2006 Lake Seminole Web Page Information Summary

Similar documents
Resource Management Accomplishments FY 2014

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS

Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT

Series 2016A-2 (Green Bonds) Final Proceeds Allocation April 2016

Angora Fire Restoration Activities June 24, Presented by: Judy Clot Forest Health Enhancement Program

FAIRFAX WATER OCCOQUAN RESERVOIR SHORELINE EASEMENT POLICY. February 17, 2011

Phosphorus. Phosphorus Lake Whatcom Cooperative Management.

Mosquito Control Guidelines

Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices

The St. Lucie River is 35 miles long and has two major forks, the North Fork and the South Fork. In the 1880s, the system was basically a freshwater

What Is Rehabilitation?

How To Plan A Buffer Zone

7/8/2015. Phragmites.org 1. Clay Township Phragmites Management Program July SEMCOG and Ducks Unlimited survey around Lake St.

Wausau and Marathon County Parks, Recreation, and Forestry Department Forestry Division 2015 Work Plan

AmeriCorps National Performance Measures Pilot Year 1: Output Instrument Packet

Laws Requiring Pollution Prevention Practices

Welcome to the future of Terwillegar Park a Unique Natural Park

Environmental Case Study Decatur, Georgia, DeKalb County A Suburban Creek Resists Channelization

3.4 DRAINAGE PLAN Characteristics of Existing Drainages Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

Oklahoma Governor s Water Conference

THE RUSKIN COMMUNITY PLAN

Previous Stocking. Rainbow Trout Cutbow Trout. Brown Trout. Rainbow Trout. Rainbow Trout Snakeriver Cutthroat Trout Cutbow Trout.

Chesapeake Bay Preservation Area (CBPA) in Virginia Beach, Virginia. The Resource Protection Area (RPA) and Buffers The First 100 Feet

Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002

Non-consumptive use of wildlife. Non-consumptive Use. Non-consumptive Use

Community Workshop 5. Overarching Goals for Machado Lake Ecosystem and Wilmington Drain Multi-Use Projects

Flood Risk Management

Flood Risk Management

Arkansas River Corridor Vision & Master Plan

Receiving Water Body:

SCHNEIDER CREEK REMEDIATION CLASS ENVIRONMENTAL ASSESSMENT ADDENDUM

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

How To Manage Your Land

GENESEE COUNTY DRAIN COMMISSIONER S OFFICE

Outlet stabilization structure

MARINA ENVIRONMENTAL MANAGEMENT POLICY

Mud in the Water. Oklahoma Academic Standards. Objective. Background. Resources Needed. Activities

Litter can be a personal issue. For some, the shock of seeing sea lions munching

King County Flood Hazard Management Plan Update Cedar/ Sammamish Rivers. Public Meeting December 5, 2012

Greater Los Angeles County Region

1.7.0 Floodplain Modification Criteria

G3 GRANT LID RETROFIT FOR THE ASHLAND MUNICIPAL PARKING LOT

Sustainable Landscape Maintenance Planning and Strategies

San Francisco Bay Area Wetlands Restoration Program Design Review Group. Project Summary Outline

Texas Section Society for Rangeland Management

Sims Bayou Federal Flood Damage Reduction Project

Florida Fish and Wildlife Conservation Commission

FY Capital Improvement Program Arroyo Projects - Lower Arroyo Summary

SITE DEVELOPMENT PLAN CHECKLIST. Project Name: Site Plan No.:

2011 Operations, Maintenance, Monitoring and Rehabilitation Plan

Proposed General Plan Update Goals, Policies, and Implementation Actions

BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY

The Everglades & Northern Estuaries; St. Lucie River Estuary, Indian River Lagoon & Caloosahatchee Estuary. Water Flows & Current Issues

Bay Area and Northern California Environmental Firms. the East Contra Costa County Habitat Conservancy

Lower Crooked Creek Watershed Conservation Plan EXECUTIVE SUMMARY

Skaguay Reservoir. FISH SURVEY AND MANAGEMENT DATA Greg A. Policky - Aquatic Biologist (Salida) greg.policky@state.co.

Waterway Technote Drains

GROWER ADVISORY Agriculture Regulations of the Wetlands Protection Act

2015 CRS Community Outreach. City of Folly Beach, South Carolina Flood Plain Management Offices PO Box 48 Folly Beach, SC ext 1838

PUBLIC ASSISTANCE DAMAGE ASSESSMENT

Section 401 Water Quality Certification

The Teton Creek Restoration Project Summary:

Southwick Conservation Commission

Experienced Planning and Design

Increasing water availability through juniper control.

Water Quality and Water Usage Surveys

Muddy River Restoration Project Project Description

Pamela Birak, Jordan Lake State Park, Chatham County, NC

EFB / Online Wetland Restoration Techniques Class Syllabus

RESTORATION AND ENHANCEMENT OF SOUTHERN CALIFORNIA LAGOONS

ELMER AVENUE. Water Augmentation Study NEIGHBORHOOD RETROFIT DEMONSTRATION PROJECT

Wildlife Habitat Conservation and Management Program

Town of Richmond Hill Community Stewardship Program

A Self Assessment to Address Climate Change Readiness in Your Community Midwest Region

CITY OF ALLIANCE REQUEST FOR QUOTES (RFQ) LAWN MOWING SERVICES

Fisheries Management On Lake Vermilion In 2011

RESTRICTING GROUNDWATER WITHDRAWALS TO PROTECT WATER RESOURCES: ECONOMIC IMPACT ASSESSMENT

Position Description for Conservation Specialist

Stormwater Wetland Design and Construction Mitigation Duke Bitsko. Construction Activities, Schedule and Sequence Tom Ritchie

ANGORA FIRE RESTORATION PROJECT

JOINT PUBLIC NOTICE June 28, 2016

INNOVATIONS IN STREAM RESTORATION AND FLOOD CONTROL DESIGN MEETING FLOOD CAPACITY AND ENVIRONMENTAL GOALS ON SAN LUIS OBISPO CREEK 1

What is the Ecological Role of an Estuary?

Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. CIVL 1112 Detention Ponds - Part 1 1/12

Living on the Fox River

PUBLIC NOTICE. Federal Aid Project MO F-54-D-20 May 1, 2016 December 31, Project Description

3. The submittal shall include a proposed scope of work to confirm the provided project description;


St. Vrain Watershed Master Plan Thursday, January 23 10:00 a.m. 12:15 p.m.

STATEMENT OF SHARON BUCCINO SENIOR ATTORNEY NATURAL RESOURCES DEFENSE COUNCIL WASHINGTON, DC

APPLICATION FOR A FILL, EXCAVATION AND SITE GRADING PERMIT

Daybreak s Environmental History

LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN

Natural Resources and Landscape Survey

Conservation Tax Credit Regulations Chapter A-1 RULES OF GEORGIA DEPARTMENT OF NATURAL RESOURCES CHAPTER

STORM WATER MANAGEMENT PLAN (SWMP)

U.S. Fish and Wildlife Service will invest $15 million for post-sandy cleanup and marsh restoration on Long Island

Annual Report

Transcription:

2006 Lake Seminole Web Page Information Summary May 25, 2005 - Pinellas County, the Southwest Florida Water Management District, and the Florida Fish and Wildlife Conservation Commission hosted the Lake Seminole Restoration and Recovery Public Meeting to discuss with citizens the 2006 construction schedule including the lake lowering, habitat restoration project, and the stormwater improvements. Public meeting at City of Seminole Recreation Center located on 113th Street in Seminole. Lake Seminole public meeting held May 25, 2005. January 9, 2006 - The gates were opened to lower Lake Seminole for a series of restoration activities. The gates were closed at the end of January at a lake level of 2.5. On February 6, 2006 a 100 year rain event brought over 2.5 feet of water back into the lake. On February 9, 2006 the gates were re-opened and then closed at the end of February 2006. Looking south from the 102nd Avenue bridge showing exposed lake shoreline after the lake reached 2.5 feet. South shoreline after lake water levels are lowered so new grading by County Highway Department can begin.

February 25 and March 4, 2006-464 volunteers removed over 26 tons of trash and debris. This event kicked off Keep Pinellas Beautiful s 2006 Great American Clean Up. Work in 2006 began with the lake lowering on January 9, 2006. A 100-year rain event on February 3, 2006 refilled the lake and lowering resumed on February 6, 2006. The gates were closed again on February 23, 2006. Photograph taken 2/25/06 at the Holiday Shores community center prior to starting clean up activities. Participating in a clean up event can be fun! Several volunteers working on Lake Seminole Park shoreline stop for the camera. Volunteers walking along the bottom of Lake Seminole remove bottles, cans, plastic bags, and other litter from the south end of the lake. Racking up the community service hours can be fun work! High school students participate in the Lake Seminole clean up. Volunteers work to remove trash from the south east shoreline of Lake Seminole. Volunteers model their "I Walked on the Bottom of Lake Seminole" t-shirts.

Photograph taken 3/04/06 looking south from the Lake Seminole Park boat ramp. All trash and debris is gone beautiful! March 8, 2006 - The restoration of the southern shoreline of Lake Seminole began. Activities included invasive species removal: Brazilian pepper, castor bean, primrose willow, sea hibiscus, and cattails. Restoration will include installation of native aquatic plants and trees, and park-style benches. Southern shoreline of Lake Seminole along Park Blvd. looking east. Southern shoreline of Lake Seminole along Park Blvd. looking east. February 28, 2006 - Repairs to the boat launching facilities at Lake Seminole Park began. Photograph taken on 3/30/06 of new docks prior to installation. Photograph taken 3/30/06 from Lake Seminole Park looking north showing newly constructed launching facilities and a boat basin now free of invasive plants

March 29 and 30th, 2006 - Several areas were inspected: the north end of the lake, the Park restoration area, the boat ramp improvement project, and the drainage improvement area at 102nd Avenue. North end of lake looking southeast. North end of lake looking northeast. North end of lake looking northwest. Photograph taken 4/24/06 looking west from the southwest end of the 102nd Avenue bridge. Photograph taken 3/29/06 looking east from the southwest end of the 102nd Avenue bridge. Southwest end of 102nd Avenue bridge, south side looking east.

The 118th Avenue canal is heavily impacted by sediment build up. Work began 5/01/06. Estimated completion date 5/26/06. Photograph taken 4/24/06 looking west at the 118th Avenue canal before restoration start. April 12, 2006 - A hydraulic pump was installed at the north end of the lake to bring water from the bypass canal into the lake. North end of lake. Lake Seminole lower part of picture and the Bypass Canal upper part of picture. Pinellas County Highway and Utilities personnel work to install pump on Lake Seminole. April 19, 2006 - Texas Aquatic Harvesting Inc. began restoring over 16 acres of lake bottom impacted by muck sediments and overgrowth of cattails and willow trees. North end of Lake Seminole Park. East shoreline of Lake Seminole Park.

April 28, 2006 - Pumping was temporarily suspended due to low canal levels. The area has not received rain in over 30 days. Pumping will resume when rain brings a sufficient amount of water into the canal. May 1, 2006 - Work began to grade the southern shoreline and prepare the area for sod and new oak trees. May 16, 2006 - The contractor has completed the habitat restoration project. The Lake Seminole Park recreation trail has been cleared of debris and is now open to the public for use. Public Works' Lake Management section and Park Department staff will be on the lake next week to cut down and mark some of the known hazards on the lake. Signage is currently being updated at the launch facility so that it will be in place when the water levels rise enough to open the ramps to the public. June 2, 2006 - Pumps were turned on again today after the rain events on May 31st and June 1 refilled the Bypass Canal. Due to the lack of rain, pumping has been periodically shut down. Water levels in the Bypass canal get too low and the pumps are then shut off. Intermittent pumping has kept the lake from going any lower. Boat ramps remained closed until lake levels reach approximately 3 feet. The Pinellas County Highway Department continues work on the southern shoreline and on two drainage improvement projects at 118th Avenue and 94th Avenue. June 7, 2006 - Read the Seminole Beacon's "Efforts at Lake Seminole taking root ". July 19, 2006 - Grasses Grasses Everywhere, What Can I Do? 1. Will they die once water levels come back up? Yes. The plants growing on the bottom of the lake are land plants and cannot survive under water. Why can't someone come out and spray? The airboat and spray equipment used for treatments cannot access most areas due to low water levels. Additionally, we cannot spray all the vegetation at once. Once water levels are high enough to operate the equipment, we will use a combination of spraying and allowing natural breakdown to occur. 2. Can I kill it? Yes you can mow your shoreline or use a weed trimmer to knock down the plants. They are not protected grasses. You can spray, but you must use an approved herbicide that can be applied in or near water. It is illegal

to use Round Up or similar products in or near water. It is best to work with a certified herbicide applicator for this process. For more information: http://plants.ifas.ufl.edu/guide/sup3herb.html 3. What do we do about the mosquitoes? Please call and report mosquito issues to Mosquito Control at 464-7503. Refer to Mosquito Control for more information. Lastly, I know everyone is very frustrated with the condition of the lake right now. The overly dry spring has held things up, but with a little luck and a couple of good strong rain events we'll be back in business. I thank many of you for your understanding and kind words. Lake Seminole cannot reach its restoration goals without everyone's support! September 5, 2006 - In several areas of the lake Primrose Willow has become a navigational issue. Plans to harvest this vegetation are in the works. The anticipated start date is Monday September 11, 2006. Grasses, like those at the very northeast end of the lake, are dying off on their own and will not be harvested. Additionally, beneficial native vegetation is cropping up in many areas. This is a good thing for the lake. You may just be seeing the leaves or a reed coming up. Cattails have a flat blade like sheath. The reeds seen coming in are round. These plants are protected so your safe bet is to call first. Jetskiers, waterskiers, and boaters: no wake zones are established in all areas 100 feet from the vegetation and from the south side of the 102nd Avenue bridge through the narrows. New buoys will be installed in approximately 60 days. Waterskiers who have set up slalom courses are required to check ownership of the area and ensure all activities are outside the protected vegetation zones. Courses that are in violation will be removed.

December 5, 2006, This month's activities: 1. Complete aquatic harvesting of northwest area (EST December 31, 2006 Based on Weedbusters' schedule) 2. Continue inspecting and retreating spray areas as needed 3. Florida Fish and Wildlife Conservation Commission monitoring of 10,000 large mouth bass released into Lake Seminole 4. Continue planning efforts with local Eagle Scout to plant live oaks along Park Blvd. 5. Continue planning efforts for Spring shoreline revegetation along Park Blvd. Before During After