GoM Region Ground Disturbance Safe Work Practice (SWP) Document Number: CD # UPS-US-SW-GOM-HSE-DOC
|
|
|
- Vernon Osborne
- 9 years ago
- Views:
Transcription
1 GoM Region Ground Disturbance Safe Work Practice (SWP) Page 1 of 6 GoM Region Ground Disturbance Safe Work Practice (SWP) Document Number: CD # UPS-US-SW-GOM-HSE-DOC Document Authority: GoM H&S Director Document Custodian: GoM Safety Programs Lead Scope: GoM H&S Doc Admin: GoM H&S Document Management Administrator Issue Date: 02/28/06 Issuing Dept: GoM H&S Revision Date: 08/15/12 Control Tier: 2 GoM H&S Next Review Date: 03/01/17 OMS Element: 4.5 Control of Work 1 Purpose/Scope This document outlines Safe Work Practices for excavations and trenches. NOTE: For diving related Ground Disturbance, refer to the Diving Operation Procedures. 2 Key Responsibilities Location Manager (Issuing Authority [IA], Person in Charge [PIC], On-Site Manager) confirms proper permit(s) are completed and implemented by a competent person. 3 Procedures 3.1 Excavation Excavation Steps Personnel engaged in excavation activities shall adhere to the steps below: Before beginning an excavation, identify and mark utility installations, such as sewer, telephone, fuel, power lines, water lines, pipelines, or any other underground installations. If applicable, contact utility companies and advise of proposed work prior to the start of actual excavation and call state/local agencies such as "One Call" or "DIG", as required. After all underground installations have been marked, the BP representative shall determine if these installations are within 10 feet of the proposed excavation area, which could create a hazard if contacted by the probing or excavation tools being used. NOTE: Municipalities or other regulatory agencies may require permits. Prepare a JSEA and Ground Disturbance Permit and conduct a pre-job safety meeting. When underground installations are identified, the area shall be excavated using procedures approved by a BP supervisor. Confirm that all identified hazards are outlined on the Ground Disturbance permit and JSEA forms. Unprotected electric lines and nonmetallic pipelines shall always be isolated, de-energized, and locked out/tagged out prior to beginning any excavation activity. The BP representative shall confirm that markings remain in place during digging and excavation operations. Pipeline crossings shall be marked with orange plastic barrier(s) or equivalent. The barriers shall remain in place until that area is ready for excavation. When BP is performing excavation and trenching, a BP representative shall be on site if excavation is within 10 feet of any buried utility or other underground installation. BP Representative shall confirm that all appropriate personnel are on site prior to any excavation. Examples of appropriate personnel are qualified backhoe operator, spotter, and roustabouts.
2 GoM Region Ground Disturbance Safe Work Practice (SWP) Page 2 of 6 A spotter is required while excavating and trenching where the potential for hitting a line exists. More than one spotter may be required while working around overhead power lines. Use a moboard/digging bar (a flat piece of metal attached to the teeth of the bucket to prevent the puncture of a pipe) on backhoe/track hoe when digging in known proximity of lines. Backhoe operator shall dig parallel to the line. Appropriate training for the equipment operator shall be verified. Decide whether to guard the walls by shoring, sloping, benching, or some other equivalent means. Perform sloping or shoring in accordance with Occupational Safety and Health Administration (OSHA) regulations. A registered professional engineer shall design sloping or benching for excavations greater than 20-feet deep. Table 1: Maximum Allowable Slopes (H:V) for Excavations Soil or Rock Type Less than 20 Feet Deep Stable Rock Vertical (90 ) Type A Soil ¾ : 1 (53 ) Type B Soil 1 : 1 (45 ) Type C Soil 1½ : 1 (34 ) Mixed Soil Types 1½ : 1 (34 ) NOTE: Numbers shown in parentheses next to maximum allowable s09lopes are angles expressed in degrees from horizontal, H = horizontal and V = vertical STABLE ROCK TYPE A SOIL TYPE B SOIL TYPE C SOIL MIXED SOIL TYPES Figure 1: Required Slopes for Different Soil Types
3 GoM Region Ground Disturbance Safe Work Practice (SWP) Page 3 of Excavation Safety Practices When working in excavations and trenches more than four feet deep, a Confined Space Entry Permit is required, as outlined in the Confined Space Entry Program of the CoW SWP. Ladders, steps, or ramps located so that no more than 25 feet of lateral travel is required to reach. Excavated soil, material, or equipment that could fall or roll into an excavation shall be stored and retained at least two feet from the edge of the excavation. If excavations endanger the stability of adjacent structures (building, walls, or other structures), support systems shall be utilized. A Competent Person shall make daily inspections of excavations prior to the start of the work shift. This person has the authority and responsibility to modify shoring or work methods as necessary to provide greater safety. If evidence of possible cave-ins or slides (such as accumulating water or seepage) is apparent, all work in the excavation shall cease until necessary precautions have been taken to safeguard personnel. Use barriers and barricades as necessary to protect individuals and mobile operating equipment near the excavation. Personnel shall not be in the excavation or trench when power equipment is being used to perform the excavation. 4 Definitions Term Benching Competent Person Excavation Shoring Sloping Soil Classification System Stable Rock Thumb Penetration Test Trenching Definition Shaping the sides of an excavation to form one or more horizontal levels or steps, usually with vertical or near-vertical surfaces between levels. A person capable of identifying existing and predictable hazards, soil types in the surroundings, or working conditions that are unsanitary, hazardous, or dangerous to personnel and who has authorization to take prompt corrective measures to eliminate them. Any man-made cut, cavity, trench, or depression in an earth surface that is formed by earth removal. A structure that supports the sides of an excavation and one that is designed to prevent cave-ins. Examples of such shoring systems are metal, hydraulic, mechanical, or 'timbershoring'. Tapering the sides of an excavation. The angle of incline is a variable of factors including soil type, environmental conditions of exposure, and surface load. Classification used by the National Bureau of Standards. Natural solid mineral matter that can be excavated with vertical sides and remain intact while exposed. A test used to estimate the unconfined compressive strength of cohesive soils. This test is based on the thumb penetration test described in American Society for Testing and Materials (ASTM) Standard designation D "Standard Recommended Practice for Description of Soils (Visual - Manual Procedure)." Refers to an excavation where the depth is larger than its width that does not exceed a 15 foot width at the bottom.
4 GoM Region Ground Disturbance Safe Work Practice (SWP) Page 4 of 6 Term Type A Soil Type B Soil Type C Soil Definition A cohesive soil with an unconfined compressive strength of 1.5 tons/ft2 (tsf) or greater; examples are clay, silty clay, sandy clay, clay loam, silty clay loam, sandy clay loam, caliche, and hardpan (if a soil is fissured, subject to vibration, or previously disturbed, it is not considered Type A). A less-cohesive soil with an unconfined compressive strength greater than 0.5 tsf but less than 1.5 tsf; examples are angular gravel or crushed rock, silt, silt loam, sandy loam, dry rock that is not stable, partly sloped material, and previously disturbed Type A soil that is not considered Type C soil. The least-cohesive classification of soil, with an unconfined compressive strength of 0.5 tsf or less; examples are gravel, sand, loamy sand, submerged soils or freely seeping soils, submerged rock that is not as stable, or a layered system.
5 GoM Region Ground Disturbance Safe Work Practice (SWP) Page 5 of 6 5 Key Documents/Tools/References Facility Name and Job Description: CHECK LIST FOR GROUND DISTURBANCE Notes: 1) This form is to be used when excavating, digging around existing pipe, underground equipment or buried electric lines. 2) Once job is complete, this form is to be filed in the appropriate facility, well, or construction file. Pre-Excavation Checks: OK 1. Has the state "One Call" been made? Document the "One Call" verification number. Verification #. OK 2. If the state's "One Call" has not been notified, then the excavation shall not proceed. a) In the event of an emergency the BP Supervisor has the authority to excavate the location. OK 3. Are all of the lines marked and flags visible? Is the pipeline right-of-way barricaded? OK 4. Have the Minimum Requirements For Excavation of Buried Lines been reviewed? OK 5. Has the excavator/contractor been informed of the BP Minimum Requirements? OK 6. Does the contractor know what their job duties are regarding the excavation? (Backhoe operator, spotter, etc.) OK 7. No digging within 1' foot of any line with a motorized tool. a) Determine whether any installations within 10' foot of the proposed excavation area might possible create a hazard if contacted by the probing or excavation tools being used. If Yes, the area should be excavated using procedures approved by the BP Supervisor, and discussed in this meeting. OK 8. If excavating around electrical lines, are the lines de-energized? And are they LOTO (Per Minimum Excavation Requirements) OK 9. If excavating or digging around fiberglass or poly lines are they de-energized? And are they LOTO? (Per Minimum Excavation Requirements) OK 10. Excavated soil or other materials / equipment that could pose a hazard by falling or rolling into excavation shall be stored or retained at least two (2) feet from the edge of the excavation. OK 11. Potential for a hazardous atmosphere? Describe the purge process in the comments section below. OK 12. If a pipeline is to be cut-into during the entry, how is the initial "minimal entry" going to be accomplished: Method Used: Hacksaw cut Pneumatic saw or drill Other equivalent non-spark producing means Describe: OK 13. How are escape routes out of the excavation provided? OK No more than 25 of lateral travel is required from anywhere in excavation. OK Ladders, steps, or ramps. OK Other provisions, Describe below: Preference is to have minimum of two routes of escape meeting the following criteria: 1. At opposite ends of the excavation. 2. Situated on opposite sides of piping in the excavation. OK 14. Pre-Entry atmospheric checks: O2 % LEL % or H2S. Note: Atmosphere is to be continuously monitored for LEL and O2. Circle the appropriate response for the following criteria: Yes No 1. Contains or has a potential to contain a hazardous atmosphere Yes No 2. Contains a material that has the potential for engulfing an entrant Yes No 3. Has an internal configuration such that an entrant could be trapped or asphyxiated by inwardly converging walls or by a floor which slopes downward to a smaller cross-section Yes No 4. Contains any other recognized serious safety and health hazard Yes No 5. Contains a hydrocarbon line that will be opened Note: If any of the previous 5 questions are answered Yes, then a Confined Space exists and entry shall be approved by a Q.P. / Entry Supervisor. Notes / Comments: SIGNATURE OF ON-SITE SUPERVISOR OR DESIG. ALTERNATE: DATE:
6 GoM Region Ground Disturbance Safe Work Practice (SWP) Page 6 of 6 Revision Log Revision Date Authority Custodian Revision Details 08/15/12 GoM H&S Director GoM Safety Programs Lead Reformatted document to meet new GoM document control template standardization guidelines. Updated Figure 1 Stable Rock to 90 02/03/12 GoM H&S Director GoM Safety Programs Lead Reviewed chapter no revisions made 06/01/08 GoM HSSE Director GoM HSSE Programs Manager Added ground disturbance checklist 02/28/06 S. Garner/ S. Tink/ R. DeLeonardis/ C. Jackson Kathy Kanocz Changed CD # from to UPS-US-SW- GOM-HSE-DOC to conform to the new numbering nomenclature inside of the new GoM HSSE Doc base. Changed 3 authorities and 1 custodian. 02/06/02 S. Garner/ B. Herbert/ R. White/ S. Flynn Ray Britt Initial issue as controlled document. Prior revision history located in hard-copy consolidated manual.
Trenching and Excavation Safety
1.0 ACTIVITY DESCRIPTION 1.1 This document provides basic safety guidelines related to excavation and trenching in pipeline construction activities. These guidelines are applicable to the locating, marking
E4055. Quiz. Soil Classification. Name: SOIL CLASSIFICATION QUESTIONS
E4055 Soil Classification Quiz SOIL CLASSIFICATION Name: Date: QUESTIONS 1 TRUE/FALSE 1. An average cave-in can drop five yards or 13,500 pounds of dirt. 2. A competent person should be knowledgeable of
Excavation Procedure. MIDGA Reviewed: 07/29/14 Effective: 06/20/09 Supersedes: Original Preparer: Owner: Approver: Safety Safety Safety
Procedure No.: SOP-0203 Page: 1 of 5 Preparer: Owner: Approver: Safety Safety Safety 1. PURPOSE The purposes of this procedure is to ensure safe excavation, reduce the potential of damaging underground
Trenching and Shoring Procedures
Trenching and Shoring Procedures Scope & Application This policy sets forth the official practices required for excavations General Requirements Soil Types Testing Methods Aluminum hydraulic shoring Benching
STATE OF ALASKA DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH REVIEW BOARD P.O. BOX 21149 JUNEAU, AK 99802
STATE OF ALASKA DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH REVIEW BOARD P.O. BOX 21149 JUNEAU, AK 99802 STATE OF ALASKA, DEPARTMENT ) OF LABOR, DIVISION OF LABOR ) STANDARDS AND SAFETY, ) OCCUPATIONAL
Trench Rescue by Buddy Martinette
Trench Rescue by Buddy Martinette SOIL TYPE AND TESTING It is imperative that rescue personnel understand soil types and testing procedures if the want to be competent at trench rescue operations. Determining
There is no water, surface tension cracks, nor other environmental conditions present that reduce the stability of the excavation.
Part 1926 Subpart P Introduction The Occupational Safety and Health Administration (OSHA) issued its first Excavation and Trenching Standard in 1971 to protect workers from excavation hazards. Since then,
SECTION 25. Excavation and Trenching
SECTION 25 Excavation and Trenching 25.A General. The requirements of this Section are applicable to all Government and contractor work forces when their employees are performing excavation or trenching
TRENCHING AND SHORING EXCAVATIONS PROGRAM
TRENCHING AND SHORING EXCAVATIONS PROGRAM TRENCHING AND SHORING EXCAVATIONS PROGRAM The purpose of this program is to provide information to our company employees and to interested persons that Northern
Excavation, Trenching and Shoring Safety and OSHA s Excavation Standard
Excavation, Trenching and Shoring Safety and OSHA s Excavation Standard AFSCME Training and Education Institute Manual This material was produced under grant number 46C4 DT05 from the Occupational Safety
THE COMPETENT PERSON & SOIL TESTING. This easy-to-use Leader s Guide is provided to assist in conducting a successful presentation.
THE COMPETENT PERSON & SOIL TESTING This easy-to-use Leader s Guide is provided to assist in conducting a successful presentation. Featured are: INTRODUCTION: A brief description of the program and the
University of Tennessee Safety Guidelines
University of Tennessee Safety Guidelines Policy Subject: Trenching and Shoring Guidelines Effective Date: 9/1/12 Area Affected: Any departments who are involved in excavation work and trenching. Reviewed/Revised:
SAFETY AND HEALTH PROGRAM
PROGRAM NUMBER NO. PAGES 05-005 10 REVISION ISSUE DATE Revision 2 11/1/2005 SAFETY AND HEALTH PROGRAM Confined Space Entry 1.0 INTRODUCTION Confined Space Entry is a serious workplace hazard, capable of
CONFINED SPACE POLICY
UNIVERSITY OF ALASKA FAIRBANKS SAFETY SYSTEM POLICY AND PROCEDURE DOCUMENT NUMBER: 804 ISSUE DATE: SEPTEMBER 1996 SUBJECT: Confined Space Policy CONFINED SPACE POLICY PURPOSE: The purpose of this policy
Excavation & Trenching Procedure
Excavation & Trenching 1. Overview The will ensure, as far as is reasonably practicable, that the conduct of work relating to excavation and trenching will not be harmful to the health and safety of employees
UNIVERSITY OF KENTUCKY CONFINED SPACE PROGRAM
SCOPE AND APPLICATION: The University of Kentucky has developed a written policy for safe entry into confined spaces. The University recognizes that certain environmental conditions within confined spaces
Competent. Person Manual. Course Preview TRENCHSAFETY
Course Preview Competent Person Manual A guide to industry standards, practices, and regulatory requirements for OSHA Construction Industry Regulations 29 CFR 1926, Subpart P - Excavations TRENCHSAFETY
TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL
TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL SCOPE This section of the specifications includes requirements for the Slurry Trench Cutoff Wall and related work as indicated on the
Safety and Health Resource Manual. Sample Permit-Required Confined Space Written Program
Sample Permit-Required Confined Space Written Program Purpose The purpose of this document is to communicate Employer s compliance with MIOSHA s requirements for a permit-required confined space entry
Millersville University - Office Of Environmental Health & Safety Scope & Application
Confined Space Entry Millersville University - Office Of Environmental Health & Safety Scope & Application The Confined Space Entry (CSE) program applies to the safe working practices for entering and
A Guide to OSHA Excavations Standard
Industry Guide 14 A Guide to OSHA Excavations Standard Occupational Safety and Health Division N.C. Department of Labor 1101 Mail Service Center Raleigh, NC 27699-1101 Cherie Berry Commissioner of Labor
Confined Space Air Monitoring
November 2008 Vol. 26. No. 3 Confined Space Air Monitoring Scott Shinn, C.I.H. Scott Shinn is a Certified Industrial Hygienist with 3M OH&ESD Technical Service and Regulatory Affairs. Summary Over the
Safety. Vopak Fundamentals on Safety
Safety Vopak Fundamentals on Safety Introduction Every person working at a Vopak location should be able to go home at the end of the working day without having suffered or caused harm in any way. Eliminating
Hydraulic Excavators
Chapter 8 Hydraulic Excavators Hydraulic excavators are designed to excavate below the ground surface on which the machine rests. These machines have good mobility and are excellent for general-purpose
CONFINED SPACE ENTRY (PROJECT STANDARDS AND SPECIFICATIONS) KLM Technology Group
Page : 1 of 34 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENTS Purpose 2 Scope
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
CONFINED SPACE PROGRAM
California Institute of Technology CONFINED SPACE PROGRAM Caltech Environment, Health, and Safety Office 1200 E. California Blvd., M/C 25-6 Pasadena, CA 91125 Phone: 626.395.6727 Fax: 626.577.6028 Email:
Procedure for Working in or around Excavations
RMS WHS Procedure: PN 066P12 (for Policy No. PN066) Procedure for Working in or around 1 of 15 Contents 1 Purpose... 3 2 Scope... 3 3 General requirements... 4 4 Definitions... 4 5 Responsibilities...
SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes)
SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes) Maintenance Office Administrative Office Billing Office 530-426-7802 530-426-7800 916-332-4872
Overview of the OSHA Confined Spaces in Construction Final Rule
Labor, Safety & Health Policy National Association of Home Builders Overview of the OSHA Confined Spaces in Construction Final Rule On May 4, 2015 the U.S. Occupational Safety and Health Administration
SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)
Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks
Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.
Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer
Confined Space Plan Prepared by: Environmental Health and Safety Office October, 2014
Confined Space Plan Prepared by: October, 2014 Table of Contents Table of Contents... i Acronyms... ii 1.0 Introduction... 1-1 1.1 Purpose... 1-1 1.2 Scope... 1-1 2.0 Roles and Responsibilities... 2-2
EXCAVATOR SAFETY TRAINING
EXCAVATOR SAFETY TRAINING INSPECTION CHECKLIST INSPECTION AREA INSPECTION RESULTS Sat. Unsat. N/A Comments Carrier & Car Body Rotation system Tracks Rollers Frame, welds, bolts Drive system Upper Structure
CONFINED SPACE HAZARD ANALYSIS. In order to determine if the space is a confined space, please answer Yes or No to the following questions:
Appendix A Name of Confined Space: Space Location: CONFINED SPACE HAZARD ANALYSIS In order to determine if the space is a confined space, please answer Yes or No to the following questions: A. IS IT A
Pressure Testing (Hydrostatic / Pneumatic) Safety Guidelines
The INGAA Foundation, Inc. 1.0 ACTIVITY DESCRIPTION 1.1 This document provides basic safety guidelines for the safety of all personnel and the general public during pressure (e.g., hydrostatic, pneumatic)
SECTION 31 20 00 EARTH MOVING
SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to
Oregon OSHA Excavation Safety Presented by the Public Education Section Oregon OSHA Department of Consumer and Business Services
Oregon OSHA Presented by the Public Education Section Oregon OSHA Department of Consumer and Business Services 0602-05 Oregon OSHA Public Education Mission: We provide knowledge and tools to advance self-sufficiency
Walking and Working Surface Checklist:
Walking and Working Surfaces Purpose: This information is presented to improve the level of safety in our operations, and to inform you that we will comply with the OSHA Standard 29 CFR 1910.23. Responsibility:
ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR 1910.252 WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600
OSHA REGULATION: 9 CFR 90.5 WELDING, CUTTING, AND BRAZING ( HOT WORK ) A. POLICY. This procedure follows requirements set forth in 9 CFR 90.5.. This policy applies to all Hot Work operations being done
SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT
SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT The following are minimum requirements for installation of conventional trench sewage disposal systems in St. Mary s County,
Confined Space Training
Confined Space Training Regulations are changing New rule eliminates the distinction between a permitrequired confined space (permit space) and a non permitrequired confined space. Under this rule, a space
CONFINED SPACE ENTRY NON-MARINE FACILITES
CONFINED SPACE SAFETY CONFINED SPACE ENTRY NON-MARINE FACILITES EM-385 Chapter 34 CONFINED SPACE ENTRY NON- MARINE FACILITIES UFGS 013526 OSHA 29 CFR 1910.146 A space that: What is a Confined Space? Is
OSHA 3825-09 2015. Protecting Construction Workers in Confined Spaces: Small Entity Compliance Guide
OSHA 3825-09 2015 Protecting Construction Workers in Confined Spaces: Small Entity Compliance Guide Occupational Safety and Health Act of 1970 To assure safe and healthful working conditions for working
Construction Safety. Mark Reising, Tetra Tech, Inc. NARPM Training Program nd Annual nd Annual NARPM Training Program. NARPM Training Program
Construction Safety Mark Reising, Tetra Tech, Inc. 22 nd Annual 22 22 NARPM Training Program nd Annual nd Annual NARPM Training Program NARPM Training Program 0 Construction Concerns Excavations Confined
Confined Spaces. Notes
29 CFR 1910.146 - Permit-required confined spaces Standard Number: 1910.146 Standard Title: Permit-required confined spaces SubPart Number: J SubPart Title: General Environmental Controls Confined Spaces
Section 02317 EXCAVATION AND BACKFILL FOR UTILITIES
Section 02317 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Excavation, trenching, foundation, embedment, and backfill for installation of utilities, including manholes and other pipeline structures. 1.02
Excavation Safe Working Practices
Excavation Safe Working Practices The Construction (Health, Safety and Welfare) Regulations 1996 under Excavations (Regulation 12) states that:- All practicable steps shall be taken where necessary to
The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
Ladder, Scaffolding, and Excavation Safety Plan
Ladder, Scaffolding, and Excavation Safety Plan Environmental Health, Safety, and Risk Management Department Box 6113, SFA Station Nacogdoches, Texas 75962-6113 Revised: January 2011 LADDERS In reducing
Guideline for Excavation Work
EVERYONE'S RESPONSIBILITY Guideline for Excavation Work December 2007 Guideline for Excavation Work Workplace Safety & Health Divsion 200 401 York Avenue Winnipeg, Manitoba R3C 0P8 December 2007 Guideline
CONFINED SPACE ENTRY REQUIREMENTS
CONFINED SPACE ENTRY REQUIREMENTS Safety Hazards in Confined Spaces A. The Contractor shall comply with the following, including all appendices, when entering any confined space on Maryland Aviation Administration
CONSTRUCTION SAFETY. NOTE: Barriers, guards, and warning signs are required to ensure safety against existing hazards.
CONSTRUCTION SAFETY Introduction The following sections provide general guidelines and procedures for construction safety. This chapter covers the following topics: TOPIC PAGE General Construction Guidelines
CONFINED SPACES. Introduc8on TOOL BOX SAFETY TOPIC
TOOL BOX SAFETY TOPIC CONFINED SPACES Introduc8on The OSHA General Industry standard for Permit- Required Confined Spaces is found in 29 CFR 1910.146. OSHA s construcion standards do not include a separate
PVC PIPE PERFORMANCE FACTORS
PVC PIPE PERFORMANCE FACTORS PVC pipe, like all flexible pipe products, is very dependent on the surrounding soil for its structural capacity, in addition, the pipe material must have sufficient inherent
HOT WORK PERMIT PROCEDURES
COLUMBIA UNIVERSITY ENVIRONMENTAL HEALTH & SAFETY HOT WORK PERMIT PROCEDURES COLUMBIA UNIVERSITY MEDICAL CENTER February 2010 1 TABLE OF CONTENTS A. PURPOSE 3 B. SCOPE 3 C. POLICIES AND PROCEDURES 3-4
EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS
NMP 1.4 EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS Index Purpose... 2 Application... 2 Referral Agency... 2 Associated Requirements... 2 Referenced Standards...2 Definitions...
San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS
ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located
Appendix D.1. Testing Requirements for Infiltration, Bioretention and Sand Filter Subsoils
Appendix D.1 Testing Requirements for Infiltration, Bioretention and Sand Filter Subsoils General Notes Pertinent to All Testing 1. For infiltration trench (I-1) and basin (I-2) practices, a minimum field
Estimating Trench Excavation
Estimating Excavation By Steven J. Peterson, PE, MBA Introduction excavation is often performed by hydraulic backhoe excavators. This is because hydraulic excavators are not only good at excavating below
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
Proposed Minimum Subterranean Termite Treatment Standards
Proposed Minimum Subterranean Termite Treatment Standards Introduction This document is intended to serve as a model for states considering the adoption of standards for soil application of termiticides.
The Verdura Wall check with your local building department
The Verdura Wall The Verdura Wall by Soil Retention Products, Inc of Carlsbad, California can be constructed as a gravity retaining structure or a geosynthetic reinforced segmental retaining wall, depending
Chevron Mining Inc. Managing Safe Work at Chevron Mining
Chevron Mining Inc. Managing Safe Work at Chevron Mining Table of Contents Introduction... 1 Tenets of Operation... 2 Stop Work Authority... 3 Types of Work Definitions... 4 SWP / JSA / SOP Definitions...
STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY
STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY Approved and adopted as Official Document Number 800576 this 10th day of December, 1980 Donald R. Boyd, P.E., Director Water
SAFETY STAND DOWN Focus Four Hazards
SAFETY STAND DOWN Focus Four Hazards This information is to help you organize your Stand Down. This is a suggested agenda for the onsite supervision. Please review prior to facilitating the material. Summary
READ FIRST. Confined Space Entry Procedure. San José State University Environmental Health and Safety. Confined Space Entry Procedure
READ FIRST 1. The purpose of a is to save lives by controlling the inherent hazards of a confined space prior to entry. a. If possible, avoid entering a confined space. Every consideration should be given
Louisiana Administrative Code Title 51 Part XIII. Sewage Disposal
Louisiana Administrative Code Title 51 Part XIII. Sewage Disposal Regulations Regarding Septic Tank Installations with Field Beds/Absorption Trenches For Individual Residential Installations Chapter 3.
Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems
Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems The septic tank-absorption field sewage treatment system is composed of two major elements; the
Specification Guidelines: Allan Block Modular Retaining Wall Systems
Specification Guidelines: Allan Block Modular Retaining Wall Systems The following specifications provide Allan Block Corporation's typical requirements and recommendations. At the engineer of record's
APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT
APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
SECTION 02200 SUPPORT OF EXCAVATION
SECTION 02200 PART 1 GENERAL 1.01 DESCRIPTION A. Section including specifications for design and installation of excavation support. B. Section also includes specifications for excavation support systems
CONSTRUCTION SAFETY POLICY
California Institute of Technology CONSTRUCTION SAFETY POLICY Caltech Environment, Health, and Safety Office 1200 E. California Blvd., M/C 25-6 Pasadena, CA 91125 Phone: 626.395.6727 Fax: 626.577.6028
SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT
SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT 1.0 SOIL IMPROVEMENT 1.1 General Soil Investigation Information are provided in Part B1 annex as a guide to the Contractor for his consideration
Drained and Undrained Conditions. Undrained and Drained Shear Strength
Drained and Undrained Conditions Undrained and Drained Shear Strength Lecture No. October, 00 Drained condition occurs when there is no change in pore water pressure due to external loading. In a drained
3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.
The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:
The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11
Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;
Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile
Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS
Business Procedure HS Contract Management Document Number OHS-PROC-136 This document applies to the following site(s): Rockhampton Office Brisbane Office Tarong Site Barron Gorge Hydro PS Kareeya Hydro
Confined Space Training. Developed and Presented by: Scott Cole, CSP (440) 520-9499 [email protected]
Confined Space Training Developed and Presented by: Scott Cole, CSP (440) 520-9499 [email protected] Objectives To understand and recognize a confined space, To understand the difference in a permit required
Working in a quarry guidelines
Working in a quarry guidelines July 2011 Introduction Not much material exists on quarries in SA. In the mining industry, quarries are often not focussed on or dealt with although a quarry in SA is a mine.
SITE SPECIFIC FALL PROTECTION PLAN
1 THIS PLAN IS SPECIFIC TO: PROJECT & ADDRESS 1.1 THIS PLAN IS SPECIFIC TO THE FOLLOWING AREA(S) ON SITE: Parkade level: Typical level: Other: Between G/L: 1.2 THIS PLAN IS APPLICABLE TO THE FOLLOWING
4. How often should vehicles being used at worksites be inspected?
Notes for Scoring: The correct answer is highlighted in yellow. The source for the answer is listed in red. 1. Ground Fault Circuit Interrupters (GFCI) are required by the National Electrical Code: a.
Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation
Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Jeff R. Hill, P.E. Hayward Baker Inc. 111 W. Port Plaza Drive Suite 600 St. Louis, MO 63146 314-542-3040 [email protected]
SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING
SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING 1 TABLE OF CONTENTS 1.0 Introduction and Purpose 3 2.0 Description of Work 3 3.0 Site Supervisor/Foremen Responsibilities 4 4.0 Equipment
Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing
1 Most basements show some signs of leaking and cracking. Through the years, problems with water, poor soils, grading, drainage and possible settling affect the integrity of a basement. Being able to recognize
Permit Required Confined Space/Boot Pit Evaluation Guide for Grain Elevators
Permit Required Confined Space/Boot Pit Evaluation Guide for Grain Elevators National Grain and Feed Association September 2013 Copyright 2013 By the National Grain and Feed Association 1250 I St., N.W.,