IMPLEMENTATION OF 5S TECHNIQUE IN A MANUFACTURING ORGANIZATION: A CASE STUDY. Abstract

Similar documents
Welcome to the 5S and Kanban Training

The 5S-Method. The 5S-Method. Clean up and nothing else? or a step further on the ladder of continuous improvement?

Clean House With Lean 5S

5S Training - Lean Manufacturing Housekeeping

The title 5S refers to five activities within the tool as follows (in brief):

5S: GOOD HOUSEKEEPING TECHNIQUES FOR ENHANCING PRODUCTIVITY, QUALITY AND SAFETY AT THE WORKPLACE. No 89/2012

Performance Improvement through 5S in Small Scale Industry: A case study

STANDARDIZED WORK 2ND SESSION. Art of Lean, Inc. 1

Table of Contents MODULE 1: QUALITY MANAGEMENT SYSTEM Introduction:... 3 What is a QMS (Quality Management System)?... 3

MANAGEMENT OF HUMAN RESOURCES IN THE AUTOMOTIVE INDUSTRY

Lean Manufacturing: Part 2. Charles Theisen, CPIM, CIRM. Lean Manufacturing Part 1I

Audit Worksheet Sort

Fettling the most ignored operation in Foundries

Why is lighting in the workplace important?

JUST IN TIME (JIT) CONTEXT A PHILOSOPHY, A PROCESS P6/341-I ORIGINS:

Lean process improvement is CDOT s approach for engaging everyone, every day, to improve every process and product, to benefit every customer.

THE 5S STRATEGY FOR CONTINUOUS IMPROVEMENT OF THE MANUFACTURING PROCESSES IN AUTOCAR EXHAUST

Hessel Visser NCOI Les 6 A P 373. Operations Management, 7E: Chapter 14 en15

Quality and Quality Control

TOYOTA AND ITS COMPONENT SUPPLIERS CASE STUDY

Supplier/ Vendor Evaluation Form

Improving supply chain management information systems in public administration using a new theory

Case Study: Mass Production in Small Scale Industries

Copies of this document shall be classified either as Controlled or Uncontrolled, and shall be identified as such on the cover sheet.

Appendix Lean Glossary Page 1

ESTABLISHING CONTROL ON CONSUMABLES INVENTORY IN A PRESSURE VESSEL MANUFACTURING INDUSTRY USING MICROSOFT EXCEL (A CASE STUDY)

Lean Manufacturing Application on Welding Defects in Cryogenic Vessel

FOREWORD OF THE SERIES

EMERGENCY ACTION AND FIRE PREVENTION PLAN

AN INDUSTRIAL APPLICATION OF THE SMED METHODOLOGY AND OTHER LEAN PRODUCTION TOOLS

Implementation of Best Practices in Environmental Cleaning using LEAN Methodology. Tom Clancey and Amanda Bjorn

International Journal of Scientific and Research Publications, Volume 5, Issue 4, April ISSN

Workplace Color Coding Standards

Toyota Production System. Lecturer: Stanley B. Gershwin

Schoeller Allibert Limited Job Description. Reports to: Operations Director Date of Completion. 04/05/16

APPROVED BY: Ed Seman. Red Tag is one of the implementation plans for Sort (seiri), part of the kaizen strategy of workplace improvement.

Process Confirmation & Go, Look, See

LEAN MANUFACTURING LEAN MANUFACTURING, 5S AND SIX SIGMA

Process Streamlining. Whitepapers. Written by A Hall Operations Director. Origins

An Introduction to Total Productive Maintenance (TPM)

Session 4-Lean Tools- 5S, Kanban, VSM, SMED, TPM

DESIGN OF PLASTIC INJECTION MOLD FOR AN AIR VENT BEZEL THROUGH FLOW ANALYSIS (CAE) FOR DESIGN ENHANCEMENT

BRC Food Safety and Quality Management System. New Issue 7

ISO Food Safety Management System

SC21 Manufacturing Excellence. Process Overview

Implementing 5S in a laboratory environment. David Ball Peccoud Lab 2/27/2013

This can be done by simply counting pieces in the line or subtracting total number of pieces loaded to total number of pieces unloaded from the line.

Factors Contributing To The Sustainability Of 5S Programmes In Government Hospitals In Regional Director Of Health Services Area Kurunegala

Content Sheet 4-1: Purchasing and Inventory Overview

UNCONTROLLED COPY FOR REFERENCE ONLY

Computer Integrated Manufacturing CIM A T I L I M U N I V E R S I T Y

Risk management a practical approach

Free Examples of plant layout drawing

CHAPTER 1. Introduction to CAD/CAM/CAE Systems

Lean Implementation in a Low Volume Manufacturing Environment: a Case Study

Redesign of procurement processes through the utilization of lean manufacturing techniques and barcode technology

Primary Logistics Activities

ISE Lean Production Week 1 IDEAL Systems HOW?

LEAN SIX SIGMA PRESENTATION TO CAMA

The Thinking Approach LEAN CONCEPTS , IL Holdings, LLC All rights reserved 1

Housekeeping Audit Check Sheet for Warehouse (Refer SOP QMS-105)

Introduction to JIGS AND FIXTURES

Health and Safety Policy and Procedures

ENGR 1181 Lab 2: Quality and Productivity Lab

A Sheet Plant s Lean Journey

Module: TPM. Element: Quick Changeover (SMED) Training pack

The Consultants Guide to. Successfully Implementing 5S

WEEKLY SAFETY MEETING All Euramax Subsidiaries HOUSEKEEPING. Safety Meeting Contents. Meeting Notice. Leaders Guide. Employee Handout.

Operations Management and Lean Six Sigma. Presented by: David Muncaster Manager, CI and CSAT Staples Advantage Canada

Lean Management Standards: Manufacturing

ARTICLE IN PRESS. LeanThinking. journalhomepage: Redesinging an Automotive Assembly Line Through Lean Strategy

National Workshop on Enabling MSME to be Competitive through Quality Tools

PPG SUPPLIER DEVELOPMENT ASSESSMENT

PLC Based Liquid Filling and Mixing

Internship Overview EX 1. years now. And during this time I have learned a great deal about project management and leadership.

Lean enterprise Boeing 737 manufacturing Lean Production System

Lean Manufacturing: Part 1. Charles Theisen, CPIM, CIRM. Lean Manufacturing Part 1

TABLE OF CONTENTS CHAPTER NO. TITLE PAGE NO. LIST OF TABLES LIST OF FIGURES LIST OF SYMBOLS AND ABBREVIATIONS

Aberdeen Drilling Consultants Presentation on Asset Integrity and The ADC TRAMS System

WORKPLACE HEALTH AND SAFETY AUDITING GUIDELINES

Developing an Organisational Vision

LEAN 101 CRASH COURSE. Presented by Jacob McKenna and Seaver Woolfok

FOREIGN MATTER MANAGEMENT 36 QUESTION ASSESSMENT

Engineering Graduate Training Scheme "A" Manufacturing & Industrial Engineering. Model Training Guide

OPERATIONS MANAGEMENT PRE-ISSUED CASE STUDY & GUIDELINES

Quality with Compassion: the future of nursing education

What is Lean Manufacturing?

Enterprise Resource Planning Analysis of Business Intelligence & Emergence of Mining Objects

Tel CNH INDUSTRIAL SERVICE LTD. 173 South Sathorn Asia Center 23rd floor, Bangkok,

VOLVO INDIA PVT. LTD.

BEGINNING THE LEAN IMPROVEMENT JOURNEY IN THE CLINICAL LABORATORY

Development of Application Software for Stock Material Selection for Manufacturing of Shafts

TRANSPORT FOR LONDON CORPORATE PANEL

VALUE STREAM MAPPING FOR SOFTWARE DEVELOPMENT PROCESS. Ganesh S Thummala. A Research Paper. Submitted in Partial Fulfillment of the

Express Technology. Maintenance Solutions Express Technology Inc.

Energy Conservation for a Paint Company Using Lean Manufacturing Technique

Transcription:

IMPLEMENTATION OF 5S TECHNIQUE IN A MANUFACTURING ORGANIZATION: A CASE STUDY Abhay R. Kobarne 1, Vineet K. Gaikwad 2, Sourabh S. Dhaygude 3, Nikhil A. Bhalerao 4 1 B. Tech Mech.(Student), Mechanical Engineering Department, Walchand College Of Engineering, Sangli, Maharashtra, India 2 Tech Mech.(student), Mechanical Engineering Department, Walchand College Of Engineering,Sangli, Maharashtra, India 3 B. Tech Mech.(student), Mechanical Engineering Department, Walchand College Of Engineering,Sangli, Maharashtra, India 4 B. Tech Mech.(student), Mechanical Engineering Department, Walchand College Of Engineering,Sangli, Maharashtra, India Abstract The paper represents an application of 5S technology in one of the MNC M e n o n P i s t o n Ltd., plant 2, Kupwad, Sangli, Maharashtra which is the leading manufacturer of Pistons and Piston Pins in the world. 5S in simple terms is a Japanese technique consisting of five S terms namely Seiri (sorting), Seiton (set in order), Seiso (shine), Seiketsu (standardize) and Shitsuke (sustain) having a deep sense for managing the work place. The aim of the implementation of 5S in the organization is to organize a work space for efficiency and effectiveness by identifying and storing the items used, maintaining the area and items, and sustaining the new order. The decision-making process usually comes from a dialogue about standardization, which builds understanding among employees of how they should do the work. The need for the implementation of 5S in the organization came into existence due to unorganized work-stations, uncomfortable working environment and the excessive wastes in the company. Hence to get rid-off of the above factors, there was an urgent need for the successive implementation of 5S in the organization. The effective following on 5S in the organization by the various official staff and workman s strengthens the work ethic between them resulting in the motivation towards teamwork. The successive implementation of 5S transformed the organization drastically, right from the working conditions to the employees working satisfaction. Keywords: 5S, Workplace Management Scholarly Research Journal's is licensed Based on a work at www.srjis.com 1. INTRODUCTION MAR-APRIL 2016, VOL-3/23 www.srjis.com Page 1851

Every organization aims for profit. In today s global market of decreasing profit margins, the profit made from the waste as well as through proper workplace management is mandatory. Thus it is directly related to the competition of the particular organization with the competitor. Hence the profit from the waste and through the proper workplace management can be made only when there will be a stringent implementation of some workplace management technique and that technique is 5S concept. Also the Menon Piston Ltd., Sangli aims for building it to a world-class level organization. Thus organization adopted the concept of 5S for enhancing the profit, class of the company, working conditions, etc. and implemented the 5S technique successfully. Also the organization have various departments such as assembly, stores, injection moulding, maintenance and tool room, administration where the implementation of 5S would result in a huge enhancement in productivity, proper workplace condition, increased profits and motivation to employees. 1.1 What Is 5S? 5S is one of the Japanese techniques which was introduced by Takashi Osada in the early 1980s [2]. It is basically a workplace management methodology which helps for improving working environment, human capabilities and thereby productivity [6]. The word 5S represents the 5 discipline for maintaining visual workplace. 5S is workplace management to minimize the loss of time and unnecessary movements as well. It comprises 5 principles in making the organization highly efficient and effective those are:- Seiri: - (sorting) 1. Perform sorting activity at your workplace i.e. into wanted and unwanted things. 2. Remove all the unwanted things that are at your workplace. 3. Only keep those things that you need. Seiton: - (set in order) 1. Decide place for everything that you need. 2. Give proper identification to it for ease of search. 3. Keep everything at its defined place after use. 4. Make sure every time that everything is at its place. Seiso: - (shine) 1. Always keep cleanliness at your workplace. 2. Keep the tools always clean after its use. 3. Areas should be properly marked or painted. MAR-APRIL 2016, VOL-3/23 www.srjis.com Page 1852

Seiketsu: - (standardize) 1. Define standard method/way of doing the work i.e. prepare standard operating procedure (SOP). 2. Do the work in that method/way only. 3. Maintain the discipline in your work [5]. Shitsuke: - (sustain) 1. Maintain consistency in the method of doing work [3]. 2. Stick to the 5S rules for proper workplace management. 3. Encourage the participation of all, for consistency in 5S activities. 4. Perform 5S activities periodically. 1.2 Organization Introduction Menon Piston Ltd, Maharashtra, India inaugurated in 1969 MPL is a total engineering solution provider wherein the product is designed as per the customer requirements, prototype are manufactured, tested and validated before mass production. MPL group is specialized in manufacturing of pistons, piston rings, piston pins and bearings as well. The products are manufacture at various locations depending upon the availability of skilled labours and logistics benefit. 2. Problem Statement The following problems occurred before implementation of 5S in the organization: 1. Improper utilization of storage space for raw material, bins and finished products. 2. Wastage of time in searching the raw material due to non-permanent location for storage of raw material. 3. Low productivity due to the time wastage in searching for tools, materials due to improper workplace management. 4. Presence of unwanted materials at the workplace which affects the moral of the worker while working. 5. Useful storage space being acquired by the unwanted materials. 6. More time and cost required for the inventory process of unwanted stored materials in raw material stores. 7. No well defined space for storing the unwanted or rejected material. 8. Unequal participation of officers and workers in workplace management due to non standardization. MAR-APRIL 2016, VOL-3/23 www.srjis.com Page 1853

3. METHODOLOGY The following method was adopted to implement 5S : 1. To create awareness among the employees for the implementation of 5S, various awareness programs and presentations were undertaken by the various experts in the organization. Also the official staff visited the leading organization s in which 5S had already being implemented successfully. 2. As the organization consist of various departments it was difficult and impossible to imply directly the 5S technique in the organization. Hence the organization was simplified various zones consisting of specific departments along with it, the zone leaders and subzone leaders were also appointed. The organization was simplified as: Table 1: Simplification of organization Zones Sub-Zones 1. Parking and Main Gate 1. Peripheri 2. Gate House 3. Gardening and Perifery road 2. Store Room 1. Raw material room 1. Vendor Section 2. Heating and casting 3. Heat Treatment 3. Inspection lab 4. Maintnance Room 1. Centreless Grinding machines( No. 1,2,3) 2. CNC Section 4. Machine Shop 3. Packing Section 4. Quality control lab 1. Plant head office 5. Office 2. HR Office 3. Now as the organization was simplified into different zones, the 1S activity was undertaken by the respective zones under the guidance of respective zone leaders. 4. After the implementation of 1S in various zones, the audit was conducted by the apex team of the organization. Then the queries raised from the audit by the apex team were taken into consideration by the respective zones and the corrective measures were taken on it. into 3.1 Pre-Audit report As need for implementation of 5-S a pre-audit was conducted in foundry and checklist was prepared for concerned departments showing layout of shop, useful and unnecessary items. On the basis of pre audit, different problems are found out and necessary solutions are suggested. MAR-APRIL 2016, VOL-3/23 www.srjis.com Page 1854

3.1.1 Maintenance department (Zone 1) 3.1.1 (A) Layout 1 8 7 6 2 3 4 5 1-Maintenance rack 1, 2-Maintenance rack 2, 3-Supply panel, 4-Lockers, 5-Entry, 6-Incharge section, 7-Maintenance Files, 8-Nut and Bolt section Fig 1 Layout of maintenance Department 3.1.1 (B) Checklist for Maintenance room Table 2 Checklist for Maintenance room Sr. No. Check list for step S1 (sorting) Yes No 1 Are there any useless things that can bother your work environment? Yes 2 3 Are there any useless raw materials, semi-finished products and/or waste left as is, nearby workplace? Are there any tools, spare parts, materials left on the floor, nearby equipment? Yes Yes 4 Are all frequently used objects sorted, arranged, stored and labelled? No 5 Are all measurement instruments/devices sorted, arranged, stored and labelled? No MAR-APRIL 2016, VOL-3/23 www.srjis.com Page 1855

3.1.2 Purchase and store Department (Zone 2) Date: 15 Feb, 2016 3.1.2 (A) Layout 1 2 3 4 6 5 1-Inspection of incoming material, 2-Supervisor Cabin, 3-4-5- Raw material, 6- Tray section Fig 2 Layout of purchase and store department 3.1.2 (B) Checklist for purchase and store room Sr. No. Table 3 Checklist for purchase and store room Check list for step S1 (sorting) 1 Are there any useless things that can bother your work environment? Yes 2 Are there any useless raw materials, semi-finished products and/or waste left as is, nearby workplace? Yes No No 3 Are there any tools, spare parts, materials left on the floor, nearby equipment? No 4 Are all frequently used objects sorted, arranged, stored and labelled? No Are all measurement instruments/devices sorted, arranged, stored and 5 labelled? No 6 Does the inventory or in-process inventory include any unneeded materials or parts? No 7 Are there any unused machines or other equipment around? Yes 8 Are there any unused jigs, tools, dies or similar items around? Yes 9 Is it obvious which items have been marked as unnecessary? Yes 10 Has establishing the 5S's left behind any useless standards? Yes MAR-APRIL 2016, VOL-3/23 www.srjis.com Page 1856

3.2 Actual Department wise implementation 3.2.1 Maintenance department (Zone 1) 3.2.1 (A) Problem Statements The following problems occurred before implementation of 5S in the organization: Wastage of time in searching the raw material due to non-permanent location for storage of raw material. Low productivity due to the time wastage in searching for tools, materials due to improper workplace management. Presence of unwanted materials at the workplace which affects the moral of the worker while working. Useful storage space being acquired by the unwanted materials. More time and cost required for the inventory process of unwanted stored materials in raw material stores. No well defined space for storing the unwanted or rejected material. Unequal participation of officers and workers in workplace management due to non standardization. 3.2.1 (B) Formation of 5S Council Objective of this is to enhance total participation at all levels of employees and develop a continuous improvement culture and best performance spirit in the teams. 5S Council comprises the following: 5S Steering Committee Managing Director as Advisor General Manager as Chairman Head of Departments as Facilitators 5S Training Committee 5S Promotion Committee 5S Audit Committee Steering Committee Training Promotion Audit Fig 3 5S Council MAR-APRIL 2016, VOL-3/23 www.srjis.com Page 1857

3.2.1 (C) Employee training This training programme, which is the starting point of 5S: Step-by-Step Implementation, encourages workers to become actively involved in the application exercises. This is the responsibility of the 5S Training Committee. Once the preliminary training is completed, everyone will have the required basic knowledge, and be responsible for action in progress. Plans describing implementation of the 5S phases must be prepared and released during the 5S declaration. The most common mistake organizations make when implementing the 5S system, is the failure to train adequately at the outset. Training should proceed as follows: 5S Awareness for Top Management 5S Awareness for Operators Step-by-Step 5S Implementation for Facilitators Step-by-Step Internal 5S Audit We have given training of 5S to top management, lower management and workers as well. Following are the some photographs of training programme. Fig 4 Vendor s training Fig 5 Vendor s Training Fig 5 Training of maintenance department employees MAR-APRIL 2016, VOL-3/23 www.srjis.com Page 1858

3.2.1 (D) Implementation of Seiri and Seiton:- Sorting aims for removing all the unwanted materials from the workplace. After sorting the unwanted materials from the workplace, they are placed in the red tag area and the details of it are noted down on the red tag card. ( as shown in Fig 6 ) The materials noted down on the red tag card are then moved to scrap yard or located properly or rectified or segregated or returned to the supplier based on the decision of apex team and zone leader. Set in order aims at place for everything and everything in its place [2]. After sorting, the specific location is defined for the useful material and located in the predefined order. Front side Fig 6 Example of Red tag Back side Fig 7 Red tagging to materials Fig 8 Red tagging to wastage MAR-APRIL 2016, VOL-3/23 www.srjis.com Page 1859

Above pictures shows red tagging to the various kinds of materials. Fig 9 Red tagging to unwanted material After red tagging it is necessary to sort the material according to type. Because employees of the company has habit of keeping tools at random places. Previously the cupboards, boxes and nut- bolt section were not properly sorted so we arranged those so as to remove all the junk and provide place for every component. Also care is taken to ensure that every component is in proper place. Fig 10 Maintenance department (Before) Fig 11 Maintenance department (After) MAR-APRIL 2016, VOL-3/23 www.srjis.com Page 1860

Fig 12 Nut and bolt section (Before) Fig 13 Nut and bolt section (After) Fig 14 Table of the supervisor (Before) Fig 15 Table of the supervisor (After) Fig 16 Tool box (Before) Fig 17 Tool box (After) MAR-APRIL 2016, VOL-3/23 www.srjis.com Page 1861

Fig 18 Boxes before labelling Fig 19 Boxes after labelling 3.2.1(E) Implementation of Seiso (Shine) Shine aims for keeping cleanliness at workplaces, workstations, offices, stores, outlet, passage ways, gangways, etc. in the organization. The workplace was untidy previously. It was excessively dusty. So we cleaned the cupboards and floor to ensure the Seiso. For implementation of Seiso worker s participation and support is most important. Fig 20 Worker s Participation for cleaning the floor MAR-APRIL 2016, VOL-3/23 www.srjis.com Page 1862

Fig 21 Floor of maintenance dept. (Before) Fig 22 Floor of maintenance dept. (After) 3.2.1 (F) Implementation of Seiketsu (Standardize): Standardize aims for preparation of standard methods to continue to follow the first 3S effectively in the organization, thus to standardize, following activities were taken into consideration: We have maintained a red tag register in which we kept record of all the red tags for our reference. In daily routine, if workers notice unwanted thing at the workplace then a red tag is paste on it and decisions (to scrap or else) is taken. We used to collect that tags after every 8 days, then after 15 days, then after 1 month and maintained the record of it. Thus from the record we found out that the number of red tags decreased day by day (i.e. unwanted things vanished from the workplace). We have made a standard space for dustbins and material under inspection because previously shop floor was dirty. We also defined the standard way of stacking/storing of the material which saves the cost of storage. We also made the habit to conduct 5S meetings. Following are the some examples of standardization: Before After Fig 23 Standardization for material under inspection and dust bin MAR-APRIL 2016, VOL-3/23 www.srjis.com Page 1863

For implementation of shiketsu we also prepared work instruction sheets for workers to standardise the processes. 3.2.2 Purchase and store room (Zone 2) 3.2.2 (A) Problem Statements The following problems occurred before implementation of 5S in the organization: Improper utilization of storage space for raw material, bins, boxes. Wastage of time in searching the raw material due to non-permanent location for storage of raw material. From the Pre-audit, we came to know about the different problems which the workers face while working in this shop. We also talked to the workers working there and store head and according to that we made the 5 S sheets. Then we suggested some solutions to overcome the problem. 3.2.2 (B)Implementation of Seiri and Seiton:- Various tools, components (pins and pistons) and store files are sorted according to their types. Now with proper sorting available space is wisely utilised for the present components and those components are sorted clearly. The compartments are labelled according to components included in it. This will lead to less time for searching the components and increase the aesthetic look of the room. Following are the some of the implemented ideas. Fig 24 Store room (Before) MAR-APRIL 2016, VOL-3/23 www.srjis.com Page 1864

Fig 25 Store room (After) Fig 26 Semi finished piston storage (Before) MAR-APRIL 2016, VOL-3/23 www.srjis.com Page 1865

Fig 27 Semi finished piston storage (After) Above picture shows the proper arrangement of semi finished pistons. 3.2.2 (C) Implementation of Seiso (Shine) There was lot of dust, rust and oil fumes on the parts as well as on the floor also. So we have started to clean the compartments and floor to increase the aesthetic view. It also creates pleasant atmosphere to the workers to work there. The Fig. 28 and Fig 29 shows the need of Seiso in the Store. We completed seiso for shelf and rest was explained to the workers of Menon Piston Ltd. Fig 28 Semi finished piston storage (Before) MAR-APRIL 2016, VOL-3/23 www.srjis.com Page 1866

Fig 29 Semi finished piston storage (After) Semi finished pins were also placed at any random place and heavily dense. So we placed them to proper position and create a clean surface so workers are able to reach to required placed. Following fig shows the result of shine. Fig 30 Pin store room (Before) Fig 31 Pin store room (After) MAR-APRIL 2016, VOL-3/23 www.srjis.com Page 1867

3.3 Post Audit report 3.3.1 Maintenance department (Zone 1) Table 4 Check results for Post Audit of Maintenance Room (Zone 1) Sr. No. Check list for step S1 Yes No 1 Are there any useless things that can bother your work environment? No 2 3 Are there any useless raw materials, semi-finished products and/or waste left as is, nearby workplace? Are there any tools, spare parts, materials left on the floor, nearby equipment? No No 4 Are all frequently used objects sorted, arranged, stored and labelled? Yes 5 6 Are all measurement instruments/devices sorted, arranged, stored and labelled? Does the inventory or in-process inventory include any unneeded materials or parts? Yes No 7 Are there any unused machines or other equipment around? Yes 8 Are there any unused jigs, tools, dies or similar items around? No 9 Is it obvious which items have been marked as unnecessary? Yes 10 Has establishing the 5S's left behind any useless standards? Yes 11 Is the workplace is properly cleaned? Yes 12 Is the procedure is standardised? Yes MAR-APRIL 2016, VOL-3/23 www.srjis.com Page 1868

3.3.2 Purchase and Store room (Zone 2) Table 5 Check results for Post Audit of Purchase and store room (Zone 2) Sr. No. Check list for step S1 Yes No 1 Are there any useless things that can bother your work environment? No 2 3 Are there any useless raw materials, semi-finished products and/or waste left as is, nearby workplace? Are there any tools, spare parts, materials left on the floor, nearby equipment? No No 4 Are all frequently used objects sorted, arranged, stored and labelled? Yes 5 6 Are all measurement instruments/devices sorted, arranged, stored and labelled? Does the inventory or in-process inventory include any unneeded materials or parts? Yes No 7 Are there any unused machines or other equipment around? No 8 Are there any unused jigs, tools, dies or similar items around? No 9 Is it obvious which items have been marked as unnecessary? Yes 10 Has establishing the 5S's left behind any useless standards? Yes 11 Is the workplace is properly cleaned? Yes 12 Is the procedure is standardised? Yes 3.4 Conclusions MAR-APRIL 2016, VOL-3/23 www.srjis.com Page 1869

The most significant barrier was the poor training, awareness of 5S, lack of communication, gap between the top management and shop floor employees, consciousness of this activity amongst the staff. Thus, the full benefits of the 5S cannot be experienced in the business sector until all the obstacles associated with implementation of the technique are recognized, fully understood and addressed. Since some critical decisions of 5S activities, including time and budget performance must approve and support by management, therefore more cooperation is recommended during implementation period. It is concluded that 5S key of success is training. 5S implementation is not possible without proper training and employees are not capable to actively standardize the 5S. Therefore, it is believed that continuous training is the key applying to change the organization culture, and assessment should focus on improvement and progress regarding all input from the organization until complete establishment of 5S system. The efficient implementation of 5S technique leads to subsequent improvement in productivity of the manufacturing plant. The 5S improves environmental performance and thus relate primarily in reduction of wastes in manufacturing. It promotes neatness in storage of raw material and finished products. The 5S implementation leads to the improvement of the case company organization in many ways for instance. 1. Better usage of working area. 2. Work environment improvement. 3. Prevention of tools losing. 4. Reduction in pollution 5. Discipline in the employee. 6. Increasing of awareness and moral of employee. 7. Improvement in the internal communication. 8. Improvement in the internal human relation. MAR-APRIL 2016, VOL-3/23 www.srjis.com Page 1870

ACKNOWLEDGEMENT With deep sense of gratitude we would like to thanks to all the people who have lit our path with their kind guidance. We are very grateful to these intellectuals who did their best to help during the case study. It is our proud privilege to express deep sense of gratitude to Mr. P. B. Chavan (Plant Incharge, Menon piston ltd, Sangli plant 2) for his valuable guidance and kind permission for the completion of the case study. We are also thankful to the whole organization. And lastly we thanks to our H.O.D Prof. Dr. U. A Dabade and guide Prof. Dr. M.M. Khot of Mechanical Department for their timely suggestion. REFERENCES [1] P. M. Rojasra, M. N. Qureshi, (2013), Performance Improvement Through 5S in Small Scale Industry- A case study, International journal of Modern Engineering Research, Vol. 3, pp- 1654-1660. [2] Shahryar Sorooshian, Maysam Salimi, Shanthi Bavani, Hasti Aminattaheri, (2012), Case Report- Experience of 5S Implementation, Journal of Applied Science Research, 8(7) 3855-3859. [3] Lingareddy et al., 5S As a Tool And Strategy For Improvising The Workplace, International Journal of Advanced Engineering Technology [4] Arash Ghodrati, Norzima Zulkifli,(2013), The Impact of 5S Implementation on Industrial Organizations, International Journal of Business and Management Invention, Vol. 2, Issue 3, pp-43-49. [5] Mohd Nizam Ab Rahman et al., (2010), Imlementation of 5S practices in The Manufacturing Companies: A case study, American Journal of Applied Science 7(8): 1182-1189. [6] Noni Hartika Binti Juhari et al., (2011), Human Resource Management, Elixir Hum. Res. Mgmt 39(2011) 4836-4847. MAR-APRIL 2016, VOL-3/23 www.srjis.com Page 1871

BIOGRAPHIES. Abhay Rajendra Kobarne, Pursuing Final Year B. Tech Mechanical Engineering degree from Walchand College of Engineering, Sangli, Maharashtra, India. Vineet Kailas Gaikwad, Pursuing Final Year B. Tech Mechanical Engineering degree from Walchand College of Engineering, Sangli, Maharashtra, India. Sourabh S. Dhaygude, Pursuing Final Year B. Tech Mechanical Engineering degree from Walchand College of Engineering, Sangli, Maharashtra, India. Nikhil Anil Bhalerao, Pursuing Final Year B. Tech Mechanical Engineering degree from Walchand College of Engineering, Sangli, Maharashtra, India MAR-APRIL 2016, VOL-3/23 www.srjis.com Page 1872