us at 604 818 1706. Developing B.C. mining assets to create profitable gold production. WILLAMAX PROJECT Developing B.C. mining assets to create profitable gold production May 2014 Reach us at 604 818 1706 Management Team Akash Patel, President and CEO Mr. Patel has received a bachelor in

More information

Types of Mining - Expert Table

Types of Mining - Expert Table See page 6 Minerals Downunder Teacher Guide (2002) - Activity 4a Types of Mining - Expert Table How to Jigsaw Information 1. Divide the class into Home Groups of five for the five different types of mining

More information

NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS

NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS Project Generates 32% IRR and C$33 Million NPV After-Tax; Cash Costs of US$865 per Ounce

More information

For personal use only

For personal use only DECEMBER 2011 Issued 31 January 2012 HIGHLIGHTS INDIAN IRON ORE MINING PROJECT Significant on-site work completed and installation of phase one processing infrastructure underway at Kurnool iron beneficiation

More information

The successful integration of 3D seismic into the mining process: Practical examples from Bowen Basin underground coal mines

The successful integration of 3D seismic into the mining process: Practical examples from Bowen Basin underground coal mines Geophysics 165 Troy Peters The successful integration of 3D seismic into the mining process: Practical examples from Bowen Basin underground coal mines This paper discusses how mine staff from a number

More information

Developing Power Projects in Southern Africa. Cape Town Presentation 8 th February 2016

Developing Power Projects in Southern Africa. Cape Town Presentation 8 th February 2016 Developing Power Projects in Southern Africa Cape Town Presentation 8 th February 2016 Company Highlights AFR now participating in the development of three large-scale power projects in Botswana Completion

More information

Application of the Thermo Scientific CQM Online Coal Analyzer in Anjialing Coal Preparation Plant s Rail Loadout

Application of the Thermo Scientific CQM Online Coal Analyzer in Anjialing Coal Preparation Plant s Rail Loadout Application of the Thermo Scientific CQM Online Coal Analyzer in Anjialing Coal Preparation Plant s Rail Loadout Pingshuo Coal Industry Limited Liability Corporation (PSC) is China Coal Energy Group's

More information

Gemcom Minex and the Corporate Database

Gemcom Minex and the Corporate Database *Gemcom Software was acquired by Dassault Systèmes, the 3DEXPERIENCE Company, in July 2012. It is now known as GEOVIA. Gemcom Minex and the Corporate Database Jon Barber - Vice President, Minex, - Gemcom

More information

Avion will host a conference call at 10:30 AM (EST) on Monday, April 2, 2011 to discuss the results. To participate in the call please dial:

Avion will host a conference call at 10:30 AM (EST) on Monday, April 2, 2011 to discuss the results. To participate in the call please dial: March 31, 2012 A v i o n G o l d A n n o u n c e s F o u r t h Q u a r t e r 2 0 1 1 E a r n i n g s o f $ 8. 1 M i l l i o n W i t h E a r n i n g s P e r S h a r e O f $ 0. 0 2 R e c o r d 2 0 1 1 E

More information

Small Scale Coal Power Plant in Indonesia

Small Scale Coal Power Plant in Indonesia Small Scale Coal Power Plant in Indonesia Taufik Sastrawinata Director Technology and Business Development of PT. Advance Technology Indonesia and Secretary General of Indonesian Coal Society Indonesia

More information

Corporate Presentation October 2015

Corporate Presentation October 2015 TSX.V: GBB OTC PK: GBBFF THE GRANADA GOLD PROPERTY IN ROUYN - NORANDA QUEBEC a Corporate Presentation October 2015 GoldBullionDevelopmentCorp.com A Compelling Value Proposition High-grade rolling start

More information

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY 10 August 2015 ASX: AOH, FSE: A2O TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY Estimated oxide and sulphide resources within the optimum pit is 17.3

More information

Mongolian power sector:

Mongolian power sector: Mongolian power sector: Background and current policy Kh.Erdenechuluun Representing UBEDN, Mongolia BRIEFLY ABOUT MONGOLIA Territory: 1.564 million km 2 Population: 2.7 million Capital city: Ulaanbaatar

More information

Sharyn Gol JSC. Enkhbayar Davaatseren +976-70 100095 [email protected]. March 2011

Sharyn Gol JSC. Enkhbayar Davaatseren +976-70 100095 enkhbayar@resource-cap.com. March 2011 31-Dec 28-Feb 30-Apr 30-Jun 31-Aug 31-Oct 31-Dec 28-Feb MNT thousands 29 November March 30, 2010 2011 30, 2010 MSE Ticker/Code SHG/309 Equity Research/Metal & Mining/Initiation Equity Research coverage

More information

Biocoal for Renewable. Copyright Bepex International 2011 All Rights Reserved

Biocoal for Renewable. Copyright Bepex International 2011 All Rights Reserved RD3-4 Biocoal for Renewable Biomass Power Generation Acknowledgement Project funding provided by customers of Xcel Energy through a grant from the Renewable Development Fund. Why Biocoal? Coal is the largest

More information

Questions/Analysis: 1: Were the minerals evenly distributed throughout the cookie mines? Explain how this relates to real mining.

Questions/Analysis: 1: Were the minerals evenly distributed throughout the cookie mines? Explain how this relates to real mining. APES- Cookie Mining Lab Activity Questions/Analysis: 1: Were the minerals evenly distributed throughout the cookie mines? Explain how this relates to real mining. 2: Were you able to reclaim the land after

More information

WORK BREAKDOWN STRUCTURE FOR A TYPICAL MINE

WORK BREAKDOWN STRUCTURE FOR A TYPICAL MINE WORK BREAKDOWN STRUCTURE FOR A TYPICAL MINE LEGEND [GeoMine] = Technology Sites [Exploration-Geology-Reserves] = Edumine Courses [GEOCHEMISTRY] = State-of-the-Art Review (SOAR) 1 EXPLORATION [GEOMINE]

More information

COMPARISON OF ELECTRICITY GENERATION COST OF NPP WITH ALTERNATES IN PAKISTAN

COMPARISON OF ELECTRICITY GENERATION COST OF NPP WITH ALTERNATES IN PAKISTAN COMPARISON OF ELECTRICITY GENERATION COST OF NPP WITH ALTERNATES IN PAKISTAN IAEA INPRO dialogue forum 8 toward nuclear energy system sustainability: economics, resource availability and institutional

More information

Candelaria and Ojos del Salado Chile

Candelaria and Ojos del Salado Chile TSX : LUN OMX : LUMI 2016 Candelaria Key Facts Open Pit and Underground Mine Copper, gold, and silver 2016 estimate 124,000-128,000 tonnes copper Cash costs of $1.45 per lb copper after by-product credits

More information

Arnot South Coal Resource Competent Person s Report. Coal of Africa Limited & Peel Hunt LLP

Arnot South Coal Resource Competent Person s Report. Coal of Africa Limited & Peel Hunt LLP Arnot South Coal Resource Competent Person s Report Report Prepared for: Coal of Africa Limited & Peel Hunt LLP Report Prepared by: Gemecs (Pty) Ltd Sentinel House 37 Walter Sisulu Street Middelburg Republic

More information

Investments in Private Energy Partnerships

Investments in Private Energy Partnerships Investments in Private Partnerships August 2010 Private energy partnership investments offer a meaningful addition to a diversified private equity or real asset portfolio. Over the past 20 years, private

More information

Aspire Mining Limited

Aspire Mining Limited Aspire Mining Limited Investor Presentation March 2011 Forward Looking Statements & Disclaimer Forward Looking Statements Certain statements in the presentation are or may be forward looking statements

More information

El cinturón de oro del río Narcea: el futuro de la minería de oro en España. Dr. Vern N. Rampton Presidente y CEO de Kinbauri Gold Corp.

El cinturón de oro del río Narcea: el futuro de la minería de oro en España. Dr. Vern N. Rampton Presidente y CEO de Kinbauri Gold Corp. El cinturón de oro del río Narcea: el futuro de la minería de oro en España Dr. Vern N. Rampton Presidente y CEO de Kinbauri Gold Corp. CORPORATE PRESENTATION JUNE 16, 2009 TARGETED TO BECOME ONE OF WESTERN

More information

ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY

ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY ANNEX D1: BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN DRA FOR SAFETY D1-1 ANNEX D1 BASIC CONSIDERATIONS

More information

COALWORKS Limited. Investor Series:Coal August 2008

COALWORKS Limited. Investor Series:Coal August 2008 Investor Series:Coal August 2008 1 DISCLAIMER The information in this presentation does not purport to contain all the information that may be required to evaluate the prospects of Coalworks and in particular

More information

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION GROUP 867 ARCHITECTURAL, ENGINEERING AND OTHER TECHNICAL SERVICES Excerpt from CPCprov-en-Publication.doc - United Nation Statistic Division Group Class Subclass

More information

Canadian Spirit Resources Inc.

Canadian Spirit Resources Inc. This management discussion and analysis ( MD&A ) of the financial conditions and results of operations should be read in conjunction with the audited financial statements for the year ended December 31,

More information

North Atlantic and Rio Tinto Joint Venture Potash Project in Saskatchewan, Canada. Resource Summary

North Atlantic and Rio Tinto Joint Venture Potash Project in Saskatchewan, Canada. Resource Summary North Atlantic and Rio Tinto Joint Venture Potash Project in Saskatchewan, Canada Resource Summary The Canadian Potash Project is located in the central Saskatchewan Potash district that represents nearly

More information

Our Deep Geothermal Energy Potential: A Case Study in Saskatchewan with Application Throughout the Western Canadian Sedimentary Basin

Our Deep Geothermal Energy Potential: A Case Study in Saskatchewan with Application Throughout the Western Canadian Sedimentary Basin Our Deep Geothermal Energy Potential: A Case Study in Saskatchewan with Application Throughout the Western Canadian Sedimentary Basin Introduction Deep geothermal energy relates to the heat-energy stored

More information

Endeavour Management Presentation

Endeavour Management Presentation Endeavour Management Presentation June 2014 GOLD PRODUCER WEST AFRICA CASH FLOW Disclaimer & Forward Looking Statements This presentation contains forward-looking statements including but not limited to,

More information

Trading Symbol: TSX: SVM February 17, 2011 NYSE: SVM

Trading Symbol: TSX: SVM February 17, 2011 NYSE: SVM PRESS RELEASE Trading Symbol: TSX: SVM February 17, 2011 NYSE: SVM SILVERCORP ANNOUNCES POSITIVE PRELIMINARY ASSESSMENT FOR THE SILVERTIP SILVER-LEAD-ZINC PROJECT, BRITISH COLUMBIA, CANADA VANCOUVER, British

More information

Deep geological disposal of radioactive waste in Switzerland - overview and outlook

Deep geological disposal of radioactive waste in Switzerland - overview and outlook Deep geological disposal of radioactive waste in Switzerland - overview and outlook Michael Schnellmann (Section Head Geosciences) Annual Convention 2015 Baden 20 th June 2015 Nagra Mandate from the Swiss

More information

Yu. F. Vasyuchkov*, M. Yu. Bykova* NEW TECHNOLOGY OF GAS EXTRACTION ON THE BASE OF A COAL TO A HYDROGEN TRANSFER

Yu. F. Vasyuchkov*, M. Yu. Bykova* NEW TECHNOLOGY OF GAS EXTRACTION ON THE BASE OF A COAL TO A HYDROGEN TRANSFER WIERTNICTWO NAFTA GAZ TOM 28 ZESZYT 1 2 2011 Yu. F. Vasyuchkov*, M. Yu. Bykova* NEW TECHNOLOGY OF GAS EXTRACTION ON THE BASE OF A COAL TO A HYDROGEN TRANSFER In modern period the useful extraction of energy

More information

A new short- and medium-term production scheduling tool MineSight Schedule Optimizer (MSSO)

A new short- and medium-term production scheduling tool MineSight Schedule Optimizer (MSSO) A new short- and medium-term production scheduling tool MineSight Schedule Optimizer (MSSO) Zhanyou Huang a, Wenlong Cai a, A. Frederick Banfield a a Mintec, Inc., Tucson, Arizona, USA The MineSight Schedule

More information

THIRD QUARTER EARNINGS NOVEMBER 12, 2015

THIRD QUARTER EARNINGS NOVEMBER 12, 2015 THIRD QUARTER EARNINGS NOVEMBER 12, 2015 CAUTIONARY NOTES Qualified Person Brian Morris, is the non-independent Klondex Mines "qualified person" as defined by National Instrument 43-101 Standards of Disclosure

More information

KOPY GOLDFIELDS AB. A thorny path of a public Junior Gold Exploration Company in Russia Russian & CIS Metals Summit 2014, Moscow, February, 2014

KOPY GOLDFIELDS AB. A thorny path of a public Junior Gold Exploration Company in Russia Russian & CIS Metals Summit 2014, Moscow, February, 2014 KOPY GOLDFIELDS AB A thorny path of a public Junior Gold Exploration Company in Russia Russian & CIS Metals Summit 2014, Moscow, February, 2014 Disclaimer - Forward looking statement Forward Looking Information

More information

FIRST BAUXITE CORPORATION Suite 1220 1066 West Hastings St. Vancouver, B.C., V6E 3X1 604-806-0916 Fax: 604-806-0956 www.firstbauxite.

FIRST BAUXITE CORPORATION Suite 1220 1066 West Hastings St. Vancouver, B.C., V6E 3X1 604-806-0916 Fax: 604-806-0956 www.firstbauxite. FIRST BAUXITE CORPORATION Suite 1220 1066 West Hastings St. Vancouver, B.C., V6E 3X1 604-806-0916 Fax: 604-806-0956 www.firstbauxite.com October 6, 2011 NEWS RELEASE Symbol: FBX: TSX V FBI: FWB/BER FIRST

More information

Botswana Power Development! March 2015!

Botswana Power Development! March 2015! Botswana Power Development! March 2015! Power development business overview! Strong regional power demand underpinning business strategy " Independent power producers (IPPʼs) required to build new capacity"

More information

Annual General Meeting

Annual General Meeting Annual General Meeting Westbury Hotel, Dublin, 13th September 2013 Forward Looking Statements The content of this presentation relating to Moesia Oil and Gas plc ( Moesia ) has not been approved by an

More information

MINIMUM ENGINEERING STUDY REQUIREMENTS UPDATE

MINIMUM ENGINEERING STUDY REQUIREMENTS UPDATE Issue No. 128 June 2015 MINIMUM ENGINEERING STUDY REQUIREMENTS UPDATE Issue No. 95 (March 2009) of this publication, formally known as Pincock Perspectives, has been one of our most requested and referenced

More information

THERMAL COAL FINANCIAL HIGHLIGHTS

THERMAL COAL FINANCIAL HIGHLIGHTS THERMAL COAL FINANCIAL HIGHLIGHTS THERMAL COAL In, Thermal Coal owns and operates nine mines. In Colombia, we have a one-third shareholding (with BHP Billiton and Xstrata each owning one-third) in Cerrejón,

More information

Underground Coal Gasification in South Africa the SAUCGA

Underground Coal Gasification in South Africa the SAUCGA Underground Coal Gasification in South Africa the SAUCGA Wessel Bonnet, Sasol New Energy Johan Brand, Africary Johan van Dyk, Africary Neo Coangae, Exxaro Services Shaun Pershad, Eskom Holdings SOC Ltd

More information

ALROSA Q1 2015 IFRS results conference call edited transcript

ALROSA Q1 2015 IFRS results conference call edited transcript ALROSA Q1 2015 IFRS Results Conference Call Edited Transcript ALROSA Q1 2015 IFRS results conference call edited transcript 4 June 2015 1 ALROSA speakers Igor Kulichik CFO, Vice - president Sergei Mezhokh

More information

UNDERGROUND COAL GASIFICATION. By Lian Hattingh

UNDERGROUND COAL GASIFICATION. By Lian Hattingh UNDERGROUND COAL GASIFICATION By Lian Hattingh Agenda What is UCG The history of UCG How does UCG work Environmental impact of UCG Why Sasol is interested The impact of UCG on Sasol business Advantages/Disadvantages

More information

Copper and Gold at Our Core

Copper and Gold at Our Core Copper and Gold at Our Core January 2016 TSX: ETG NYSE MKT: EGI FRANKFURT: EKA Cautionary Statement This presentation contains forward-looking statements within the meaning of the United States Private

More information

NuGeneration Ltd Site Investigations

NuGeneration Ltd Site Investigations NuGeneration Ltd Site Investigations Introducing the site assessment and radiological characterisation project NuGen has commissioned an engineering consortium - which is a joint venture of IBERDROLA Ingeniería

More information

Payback period 2.4 years (7% improvement from 2.6 years stated in the MPFS);

Payback period 2.4 years (7% improvement from 2.6 years stated in the MPFS); Kibo Mining Plc (Incorporated in Ireland) (Registration Number: 451931) (External registration number: 2011/007371/10) Share code on the JSE Limited: KBO Share code on the AIM: KIBO ISIN:IE00B97C0C31 (

More information

Continental Gold Announces a Positive Preliminary Economic Assessment for the Buriticá Project

Continental Gold Announces a Positive Preliminary Economic Assessment for the Buriticá Project Continental Gold Announces a Positive Preliminary Economic Assessment for the Buriticá Project Toronto, Ontario, November 17, 2014 - Continental Gold Limited (TSX:CNL; OTCQX:CGOOF) ("Continental" or the

More information

In-Pit Crushing and Conveying Phil Morriss

In-Pit Crushing and Conveying Phil Morriss In-Pit Crushing and Conveying Phil Morriss AGENDA 1. Introduction - what is In-Pit Crushing and Conveying (IPCC)? 2. What does a quarry need from IPCC? 3. Why and when should we consider using it? 4. How

More information

Forgotten savings: Heat recovery from surface blowdown

Forgotten savings: Heat recovery from surface blowdown Forgotten savings: Heat recovery from surface blowdown 1. Introduction The purpose of this article is to inform thermal plant operators of the interesting fuel savings that can be obtained by recovering

More information

Challenges of Investing in Junior Mining Companies and. Sotkamo Silver

Challenges of Investing in Junior Mining Companies and. Sotkamo Silver Challenges of Investing in Junior Mining Companies and Sotkamo Silver Life Cycle of Junior Explorer High Risk - High Potential Full value Relative Value Possible takeover Speculation Discovery Lowered

More information

CANADA S INTERMEDIATE GOLD PRODUCER

CANADA S INTERMEDIATE GOLD PRODUCER CANADA S INTERMEDIATE GOLD PRODUCER Third Quarter 2015 Results Conference 1 Call & Webcast October 29, 2015 Forward Looking Information This presentation contains certain forward-looking information and

More information

Innovative textile - industrial cluster of the Ivanovo region

Innovative textile - industrial cluster of the Ivanovo region [land of prospects] [ land of possibilities Innovative textile - industrial cluster of the Ivanovo region [ Ivanovo region] For development of the Innovative textile - industrial cluster of the Ivanovo

More information

Update of LCI Background Data Exemplified for the German Steam Coal Supply Chain

Update of LCI Background Data Exemplified for the German Steam Coal Supply Chain Update of LCI Background Data Exemplified for the German Steam Coal Supply Chain Oliver Mayer-Spohn, Markus Blesl, Ulrich Fahl, Alfred Voß University of Stuttgart, Institute of Energy Economics and the

More information

China Gold International Resources Corp. Ltd.

China Gold International Resources Corp. Ltd. Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness

More information

Unconventional Oil and Gas Production Drives Trends in Water Management and Treatment

Unconventional Oil and Gas Production Drives Trends in Water Management and Treatment Unconventional Oil and Gas Production Drives Trends in Water Management and Treatment Jelena Stanic, Global Water Intelligence A research report, Water for the Onshore Oil and Gas, by Global Water Intelligence

More information

Nemaska Lithium A near term lithium hydroxide supplier

Nemaska Lithium A near term lithium hydroxide supplier Nemaska Lithium A near term lithium hydroxide supplier Charging the future by Euro Pacific, Canada May 13, 2014 Guy Bourassa President and CEO Forward-looking Statements During the course of this presentation,

More information

Unearthing Mineral Rights:

Unearthing Mineral Rights: CourthouseDirect.com Presents Unearthing Mineral Rights: An Insider s Guide to Searching Titles for Mineral Rights Introduction Mineral rights can be one of the more difficult types of property to research

More information

13.2.4 Aggregate Handling And Storage Piles. 13.2.4.1 General

13.2.4 Aggregate Handling And Storage Piles. 13.2.4.1 General 13.2.4 Aggregate Handling And Storage Piles 13.2.4.1 General Inherent in operations that use minerals in aggregate form is the maintenance of outdoor storage piles. Storage piles are usually left uncovered,

More information

USE OF MICROPILES IN TEXAS BRIDGES. by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch

USE OF MICROPILES IN TEXAS BRIDGES. by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch USE OF MICROPILES IN TEXAS BRIDGES by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch DEFINITION OF A MICROPILE A micropile is a small diameter (typically less than 12 in.), drilled and

More information

Walter Energy, Inc. 10-K

Walter Energy, Inc. 10-K Walter Energy, Inc. 10-K Annual report pursuant to section 13 and 15(d) Filed on 02/28/2011 Filed Period 12/31/2010 UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 FORM 10-K (Mark

More information

THE MINERAL INDUSTRY OF NEBRASKA

THE MINERAL INDUSTRY OF NEBRASKA THE MINERAL INDUSTRY OF NEBRASKA This chapter has been prepared under a Memorandum of Understanding between the U.S. Geological Survey and the University of Nebraska-Lincoln, Nebraska Geological Survey,

More information

Establishing the feasibility of your proposed mining venture

Establishing the feasibility of your proposed mining venture RUPPRECHT, S. Establishing the feasibility of your proposed mining venture. International Platinum Conference Platinum Adding Value, The South African Institute of Mining and Metallurgy, 2004. Establishing

More information

Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. March 2012 Erste Securities Istanbul Turkey in Focus Conference

Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. March 2012 Erste Securities Istanbul Turkey in Focus Conference Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. March 2012 Erste Securities Istanbul Turkey in Focus Conference Contents I. Ciner Group in Brief 3 II. Park Elektrik Overview 6 III. Operations 10

More information

QUARTERLY ACTIVITIES REPORT For the period ending 31 December 2013

QUARTERLY ACTIVITIES REPORT For the period ending 31 December 2013 HIGHLIGHTS QUARTERLY ACTIVITIES REPORT For the period ending 31 December 2013 MOORLANDS PROJECT Moorlands Mine Scoping Study completed by Xenith Mining Consultancy in November 2013, confirming robust project

More information

Economic Outlook & PPP Projects in Mongolia

Economic Outlook & PPP Projects in Mongolia Economic Outlook & PPP Projects in Mongolia BEKHBAT SODNOM Director General Department of Innovation and Public Private Partnership Ministry of Economic Development Tokyo, Japan February 3, 2014 Content

More information

Accounting for stripping costs in the production phase costs of waste removal and the associated benefit

Accounting for stripping costs in the production phase costs of waste removal and the associated benefit IFRIC Meeting Agenda reference 2A Staff Paper Date March 2010 Project Topic xtractive Activities Accounting for stripping costs in the production phase costs of waste removal and the associated benefit

More information

LYDIAN ANNOUNCES $325 MILLION CONSTRUCTION FINANCING FOR AMULSAR GOLD PROJECT

LYDIAN ANNOUNCES $325 MILLION CONSTRUCTION FINANCING FOR AMULSAR GOLD PROJECT LYDIAN ANNOUNCES $325 MILLION CONSTRUCTION FINANCING FOR AMULSAR GOLD PROJECT Conference Call December 1, 2015 Lydianinternational.co.uk TSX:LYD Cautionary Statements Forward Looking Statements & Other

More information

A pound of coal supplies enough electricity to power ten 100-watt light bulbs for about an hour.

A pound of coal supplies enough electricity to power ten 100-watt light bulbs for about an hour. Did You Know? A pound of coal supplies enough electricity to power ten 100-watt light bulbs for about an hour. Nonrenewable Coal Coal Basics Coal Takes Millions of Years To Create Coal is a combustible

More information

ACQUISITION OF SIGNIFICANT COAL ASSETS IN INDONESIA AND STRENGTHENING OF INDO MINES BOARD

ACQUISITION OF SIGNIFICANT COAL ASSETS IN INDONESIA AND STRENGTHENING OF INDO MINES BOARD ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE: 27 JANUARY 2010 ACQUISITION OF SIGNIFICANT COAL ASSETS IN INDONESIA AND STRENGTHENING OF INDO MINES BOARD Highlights: Acquisition of rights to an advanced

More information