11. Excavating, Trenching and Shoring

Similar documents
Trenching and Excavation Safety

There is no water, surface tension cracks, nor other environmental conditions present that reduce the stability of the excavation.

Excavation Procedure. MIDGA Reviewed: 07/29/14 Effective: 06/20/09 Supersedes: Original Preparer: Owner: Approver: Safety Safety Safety

SECTION 25. Excavation and Trenching

Trenching and Shoring Procedures

Excavation, Trenching and Shoring Safety and OSHA s Excavation Standard

Walking and Working Surface Checklist:

Excavation Safe Working Practices

TRENCHING AND SHORING EXCAVATIONS PROGRAM

Hydraulic Excavators

HERSHEY ENTERTAINMENT AND RESORTS COMPANY TRENCHING AND SHORING TRAINING

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

CONSTRUCTION SAFETY. NOTE: Barriers, guards, and warning signs are required to ensure safety against existing hazards.

EXCAVATOR SAFETY TRAINING

University of Tennessee Safety Guidelines

Excavation & Trenching Procedure

Ladder, Scaffolding, and Excavation Safety Plan

AWWA Small Systems Pipe Repair Checklist, as published in July 2008 Opflow Question of the Month

Procedure for Working in or around Excavations

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

GoM Region Ground Disturbance Safe Work Practice (SWP) Document Number: CD # UPS-US-SW-GOM-HSE-DOC

Preventing trench wall cave-in and soil

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

Contractor s Safe Working Agreement

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY

STATE OF ALASKA DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH REVIEW BOARD P.O. BOX JUNEAU, AK 99802

MODEL T-4 TRENCHER. Operators Manual

SECTION EARTH MOVING

Best Practices for Excavation. Best Practices for. Excavation

Gas Meter Clearances and Service Installation Requirements

Nuclear Safe Work Practice 4.2. Operation of Light / Heavy Equipment

CAER Construction and Environmental Resource

v ations Exca OregonOSHA Safe practices for small business owners and contractors

Construction Safety. Mark Reising, Tetra Tech, Inc. NARPM Training Program nd Annual nd Annual NARPM Training Program. NARPM Training Program

Competent. Person Manual. Course Preview TRENCHSAFETY

Section 14. Forklift Safety Contents 14.1 Operator Safety

SAFETY AND HEALTH PROGRAM

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

Watershed Works Manual

Appendix 6145-T1 Forklift Use Practices

Safe & Sound Bridge Terminology

EQUIPMENT SAFETY EARTHMOVING MATERIAL HANDLING NAVFAC MIDLANT

Notes. Material 1. Tools the employee is expected to operate

PROCEDURES PREVENTION OF ACCIDENTAL IGNITION

Compressed Gas Cylinder Safety

SECTION SHEETING, SHORING AND BRACING

Independent Contractor Policy

Storm Drain Inlet Protection - IP

A Guide to OSHA Excavations Standard

Waste Collection Systems

Ladder Program and Training Materials

City of Shelbyville Site Inspection Checklist

North Dakota State University Slips, Trips, & Falls Program

Compressed Gas Cylinder Storage and Handling Guide

Level 1 Award in Health and Safety in a Construction Environment

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS

SECTION SUPPORT OF EXCAVATION

Gas Meter Clearances and Service Installation Requirements

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

CCR Fugitive Dust Control Plan CPS Energy Calaveras Power Station San Antonio, Texas

CONSTRUCTION PERMIT REQUIREMENTS

How To Retaining Wall Guide

E4055. Quiz. Soil Classification. Name: SOIL CLASSIFICATION QUESTIONS

RETAINING WALL CONSTRUCTION DETAILS 2006 ESTIMATING AND INSTALLATION MANUAL. Featuring Highland Stone. anchorwall.com

University of Tennessee Safety Guidelines

Millersville University - Office Of Environmental Health & Safety Scope & Application

GET A GRIP TO AVOID INJURIES

CONSTRUCTION SAFETY POLICY

HEALTH AND SAFETY REDUCING ACCIDENTS IN KITCHENS

Fixed and Portable Ladders- A Guide to OSHA Rules

San Antonio Water System Standard Specifications for Construction ITEM NO POINT REPAIRS AND OBSTRUCTION REMOVALS

Drew University Powered Industrial Truck Program Policy Draft 04/12

A. Fire Protection Plan. B. Access and Parking

SITE SPECIFIC FALL PROTECTION PLAN

MDWASD 8/1999 SECTION TRENCHING AND BACKFILLING FOR PIPING SYSTEMS

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA (7300 Short Road, Serene Lakes)

1000-LB. TRAILER JACK OWNER S MANUAL

BCIT. CNST 1100 Construction Safety Officer Training. Lesson Plan

Guidelines for Excavations

Confined Space Training

How To Prevent Accidents At Work

SECTION EXCAVATION, TRENCHING AND BACKFILLING (Pipeline Construction)

Construction Site Inspection Checklist for OHC By making use of some simple Best Management Practices (BMPs) a construction site operator can

Walking Working Surfaces and Fall Protection Program

TEMPORARY EMPLOYEES SAFETY PROCEDURES

Ontario Electrical Safety Code - Info Sheet

Summary of 2012 Fatal Accidents at Metal/Nonmetal Mines and Preventative Recommendations.

CONSTRUCTION SITE HEALTH AND SAFETY SELF AUDIT

Guideline for Excavation Work

Types of Mining - Expert Table

GUIDE TO TRENCH EXCAVATIONS (SHORING SUPPORT AND DRAINAGE MEASURES)

50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance

NJ Interception Drainage

Tremline Pty Ltd trading as The Hills Bark Blower

68 Metal Industry Guidelines for Safe Work

Powered Industrial Truck Safety Program

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

Transcription:

11. Excavating, Trenching and Shoring Overview This section discusses the following topics: General Guidelines for Excavating and Trenching Operations Excavation Safety Trenching and Shoring Safety Heavy Equipment Safety References OSHA 29CFR1910.268(a)(3) and 29CFR1926 Subpart P (Excavations) General Guidelines for Excavating and Trenching Operations General guidelines for the following operations are discussed: Before Excavating and Trenching During Excavating and Trenching After Excavating and Trenching FairPoint Communications, Inc. Health & Safety Manual 11-1

Before Excavating and Trenching Follow the guidelines below before beginning excavation and trenching operations: 1. Ensure general public safety. 2. Evaluate soil conditions or other material to be dug. 3. Evaluate the water table level and percolation conditions. 4. Evaluate proximity to underground utility, cable, and pipelines. 5. Mark all underground utilities, cables, and pipelines. 6. Evaluate proximity to buildings, roads, railroad tracks, and public right-ofway. 7. Contact owners of utilities, right-of-ways, transmission piping, etc. 8. Ensure all employees receive proper training, including first aid and CPR, and are competent in excavation and trenching operations. 9. Ensure there is adequate equipment, including personal protective equipment, shoring materials, signs, fire extinguishers, barricades, and machinery, before starting the job. 10. Check the location of heavy equipment, power shovels, backhoes, trenchers, trucks, and spoil pile to ensure they are at least two feet from the opening edge. 11. Ensure shoring equipment or trench boxes/shields are adequate for the job at hand. After evaluating and completing the above tasks, additional precautionary measures may need to be taken before starting any excavation or trenching operations. FairPoint Communications, Inc. Health & Safety Manual 11-2

During Excavating and Trenching Follow the guidelines below during excavation and trenching operations: 1. Continue to evaluate soil conditions, especially after a rainfall and after passing trains or heavy vehicles. 2. When vehicles, internal combustion engines, or heavier-than-air gases (like propane) are used in or near trenches, take precautions to ensure exhaust gases don t enter trenches. Continue to evaluate possible oxygen deficiency or gaseous conditions. 3. Continue to evaluate adequacy of shoring and/or sloping as work progresses, as well as sheeting, bracing, shoring, and underpinning stability. 4. Hand dig around underground utilities, cables, and pipelines, if necessary, to avoid damage. 5. Note in job records any damage resulting from erroneous information received from utility companies. 6. Maintain proper and adequate entrance and exit facilities. 7. Install shoring support/braces from the top down and remove them from the bottom up. 8. Observe changes in vehicle and machinery operational patterns, size of materials, and equipment near trench. 9. Ensure employees working in trenches wear hard hats, safety glasses, and appropriate footwear. 10. Keep workers out of the immediate area of excavating equipment and do not allow workers to work ahead of the shoring. 11. Place tools and rocks either on the outer slope of the excavated materials or on the other side of the trench if the surface is flat. 12. When working on hard surface roads where traffic flow is maintained, stones are often thrown with great speed by passing vehicle tires and can cause serious injury. Place work area protection signs and barricades when work interferes with vehicle traffic. FairPoint Communications, Inc. Health & Safety Manual 11-3

13. Be aware of fall hazards around construction trenches. Serious personal injuries can occur when workers fall into construction trenches. Falls can result from workers attempting to leap across or into the trench. Rocks and tools near the trench edge can fall into the trench and should be kept far away. After Excavating and Trenching Follow the guidelines below after excavation and trenching operations: 1. Barricade any excavation left unattended with warning devices for the protection of employees and the general public. 2. Reevaluate the depth of the trench or excavation, its sloping and/or shoring, sloping of banks, sides, and walls in relation to depth of cut, water content, and vibrations. 3. Provide a ladder for exit from the excavation. 4. Ensure correct positioning of cross braces or the trench jack to prevent sliding, falling, or kick outs. Excavation Safety The following guidelines apply to excavation safety: 1. Follow the machine guidelines below: a. Never oil, grease, or refuel a machine while the motor is running. b. Operators must keep employees and bystanders a safe distance from a machine in operation. c. Never attempt to clear buckets, blades, scoops, chutes, etc. while a machine is in operation. 2. Never stand under loads handled by power shovels, derricks, and hoists. To avoid being struck by spillage, stand away from vehicles being loaded. FairPoint Communications, Inc. Health & Safety Manual 11-4

3. Inspect excavations daily. If evidence of possible cave-ins or slides is apparent, cease all work in the excavation until necessary precautions are taken to safeguard employees. After a rainstorm or other event occurs that increases the likelihood of a hazard, make additional inspections of the excavation and provide additional protection if necessary. 4. Take special precautions to slope or shore the sides of an excavation adjacent to a previously backfilled excavation. 5. Use diversion ditches, dikes, or other suitable means to prevent surface water from entering an excavation and to provide adequate drainage of the area adjacent to the excavation. Do not allow excess amounts of water to accumulate in trenches. 6. If it is necessary to place and operate power shovels, derricks, trucks, materials, or other heavy objects on a level above and near an excavation, brace the side of the excavation as necessary to resist the extra pressure due to such superimposed loads. 7. When mobile equipment is allowed or used adjacent to excavations, install substantial stop logs or barricades. If possible, the grade should be away from the excavation. 8. Provide adequate physical barrier protection at all excavations. Barricade or cover all wells, pits, shafts, etc. Backfill temporary wells, pits, shafts, etc. upon completion of exploration and similar operations. Trenching and Shoring Safety The following guidelines apply to trenching and shoring safety: 1. Trenches over 5 feet deep in compact or hard soils or in ground with hazardous soil conditions must be shored, braced or sloped to the angle of repose. Refer to Figure 11-1. FairPoint Communications, Inc. Health & Safety Manual 11-5

Note: Clays, silts, loams or non-homogenous soils require shoring and bracing. The presence of ground water requires special treatment. A-Solid rock, shale, or cemented sand and gravels 90% B-Compacted angular gravels 1/2:1 63, 23 degrees C-Recommended slope for average soils 1:1 45 degrees D-Compacted sharp sand 1 1/2:1 33, 41 degrees E-Well rounded loose sand 2:1 26, 34 degrees A B C D E Original Ground Line Figure 11-1. Approximate Angle of Repose for Sloping of Excavation Sides 2. Sides of trenches in unstable or soft material, less than 5 feet deep, should be shored, sheeted, braced, sloped or otherwise supported with sufficient strength to protect employees working within them. 3. Place all spoil, tools, and other materials removed from trenches and excavations at least 24" from the edge of the excavation. 4. Never jump over a trench. 5. A backhoe bucket or suspended materials can strike men in a trench. Control of equipment and materials requires continuous attention by the supervisor. 6. When working in a trench over 5 feet deep, ensure an employee is always available in the immediate vicinity to provide emergency assistance if necessary. 7. When employees are required to be in trenches 4 feet or more deep, provide an adequate means of exit, such as a ladder or steps. Place them so it requires no more than 25 feet of lateral travel to exit. 8. Never work under pipe that is only supported on skids over a trench. 9. Release pressure on air tools before equipment is left unattended. 10. Always make sure connections to air tools are secure before turning on air pressure. Before making any adjustments, close air valves. FairPoint Communications, Inc. Health & Safety Manual 11-6

11. Materials used for sheeting and sheet piling, bracing, shoring, and underpinning should be in good serviceable condition. Timbers used should be sound and free from large or loose knots. All materials must be designed and installed to be effective to the bottom of the excavation. 12. Always take additional precautions through the use of shoring and bracing to prevent slides or cave-ins when excavations or trenches are made adjacent to back-filled excavations. Also, take precautions when excavations are subject to vibrations from railroad or highway traffic, machinery operations, or any other source. 13. Do not flatten the angle of repose when an excavation has water conditions, silt materials, loose boulders, and areas where erosion, deep frost action, and slide planes appear. 14. Place cross braces or trench jacks in a true horizontal position, spaced vertically, and secured to prevent sliding, falling or kick outs. 15. Portable trench boxes or sliding trench shields may be used for protection of personnel instead of a shoring system or sloping. If trench boxes or shields are used, they should be designed, constructed, and maintained to provide protection equal to or greater than the sheeting or shoring required for the trench. Heavy Equipment Safety The following guidelines apply to heavy equipment safety: 1. When an end-loader is loaded by hand, the machine operator should keep his hands and feet free of all controls. 2. Do not use ditching machines on slopes or inclines without first preparing the right-of-way to prevent overturning. 3. When parking equipment on streets or highways, use adequate warning devices. 4. When it is necessary to leave excavating equipment unattended, lower the blade, bucket or scoop to the ground and lock the ignition system. FairPoint Communications, Inc. Health & Safety Manual 11-7