TILE ROOF INSTALLATION MANUAL ADDENDUM

Similar documents
Installation Manual. Solar Pool Heating System. Read the complete manual before beginning the installation

Industrial Strength Rocket Launcher

SunMor SM-V30 Solar Water Heater Installation Manual

Plumbing. Helpful Hints Residential Construction. Lincoln County. Bert Polk Plumbing Inspector

Installation Manual Gravity Solar Water Heater Evacuated Tube Integrated (Direct) System, unpressurized

Making Your Home Ready For Solar Water Heating

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

FLAT ROOF REPAIR CUT COST WITHOUT CUTTING CORNERS

Installation Manual. Thermomax Solar Water Heater ... Installation Procedure for Flatroof and Ground. Revision 8

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

Juice Box Stages 1&2 135&335 Installation Guide 5/10/08

RESIDENTIAL INSTALLATION MANUAL HELIOCOL SOLAR POOL HEATER


VITOSOL r 200-T SP2A. VITOSOL 200-T Type SP2A

POOL SUNSHINE IONIZER MODELS SPD, SPD2 AND SPS INSTALLATION INSTRUCTIONS

Select Radiators Installation Guide

DIY Poly Digester. What is Supplied in the Kit. Sketch of Arrangement

Roofing Systems. There are many different systems, each with it's own special requirements and benefits. Browse through all the options below.

Arctic Leash Instruction Manual Alaskan Products Company LLC.

Solar Pool Heating Proposal

Fixtures - Parts - Accessories to shampoo bowls

Introduction... 3 Setting the Combination... 4 Securing the DEFCON CL... 5 Locking the DEFCON CL to your Notebook Computer...

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

How to Make a Solar Cooker Kristi Jerger s 5th grade class

TABLE OF CONTENTS" SECTION 3: Comparing Standing Seam Metal to Other Metal Roofs PAGE 7"

2010 Residential Water Heater Replacement Check List

UNIT 4: SHEATHING AND SHINGLING THE ROOF

Transfer of Energy Forms of Energy: Multiple Transformations

SOLAR WATER HEATER USER AND INSTALLATION MANUAL

CAST IRON THE BASICS. Heatline - Cast Iron Radiators SMOOTH FLAT FILE TO REMOVE ANY SWARF. ONE TIME. ASSEMBLY. JOINTS SHOULD BE TIGHTENED.

Mark Cramer Inspection Services, Inc.

BEDFORD DORMOBILE PARTS LIST JUNE 2016

Premier & Deluxe 3-Season Room Sliding Glass Door

LIFE SCIENCE. Hoop House Construction for New Mexico: 12-ft. x 40-ft. Hoop House BRINGING TO YOUR HOME ECONOMICS COLLEGE OF AGRICULTURE AND

30 minutes in class, 2 hours to make the first time

Assembly and Usage Instructions

Fiberstars Lighted Laminar Flow Fountain Installation Manual

Build Your Own Solar Car Teach build learn renewable Energy! Page 1 of 1

FRAMED & MOUNTED TILE MURAL

Table of Contents. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide. Notes to Designer /Installers..

Alpha System ADAPTABLE KEWAUNEE LABORATORY FURNITURE. encouraging new discovery

Auxiliary Rams USERS MANUAL

AZEK Rail Install Guide

Build and Fly the Fokker D- 8

Do-It-Yourself- Hydraulic Press Make Your Own, by Marshel Rossow

BRIDGE & SUPPLY COMPANY. Installation Guide. Ultra Includes:

Installation Instructions

Installing Window and Door Mouldings

Building Owners Guide to a Duro-Last System!

RadianceRail Installation Guide

KITCHENS. Tip PAGE 1 FITTING YOUR KITCHEN GUIDE. How to mark out a kitchen. Tools required for installing a kitchen STEP ONE STEP TWO STEP THREE

GENERAL RUBBER LINING PRINCIPLES

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING

When Should Examination Preparation Begin?

GENUINE PARTS INSTALLATION INSTRUCTIONS

HOW TO-SOLAR HOT WATER

SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)

EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines

Installation Instructions

Installation Manual Evacuated Tube Solar Water Heaters

Finding and Fixing Leaks

Modular Locomotive System Instruction Manual for HBK8 George Body Kit

Installation Guide. Bath and Wall Surrounds SERIES B

This kit may void factory warranty please check with manufacturer.

Chapter 3 Installing Over-the-Post Railing on an L-Shaped Stair

TECHNICAL BULLETIN. Meritor WABCO Cab Leveling Valves and Chassis Leveling Valves. How the Cab Leveling and Chassis Leveling Valves Work

The following are just a few of the advantages that Techno-Solis offers you as a solar contractor: Contact Us!

W I T H I N J O I ST S I N STA L L AT I ON

A Screened Bottom Board

OWNER S MANUAL Table Tennis Table Patent Pending

Solar Collector Series. Product List

Ceiling Mounted Folding Attic Ladders Installation Instructions

Power Window/Power Lock Installation. To begin with you will need all the parts listed below:

ETL listed for installations within 5 ft. (1.5M) of outer edge of water Rev E Page 1 of 10

Vacuum Tube Solar Water heater Non-pressure. User manual

Can you design a frameless shower enclosure that doesn't leak?

Chapter 10 - Scaffolding Systems

Chris & Brenda s Solar Water Heating System

STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13

This kit may void factory warranty please check with manufacturer.

Power Cube Open Source Ecology Page 1. Power Cube. Version 4

If you put the same book on a tilted surface the normal force will be less. The magnitude of the normal force will equal: N = W cos θ

SWIM PC USER and INSTALLATION MANUAL SOLAR WATER INTERNET MONITORING PROGRAMMABLE CONTROLLER

Thank you for downloading this tutorial! Before you get to work, please take the time to read the tutorial thoroughly.

LS 2540 SEWER LATERALS AND INSPECTION TEES

TREX SELECT RAILING. Installation Instructions BUY TREX PARTS G * I ** H *

7. PRINCIPAL STEPS 8. POTENTIAL HAZARDS 9. RECOMMENDED CONTROLS

BENDING CONDUIT / TUBING Jan 2012 USING HAND BENDERS

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

Installation Instructions For Slider Casement Air Conditioners

THERMOSTATIC MIXING VALVE TRIM K-T9493, K-T9494

DASH KIT INSTALLATION

Herringbone Pattern Flooring

March 14, Installation of Bay, Bow and Garden Windows

Battery Backup Sump Pump System

Installation Instructions

Classic Products, Inc. ClickLock Standing Seam Installation Manual

DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H

All content including text and photographs are protected by law - Copyright 2010 by

GEET Fuel Processor Plans

Transcription:

Distributed and serviced in the USA by Hot Sun Industries Inc 103-13200 Kirkham Way, Poway CA 92064 858-683 0800 e-mail: ken@h2otsun.com web site: http://www.h2otsun.com TILE ROOF INSTALLATION MANUAL ADDENDUM Note: In winter ensure all piping slopes downhill to drain and all drains are left open (unless you live where it won t freeze.) Hot Sun s flexible fin-tubing can freeze full of water without concern. 2009-2016 copyright Hot Sun Industries Inc (USA) and Hot Sun Industries Ltd (Canada) All rights reserved WEAR EYE PROTECTION AND GLOVES WHEN WORKING WITH THE SPECIAL CA ADHESIVE. FOLLOW PROPER SAFETY PROCEDURES WORKING ON A ROOF. DO NOT ATTEMPT THIS WORK IF YOU ARE NOT TRAINED AND CERTIFIED IN FALL PROTECTION. REFER TO HOT SUN GENERAL INSTALLATION MANUAL. Make sure you know the plumbing scheme recommended for your unique situation. Consult Hot Sun or your dealer. Background information is at www.h2otsun.com/pools. Hot Sun solar pool heaters come with full design support and warranty. This technology is tricky. 1

Read the general installation manual. It covers how to attach headers to fin tubes and other important instructions that apply to all systems. This manual only discusses the methods unique to tile roofs. The fin tubing comes in 88 foot lengths, 3.75 inches in width, including 6 water flow tubes. Three of these strips of the fin tubing fit on one row of tile. A single header manifold corresponds to the same one row of tile. A header manifold is 13.5 inches long. In most cases headers will alternate meaning the male ends are connected via couplings (removable or glue-one) and the female ends are connected via lengths of 1.5 pvc pipe. These lengths are determined by the tile row spacing. You want to match the header manifolds to the fin tubes one row of tile at a time. 2

If your tile spacing is tighter than 13.5 you can steal and extra inch by gluing the male end to the female end of two adjacent headers but don t glue too many together like this. You want to be able to service it. Read the main installation manual for instructions on the use of pvc cement. We recommend heavy body grey pvc cement for the connections to the headers (no primer). 1) Once its laid out and you know which row to do first without wasting fin tubing (see main manual) attach the first header to the first 3 strips of fin tubing. 2) Roll out that first row of fin tubing and strap it down one foot away from the header. Strapping it down is done with a one tube wide strip of fin tubing stitched to the roof with an 8 length of black pvc coated solid copper electrical wire. The strap is made by separating one or two tubes of Powerstrip material. It tears along a perforation once started. 3

Use regular solid electrical wire (12 gage). Just cut pieces about 8 long, bend one end 90 degrees, lift tile with a screwdriver, slide the bend end between tiles until you can rotate the wire 90 degrees so it grabs the top of the tile below. See ideo under videos at www.h2otsun.com This wire can secure the strap. This positions and secures all the fin tubing. You can glue it all down later with construction mastic or use a strap every tile trough negating the need to glue the fin tubing down at all. This is called stitching the system to the roof. 3) Attach the second header to its fin tubes and roll those fin tubes out and strap them down part way. Attach this header manifold to the first one and secure the assembly to the roof. This row of headers will sit in a trough. Its very important that the fin tubes come off the headers at the same angle and that the fin tubes don t touch the roof next to headers. The headers will expand and contract with temperature and this movement against the tile will wear the fin tubing and a leak will develop. See repair manual under manuals on www.h2otsun.com. 4

The supplied riveted plate (a ss strap bracket riveted to a ss plate supplied by Hot Sun) can be slipped between tiles. Secure this plate by gluing it to the tile above and below. Gluing is done with construction mastic. Lepages Premium or Loctite Powergrab are the ones we typically use. Other methods can be employed. Continue until your entire row of headers is complete. Note the reason you attach a header before stitching the fin tube to the roof is so you don t have to trim the fin tubing to length. The reason you attach fin tubes to headers before connecting headers together is ease of assembly. Its easy to glue headers together. The work and the challenge is gluing (see general manual) the fin tubes to the headers fully. You have to inspect from all angles and you can t do that if the header is glued in place first. Take the weight of the headers. Its best to do this at the bottom because if you hang it at the top as shown, you stress all the removable coupling connections. One good way is to slip ppa coated ss strap through a strap bracket as shown above left. Then just slip it between tiles (lift tiles with a screwdriver). Note we glued the cap to the end of the row of headers via an elbow so we had an easy way to hang it. Another good way is to secure to the wood you will find under the ridge cap as seen below left.. Secure the headers down every 2 headers to prevent lifting in wind. Remember the headers still need to expand and contract as they change temperature so don`t lash them down tight. Below right is a plate with a strap bracket riveted to it, glued between tiles using construction mastic. Then a loop of ppa coated ss strap goes around the header and the loop is completed with a strap clamp. 5

If you strip the 6 tube wide strips into individual tubes you can twist it to go around bends as shown above right. Separating into individual tubes at the end and attaching each tube individually to the header allows you to angle the headers. The headers do not need to be perpendicular to the flow! If the headers are angled it simply means there is a longer stub of pvc pipe between female ends. You`ll need a glue-on PVC coupling for each male to male end. Always paint any piping exposed to the sun. We recommend paint that comes in a can as opposed to spray paint. For more on corners and angled headers refer to the main installation manual. 4) Assemble the headers at the other end to the fin tubes first, then to each other and secure to the roof using the same methods described. It s very important you don t try to glue the headers to each other first. Attach headers to fin tubes first then to each other. Complete the stitching to the roof. The straps go every trough which is approximately every foot and stitch to the roof at every single row of tiles. Its one stitch for every square foot. You might want to complete the plumbing first and run water thru the system to keep the surface cool as you crawl around on it. Hot Sun collectors can be very hot in hot sun. 6

¼ copper tube drains dead corner The vacuum breaker should be teed off the pipe entering the bottom corner of the bank of collectors. It needs to be positioned vertically. Recognize that water freezes inside a black surface exposed to the night sky at an air temperature of 42F not 32F. There s one place that water gets trapped and that s the dead lower corner of the bank. You can put a drain there that has to be opened (nah) or you can plumb from there to the return pipe with a ¼ copper tube (see main manual) or you can install an automatic freeze dump valve that we can supply. Once system is plumbed, check pressure at vacuum breaker location with solar off and with solar on. It should be zero with solar off and no more than 3 with solar on. If not read the main installation manual or consult with Hot Sun or your dealer. Flexibility is absolutely key to longevity of a solar heater like this and Hot Sun collectors are the only flexible collectors made in North America that are not epdm synthetic rubber and therefore do not break down in pool chemistry guaranteed. See www.h2otsun.com/warranty.pdf Watch the video on tile roof installations under videos at www.h2otsun.com 7