Baganuur coal mine expansion Opportunities for investors. Ulaanbaatar
|
|
|
- Gerald Lewis
- 9 years ago
- Views:
Transcription
1 Baganuur coal mine expansion Opportunities for investors Ulaanbaatar
2 Content Introduction Resources and reserves Coal production Market outlook Mine expansion plan Research and development Investment issues
3 Introduction ESTABLISHED IN1978. SE 130 KM FROM ULAANBAATAR. CONNECTED TO PAVED ROAD AND RAILWAY NETWORK. GOVERNMENT OWNS 75%, OTHERS 25% OF SHARES RESPECTIVELY. EMPLOYEES 1100 EXTRACTS 50% OF COAL CONSUMPTION FOR PRODUCING ENERGY OF MONGOLIA, 60% FOR CENTRAL REGION.
4 Coal quality standart MNS Type of coal size Ash content /%/ <A ã Moisture /%/ <W ã Sulfur content /%/ S d t Volatile matter /%/V Calorific value <Q ã t Kkal/kg KJ/kg Brown coal type -B
5 Main consumers Annual supply # Thermal power plants /thous.tn/ Shares to total consumption 1 TPP % 2 TPP % 3 TPP % 4 Darkhan TPP % 5 Erdenet TPP %
6 Resource and reserve Proved in 1978 with million tons. Updated in 1998 with million tons as a result of detailed survey. In total, 88.4 million tons of coal has been extracted since Norvest migrated the reserve model of 1978 into Minex in 3D.
7 Resource and reserve Millions ,00 4,50 4,00 Кхх, м3/тн 2-р Seam давхарга 2 2a-р Seam давхарга 2a ,50 3,00 2,50 3-р Seam давхарга 3 Хязгаарласан Limiting strip ratio m3/ton хөрс хуулалтын итгэлцүүр, м3/тн - 2,00 0,2 0,3 0,4 0,5 0,6 0,7 0,8 0,9 1 1,1 1,2 1,3 1,4 1,5 1,6 Minimum thicknesses of coal seam, m Reserve can be elevated up to 700 million tones depending on the availability of minable coal seam thicknesses. 1,7 1,8 1,9 2
8 Quality of survey results Laboratory analysis: In total samples from drilled boreholes Ash analysis 47% Caloric value analysis 24% Sulphur content analysis 47% Volatile analysis 29% Core recovery (60-70%) Insufficient quality of survey to prepare a Feasilibility study for a bank Requires detailed survey to choose proper mine technology for the mine. Potentiality of resource increase up to 1.0 billion tones by conducting additional geological survey in accordance with international standards.
9 ,00 14,00 12,00 10,00 8,00 6,00 4,00 2, COAL PRODUCTION Нүүрс Coal production, олборлолт, thous.tons м.тн Кхх, м3/тн Increase in earth moving.
10 Current situation
11 CHALLENGES Overdue overburden Water drainage issues Higher unit production cost than selling price Coal price set by government Outdated equipments and facilities - 90%, requires technical renovation. Movement in internal stock piling Unreachable reserves due to geological conditions Increase in transport distance HR risks- lower salary Financial issues Requires technical renovation and decrease in production cost
12 PROJECTED COAL CONSUMPTION IN CENTRAL REGION Million tones 20,0 18,0 16,0 14,0 12,0 10,0 8,0 6,0 4,0 2,0 18,1 15,7 13,7 12,5 8,8 6,5 6,8 7,5 10,6 11,7 13,0 5,2 5,3 5,9 7, Central energy Total consumption ТЭХС ийн system s хэрэглээ consumption Тєвийн in central бүсийн region нийт хэрэглээ 15,0 Coal consumption of central region projected to be 6.5 million tones in 2012 while it will reach 15.7 million tones in 2018, 18.1 million tones in 2025 respectively. Regarding the consumption projection, Baganuur mine needs to expand the mine capacity.
13 Capacity expansion 16,00 14,00 12,00 10,00 8,00 6,00 4,00 5,2 5,3 5,9 3,30 3,57 3,52 7,1 4,30 11,7 12,2 12,5 10,6 5,51 5,51 5,51 5,64 14,0 13,5 13,0 6,05 6,00 6,13 Багануурын Supply from нийлүүлэлт Baganuur ТЭХС-ийн Demand from эрэлт CES 2, % of coal consumption to TPP-5 which will be built with 820 MW capacity in % of coal consumption to Baganuur power plant which will be built with 270MW in projected coal production of the mine is 6 million tons by 2020.
14 Technological developments To entry Surface mining technology for Coal production and overburden To build conveyor systems for both coal and waste transport To start using underground mine technologies in some coal seams. To reduce overburden volume and optimize mine earth movements
15 COAL PRICE AND MINEABLE RESERVEs Millions Technology: Surface mining + Conveyor systems 2,72 2,74 2,75 2,80 2,43 3,00 2,80 2, ,98 2,16 2,40 2,20 2,00 1,80 1,60 Хөрс, Waste, м3 m3 Нүүрс, Coal, ton тн Кхх, Strip м3/тн ratio, m3/t ,40 1,20 1,00 Minimum coal thickness seam 0.4 m 0,7 0,8 0,9 1 1,1 1,2 1,3 Mineable reserve can be elevated to 749 million tones if selling price increased by 30% after technological renovation. Main option Coal price tugriks/ton
16 COAL PRICE AND MINEABLE RESERVE Millions Technology: Surface mining+ conveyor system Main option Coal price tugriks/ton ,7 0,8 0,9 1 1,1 1,2 1,3 Factor impacting selling price 2 р Seam давхарга 2 2a р Seam давхарга 2a 3 р Seam давхарга 3 Minimum thickness of coal seam 0.4 m
17 MINE PLAN Million ,10 3,51 3,19 2,69 2,05 2,34 2,14 2,22 2,30 2,24 2,07 4,50 4,00 3,50 3,00 2,50 2,00 1,50 1,00 Strip ratio m3/t Хөрс waste, хуулалт, m3 м3 Нийт Coal, нүүрс, ton тн Хөрс Strip хуулалтын итгэлцүүр, ratio, m3/t м3/тн 0, он 2013 он 2014 он 2015 он 2016 он 2017 он 2018 он 2019 он 2020 он 2021 он 2022 он Substantial decline in the volume of vesting
18 PROJECTED COST AFTER TECHNOLOGICAL RENOVATION Thous. tugriks 25,0 20,0 15,0 10,0 5,0 23,1 4,2 21,7 20,3 17,7 15,5 14,6 15,3 15,4 15,1 14,8 13,9 5,2 5,2 5,3 5,3 5,1 5,4 5,3 5,0 5,0 5,0 5,0 4,5 4,0 3,5 3,0 2,5 2,0 1,5 1,0 Strip ratio, m3/t 0,5 0, Unit тн нүүрсний cost/ton бүрэн coal өөрийн өртөг 1 Unit м3 Уулын cost/ m3 цулд rock ноогдох mass зардал Кхх Strip ratio
19 Preparation to stock exchange (2012) - Geophysical survey - Detailed survey drilling - Geotechnical survey - Drainage survey - Resource report in accordance with JORC - Have the resource report in accordance with Mongolian standard approved by Mineral Resource Authority. - Have the feasibility study in accordance with Mongolian standard approved by Mineral Resource Authority. - Feasibility study for a bank - Prepare documents for stock exchange - Баяжуулах үйлдвэрийн туршилт судалгаа ТЭЗҮ боловсруулах Additional shares to be sold at domestic stock exchange to raise the necessary fund while keeping state owned shares at 51% in 2012.
20 Investment plan ,6 (/in accordance with Feasibility study done by Glogex LLC) (10) 14 11,1 9,4 7,1 4,1 3,9 2,9 2,9 1,5 1,5 1, Preparation Хөрөнгийн биржд cost to stock гарах бэлтгэл ажлын exchange зардал Mine Уурхайн тоног equipments төхөөрөмж and facilities Total investment of million USD required between 2012 and 2022
21 ECONOMIC PARAMETERS Investment Facilities CAPEX 2012: USD85.5 million OPEX ( ): USD16.7 million OPEX ( ): USD29.2 million Total: USD117.5 million Preparation cost to stock exchange USD 13.9 million Total USD131.4 million Coal price/ton: tugriks in 2012, tugriks in Unit cost/ ton of coal in 2012: tugriks in 2014: tugriks in 2018: tugriks in 2022: tugriks Net present value (when 10%): 35.6 billion tugriks Internal rate of return (IRR) %, Payback period 7.91years or in 2018.
22 Thank you for your attention We welcome any kind of cooperation
Guidelines for the Estimation and Reporting of Australian Black Coal Resources and Reserves
Guidelines for the Estimation and Reporting of Australian Black Coal Resources and Reserves 2001 Edition (as referred to in the Joint Ore Reserves Committee Code ( The JORC Code ) 1999 edition) Prepared
Investing in an Underground Coal Mine in Indonesia
Coal Supplying Key Resources into expanding Asian markets Investing in an Underground Coal Mine in Indonesia Disclaimer Forward Looking Statements This presentation includes certain forward looking Statements.
TD Securities Mining Conference JANUARY 26-27, 2016. Developing the third-largest copper mine
TD Securities Mining Conference JANUARY 26-27, 2016 Developing the third-largest copper mine Forward-looking statements This presentation includes certain forward-looking information within the meaning
Exploration. Exploration methods
Exploration Activities related to establishing a mineral deposit through geological, geophysical and geochemical methods. It is preceded by Prospecting and followed by Planning & Development. Geological
Savannah North Scoping Study Looking into the future 3 February 2016
Savannah North Scoping Study Looking into the future 3 February 2016 ASX: PAN Disclaimer Cautionary Statements This presentation includes information extracted from Panoramic Resources Limited ASX announcement
By Gene Kitts, Senior Vice President-Mining Services, International Coal Group, Inc.
Why Surface Mine? By Gene Kitts, Senior Vice President-Mining Services, International Coal Group, Inc. Why do we surface mine in Central Appalachia? It s certainly not because we like the public attention
NEW HORIZONS, HOPE & INVESTMENTS WINNERS FOR THE RECOVERY THE DONKIN MINE NOVA SCOTIA
NEW HORIZONS, HOPE & INVESTMENTS WINNERS FOR THE RECOVERY THE DONKIN MINE NOVA SCOTIA Mr. Paul Vining, CEO - Cutlass Collieries, LLC Canadian Coal Association 2015 Conference Forward Looking Statements
BUSINESS PLAN FOR THE MINERAL PROJECT FOR [NAME(S) OF PERIMETER(S)] SUBMITTED TO THE MINISTRY OF NATURAL RESOURCES/RWANDA
(COVER PAGE) COMPANY NAME PHONE / Fax Physical Address P.O. Box Email Website BUSINESS PLAN FOR THE MINERAL PROJECT FOR [NAME(S) OF PERIMETER(S)] SUBMITTED TO THE MINISTRY OF NATURAL RESOURCES/RWANDA NAME
LIGNITE MINING DEVELOPMENT STRATEGY
LIGNITE MINING DEVELOPMENT STRATEGY STATEM ENT OF PRINCIPL E Recognizing that lignite will remain the principal fuel for electricity generation in the long term, the use of indigenous coal is encouraged
Coalbed Methane CO2 Sequestration Project Mecsek Mts Hungary
Coalbed Methane CO2 Sequestration Project Mecsek Mts Hungary ROTAQUA KFT UNIVERSITY OF MISKOLC Janos Foldessy University of Miskolc, Department of Geology and Mineral Resources Resources and Environment
Appraisal of Mineral Properties. August 2013 www.resourcetec.com
Appraisal of Mineral Properties August 2013 www.resourcetec.com Appraisal of Mineral Properties INSTRUCTOR: JEFFREY R. KERN Certified General Appraiser: Pennsylvania Delaware Texas Florida Georgia Virginia
Policy measures for the prevention and minimization of hazardous wastes
WASTE AND WASTE MANAGEMENT PROGRESS AND ACHEIVEMENTS Policy measures for the prevention and minimization of hazardous wastes 1. At the international level, Mongolia joined The Basel Convention on the Control
Developing Power Projects in Southern Africa. Annual General Meeting Presentation 20 th November 2015
Developing Power Projects in Southern Africa Annual General Meeting Presentation 20 th November 2015 2015 Company Highlights AFR now participating in the development of three large-scale power projects
Small Scale Coal Power Plant in Indonesia
Small Scale Coal Power Plant in Indonesia Taufik Sastrawinata Director Technology and Business Development of PT. Advance Technology Indonesia and Secretary General of Indonesian Coal Society Indonesia
COARSE DRY COAL CLEANING
COARSE DRY COAL CLEANING R. Q. Honaker University of Kentucky Department of Mining Engineering Lexington, Kentucky, USA 40506-0107 0107 Workshop on Coal Beneficiation and Utilization of Rejects : Initiatives,
WILLAMAX PROJECT. TSX-V: DVN Reach us at 604 818 1706. Developing B.C. mining assets to create profitable gold production.
WILLAMAX PROJECT Developing B.C. mining assets to create profitable gold production May 2014 Reach us at 604 818 1706 Management Team Akash Patel, President and CEO Mr. Patel has received a bachelor in
Types of Mining - Expert Table
See page 6 Minerals Downunder Teacher Guide (2002) - Activity 4a Types of Mining - Expert Table How to Jigsaw Information 1. Divide the class into Home Groups of five for the five different types of mining
NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS
NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS Project Generates 32% IRR and C$33 Million NPV After-Tax; Cash Costs of US$865 per Ounce
For personal use only
DECEMBER 2011 Issued 31 January 2012 HIGHLIGHTS INDIAN IRON ORE MINING PROJECT Significant on-site work completed and installation of phase one processing infrastructure underway at Kurnool iron beneficiation
The successful integration of 3D seismic into the mining process: Practical examples from Bowen Basin underground coal mines
Geophysics 165 Troy Peters The successful integration of 3D seismic into the mining process: Practical examples from Bowen Basin underground coal mines This paper discusses how mine staff from a number
Developing Power Projects in Southern Africa. Cape Town Presentation 8 th February 2016
Developing Power Projects in Southern Africa Cape Town Presentation 8 th February 2016 Company Highlights AFR now participating in the development of three large-scale power projects in Botswana Completion
Application of the Thermo Scientific CQM Online Coal Analyzer in Anjialing Coal Preparation Plant s Rail Loadout
Application of the Thermo Scientific CQM Online Coal Analyzer in Anjialing Coal Preparation Plant s Rail Loadout Pingshuo Coal Industry Limited Liability Corporation (PSC) is China Coal Energy Group's
Gemcom Minex and the Corporate Database
*Gemcom Software was acquired by Dassault Systèmes, the 3DEXPERIENCE Company, in July 2012. It is now known as GEOVIA. Gemcom Minex and the Corporate Database Jon Barber - Vice President, Minex, - Gemcom
Avion will host a conference call at 10:30 AM (EST) on Monday, April 2, 2011 to discuss the results. To participate in the call please dial:
March 31, 2012 A v i o n G o l d A n n o u n c e s F o u r t h Q u a r t e r 2 0 1 1 E a r n i n g s o f $ 8. 1 M i l l i o n W i t h E a r n i n g s P e r S h a r e O f $ 0. 0 2 R e c o r d 2 0 1 1 E
Small Scale Coal Power Plant in Indonesia
Small Scale Coal Power Plant in Indonesia Taufik Sastrawinata Director Technology and Business Development of PT. Advance Technology Indonesia and Secretary General of Indonesian Coal Society Indonesia
Corporate Presentation October 2015
TSX.V: GBB OTC PK: GBBFF THE GRANADA GOLD PROPERTY IN ROUYN - NORANDA QUEBEC a Corporate Presentation October 2015 GoldBullionDevelopmentCorp.com A Compelling Value Proposition High-grade rolling start
TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY
10 August 2015 ASX: AOH, FSE: A2O TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY Estimated oxide and sulphide resources within the optimum pit is 17.3
Mongolian power sector:
Mongolian power sector: Background and current policy Kh.Erdenechuluun Representing UBEDN, Mongolia BRIEFLY ABOUT MONGOLIA Territory: 1.564 million km 2 Population: 2.7 million Capital city: Ulaanbaatar
Sharyn Gol JSC. Enkhbayar Davaatseren +976-70 100095 [email protected]. March 2011
31-Dec 28-Feb 30-Apr 30-Jun 31-Aug 31-Oct 31-Dec 28-Feb MNT thousands 29 November March 30, 2010 2011 30, 2010 MSE Ticker/Code SHG/309 Equity Research/Metal & Mining/Initiation Equity Research coverage
Biocoal for Renewable. Copyright Bepex International 2011 All Rights Reserved
RD3-4 Biocoal for Renewable Biomass Power Generation Acknowledgement Project funding provided by customers of Xcel Energy through a grant from the Renewable Development Fund. Why Biocoal? Coal is the largest
Questions/Analysis: 1: Were the minerals evenly distributed throughout the cookie mines? Explain how this relates to real mining.
APES- Cookie Mining Lab Activity Questions/Analysis: 1: Were the minerals evenly distributed throughout the cookie mines? Explain how this relates to real mining. 2: Were you able to reclaim the land after
WORK BREAKDOWN STRUCTURE FOR A TYPICAL MINE
WORK BREAKDOWN STRUCTURE FOR A TYPICAL MINE LEGEND [GeoMine] = Technology Sites [Exploration-Geology-Reserves] = Edumine Courses [GEOCHEMISTRY] = State-of-the-Art Review (SOAR) 1 EXPLORATION [GEOMINE]
COMPARISON OF ELECTRICITY GENERATION COST OF NPP WITH ALTERNATES IN PAKISTAN
COMPARISON OF ELECTRICITY GENERATION COST OF NPP WITH ALTERNATES IN PAKISTAN IAEA INPRO dialogue forum 8 toward nuclear energy system sustainability: economics, resource availability and institutional
Candelaria and Ojos del Salado Chile
TSX : LUN OMX : LUMI 2016 Candelaria Key Facts Open Pit and Underground Mine Copper, gold, and silver 2016 estimate 124,000-128,000 tonnes copper Cash costs of $1.45 per lb copper after by-product credits
Arnot South Coal Resource Competent Person s Report. Coal of Africa Limited & Peel Hunt LLP
Arnot South Coal Resource Competent Person s Report Report Prepared for: Coal of Africa Limited & Peel Hunt LLP Report Prepared by: Gemecs (Pty) Ltd Sentinel House 37 Walter Sisulu Street Middelburg Republic
Investments in Private Energy Partnerships
Investments in Private Partnerships August 2010 Private energy partnership investments offer a meaningful addition to a diversified private equity or real asset portfolio. Over the past 20 years, private
Aspire Mining Limited
Aspire Mining Limited Investor Presentation March 2011 Forward Looking Statements & Disclaimer Forward Looking Statements Certain statements in the presentation are or may be forward looking statements
El cinturón de oro del río Narcea: el futuro de la minería de oro en España. Dr. Vern N. Rampton Presidente y CEO de Kinbauri Gold Corp.
El cinturón de oro del río Narcea: el futuro de la minería de oro en España Dr. Vern N. Rampton Presidente y CEO de Kinbauri Gold Corp. CORPORATE PRESENTATION JUNE 16, 2009 TARGETED TO BECOME ONE OF WESTERN
ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY
ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY ANNEX D1: BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN DRA FOR SAFETY D1-1 ANNEX D1 BASIC CONSIDERATIONS
COALWORKS Limited. Investor Series:Coal August 2008
Investor Series:Coal August 2008 1 DISCLAIMER The information in this presentation does not purport to contain all the information that may be required to evaluate the prospects of Coalworks and in particular
THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION
THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION GROUP 867 ARCHITECTURAL, ENGINEERING AND OTHER TECHNICAL SERVICES Excerpt from CPCprov-en-Publication.doc - United Nation Statistic Division Group Class Subclass
Canadian Spirit Resources Inc.
This management discussion and analysis ( MD&A ) of the financial conditions and results of operations should be read in conjunction with the audited financial statements for the year ended December 31,
North Atlantic and Rio Tinto Joint Venture Potash Project in Saskatchewan, Canada. Resource Summary
North Atlantic and Rio Tinto Joint Venture Potash Project in Saskatchewan, Canada Resource Summary The Canadian Potash Project is located in the central Saskatchewan Potash district that represents nearly
Our Deep Geothermal Energy Potential: A Case Study in Saskatchewan with Application Throughout the Western Canadian Sedimentary Basin
Our Deep Geothermal Energy Potential: A Case Study in Saskatchewan with Application Throughout the Western Canadian Sedimentary Basin Introduction Deep geothermal energy relates to the heat-energy stored
Endeavour Management Presentation
Endeavour Management Presentation June 2014 GOLD PRODUCER WEST AFRICA CASH FLOW Disclaimer & Forward Looking Statements This presentation contains forward-looking statements including but not limited to,
Trading Symbol: TSX: SVM February 17, 2011 NYSE: SVM
PRESS RELEASE Trading Symbol: TSX: SVM February 17, 2011 NYSE: SVM SILVERCORP ANNOUNCES POSITIVE PRELIMINARY ASSESSMENT FOR THE SILVERTIP SILVER-LEAD-ZINC PROJECT, BRITISH COLUMBIA, CANADA VANCOUVER, British
Deep geological disposal of radioactive waste in Switzerland - overview and outlook
Deep geological disposal of radioactive waste in Switzerland - overview and outlook Michael Schnellmann (Section Head Geosciences) Annual Convention 2015 Baden 20 th June 2015 Nagra Mandate from the Swiss
Yu. F. Vasyuchkov*, M. Yu. Bykova* NEW TECHNOLOGY OF GAS EXTRACTION ON THE BASE OF A COAL TO A HYDROGEN TRANSFER
WIERTNICTWO NAFTA GAZ TOM 28 ZESZYT 1 2 2011 Yu. F. Vasyuchkov*, M. Yu. Bykova* NEW TECHNOLOGY OF GAS EXTRACTION ON THE BASE OF A COAL TO A HYDROGEN TRANSFER In modern period the useful extraction of energy
A new short- and medium-term production scheduling tool MineSight Schedule Optimizer (MSSO)
A new short- and medium-term production scheduling tool MineSight Schedule Optimizer (MSSO) Zhanyou Huang a, Wenlong Cai a, A. Frederick Banfield a a Mintec, Inc., Tucson, Arizona, USA The MineSight Schedule
THIRD QUARTER EARNINGS NOVEMBER 12, 2015
THIRD QUARTER EARNINGS NOVEMBER 12, 2015 CAUTIONARY NOTES Qualified Person Brian Morris, is the non-independent Klondex Mines "qualified person" as defined by National Instrument 43-101 Standards of Disclosure
KOPY GOLDFIELDS AB. A thorny path of a public Junior Gold Exploration Company in Russia Russian & CIS Metals Summit 2014, Moscow, February, 2014
KOPY GOLDFIELDS AB A thorny path of a public Junior Gold Exploration Company in Russia Russian & CIS Metals Summit 2014, Moscow, February, 2014 Disclaimer - Forward looking statement Forward Looking Information
FIRST BAUXITE CORPORATION Suite 1220 1066 West Hastings St. Vancouver, B.C., V6E 3X1 604-806-0916 Fax: 604-806-0956 www.firstbauxite.
FIRST BAUXITE CORPORATION Suite 1220 1066 West Hastings St. Vancouver, B.C., V6E 3X1 604-806-0916 Fax: 604-806-0956 www.firstbauxite.com October 6, 2011 NEWS RELEASE Symbol: FBX: TSX V FBI: FWB/BER FIRST
Botswana Power Development! March 2015!
Botswana Power Development! March 2015! Power development business overview! Strong regional power demand underpinning business strategy " Independent power producers (IPPʼs) required to build new capacity"
Annual General Meeting
Annual General Meeting Westbury Hotel, Dublin, 13th September 2013 Forward Looking Statements The content of this presentation relating to Moesia Oil and Gas plc ( Moesia ) has not been approved by an
MINIMUM ENGINEERING STUDY REQUIREMENTS UPDATE
Issue No. 128 June 2015 MINIMUM ENGINEERING STUDY REQUIREMENTS UPDATE Issue No. 95 (March 2009) of this publication, formally known as Pincock Perspectives, has been one of our most requested and referenced
THERMAL COAL FINANCIAL HIGHLIGHTS
THERMAL COAL FINANCIAL HIGHLIGHTS THERMAL COAL In, Thermal Coal owns and operates nine mines. In Colombia, we have a one-third shareholding (with BHP Billiton and Xstrata each owning one-third) in Cerrejón,
Underground Coal Gasification in South Africa the SAUCGA
Underground Coal Gasification in South Africa the SAUCGA Wessel Bonnet, Sasol New Energy Johan Brand, Africary Johan van Dyk, Africary Neo Coangae, Exxaro Services Shaun Pershad, Eskom Holdings SOC Ltd
ALROSA Q1 2015 IFRS results conference call edited transcript
ALROSA Q1 2015 IFRS Results Conference Call Edited Transcript ALROSA Q1 2015 IFRS results conference call edited transcript 4 June 2015 1 ALROSA speakers Igor Kulichik CFO, Vice - president Sergei Mezhokh
UNDERGROUND COAL GASIFICATION. By Lian Hattingh
UNDERGROUND COAL GASIFICATION By Lian Hattingh Agenda What is UCG The history of UCG How does UCG work Environmental impact of UCG Why Sasol is interested The impact of UCG on Sasol business Advantages/Disadvantages
Copper and Gold at Our Core
Copper and Gold at Our Core January 2016 TSX: ETG NYSE MKT: EGI FRANKFURT: EKA Cautionary Statement This presentation contains forward-looking statements within the meaning of the United States Private
NuGeneration Ltd Site Investigations
NuGeneration Ltd Site Investigations Introducing the site assessment and radiological characterisation project NuGen has commissioned an engineering consortium - which is a joint venture of IBERDROLA Ingeniería
Payback period 2.4 years (7% improvement from 2.6 years stated in the MPFS);
Kibo Mining Plc (Incorporated in Ireland) (Registration Number: 451931) (External registration number: 2011/007371/10) Share code on the JSE Limited: KBO Share code on the AIM: KIBO ISIN:IE00B97C0C31 (
Continental Gold Announces a Positive Preliminary Economic Assessment for the Buriticá Project
Continental Gold Announces a Positive Preliminary Economic Assessment for the Buriticá Project Toronto, Ontario, November 17, 2014 - Continental Gold Limited (TSX:CNL; OTCQX:CGOOF) ("Continental" or the
In-Pit Crushing and Conveying Phil Morriss
In-Pit Crushing and Conveying Phil Morriss AGENDA 1. Introduction - what is In-Pit Crushing and Conveying (IPCC)? 2. What does a quarry need from IPCC? 3. Why and when should we consider using it? 4. How
Forgotten savings: Heat recovery from surface blowdown
Forgotten savings: Heat recovery from surface blowdown 1. Introduction The purpose of this article is to inform thermal plant operators of the interesting fuel savings that can be obtained by recovering
Challenges of Investing in Junior Mining Companies and. Sotkamo Silver
Challenges of Investing in Junior Mining Companies and Sotkamo Silver Life Cycle of Junior Explorer High Risk - High Potential Full value Relative Value Possible takeover Speculation Discovery Lowered
CANADA S INTERMEDIATE GOLD PRODUCER
CANADA S INTERMEDIATE GOLD PRODUCER Third Quarter 2015 Results Conference 1 Call & Webcast October 29, 2015 Forward Looking Information This presentation contains certain forward-looking information and
Innovative textile - industrial cluster of the Ivanovo region
[land of prospects] [ land of possibilities Innovative textile - industrial cluster of the Ivanovo region [ Ivanovo region] For development of the Innovative textile - industrial cluster of the Ivanovo
Update of LCI Background Data Exemplified for the German Steam Coal Supply Chain
Update of LCI Background Data Exemplified for the German Steam Coal Supply Chain Oliver Mayer-Spohn, Markus Blesl, Ulrich Fahl, Alfred Voß University of Stuttgart, Institute of Energy Economics and the
China Gold International Resources Corp. Ltd.
Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness
Unconventional Oil and Gas Production Drives Trends in Water Management and Treatment
Unconventional Oil and Gas Production Drives Trends in Water Management and Treatment Jelena Stanic, Global Water Intelligence A research report, Water for the Onshore Oil and Gas, by Global Water Intelligence
Nemaska Lithium A near term lithium hydroxide supplier
Nemaska Lithium A near term lithium hydroxide supplier Charging the future by Euro Pacific, Canada May 13, 2014 Guy Bourassa President and CEO Forward-looking Statements During the course of this presentation,
Unearthing Mineral Rights:
CourthouseDirect.com Presents Unearthing Mineral Rights: An Insider s Guide to Searching Titles for Mineral Rights Introduction Mineral rights can be one of the more difficult types of property to research
13.2.4 Aggregate Handling And Storage Piles. 13.2.4.1 General
13.2.4 Aggregate Handling And Storage Piles 13.2.4.1 General Inherent in operations that use minerals in aggregate form is the maintenance of outdoor storage piles. Storage piles are usually left uncovered,
USE OF MICROPILES IN TEXAS BRIDGES. by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch
USE OF MICROPILES IN TEXAS BRIDGES by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch DEFINITION OF A MICROPILE A micropile is a small diameter (typically less than 12 in.), drilled and
Walter Energy, Inc. 10-K
Walter Energy, Inc. 10-K Annual report pursuant to section 13 and 15(d) Filed on 02/28/2011 Filed Period 12/31/2010 UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 FORM 10-K (Mark
THE MINERAL INDUSTRY OF NEBRASKA
THE MINERAL INDUSTRY OF NEBRASKA This chapter has been prepared under a Memorandum of Understanding between the U.S. Geological Survey and the University of Nebraska-Lincoln, Nebraska Geological Survey,
Establishing the feasibility of your proposed mining venture
RUPPRECHT, S. Establishing the feasibility of your proposed mining venture. International Platinum Conference Platinum Adding Value, The South African Institute of Mining and Metallurgy, 2004. Establishing
Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. March 2012 Erste Securities Istanbul Turkey in Focus Conference
Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. March 2012 Erste Securities Istanbul Turkey in Focus Conference Contents I. Ciner Group in Brief 3 II. Park Elektrik Overview 6 III. Operations 10
QUARTERLY ACTIVITIES REPORT For the period ending 31 December 2013
HIGHLIGHTS QUARTERLY ACTIVITIES REPORT For the period ending 31 December 2013 MOORLANDS PROJECT Moorlands Mine Scoping Study completed by Xenith Mining Consultancy in November 2013, confirming robust project
Economic Outlook & PPP Projects in Mongolia
Economic Outlook & PPP Projects in Mongolia BEKHBAT SODNOM Director General Department of Innovation and Public Private Partnership Ministry of Economic Development Tokyo, Japan February 3, 2014 Content
Accounting for stripping costs in the production phase costs of waste removal and the associated benefit
IFRIC Meeting Agenda reference 2A Staff Paper Date March 2010 Project Topic xtractive Activities Accounting for stripping costs in the production phase costs of waste removal and the associated benefit
LYDIAN ANNOUNCES $325 MILLION CONSTRUCTION FINANCING FOR AMULSAR GOLD PROJECT
LYDIAN ANNOUNCES $325 MILLION CONSTRUCTION FINANCING FOR AMULSAR GOLD PROJECT Conference Call December 1, 2015 Lydianinternational.co.uk TSX:LYD Cautionary Statements Forward Looking Statements & Other
A pound of coal supplies enough electricity to power ten 100-watt light bulbs for about an hour.
Did You Know? A pound of coal supplies enough electricity to power ten 100-watt light bulbs for about an hour. Nonrenewable Coal Coal Basics Coal Takes Millions of Years To Create Coal is a combustible
ACQUISITION OF SIGNIFICANT COAL ASSETS IN INDONESIA AND STRENGTHENING OF INDO MINES BOARD
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE: 27 JANUARY 2010 ACQUISITION OF SIGNIFICANT COAL ASSETS IN INDONESIA AND STRENGTHENING OF INDO MINES BOARD Highlights: Acquisition of rights to an advanced