NB Guide to Accounting and Reporting TCA Appendix A Asset Classes, Thresholds, Useful Lives

Similar documents
Appendix 2 Asset Classes, Thresholds, Useful Lives. General Tangible Capital Assets. Capitalization Threshold* Asset Description/Notes.

Guide for Capitalization and Depreciation of Capital Assets Prepared by the Office of Statewide Reporting and Accounting Policy

ASSET MANAGEMENT PLAN

Description Quantity Cost Total Cost

14.1 Tangible Capital Assets

Building Tennessee s Tomorrow: Anticipating the State s Infrastructure Needs July 2011 through June 2016

UNIVERSITY OF MISSISSIPPI FIXED ASSET CAPITALIZATION POLICY

Department Engineering & Public Works - Budget For City Utilities

State System of Higher Education Financial Accounting Policy

Services outsourced in 2013 to a third-party firm (not including parts, equipment purchased). Type of Service

Examples of Eligible Projects. Project Category Description Examples

Moving Ruston Forward. City of Ruston Infrastructure Maintenance and Improvements

TOWN OF ALTONA 2016 FINANCIAL PLAN

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES

UNIVERSITY OF NEBRASKA CAPITALIZATION POLICY AND DEFINITIONS

RESOLUTION R PASSED AT SYCAMORE, ILLINOIS, THIS 16th DAY OF JUNE 2004, A.D. Chairman, DeKalb County Board ATTEST: County Clerk

HOWARD UNIVERSITY. I. Policy Statement. II. Rationale. III. Entities Affected by the Policy. IV. Definitions. Policy Number:

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets

Infrastructure assets are distinguished from other capital assets because they normally:

GAS TAX FUND CATEGORIES WITH EXAMPLES

Township of Enniskillen. Asset Management Plan

UNIT PRICE LIST January 2009

CD i -STREETS- Detail #

State of Florida State Standard Class Code for Capital Assets

The City of Basehor, Kansas

Accounting and Administrative Manual Section 100: Accounting and Finance

Fixed Asset Management

CITY OF NIAGARA FALLS. By-law No A by-law to regulate the maintaining of land in a clean and clear condition.

Bridges & Culverts Condition by Quantity

TOWNSHIP OF ORO-MEDONTE 2015 CAPITAL BUDGET- PROJECT FINANCING

General Statement of Duties

TREASURER S DIRECTIONS ACCOUNTING ASSETS Section A2.3 : Depreciation and Amortisation

Strategic Plan Where our past guides the future

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

Civil Engineering Sector Labour-Management Health and Safety Committee

TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African

City of Cape Town. Asset Management Policy

City of Auburn Summary of Capital Outlay by Fund and Department

Financial Plan Smoky Lake County Page 1

Capital Assets Accounting and Reporting

2012 Annual Report. Greene County Buildings and Grounds

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

Council Communication

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT

Premature Storm Drainage System Repairs and Replacement

CURRENT PERMIT FEE SCHEDULE Effective 1/1/2012

Town of Medway Capital Improvements Planning Committee

FIXED ASSET AND CAPITAL PURCHASE POLICY

Alphington sewer replacement

FY08 SEWER POINT REPAIRS BID TABULATION

ENGINEERING & PUBLIC WORKS ASSET MANAGEMENT PLAN

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

CAPITALIZATION AND DEPRECIATION OF INFRASTRUCTURE. OFFICE OF THE STATE AUDITOR Division of Technical Assistance. Presentation to:

SECTION SANITARY SEWER AND STORM DRAIN SYSTEMS

REGISTRATION OF INTEREST

Asset Management Plan

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

SCHEDULE OF FEES

CITY OF SAN JOSE PROPOSED OPERATING BUDGET FUND DESCRIPTIONS

AREA: 2.37 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF. Single-family, Non-conforming machine shop

Workplace Incident Fatalities Accepted by the Workers Compensation Board in 2014

NAPCS Product List for NAICS 5322: Consumer Goods Rental and Leasing

EXPENDITURES SUMMARY INCREASE BUDGET BUDGET (DECREASE) Over 2015 $ $ $

City of Green Bay Department of Public Works Engineering Department

2. What building projects are exempted? (permit not required)

Engineering Specifications February, 2004 Schedule H to Bylaw 7452, Subdivision Bylaw Page 18

C-2 Construction, Inc. - NAICS Codes

Number: 1-3 Date Issued: July 15, 1999 Date Revised: October 26, Subject: Responsible Department: Approved: Purpose. Definitions of Terms

Capital Assets Accounting

SECTION SELECTIVE DEMOLITION

EXPENDITURES SUMMARY INCREASE BUDGET BUDGET (DECREASE) (Restated) Over 2014

Phosphorus. Phosphorus Lake Whatcom Cooperative Management.

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION

Koser Field. 7th St SE 2.25

DEPARTMENT OF TRANSPORTATION PROCUREMENT OFFICE

SECTION STORM DRAIN SYSTEM

Holiday Island Suburban Improvement District Capital Improvements Program Comprehensive Detail Schedule

Connecticut Technical High School System Connecticut State Department of Education PLUMBING APPRENTICESHIP INFORMATION PACKET

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

Florida Department of Environmental Protection

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

EFFECTIVE FEBRUARY note: drainage permit required to call for a dampproof inspection

Engineering Major Service Actual Budget Projected Request Executive Adopted

Capital Assets Plan. Capital Assets Plan. Overview

STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT

X Planning X Quality X Maintenance & Operations


provided for improvements for each structure during these timeframes. Rehabilitation and Investment Strategies:

Table of Contents ALPHABETIZED LIST OF CIP PROJECTS... 1 CIP 5 YEAR SUMMARY BY CATEGORY SMART CITY CIP 5 YEAR SUMMARY BY VISION...

MARKET SCOUT CONTRACTORS QUESTIONNAIRE (complete in addition to an Acord application) 1. Applicant:

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

Information for Construction Contractors. Terry O Neill Taxpayer Service Specialist

DIVISION OF FACILITIES AND CONSTRUCTION MANAGEMENT ARCHITECTURAL/ENGINEER FEES EFFECTIVE DATE: April 18, 2016

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

City of Laredo, Texas Capital Asset Policy and Procedures Effective October 1, 2006

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011

FEMA's SCHEDULE OF EQUIPMENT RATES

SPILL PREVENTION PLAN

Auto v. Mobile Equipment in the CGL

Transcription:

NB Guide to Accounting and Reporting TCA Appendix A Asset es, Thresholds, Useful Lives Land Asset General Tangible Capital Assets Real property in the form of a plot, lot or area < Rate $0 $0 $0 n/a Includes the purchase price and all closing costs to acquire the land Costs associated with the permanent improvements of the land, such as re-grading or filling, are added to the cost of the land Examples: Municipal Park, Beach Property, Undeveloped Picnic Site, Festival Grounds, Playgrounds, Look Out Site, Heritage Area/Historic Sites, Cemetery, Community Pasture, Subdivision, Trailer Park, Ecological Reserve, Training Grounds, Landfill Site, Waste Disposal Site/Dump, Module Industrial Site Land Improvements Excludes land held for resale Includes all costs excluding land and buildings incurred in the development of land to facilitate various recreation and economic pursuits Examples include but are not limited to landfill site development, driveways, parking lots, bike paths, sidewalks, outside swimming or wading pools, fences, ball diamonds soccer fields, tennis courts, camp sites Playground structures 10 yrs Signage 5 yrs Soccer field & ball diamonds 20 yrs Outdoor Hockey Rink - 10 yrs Golf Course 25 yrs Basketball Courts - 10 yrs Running Track - 10 yrs Bowling Green - 20 yrs Skateboard Park - 15 yrs Campgrounds/Picnic Sites - 20 yrs Trails & Boardwalks walking, biking, ski & skidoo - 20 yrs Fencing 10 yrs Fountains 20 yrs Outdoor lighting 20 yrs $2,500 $5,000 $10,000 5-25 years

Brick, Mortar & Steel Wood Frame Vehicles Machinery & General Tangible Capital Assets Swimming pools 25 yrs Tennis courts 20 yrs Landscaping 25 yrs Retaining walls 15 yrs Pavilion/Gazebo - 15 yrs Erosion control structures: retaining wall, crib wall, 25 yrs Flood control structures: flood walls, dikes 25 yrs Waterfront development - 20 yrs Tunnel - 25 yrs Parking lots: (i) Gravel 10 yrs (ii) Asphalt 20 yrs (iii) Concrete 25 yrs All buildings, which function independent of an infrastructure network and are made of a solid construction Includes town/city hall, fire hall, office buildings, museum, library, sport & recreation facilities (including picnic shelter, ski hill chalet, survival shack, warm up shack) municipal depot, maintenance garages, storage sheds, trailer buildings, bus shelters, park washrooms, concessions stands, ticket kiosk, boat house, fish plant, heritage & interpretation centres, Arts & Culture Centres All buildings, which function independent of an infrastructure network, whose structural frame is made out of wood Includes town/city hall, fire hall, office buildings, museum, library, sport & recreation facilities (including picnic shelter, ski hill chalet, survival shack, warm up shack) municipal depot, maintenance garages, storage sheds, trailer buildings, park washrooms, concessions stands, ticket kiosk, boat house, fish plant, bus shelters, Arts & Culture Centres, Heritage/Interpretation centres Automobiles, vans, light trucks (1 ton & under), trailers, motorcycles, snowmobiles, ambulance, law enforcement vehicles, animal control vehicles, ice resurfacing machine, bus, mini bus, ATV Watercraft: Motor Boat, Zodiak, Tour Boats, Seadoos All types of machinery or equipment, other than machinery and equipment used in road construction and maintenance Garden maintenance equipment (including mowers, ride on mowers, trimmers, shovels, picks, wood chippers, outside sprinklers) Recreational equipment (including scoreboards, bleachers nets, picnic tables, tents, canoes/kayaks Welding equipment, generators, audio visual equipment & stage, hand tools, power tools, snow blowers, fire fighting equipment, safety < $2,500 $5,000 $10,000 3-5 years $2,500 $5,000 $10,000 5 years Rate 2

Heavy Vehicles Computer Hardware & Software & Communication Furniture & Fixtures Leasehold Improvements Assets Under Construction (AUC) General Tangible Capital Assets equipment (including traffic & noise barriers, signs, safety lights, sirens), medical equipment, fuel tanks, pumps, key lock system, incinerator, surveying & engineering equipment All types of machinery and equipment used in the construction and maintenance of roads and in the delivery of various other services Fire trucks, Garbage trucks, Salt Trucks, Dump Trucks, Snow Plows, Snow Blowers, Sidewalk Blowers, Front End Loaders, Back Hoes, Dozers, Graders, Pavers, Rollers, Boom Trucks, Crushers, Sidewalk/ Road Sweepers, Heavy attachments (buckets, blades, etc) Purchase installation of personal PC computers, peripherals and LAN Servers Off-the-shelf and related upgrades or licenses for individual personal computers, as well as LAN or communication software Does not include the purchase, design and development of major applications. All major applications should be evaluated individually. Examples: Personal computers, laptops, printers, scanners, fax machines, photocopiers, software, telephones, cell phones, 2-Way radios, satellite phones, paging systems, blackberry, cameras Examples: Desks, Chairs, File Cabinets, Kitchen Appliances, Water Dispenser Costs to renovate, modify or improve accommodations leased by the Municipality Also known as work in progress Costs incurred to construct an asset, normally a building or leasehold improvements The costs are transferred to the asset class when the asset is put into use, which is normally upon completion of the asset. < Rate $2,500 $5,000 $10,000 10-15 years $2,500 $5,000 $10,000 3-5 years $2,500 $5,000 $10,000 3-5 years $2,500 $5,000 $10,000 Over the lease term N/A N/A N/A N/A 3

Land Asset Infrastructure Transportation Includes land purchased or acquired for value for use under roads and road allowance (i.e. Right Of Way) > $4,000,00 0 and < $14,000,0 00 $0 $0 $0 N/A Road Surface Road Grade Bridges Marine Structures Excludes land held for resale Asphalt - Residential Roads (20 yrs), Collector Roads (15 yrs), Main Thoroughfare Roads (12 yrs) and gravel ( 5 yrs) surfaces Guard rails Does not include the initial application of granular on gravel roads Consider segmentation of the network Includes formation works, drainage works and culverts under 2 meters in diameter Includes the initial application of granular on gravel roads Future applications of gravel is an operating expense Consider segmentation of the network Includes: sidewalks and curbs 10-15 yrs Structures of 2 or more meters, which span and give passage over a waterway, deep valley, depression or some other obstacle such as another transportation route Includes culverts that are 2 or more meters in diameter Timber/wood 30 yrs Precast concrete 40 yrs Concrete Pre Stressed 45 yrs Steel w/o trusts 45 yrs Steel with trusts 50 yrs Culverts: (i) Plastic 25 yrs (ii) Steel/ Corrugated Steel 15 yrs (iii) Concrete 40 yrs (iv) Aluminized 50 yrs (v) Galvanized 15 yrs Wharf, stage, dock, pier, boat launch, slipway, breakwater, sea fences 25 years Ferries $2,500 $5,000 $10,000 5-15 years $2,500 $5,000 $10,000 10-30 years $2,500 $5,000 $10,000 30 to 50 years $2,500 $5,000 $10,000 25-30 years 4

Lighting / Traffic Lights Assets Under Construction (AUC) Infrastructure Transportation - 30 years Includes traffic lights and street lights for illumination Traffic Lights 15 yrs Also known as work in progress Costs incurred to construct transportation infrastructure assets The costs are transferred to the asset class when the asset is put into use, which is normally upon completion of the asset. > $4,000,00 0 and < $14,000,0 00 $2,500 $5,000 $10,000 10 to15 years N/A N/A N/A N/A Land Asset Land Improvements Infrastructure Water & Waste water Systems Includes land purchased or acquired for value used for water and waste water sites Land improvements as defined in the General Capital asset class that are associated with water and waste water sites < $0 $0 n/a $2,500 $5,000 $10,000 10-25 years Brick, Mortar & Steel Wood Frame Water and Waste Water Networks Includes lagoons, reservoirs and engineered wetlands Buildings as defined in the General Capital asset class that are associated with water and waste water treatment and pumping sites pumping station, water supply building/ water towers, purification/chlorination plant & equipment, sewer lift station, Buildings as defined in the General Capital asset class that are associated with water and waste water treatment and pumping sites pumping station, water supply building/ water towers, purification/chlorination plant & equipment, sewer lift station, Underground networks such as water distribution pipe systems, waste water collection systems and storm drainage collection systems Useful life of the underground system could vary depending on the durability of the material used (i.e. concrete, metal, polyethylene) $2,500 $5,000 $10,000 15 to 100 years 5

Infrastructure Water & Waste water Systems Sanitary Sewer Lines & Storm Sewers: (i) Metal Corrugated 15 yrs (ii) Concrete, not reinforced (CON) 40 yrs (iii) Reinforced Concrete Pipe (RCP) 60 yrs (iv) Ductile Iron & cast iron(di) 30 yrs (v) Plastic: PVC & HDPE 60 yrs (vi) Ditch / Trench - 50 yrs (vii) Manholes & Storm Drains 40 yrs (viii) Sewage Outfall 25 yrs (ix) Lagoons 30 yrs Water Mains: (i) Plastic: PVC & HDPE 25 yrs (ii) Ductile (DI) and Cast Iron 30 yrs (iii) Reinforced Concrete Pipe (RCP)) 60 yrs Useful life of the underground system could vary depending on the diameter of the pipe (main line versus an arterial line) < Machinery & Dams and Water Structures Assets Under Construction (AUC) Consider segmentation of the network All types of machinery or equipment that are associated with water and waste water sites Includes but is not limited to tanks, pumps, generators, filtration treatment systems, residue management systems, sewage treatment systems, water meters, fire hydrants, control valves, valve chambers, sewer pumps, booster pumps used in pumping station, water supply building/ water towers, purification/chlorination plant & equipment, sewer lift station, disinfection system Dams and other structures that are used to control or divert surface water such as dams, canals, dikes, ditches (not already capitalized as part of road grade), diversions, cut-offs and wells 50 year Water intake/supply structures, including drilled and dug Also known as work in progress Costs incurred to construct water and waste water infrastructure Assets The costs are transferred to the asset class when the asset is put into use, which is normally upon completion of the asset.radios, satellite phones, paging systems, blackberry, cameras $2,500 $5,000 $10,000 10-15 years $2,500 $5,000 $10,000 25-50 years N/A N/A N/A N/A 6