WETROOM INSTALLATION INSTRUCTIONS

Similar documents
Wetroom Panel (Concealed Fix)

KITCHENS. Tip PAGE 1 FITTING YOUR KITCHEN GUIDE. How to mark out a kitchen. Tools required for installing a kitchen STEP ONE STEP TWO STEP THREE

Shower Walls and Tub Surrounds

majestic install ation guide barcelona three sided enclosure 24mm surface mounted wall channels and underframe to base

How to Install GoBoard:

Folding Bath Screen Instruction Manual

8.7 Schluter -KERDI-LINE

Beautifully Traditional

Installation Instructions

PANELIZED HOME INSTALLATION GUIDELINE

INSTALLATION OF A BAY WINDOW

DIY CABINET REFACING INSTALLATION GUIDE

IMPORTANT INFORMATION

HOW-TO LAY HARDBOARD OR PLYWOOD FLOOR OVERLAY

UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS

Shower and Floor Gullies Channel Drain and Tile Drain SECTION

Eucaboard / Eucaplac/ Eucatile paneling is intended for dry interior use only and requires care in handling.

Important Information

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors

DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H

CORNER FRIDGE REFRIGERATION UNIT INSTALLATION AND OPERATION INSTRUCTIONS

THINGS YOU SHOULD KNOW

Renovation instructions

IMPORTANT INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION

REDI-EXIT COMMERCIAL FIRE DOOR AND EXTERIOR DOOR KITS INSTALLATION GUIDELINES

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS

Can you design a frameless shower enclosure that doesn't leak?

Curved Quadrant Instruction Manual

Above-Counter Bathroom Sink

Wren Kitchens Installation Tips Carefully check your kitchen delivery Measuring out and marking up Fitting the base cabinets...

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

Knauf Aquapanel Interior. Tile Backing. Cement board for wet areas. Will not deteriorate in water. Easy to score and snap

7. Installation. installation CAST-IN WINDOW SYSTEM 7.1. INSTALLATION OF WINDOW MAIN FRAME

COASTLINE QUADRANT ENCLOSURE. Installation / Maintenance Instructions Rev

12.1 Schlüter -KERDI-BOARD

Schluter -Shower System Installation Handbook Bonded Waterproofing System for Tiled Showers, Steam Showers, Steam Rooms, and Bathtub Surrounds

Installation Guide. Bath and Wall Surrounds SERIES B

INSTALLATION INSTRUCTIONS FOR LAMINATE FLOORING

How to build a Pizza Oven in 4 days

2.9 WINDOW & DOOR BUCKS

INSTALLATION INSTRUCTIONS for Vinyl Windows without Nailing Fin (JII011) ImPOrTANT INFOrmATION & GlOssAry. rough OPeNINGs

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

Window Installation Instructions

Wall Mount Installation and Use

Laminate Flooring T-Lock Angle-Drop Installation Instructions

BUILD A CARPORT. 2 - Planning the carport. 3 - Designing the carport

CAST IRON THE BASICS. Heatline - Cast Iron Radiators SMOOTH FLAT FILE TO REMOVE ANY SWARF. ONE TIME. ASSEMBLY. JOINTS SHOULD BE TIGHTENED.


IN00378 (rev A) Corner Entry

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C Date of issue , Updated July 1, 2011

Aspect Metal Peel & Stick Tile Installation Guide

Basement Window Installation Guide Hopper and Sliding

39HQ Airovision Air Handling Units

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

WATERPROOFING OF WET ROOMS

IN00419 (rev A) Aqua 6 Glide Quadrant and Off-set Quadrant Enclosure

High Performance Building Materials SCREEDS REPAIR MORTARS LEVELLING & SMOOTHING WATERPROOFING TILE ADHESIVES & GROUTS PRIMERS & ADDITIVES

Rooflight INSTALLATION INSTRUCTIONS

8.2 Schluter -KERDI-DRAIN

Close Coupled & Back To Wall WC Saintaryware. Fitting Instructions

RODENT PROOFING CHECKLIST

Heavy Glass Frameless Shower Door With Return Panel

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12

Tested to BS 6375: Part 1: 1989 and achieved a weathertightness classification of 2000 Pa (Special)

How To Level A Subfloor

OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide. GeneralShale.com

All-Season Sunroom Sliding Glass Door Installation Instructions

SECTION STORM DRAINAGE SYSTEM

Packaged Terminal Air Conditioner Wall Sleeve Installation

How To Install Your Frameless Shower Enclosure

Vanishing Lid Trays Construction Methods with Tile or Masonry

These instructions will show you how to install an internal door into a non-loadbearing partition wall. The instructions are split into three parts.

Overview PARTS LIST. B. Lever mounting base C. Flush handle assembly D. Grey/Blue float stop E. Grey float (Full Flush) F. Flush valve washer

Brick Veneer Construction

Preventing water damage in the basement

SEAMS SEAMING USING SEAM TAPE

Electrical Wiring Technical Bulletin

Ecoflex Wall Penetration Systems: An efficient, sustainable solution for penetrating concrete or block walls

Go-kart for little race-drivers

The WANZ Guide to Window Installation

first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel

plumbing products guide

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11

Integral Kit Instructions

FRAMED & MOUNTED TILE MURAL

Black Wolf POCKET BILLIARD TABLE INSTALLATION MANUAL. SERVICE DEPARTMENT P.O. BOX 68 BRISTOL, WI 53104

HALE PET DOOR INSTALLATION INSTRUCTIONS HALE STANDARD PANEL MODEL

Residential Foundations and Basements

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin

STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES

ALKALI-RESISTANT WATERPROOFING AND DECOUPLING MEMBRANE UNDER CERAMIC TILES AND NATURAL STONE

Installation for Wood Flooring

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)

tidesmarine Smart Seal Temperature Alarm System Generation II Installation Instructions Starboard side cable

FRONT WINDSHIELD SEAL INSTALLATION

Choosing the Right Floor Protectors

Natural Thin Stone Veneer

Gate Leg Drop Leaf Table Plans

Transcription:

WETROOM INSTALLATION INSTRUCTIONS Existing concrete floor, for wetrooms with a square or linear drain Before Installing: Please read these instructions prior to installing your wetroom. Before cutting in to the existing flooring, make sure there are no cables or pipes underneath that may be in the way.

A complete step by step guide: You will need: Topps Tiles Wetroom Tray Topps Tiles Square or Linear Drain Trap Topps Tiles Square or Linear Grate Topps Tiles Waterproof Wall Matting or equivalent Topps Tiles Waterproof Floor Matting or equivalent Topps Tiles Joint Tape Topps Tiles Pre-formed Internal Corners Circular saw Jig saw Drill / cordless screw driver Screws Spirit level Tape measure Pencil Sealant adhesive and gun 4-6mm square notched trowel Notched trowel suitable for tiles Margin trowel Mixing bucket Grout float Flexible cement based tile adhesive Grout Floor primer if required Have you thought about underfloor heating? Ask us in-store for more details on our range Other optional extras include: Thermostat Insulation boards Glass fibre tape Undertile heating Existing Concrete Floor These instructions describe the method for installing the wetroom tray on top of an existing concrete floor. This type of installation allows for the surrounding floor to be boarded over with insulation/construction boards. Check for existing pipework and cables in the concrete which may obstruct the route of the new waste pipe and identify the best orientation for the wetroom tray. Clear the selected area, making sure the floor and walls are clean and free from dust and debris. Check the floor with a spirit level and level out with levelling compound if necessary. Work out the best position and orientation for the wetroom tray. The tray can be sut down along the wall edges or spaced away from the wall using plywood or construction board to fill the gap. If using infill pieces at the perimeter, make sure the gradient of the tray is followed to avoid water pooling. Using the tray as a template, mark the drain position and chisel the concrete away to fit the trap and waste pipe. The rubber seal of the trap should be level with the existing floor surface but the trap should not be load bearing. Connect the trap to the waste pipe, checking it will still line up with the hole in the tray. If using a 43mm solvent weld pipe, fit the ring and seal on to the adapter and screw them to the trap. Apply solvent to the adapter and pipe and fit together. Check the joint is watertight as this area can t be accessed again once the tray is in place. Step 4 Fill around the pipe and trap with concrete or expanding foam. Before the pipe and trap have set in position ensure the trap lines up with the hole in the tray and the threaded ring can be screwed through the tray in to the trap.

Step 5 Using a cement based tile adhesive, waterproof the walls with Homelux waterproof wall matting as per the product instructions. The Topps Tiles wetroom system is also compatible with liquid waterproof membranes for the walls and floor. Step 6 Where the tray will be going up against two walls, cut a square of matting from the corner of the tray to enable the sides to fold up and meet in the middle. Step 7 Prime if necessary and apply a cement based adhesive with a 4-6mm square notched trowel under the foot print of the tray, being careful not to get the adhesive down the drain hole. Press the tray firmly in place and check the 4 sides with a spirit level. Step 8 Board over the surrounding floor to meet the level of the 22mm tray thickness. Topps Tiles 22mm construction boards are ideal, especially if you are using electric underfloor heating. Step 9 Using a cement based tile adhesive, waterproof the floor with Topps Tiles waterproof floor matting as per the product instructions. IMPORTANT The floor matting must be tucked underneath the over-lapping tray matting. All edges of the tray matting should then be fixed with tile adhesive to the surrounding wall and floor matting. Joint tape can then be used on the remaining joins between strips of floor matting and between the wall and floor matting. 0 Seal the corner with a Topps Tiles pre-formed internal corner piece and tile adhesive. This is the ideal stage to tile the walls. See the following relevant drain installation steps to complete the installation.

Installing the square drain Screw the threaded ring in to the trap below using the red key to tighten it. If the trap isn t tight up against the bottom of the tray, use the wire lifter supplied to raise it whilst screwing in the top ring. If installed on a wooden floor, lift the surrounding floor boards if possible so you can view the trap connections under the tray. Pour water into the drain hole to check for any leaks before concealing the plumbing again. Drop in the hair catcher and cover. Screw in the drain body to the height of the floor tiles being used. To ensure water doesn t pool around the drain, the metal frame should be just below the tile height after compensating for the adhesive depth under the tiles. With the flat side of a trowel, pack tile adhesive up against the drain body to give further support and hold it in place. Ensure the drain is square to the closest wall. Step 4 Tile and grout the floor, taking care to wipe away any excess adhesive or grout from the drain body. Place the grate into the drain body.

Installing the linear drain The drain body is height adjustable to suit floor tiles from 6mm to 16mm thickness. If tiles are greater than 7mm, use the self-adhesive spacers supplied to raise the drain body. Peel back the tape backing and stick to the matting under the drain body. By stacking a combination of the 2mm and 4mm spacers, the height can be increased in 2mm increments. Remember to allow for the thickness of the tile adhesive when calculating the required height. Place the metal drain body in its footprint and screw the threaded centre ring in to the trap below using the red key to tighten it. If the trap isn t tight up against the bottom of the tray, use the wire lifter supplied to raise it whilst screwing in the top ring. If installed on a wooden floor, lift the surrounding floor boards if possible so you can view the trap connections under the tray. Pour water into the drain hole to check for any leaks before concealing the plumbing again. Tile and grout the floor, taking care to wipe away any excess adhesive or grout from the drain body. Drop in the hair catcher and cover, then place the grate into the drain body. For further information call our technical helpline on: +44 (0) 7740 407223 or visit our website: toppstiles.co.uk Topps Tiles (UK) Limited Thorpe Way, Grove Park, Enderby, Leicestershire, LE19 1SU United Kingdom