February Jane Byrne Circle Interchange Project Overview 1

Similar documents
IH-635 MANAGED LANES PROJECT, SEG. 3.2

3.1 Historical Considerations

REBUILDING THE CTA FORREST CLAYPOOL, PRESIDENT CHRIS BUSHELL, SVP, INFRASTRUCTURE

KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER

3 Tappan Zee Bridge Rehabilitation Options

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

Alternatives Evaluation Overview

Roadway Cost Per Centerline Mile Revised June 2014

I-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA. PSPE Presentation, December 3, 2015

LEGISLATIVE COUNCIL PANEL ON PLANNING, LANDS AND WORKS

Chicago Neighborhoods 2015: Assets, Plans and Trends A project of The Chicago Community Trust

Safe & Sound Bridge Terminology

Public Information & Public Scoping Meeting

APPENDIX J TRAFFIC STUDY

Sector Design Concepts

I-25 / Rio Bravo Interchange

Belmont Street Bridge Rehabilitation Project

Effect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain

Granger Bay Boulevard and Green Point Roundabout

REHABILITATION PACKAGE 1-a

Project Information. New Hope - Lambertville Toll Bridge - Pavement Rehabilitation & Approach Bridges Repairs -

EPA Technical Assistance for Sustainable Communities Building Blocks

Maryland Invests $845 Million in New Highway and Bridge Projects

Ohio Department of Transportation. Lytle Tunnel Rehabilitation Phase 2 Public Information Meeting

Informational Workshop Public Meeting Kanawha Falls Bridge Project

Public Transportation: There are also public transit trains that run from both airports (blue line from O Hare, orange from Midway).

The Need for Traffic Incident Management

The Drake Hotel, Where the Magnificent Mile Begins. Guests of the hotel can choose from the following options.

Bridge Type Selection

5 ALTERNATIVE SOLUTIONS AND EVALUATION

SUMMARY OF CATEGORIES 2007 STATEWIDE PRESERVATION PROGRAM (SPP) _MAINTAIN IT_

Section ALTERNATIVES. 3. Alternatives

Virginia Approach Spans

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

Evaluation of the Shared-Use Arrow

ILLINOIS WATERWAY 2013 VERTICAL CLEARANCES TABLE - BRIDGES

Wilmington to Newark Commuter Rail Improvement Project

AGENCY COORDINATION AND PUBLIC INVOLVEMENT

Hartsfield-Jackson Atlanta International Airport s

Transportation Management Plan Template

Connecticut s Bold Vision for a Transportation Future

720 Contour Grading. General. References. Resources. Definitions

CONSTRUCTION SEQUENCE & PROGRAMME

CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR

Appendix A Alternative Contracting General Engineering Consultant RFP. Appendix A

AIR QUALITY TECHNICAL MEMORANDUM

WSDOT s Approach to Seismic Retrofit of Highway Structures

INSTRUCTIONS FOR ARRIVING & DEPARTING RAGBRAI OVERNIGHT TOWNS 2015

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

Why build the Silvertown Tunnel?

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011

TD AMERITRADE Park Omaha

Design and Implementation of Slot Left-Turn Lanes on the Manitoba Highway Network

CITY OF TRAIL MEMORANDUM

Major Improvement Schemes in Basingstoke

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC October 27, 2015 Session 26

Bruce Highway (Cooroy to Curra) Section A (Cooroy southern interchange to Sankeys Road)

11 p.m. to. Tuesday, June. will remain open. 14. closed

I-25/ARAPAHOE INTERCHANGE RECONSTRUCTION PROJECT

Cost Reduction Opportunities

Contractor of the Year

Illinois Tollway and Chicago Department of Transportation Construction Networking Event. March 13, 2015

Design of Bridges. Introduction. 3 rd to 4 th July Lecture for SPIN Training at the University of Dar es Salaam

Colorado Off-System Bridge Program Description and Guidelines for Selecting Bridges for Rehabilitation or Replacement Funding

Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E.

WYDOT Quick Facts TRAFFIC SIGNALS

Evanston Main Street Station TOD Plan and Study. Appendix A.1: Station Area Existing Conditions

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY

DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST

INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE.

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN

Elevated Roads for Sri Lanka

Civil Engineering and Architecture (CEA) Detailed Outline

Presenters. The Ups and Downs of Home Elevations 4/29/2016. Hazard Mitigation Grant (HMA) Programs

WORK ZONE SAFETY & MOBILITY GUIDANCE DOCUMENT

8+ %!0"% 8+1!%"'$%,$"$

SCOTTSDALE TRANSPORTATION COMMISSION REPORT

WASHINGTON STATE TRANSPORTATION BY THE NUMBERS:

PENNDOT 3D MODELING FOR STRUCTURES WORKSHOP. Presented by: Steven Pletcher and Chris Daniels, P.E. October 21, 2014

Alterna ves Development & Evalua on

Seagull Intersection Layout. Island Point Road - A Case Study. Authors: John Harper, Wal Smart, Michael de Roos

VERTICAL SPEED CONTROL DEVICES

Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s.

Roadside Truck Survey in the National Capital Region

OM-13: Transportation Management and Operations

Measuring the Street:

Transcription:

February 2015 Jane Byrne Circle Interchange Project Overview 1

Project Location The Kennedy Expressway (I-90/94) on the north The Eisenhower Expressway (I-290) to the west CIRCLE INTERCHANGE LINKS Congress Parkway to the east 2 The Dan Ryan Expressway (I-90/94) to the south

Project Background Late 1950 s early 1960 s The facility is in need of major repair and reconstruction. 3

Project Background (continued) American Transportation Research Institute (ATRI) + Federal Highway Administration Slowest, most congested highway freight bottleneck in the nation More than 400,000 vehicles a day travel through the interchange 4 On average, 940 crashes per year

Operational and Safety Deficiencies Over Capacity: Kennedy & Dan Ryan 5

Operational and Safety Deficiencies Over Capacity: Ramp NW 6

Operational and Safety Deficiencies Over Capacity: Ramp EN 7

Local Transportation Transit 8 Pedestrians Bicyclists

Purpose & Need 9 To provide an improved transportation facility by addressing the existing & 2040 transportation needs. Improving safety Improving mobility Improving the condition of the interchange

Stakeholder Involvement 3 Public Meetings/Hearings 8 Elected Officials Meetings 15 Agency Coordination Meetings 28 One-on-One Meetings 2 Workshops 1 Building Vibration Conference 4 Project Working Group Meetings C 1 Design Charrette Stakeholder Involvement Continues 10

Surrounding Neighborhoods UNIVERSITY VILLAGE Connect Neighborhoods Bike/Pedestrian Accommodations Aesthetics Livability/Sustainability Air Quality & Noise Old Buildings 11

Traffic Needs: Alternative (A3) Over 30 alternatives considered! XX X X X X X X X 12

Preferred Alternative Improve the safety and mobility Improve the bridges, roadway, & drainage system Minimizes environmental impacts Enhances community connectivity on the local street network 13

Key Features of the Preferred Alternative Southbound C-D Lanes Providing Local Access Northbound C-D Lanes Providing Local Access 14

Key Features of the Preferred Alternative New Bridges Morgan Street Peoria Street Cross Road Bridges Flyover Ramps Other Bridges Halsted Street Monroe Street Adams Street Jackson Blvd. Van Buren Street Harrison Street Taylor Street 15

Circle Interchange Before BEFORE 16

Circle Interchange After AFTER 17

Current Projects Contracts Morgan Street Bridge Tunnel Bulkheading and Watermain Watermain Procurement West Halsted/Harrison Street Bridge (Over SB I-90/94) Congress Street Surveillance Landscaping 1 of 4 Contracts Peoria Street Bridge/CTA Station East Harrison Street Bridge (Over NB I-90/94) Northwest Flyover Future Contracts Taylor Street West I-290 Auxiliary Lanes from Peoria Street to Morgan Street Letting Date 8/3/2013 9/20/2013 9/20/2013 11/8/2013 1/17/2014 1/17/2014 2/28/2014 4/25/2014 7/11/2014 03CY15 03CY15 Award Amounts $18,459,602.10 $4,983,836.25 $1,261,462.00 $42,559,659.58 $706,137.35 $221,009.00 $23,622,193.00 $9,185,000.00 $55,827,813.68 Estimated Cost $19,230,000.00 Estimated Cost $15,065,000.00 18

Morgan Street Bridge Reconstruction Contract 60W25 Letting: 8/3/2013 Contractor: F.H. Paschen, S.N. Nielsen & Associates LLC Low bid: $18,459,602.10 DBE Percentage: 16% Award: 8/22/2013 Execution: 8/29/2013 Start date: 9/10/2013 Completion date: 10/6/2014 TPG Trainees: 1,500 hours HCCTP Trainees: 1,500 hours Currently this Contract is 99.5% complete 19

Morgan Street Bridge Reconstruction Temporary Pedestrian Bridge ComEd Required Building West Side of Bridge First Desire to Open Station Entrance as Soon as Possible to Allow Peoria Entrance to Close Temporary Pedestrian Bridge 20

Water Supply Tunnel Bulkheading Contract 60W36 Letting: August 2, 2013 Contractor: Kenny Construction Co. Low bid: $4,983,836.65 DBE Percentage: 5% Award: 9/10/2013 Execution: 9/25/2013 Start date: 10/1/2013 Completion date: 7/6/2014 HCCTP Trainees: 1,500 hours Currently this contract is 100% complete 21

Water Supply Tunnel Bulkheading Network of Abandoned (Shallow) and Active (Deep) Water Supply Tunnels Affect Layout of Proposed Bridge Foundations Required the Filling of the Tunnels Prior To Shaft Construction 22

Halsted and West Harrison Street Contract 60W26 Letting: November 8, 2013 Contractor: Walsh Construction Low bid: $42,559,659.58 DBE Percentage: 23% (Participation goal resulting in 10 DBE firms totaling $9.8M.) Award: 12/10/2013 Completion: Fall 2015 TPG Trainees: 1,500 hours HCCTP Trainees: 1,500 hours Currently this contract is 42% complete 23

Halsted Street Bridge Reconstruction Challenges Dealing with Existing Infrastructure City, ComEd and AT&T Existing Facilities Used Asbestos More than Ten Foot Elevation Difference Between Roadway and CTA Blue Line Level Asbestos Duct Removal Per Env. Requirements Temporary Earth Retention Installed Next to Live Tracks 24

Halsted Street Bridge Reconstruction Existing View Looking South 25

Halsted Street Bridge Reconstruction Proposed View Looking South 26

Halsted Street Bridge Reconstruction Proposed View Looking North 27

Harrison Street Bridge Reconstruction Began Construction in March 2013 Same Contract as Halsted Street Shared Halsted/Harrison Intersection Harrison Street Fully Closed, Access to Cermak Pumping Station Provided from Other Bridge over I-90/94 Deck Removal Beam Removal 28

East Harrison Street Contract 60W71 Letting: April 25, 2014 Contractor: Walsh Construction Low bid: $9,185,000 DBE Percentage: 20% Award: 6/3/2014 Completion: Fall 2015 TPG Trainees: 1,000 hours Trainees: 1,000 hours 29

Peoria Street Bridge Reconstruction Contract 60W29 Letting: February 28, 2014 Contractor: Kiewit Infrastructure Co. Low bid: $23,622,193 DBE Percentage: 20% Award: 3/31/2014 Completion: Spring 2015 TPG Trainees: 2,500 hours HCCTP Trainees: 2,500 hours Currently this contract is 45% complete 30

Peoria Street Bridge Reconstruction CTA Station Entrance Rehabilitation Move Off the Bridge; Add Elevator Station Entrance Demolition 31

Peoria Street Bridge Reconstruction Existing View Looking North 32

Peoria Street Bridge Reconstruction Proposed View Looking North 33

Peoria Street Bridge Reconstruction Existing View Looking South 34

Peoria Street Bridge Reconstruction Proposed View Looking South 35

Peoria Street Bridge Reconstruction Proposed CTA Station Entrance 36

Northwest Flyover Contract 60W28 Letting: July 11, 2014 (Special Letting Date) Contractor: James McHugh Const. Co. Low bid: $55,827,813.68 DBE Percentage: 17% Award: 8/12/2014 Completion: Fall 2016 TPG Trainees: 2,000 hours N Currently this contract is 7% complete NW Flyover Ramp 37

Northwest Flyover N Retaining Wall #4 Noise Abatement Wall Taylor St Retaining Wall #3 Retaining Wall #40 Van Buren St Halsted St Retaining Wall #1 Steel Superstructure Retaining Wall #2 Rehabilitation 12 Piers & 2 Abutments Des Plaines St 38

Northwest Flyover Curved Steel Girders Divided in 6 Units Girder Depths Varies from 48 inch to 90 inches Pier Locations to accommodates future CTA tunnel extension 39

Taylor Street Over I-90/94 Contract 60W30 Current Target Letting 03CY15 (Letting date has been moved up to coincide with construction closer for the Flyover) Estimated Cost: $19,230,000 40

West I-290 Auxiliary Lanes from Peoria Street to Morgan Street Contract 60W28 Current Target Letting 03CY15 Estimated Cost: $15,065,000 N Auxiliary Lanes Taylor St Halsted St Flyover 41

Sustainability Practices Rain Gardens Limestone riffles Dense tree plantings Native Illinois Plants Limestone outcroppings and grading 43

Benefits After Project Completion, A 50% reduction in delay for all vehicles over the course of the day. 5,000 Jobs The improvement will create a safer environment for the motoring public by reducing the predicted number of severe crashes by up to 25%. 45 Reduction of up to 5 million hours annually of drivers sitting in congested traffic. Savings of $185 million annually in lost production from delayed travelers. Reduction in idle time resulting in nearly 1.6 million gallons annually. Reduce greenhouse gas emissions by one-third.

Thank you! 47