Solutions Guide for HP Data Center Architecture:

Similar documents
How To Power A Bladecenter H Servers

Rack Power Distribution. Worldwide

Rack Power Distribution

Energy Management Solutions

Rack Systems Solutions

Data Centre Solutions... energy efficient by design. APC by Schneider Electric Elite Data Centre Partner. APC s leading Elite Data Centre Solutions

Distributing Power to Blade Servers

PX100 MBP with Configurable Distribution

ADC-APC Integrated Cisco Data Center Solutions

QuickSpecs. HP Managed Power Distribution Units (mapdu) Overview

Optimizing Rack Power Distribution

APC 3Phase Power Distribution

Application Briefs: Remote Office Environment

Power Commander Power Distribution Units from Wiremold/Legrand offer

Power Distribution Systems for the Dell PowerEdge M1000e Modular Server Enclosure - Selection and Installation

Top 8. Considerations for Choosing the Right Rack Power Distribution Unit to Fit Your Needs

Power Distribution Considerations for Data Center Racks

2006 APC corporation. Cooling Solutions and Selling Strategies for Wiring Closets and Small IT Rooms

Server Technology Intl.

ED1259R5 Updated April 2011 For latest specs visit

Table of Contents. 1. Introduction PDU Package Function Installation Web Interface...7

QuickSpecs. Overview. HP Power Distribution Rack. HP Power Distribution Rack. DA North America Version 5 August 22, 2008 Page 1

PE6108/PE6208/PE8108/PE8208

Racks & Enclosures. Deliver. Design. Define. Three simple words that clearly describe how we approach a Data Center project.

QuickSpecs. HP Fixed Cord PDUs & Extension Bars (Zero-U/1U Modular PDUs) Overview

Spec Sheet. Cisco R42610 Rack CISCO SYSTEMS PUBLICATION HISTORY 170 WEST TASMAN DR. SAN JOSE, CA, REV A.6 DECEMBER 9,

Installation. Basic Rack Power Distribution Unit for Blade Servers

PE8216/PE8324. Energy Intelligence Solutions

Server Technology, Inc.

APC APPLICATION NOTE #92

PN5212/PN5320/PN7212/PN7320

Power Distribution Units (PDUs): Power monitoring and environmental monitoring to improve uptime and capacity planning

Cisco Nexus 7000 Series Power Supply Modules

Emerson Network Power Rack PDU Systems

Symmetra PX. Industry-leading efficiency, availability, and performance for small, medium, and large data centers and mission critical environments

APC APPLICATION NOTE #112

Case Study University of Aberdeen

Case Study Nottingham Trent University

8 Intelligent PDUs. Intelligent Power Distribution Units for Data Centers

A Scalable, Reconfigurable, and Efficient Data Center Power Distribution Architecture

Emerson Network Power Rack PDU Solutions Rack Power Distribution For Critical IT Equipment. AC Power For Business-Critical Continuity

A Scalable, Reconfigurable, and Efficient Data Center Power Distribution Architecture

DCF Optimized Rack System Selection Guide

CenterMind P+ Solution for efficient power management

High-Efficiency AC Power Distribution for Data Centers

Model #: SMART2200VS. 2200VA / 2.2kVA line interactive tower UPS. Maintains 120V nominal output over an input range of 79 to 147V

QuickSpecs. HP Remote Monitored Power Distribution Units (mpdu) Overview

Power distribution in data centres

Precisely distribute, monitor, analyze and manage power distribution in your facility to maximize processing capacity and promote power efficiency.

QuickSpecs. HP Modular Power Distribution Units (Zero-U/1U Modular PDUs) Overview

Smart-UPS On-Line 230 V

QuickSpecs. HP 480/277 Volt Solutions. Overview

Rack Power Distribution Unit For Critical IT Equipment

Liebert GXT3 Reliable On-Line UPS Protection In A Compact 2U Package 700VA -3000VA

QuickSpecs. HP R/T3000 G2 Uninterruptible Power System (UPS) Overview

PX Intelligent Rack PDUs

Cabinets 101: Configuring A Network Or Server Cabinet

How To Upgrade An Hp Power Distribution Rack To A Power Distribution Unit

HP R/T3000 G2 Uninterruptible Power System (UPS) Overview

How to Maximize Data Center Efficiencies with Rack Level Power Distribution and Monitoring

SmartOnline Expandable Rack / Tower UPS System Online, double-conversion protection for mission critical applications

PX Intelligent Rack PDUs

Model #: SMART2200CRMXL

Eaton epdu Data Center Product Catalog

Essential NCPI Management Requirements for Next Generation Data Centers

CoolTop. A unique water cooled air-conditioning unit for server room cooling from the top AC-TOPx-CW-240/60

Increase the efficiency of power distribution in your high-density data center

Intelligent Power Distribution in the Data Center

Data Sheet Fujitsu PRIMERGY BX400 S1 Blade Server

RACK ENCLOSURES & ACCESSORIES

SmartPro 120V 1kVA 800W Line-Interactive Sine Wave UPS, SNMP, Webcard, 1U Rack, USB, DB9 Serial

SmartPro 120V 750VA 600W Line-Interactive Sine Wave UPS, SNMP, Webcard, 1U Rack-Mount, USB, DB9 Serial

Data Center Solutions - The Containerized Evolution

Buyer s Guide to Dell Power Distribution Units

SmartPro 120V 750VA 600W Line-Interactive Sine Wave UPS, 1U Rackmount, SNMPWEBCARD Option, USB, DB9 Serial

How to enhance hyperconvergence with infrastructure management

TAA-Compliant SmartPro 120V 1kVA.8kW Line-Interactive Sine Wave UPS, SNMP, Webcard, 1U Rack, USB, DB9 Serial

Essential Rack System Requirements for Next Generation Data Centers

DATA CENTER SOLUTIONS

R5000 Uninterruptible Power System (UPS) Overview

Selecting Rack-Mount Power Distribution Units For High-Efficiency Data Centers

Industrial-Grade UPS System Heavy-duty power protection for harsh industrial environments

Panduit Infrastructure Management Software for Data Centers and Enterprises

Simplifying Data Center Design/Build

Data Center Power Distribution and Capacity Planning:

Data Sheet FUJITSU Server PRIMERGY CX420 S1 Out-of-the-box Dual Node Cluster Server

R5000 Uninterruptible Power System (UPS) Overview

Intelligent Power Distribution

Network-critical Physical Infrastructure (NCPI) Vulnerability Assessment

HP power and cooling technologies for the data center

Remote Site Management Solutions

Smart-UPS 120 V. Advanced line interactive power protection for servers and network equipment. The world s most popular network and server UPS

Secure your IT equipment with confidence... secure with NetClosure

Increasing Data Center Efficiency by Using Improved High Density Power Distribution

How To Build A T7 Rack For Information Technology

Eaton epdu. Intelligent and flexible power distribution

RELIABLE AND FLEXIBLE POWER FOR YOUR DATA CENTRE

Considerations for a Highly Available Intelligent Rack Power Distribution Unit. A White Paper on Availability

How To Build A Cisco Uniden Computing System

dctrack Data Center Infrastructure Management Visualize, Manage and Track IT and Facilities Systems dctrack

Transcription:

Solutions Guide for HP Data Center Architecture: HP BladeSystem c-class Servers With HP BladeSystem the industry s only Converged Infrastructure architected for any workload from the desktop to the data center you can drive business innovation and eliminate IT sprawl. Imagine a change-ready infrastructure that can support all your applications from infrastructure to mission-critical on a single platform, with both ProLiant and Integrity server blades and a range of storage and networking options. Blade server applications present unique challenges in terms of rack level power distribution (ack PDU), cable management and physical access space requirements for hot-swappable blade components. This application guide provides recommendations for enclosures, ack PDUs, and cable management to best address the specific physical infrastructure needs of the HP c7000 Blade Server Chassis.

Contents Instructions.. 4 ack PDU selection.5 Additional ack PDU.. 7 Enclosure Diagrams..9 Cable Management 12 2

Enclosures and ack Mount Power Distributions Units Advanced PDUs Integrates power management capabilities with other products including Symmetra PX UPS, row and room PDUs, Inow cooling, NetShelter SX enclosures, and StruxureWare for Data Centers management software suite. Features zero U, low profile design, optimized for high-density rack power solutions to minimize interference between the ack PDU and hot-swap blade components. Comprehensive device, phase, and breaker bank level metering for overload protection, capacity planning purposes, and energy efficiency initiatives ight Angle C19/C20 connectors minimize bend radius at the connection point and reduce interference in the rear of an enclosure Full Featured Enclosures NetShelter SX enclosures offer the most standard, outof-box features to ease installation and speed deployment. Single enclosure design is flexible enough to accommodate various networking and server applications. Sizes Available: 42U, 45U, & 48U heights, 600mm (24 ) & 750mm (30 ) widths, and 1070mm (42 ) & 1200mm (47.2 ) depths. Schneider Electric is a global leader in data center infrastructure - cooling, UPS, power distribution, racks and management. 3

Instructions This guide is designed to facilitate a step by step selection of ack PDUs, enclosures and accessories for HP c7000 blade servers. STEP 1: Determine estimated power load per blade chassis. After consulting the manual, determine the total power load and redundancy configurations offered. c7000 power supplies include 2250W and 2400W for 200-240V. At full redundancy (3+3), the chassis is capable of maximum input power capacity of 8320W. Total max power consumption for a typical customer configuration of c7000 chassis is 5kW. The average power is about 3-4kW. STEP 2: Table 3A, 3B: Maximum Quantity Chassis per ack PDU. Table is organized by maximum capacity of standard 20A, 30A, 50A, and 60A ack PDUs kw. Utilize power data calculated in step 1 and required number of connected servers to select the proper capacity ack PDU. STEP 3: Table 3A, 3B: Select ack PDU. Take the ack PDU capacity from within table 3A, or 3B and select the desired ack PDU based on input connection to ack PDU and compatibility of ack PDU receptacles with power cords. Additional ack PDUs are listed on page 7 and 8 if the listed ack PDU in these tables do not match your equipment configuration. This step is critical as the ack PDU must be able to connect to an input circuit on site and the servers and switches must have the correct type and quantity of receptacles to power up properly. STEP 4: Select Enclosures and Installation Diagrams. Depending on special constraints onsite, select the appropriate combination of enclosure width and depth. It is recommended using wide (750mm) and deep (1200mm) enclosures if space permits, as this offers the most flexibility during operation and ease of installation. 4

HP c7000 Power Step 1: Determine Power Configuration The HP BladeSystem c7000 Server Chassis includes options for six, single phase, hotswappable redundant power supplies with IEC C20 Inlet connections. Follow the diagram below for a fully redundant 2N (3+3) power configuration. ack PDU Source B ack PDU Source A Connect to C19 Outlets on ack PDU Step 2: Determine Anticipated Power Load Max power consumption per chassis can range from 2.5 to 7.6 KW; while a typical peak power consumption is closer to 4-5kW. Schneider recommends using power supplies with C20 inlets for power distribution flexibility with ack PDUs. If inputs of L15-30P (NAM) or IEC309-16A (5pin) plugs are used, direct connection from power distribution unit whips is recommended. HP provides power sizing tools that can be used to calculate the infrastructure required as configured and allow some flexibility for growth. These calculators can be found on the HP website. Dynamic Power Capping of the chassis can also be set in order to reduce the risk of overloading a circuit. The enclosure Dynamic Power Cap will be shared amongst all of the installed devices and individual server caps will be changed to match the server load. This will optimize the performance of the servers while ensuring that the enclosure stays below the Dynamic Power Cap value. HP c7000 chassis has a maximum of (6) Power Supplies in a fully redundant system; (3) per power source. Total power consumption for a typical configuration is 4-5kW or less per chassis enclosure. 5

HP c7000 Power Step 3: Determine Chassis Quantity The following tables show the maximum amount of c7000 chassis which can be supported from a desired rack PDU. The data for Table 3A and 3B is organized based on the power capacity ratings for standard rack mount PDUs, showing both single phase and three phase options The tables show recommended Metered ack PDUs with a zero U form factor and IEC outlets. Please note that additional rack PDUs in different configurations are shown on page 7 and 8. Table 3A - North America Solutions Number of Chassis per ecommended PDU * Limited by number of C19 outlets on PDU ** Limited by internal circuit breaker capacity UL mandates 80% derating (16A)for continuous loads. Table 3B- International Solutions Number of Chassis per ack Based on Calculated Power Load * Limited by number of C19 outlets on PDU ** Limited by internal circuit breaker capacity (16A). 6

ack PDU Charts - Metered Metered ack Power Distribution Units (PDUs) provide active metering to enable energy optimization and circuit protection. User-defined alarm thresholds mitigate risk with real-time local and remote alerts to warn of potential circuit overloads. Metered ack PDUs provide power utilization data to allow Data Center managers to make informed decisions on load balancing and right sizing IT environments to lower total cost of ownership. AP8000 series Metered ack PDUs include real power monitoring, a temperature/humidity sensor port, locking IEC receptacles, and ultra low profile circuit breakers. Users can access and configure Metered ack PDUs through secure Web, SNMP, or Telnet Interfaces. ack PDUs recommended on page 6 and 7. AP8868 AP8866 AP8888 7

ack PDU Charts - Switched Switched ack Power Distribution Units (PDUs) enable advanced, user-customizable power control and active monitoring. emote outlet level controls allow power on/off functionality for power recycling to remotely reboot equipment and restrict unauthorized use of individual outlets. Power sequencing time delays allow users to define the order in which to power up or down attached equipment. Avoid circuit overload during power recovery and extend uptime of critical equipment by prioritizing the load shedding. Input Current metering provides real-time remote monitoring of connected loads. AP8000 series Switched ack PDUs include real power monitoring, a temperature/humidity sensor port, and locking IEC receptacles. User-defined alarms warn of potential circuit overloads before critical IT failures occur. Users can access, configure, and control Switched ack PDUs through secure Web, SNMP, or Telnet Interfaces. Metered by Outlet with Switching ack Power Distribution Units (PDUs) enable advanced, user-customizable power control and individual outlet power metering. 8

9

Enclosure ecommendations 600mm/24 Wide The following diagrams are intended to show how the HP c7000 chassis fits within the different widths and depths of the NetShelter SX. Blade chassis in general offer unique challenges of space and access. The rear area needs to be completely clear of cable managers and PDUs in order to access the rear hot-swappable components. TOP VIEW Yellow areas show data cabling area. ecommended cable managers: A7710 The 1070mm (42 ) deep enclosure is not recommended due to lack of the space for cable management. If 1070mm deep must be used, maximize space by rotating PDUs 90 degrees so that the outlets are facing the rear. Use A7711 kit to rotate PDUs. Add right angle power cord kits to improve clearance with enclosure frame. For cable management, use A7540 Toolless Cable ing kit in any available space. The 1200mm (47 ) deep enclosure offers more mounting options for PDUs and cable managers. The above two diagrams show suggested options. PDUs should be mounted in rear-most toolless channels to avoid interference with blade chassis components. If it is preferred to mount PDUs on opposite sides, maximize space by rotating PDUs 90 degrees so that the outlets are facing the rear. ecommended cable manager A7710 mounted in toolless rear channels. AP8866 rack PDU shown in illustration; however, configuration would be common for any PDU selection. EA VIEW 10

Enclosure ecommendations 750mm/30 Wide The below diagrams show the available rear space for 750mm (30 ) wide NetShelter s and the recommended ack PDU and cable management options. TOP VIEW ack PDUs can be placed on either side of rack enclosure Yellow areas show data cabling area. ecommended cable managers: A7710, A7721, or A7580A 1200mm enclosure has additional space for access and cable management (can use additional A7721 kits or A7710 kits) The wider 750mm (30 ) enclosures are the recommended enclosures for blade applications. They offer the best clearance with absolutely no interference with the ack PDUs/cable managers and the removable modules of the blade chassis. ecommended cable manager A7710 mounted in toolless rear channels. EA VIEW 11